| issue date = 12/06/1990
| issue date = 12/06/1990
| title = LER 90-022-00:on 901108,missed Surveillance Test for Secondary Waste Sample Tank Due to Incorrect Procedure Rev
| title = LER 90-022-00:on 901108,missed Surveillance Test for Secondary Waste Sample Tank Due to Incorrect Procedure Rev
| author name = RICHEY R B, VERRILLI M
| author name = Richey R, Verrilli M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTR BUTION DEMONSTRATION SVS>aiVI REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9012120132 DOC.DATE: 90/12/06 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTR BUTION DEMONSTRATION SVS>aiVI REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VERRILLI,M.
ACCESSION NBR:9012120132             DOC.DATE:   90/12/06   NOTARIZED: NO       DOCKET  N FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                 05000400 AUTH. NAME           AUTHOR AFFILIATION VERRILLI,M.     'arolina         Power 6 Light Co.
'arolina Power 6 Light Co.RICHEY,R.B.
Carolina Power 6 Light Co.
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000400
RICHEY,R.B.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER 90-022-00:on 901108,missed surveillance test for secondary waste sample tank due to incorrect procedure rev.DXSTRIBUTION CODE: IE22T COPXES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden Rpt, etc.NOTES:Application for permit renewal filed.05000400 A RECIPIENT ID CODE/NAME PD2-1 LA BECKER, D, INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DS P NRR/DET/EMEB 7E NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7E NRR/DST/SRXB 8E RES/DSIR/EIB EXTERNAL EG&G BRYCE i J H NRC PDR NSIC MURPHY,G.A COPIES LTTR ENCL 1 1 1 1 2 2 1 1 2'1 1.1 1 2.2 1 1 1 1 1 1 3 3 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD ACRS AEOD/DSP/TPAB NRR/DET/ECMB 9H NRR/DLPQ/LHFBll NRR/DOEA/OEAB NRR/DST/SELB 8D NRR/BBDl REG FILE 02 RGN2 01 L ST LOBBY WARD NSIC MAYS,G NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
LER   90-022-00:on 901108,missed surveillance test for secondary waste sample tank due to incorrect procedure rev.
A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUXRED: LTTR 33 ENCL 33 CNIL Carolina Power 8 Ljght Company P.O.Box 165~New Hill, N.C.27562 DEC 0 6 1990 R.8.AICHEY Vice Preaideflt Harria Nuclear Project Letter Number.'H0-900202 (0)U.S.Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO.50-400 LICENSE NO NPF-63 LICENSEE EVENT REPORT 90-022-00 Gentlemen.'I In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted.
DXSTRIBUTION CODE: IE22T COPXES RECEIVED:LTR                   ENCL     SIZE:
This report fulfills the requirement for a written report within thirty (30)days of a reportable occurrence and is in accordance with the format set forth in NUREG-1022, September 1983.Very truly yours, p/,/i R.B.Richey Vice President Harris Nuclear Project RBR:msb Enclosu're cc: Mr.R.A.Becker (NRR)Mr.S.D.Ebneter (NRC-RII)Mr.J.E.Tedrow (NRC-SHNPP)90i2i20132 90i206.PDR ADOCK 05000400 8 PDC MEM/LER-90-022/1/Osl l~iilC FORM 355 (549)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LERI PPROVED OMB NO.3)504)OC EXPIRES: C/30/9'2 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REGUESTr 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS ANO REPORTS MANAGEMENT BRANCH IP430).U.S.NUCLEAR REGULATORY COMMISSION.
TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden               Rpt, etc.
WASHINGTON, OC 20555.AND TO THE PAPERWORK REDUCTION PROJECT (3150410CI.
NOTES:Application for permit renewal filed.                                       05000400 A
OFFICE OF MANAGEMENT ANO BUDGET, WASHINGTON.
RECIPIENT               COPIES            RECIPIENT        COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME     LTTR ENCL          D PD2-1 LA                     1      1    PD2-1 PD              1    1 BECKER, D,                   1      1                                            D INTERNAL: ACNW                         2      2    ACRS                  2    2 AEOD/DOA                     1    '
OC 20503.FACILITY NAME (1)Shearon Harris Nuclear Power Plant-Unit//1 TITLK Iel Missed Surveillance Test Due to Incorrect Procedure Revision DOCKET NUMBER (2)PA 5 3 0 5 0 0 04 0 0 1 OFO 3 MONTH OAY YEAR YEAR EVENT DATE (5)I.ER NUMBER (Sl SSOVSNTIAL NVMSSR REVISION rrvMBSR REPORT OATK (7)MONTH OAY YEAR OOCKFT NUMBER(s)0 5 0 0 0 FACILITY NAMES OTHER FACILITIES INVOLVED IS)0 8 909 0 022 0 0 12 069 0 0 5 0 0 0 OPERATING MODE (Sl POWER LEYEL 1 0 0 r"'r+a e4kk<20A02(bl 20AOS(el(1)(i) 20AOSI~)(1)(SI 20 ASS(e)ll I ()BI 20AOS(el(1)(ie) 20.COS(el(1 l(el 20AOSIcl SOM(cl(II SOM(cl(2)50.73(ell2) li)50.73(el(2)
1    AEOD/DSP/TPAB          1    1 AEOD/ROAB/DS P               2            NRR/DET/ECMB 9H        1    1 NRR/DET/EMEB 7E              1      1. NRR/DLPQ/LHFBll        1    1 NRR/DLPQ/LPEB10              1      1    NRR/DOEA/OEAB          1    1 NRR/DREP/PRPB11              2  . 2    NRR/DST/SELB 8D        1     1 NRR/DST/SICB 7E              1       1   NRR/        BBDl      1   1 NRR/DST/SRXB 8E              1       1   REG FILE        02    1     1 RES/DSIR/EIB                1       1   RGN2            01    1     1 EXTERNAL  EG&G BRYCE i J H            3       3   L ST LOBBY  WARD      1     1 NRC PDR                      1       1   NSIC MAYS,G            1    1 NSIC MURPHY,G.A              1      1    NUDOCS FULL TXT        1    1 D
(9)50.73(el(2)
A D
IIII)LICENSEE CONTACT FOR THIS LER H2)50.73(e I (2)I Ie)50,73(el(2)(e) 50.73(el(2)(eSI 50,73(e I (2)(riii)(A)50.73(e)12)lriS)(5)50.73(~l(2)(el THIS REPORT IS SUBMITTED PURSUANT T 0 THE RLGUIRKMENTS OF 10 CFR (): IChecrr one or more o/the/orrorrin/I (11 73.71(SI 73.71(cl OTHER/Speclly/n AOrtrect Oererrenr/
D NOTE TO ALL "RIDS" RECIPIENTS:
ln Teer,//RC FOrm 3661/NAME Michael Verrilli-Regulatory Compliance Technician TELEPHONE NUMBER AREA CODE 91 936 2-230 3 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE OKSCRIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT MANUFAC.TURKR CAUSE SYSTEM COMPONENT MANUFAC.TURER F.PORTABLE TO NPRDS A&k SUPPLEMENTAL REPORT EXPECTED (ICI X NO YES II/yer, complete EXPECTED Sr/8M/SS/D//
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
DATE/ABsTRAcT IL/mlt to/coo rp>>cct,/.A.epproelmerely
FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUXRED: LTTR                33  ENCL    33
/llrecn rrnprccpece typcrrrrtrcn
 
/incr/llsl EXPECTED SU 5 MISSION OATS II Sl MONTH OAY YEAR On November 8, 1990, the plant was operating in Mode 1 at 100K power.Upon evaluation of a Significant Operational Occurrence Report (SOOR)it was determined that part of the required surveillance test for the Secondary Waste Sample Tank (SWST)Radiation Monitor HAREM"21WS-3542 had not been performed within its quarterly time interval.This was due to a revisi."n of the applicable maintenance surveillance test procedure (MST-I0330 Secondary Waste Tank Dx,scharge Monitor Operational Test).This revision incorrectly deleted the"loss of counts test" portion of the procedure that was required by Technical Specification (TS)Section 4.3.3.10 table 4.3-8 item l.a.3 table notation (1)b.As a result, the"loss of counts test" was not performed within its 92 day frequency (plus 23-days for 25K margin)and violated TS Section 4.3.3.10 for a period of 25 days.The cause of this incident was a misinterpretation of TS requirements on the part of maintenance procedure personnel.
CNIL Carolina Power 8 Ljght Company P. O. Box 165 ~ New Hill, N. C. 27562 DEC 0 6 1990 R. 8. AICHEY Vice Preaideflt Harria Nuclear Project Letter       Number.'H0-900202     (0)
The following corrective actions were taken'.MST-I0330 was revised to re-insert the"loss of counts test" into the procedure and maintenance procedure personnel were counseled on the incident to provide emphasis on the importance of understanding surveillance requirements in MST procedures to prevent future recurrence.
U.S. Nuclear Regulatory Commission ATTN:         NRC Document Control Desk Washington,       DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT                   UNIT 1 DOCKET NO.         50-400 LICENSE NO NPF-63 LICENSEE EVENT REPORT 90-022-00 Gentlemen.'I In accordance with Title             10   to the       Code       of Federal Regulations, the enclosed Licensee Event Report is submitted.                                 This report fulfills the requirement             for   a   written         report   within thirty (30) days of a reportable           occurrence           and       is     in accordance with the format set forth       in NUREG-1022,         September           1983.
In addition, Radiation Monitor HAREM-21WS-3542 will be tested upon completion of maintenance and returned to operable status.A review of composite samples taken revealed no non-natural activity present in the SWST release;therefore, no significant safety consequences resulted from this event.This event is being reported in accordance with lOCFR50.73 (a)(2)(i)(B)as a TS violation.
Very     truly yours, p/, /iR. B. Richey Vice President Harris Nuclear Project RBR:msb Enclosu're cc:       Mr. R. A. Becker (NRR)
Mr. S. D. Ebneter (NRC RII)
Mr. J. E. Tedrow (NRC SHNPP) 90i2i20132 90i206
                      .PDR   ADOCK 05000400 8                     PDC MEM/LER-90-022/1/Osl
 
l~iilC FORM 355                                                             US. NUCLEAR REGULATORY COMMISSION                               PPROVED OMB NO. 3)504)OC (549)                                                                                                                                              EXPIRES: C/30/9'2 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REGUESTr 50.0 HRS. FORWARD LICENSEE EVENT REPORT (LERI                                                        COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS ANO REPORTS MANAGEMENT BRANCH IP430). U.S. NUCLEAR REGULATORY COMMISSION. WASHINGTON, OC 20555. AND TO THE PAPERWORK REDUCTION PROJECT (3150410CI. OFFICE OF MANAGEMENTANO BUDGET, WASHINGTON. OC 20503.
DOCKET NUMBER (2)                            PA 5 3 FACILITY NAME (1)
Shearon           Harris Nuclear                 Power   Plant       Unit //1                                                 0  5    0    0      04      0 0        1  OFO      3 TITLK Iel Missed Surveillance Test Due to Incorrect Procedure Revision EVENT DATE (5)                       I.ER NUMBER (Sl                       REPORT OATK (7)                         OTHER FACILITIES INVOLVED IS)
SSOVSNTIAL        REVISION MONTH         OAY   YEAR             FACILITYNAMES                          OOCKFT NUMBER(s)
MONTH        OAY        YEAR    YEAR            NVMSSR          rrvMBSR 0   5   0     0     0 0 8         909         0           022             0 0       12 069                 0                                                     0   5   0     0     0 THIS REPORT IS SUBMITTED PURSUANT T 0       THE RLGUIRKMENTS OF 10 CFR (): IChecrr one    or more o/ the /orrorrin/I (11 OPERATING MODE (Sl                    20A02(bl                                20AOSIcl                          50.73(e  I  (2) I Ie)                          73.71(SI 20AOS(el(1)(i)                         SOM(cl(II                         50,73(el(2)(e)                                 73.71(cl POWER LEYEL                                                                                                                                                      OTHER /Speclly /n AOrtrect 1      0 0        20AOSI ~ )(1)(SI                        SOM(cl(2)                         50.73(el(2)(eSI Oererrenr/ ln Teer, //RC FOrm r  " 'r+a                          20 ASS(e) llI ()BI                      50.73(ell2) li)                    50,73(e I (2) (riii)(A)                         3661/
20AOS(el(1)(ie)                         50.73(el(2) (9)                    50.73(e) 12) lriS) (5) e4kk<                                20.COS(el(1 l(el                        50.73(el(2) IIII)                  50.73( ~ l(2)(el LICENSEE CONTACT FOR THIS LER H2)
TELEPHONE NUMBER NAME Michael           Verrilli Regulatory                       Compliance Technician AREA CODE 91 936                     2- 230                 3 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE OKSCRIBED IN THIS REPORT (13)
CAUSE     SYSTEM       COMPONENT MANUFAC.
TURKR CAUSE SYSTEM   COMPONENT MANUFAC.
TURER F.PORTABLE TO NPRDS A&k MONTH        OAY    YEAR SUPPLEMENTAL REPORT EXPECTED (ICI                                                         EXPECTED SU 5 MISSION OATS    IISl YES II/ yer, complete EXPECTED Sr/8M/SS/D// DATE/                           X    NO ABsTRAcT IL/mlt to /coo rp>>cct, /.A. epproelmerely /llrecn rrnprccpece typcrrrrtrcn /incr/ llsl On November                 8, 1990, the plant was operating in Mode 1 at 100K power.                                                                           Upon evaluation               of a Significant Operational Occurrence Report (SOOR) it was determined that part of the required surveillance test for the Secondary Waste Sample Tank (SWST) Radiation Monitor HAREM"21WS-3542 had not been performed within its quarterly time interval. This was due to a revisi."n of the applicable maintenance surveillance test procedure (MST-I0330 Secondary Waste Tank Dx,scharge Monitor Operational Test). This revision incorrectly deleted the "loss of counts test" portion of the procedure that was required by Technical Specification (TS)
Section 4.3.3.10 table 4.3-8 item l.a.3 table notation (1) b. As a result, the "loss of counts test" was not performed within its 92 day frequency (plus 23-days for 25K margin) and violated TS Section 4.3.3.10 for a period of 25 days. The cause of this incident was a misinterpretation of TS requirements on the part of maintenance procedure personnel.                                           The following corrective actions were taken'.
MST-I0330 was revised to re-insert the "loss of counts test" into the procedure and maintenance procedure personnel were counseled on the incident to provide emphasis on the importance of understanding surveillance requirements in MST procedures               to prevent future recurrence.                                         In addition, Radiation Monitor HAREM-21WS-3542 will be                           tested           upon         completion     of maintenance and returned to operable status.                           A review of composite samples taken revealed no non-natural activity present in the SWST release; therefore, no significant safety consequences resulted from this event.
This event is being reported in accordance with 10CFR50.73 (a) (2) (i) (B) as a TS     violation.
NRC Form 355 (549)
NRC Form 355 (549)
NRC FORM366A I~o$9)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED 0 M 0 NO.31504)04 EXPIRES: a/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUEST: 50J)HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (F430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (3150410al.
 
OFFICE OF MANAGEMENT AND BUDGET,WASHINGTON, DC 20503.FACILITY NAME (1)Shearon Harris Nuclear Power Plant Unit 81 TEXT///more space/s IeEIa)ed, use ddd/dona/HRC ferns 3564's/OT)DOCKET NUMBER (2)o s o o o 40 YEAR LER NUMBER (6)SEOVENTIAL k.: NVMSEA 0 2 2 (@AEVISION NVMSEA 0 0 PAGE (3)02 oFO 3 EVEHT DESCRIPTION:
NRC FORM366A                                                           US. NUCLEAR REGULATORY COMMISSION APPROVED 0 M 0 NO. 31504)04 I~o$ 9)
On November 6, 1990, the plant was operating in Mode 1 at 100X power.Maintenance procedure personnel submitted a SOOR to the Shift Foreman in the Main Control Room.This was in regard to the requirements of TS Table 4.3-8.Upon evaluation by the Regulatory Compliance group on November 8, 1990, it was determined that section 4.3.3.10 table 4.3-8 item l.a.3 table notation (1)b.required a quarterly (once per 92 days)"loss of counts test" for Radiation Monitor REM-21WS-3542.
EXPIRES: a/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS LICENSEE EVENT REPORT (LER)                                            INFORMATION COLLECTION REOUEST: 50J) HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS TEXT CONTINUATION                                                AND REPORTS MANAGEMENT BRANCH (F430), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (3150410al. OFFICE OF MANAGEMENTAND BUDGET,WASHINGTON, DC 20503.
This test had last been performed satisfactorily on April 26, 1990, as a part of MST-I0330 (Secondary Waste Tank Discharge Monitor Operational Test).A revision to this procedure was issued on July 7, 1990, to comply with corrective action number 5 of LER-90-005.
FACILITYNAME (1)                                                             DOCKET NUMBER (2)                    LER NUMBER (6)                    PAGE (3)
This corrective action required the deletion of steps in procedure MST-Z0356 that disconnected and subsequently reconnected coaxial cables.This revision was to prevent pin breakage in these cables, specifically for Radiation Monitor REM-1LT-3502A (RCS Leak Detection System).The corrective action also stated that this revision would apply to other applicable maintenance procedures.
SEOVENTIAL      AEVISION Shearon         Harris Nuclear                 Power       Plant                                     YEAR    k.:  NVMSEA    (@  NVMSEA Unit     81 40                    0    2 2        0 0      02    oFO    3 o  s  o  o    o TEXT ///more space /s IeEIa)ed, use ddd/dona/HRC ferns 3564's/ OT)
This corrective action was incorrectly applied to MST-I0330.
EVEHT DESCRIPTION:
Therefore, a time period of 140 days elapsed between the last satisfactory"loss of counts test", which occurred on April 26, 1990, and the day that the monitor was declared inoperable (for maintenance) on September 13, 1990.The 92 day frequency plus 23 days (25X margin)would have elapsed on August 20, 1990.This resulted in violation of TS section 4.3.3.10 for a period of 25 days.CAUSE: The cause of this event was a misinterpretation of TS requirements on the part of the individuals revising and reviewing the MST procedure while attempting to comply with the intent of LER 90-005-00 corrective action number 5.SAPETY SIGNIFICANCE:
On     November 6, 1990, the plant was operating in Mode 1 at 100X power.
There were no significant safety consequences as a result of this event.Although the"loss of counts" surveillance test was not performed within the required frequency, the monitor was verified twice a day to be operating properly by the performance of a trend check.This check is conducted and documented by Health Physics radiation monitoring system personnel.
Maintenance procedure personnel submitted a SOOR to the Shift Foreman in the Main Control Room. This was in regard to the requirements of TS Table 4.3-8. Upon evaluation by the Regulatory Compliance group on November 8, 1990,                                                                 it     was determined that section 4.3.3.10 table 4.3-8 item l.a.3 table notation (1)
Additionally, a composite sample is collected and analyzed on a weekly basis when continuous releases are made from the SWST.A review of these samples for the time period during which the surveillance interval was exceeded, revealed no non-natural activity present in the SWST release.NRC Foam 366A (669)
: b. required a quarterly (once per 92 days) "loss of counts test" for Radiation Monitor REM-21WS-3542.                                 This test had last been performed satisfactorily on April 26, 1990, as                         a   part of MST-I0330 (Secondary Waste Tank Discharge Monitor Operational Test).                         A   revision to this procedure was issued on July 7, 1990, to comply         with         corrective             action number 5 of LER-90-005. This corrective action required the deletion                               of     steps in procedure MST-Z0356 that disconnected and subsequently reconnected coaxial cables.                                             This revision was to prevent pin breakage in these cables, specifically for                                       Radiation       Monitor REM-1LT-3502A (RCS Leak Detection System).                                   The corrective action also stated that this revision would apply to other applicable maintenance procedures.                                                 This corrective action was incorrectly applied to MST-I0330.
NRC FORM 355A etYT49)O ILS.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT ILER)TEXT CONTINUATION APPROVED OMB NO.31500)0l EXPIRES: e/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUEST1 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.
Therefore,               a   time period of 140 days elapsed between the last satisfactory "loss of counts test", which occurred on April 26, 1990, and the day that the monitor was declared inoperable (for maintenance)                                         on September 13, 1990.                   The 92 day frequency plus 23 days (25X margin) would have elapsed on August 20, 1990. This resulted in violation of TS section 4.3.3.10 for a period of 25 days.
OC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500104), OFFICE, OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.FACILITY NAME (I)Shearon Harris Nuclear Power Plant Unit I/1 TEXT///more epece/e relrrkaL rree er///1/rme/HRC Fomr 3/l//49/(17)CORRECTIVE ACTIOHS: DOCKET NUMBER (2)o e o o o 4 o LER NUMBER (BI YEAR+%5 SECVENTIAL
CAUSE:
'+@REVISION YRB NUMBER~?Nr NUMBEII 9 0 0 22 00 PAGE (3)0 3 03 DF 1.Procedure MST"I0330 was revised to re-insert the"loss of counts test" back into the procedure.
The cause               of this event was a misinterpretation of TS requirements on the part of the individuals revising and reviewing the MST procedure while attempting to comply with the intent of LER 90-005-00 corrective action number 5.
2.Maintenance procedure personnel were counseled on this incident to provide emphasis on the importance of understanding surveillance requirements in MST procedures.
SAPETY SIGNIFICANCE:
3.Radiation Monitor gRITM-21WS-3542 will be tested upon completion of maintenance and returned to operable status.EISS CODE IMFORMATION:
There           were         no     significant safety                 consequences         as   a     result of this event.
Radiation Monitoring System IL NRC Form 355A (559)}}
Although the "loss of counts" surveillance test was not performed within the required frequency, the monitor was verified twice a day to be operating properly by the performance of a trend check.                                     This check is conducted and documented by Health Physics radiation monitoring system personnel.                                               Additionally, a composite sample is collected and analyzed on a weekly basis when continuous releases are made from the SWST.                           A review of these samples for the time period during which the surveillance interval was exceeded, revealed no non-natural activity present in the SWST release.
NRC Foam 366A (669)
 
NRC FORM 355A                                                               ILS. NUCLEAR REGULATORY COMMISSION APPROVED OMB NO. 31500)0l etYT49)
LICENSEE EVENT REPORT ILER)
O                                                            EXPIRES: e/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUEST1 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS TEXT CONTINUATION                                                  AND REPORTS MANAGEMENT BRANCH (P430), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON. OC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500104), OFFICE, OF MANAGEMENTAND BUDGET, WASHINGTON, DC 20503.
FACILITY NAME (I)                                                                 DOCKET NUMBER (2)                    LER NUMBER (BI                  PAGE (3)
Shearon Harris Nuclear                             Power         Plant                                       YEAR  +%5 SECVENTIAL '+@ REVISION YRB  NUMBER    ~?Nr NUMBEII Unit I/1 o  e  o  o    o  4 o      9    0      0    22          00 03        DF 0    3 TEXT /// more epece /e relrrkaL rree er///1/rme/HRC Fomr 3/l//49/ (17)
CORRECTIVE ACTIOHS:
: 1.         Procedure               MST"I0330 was revised to                   re-insert the "loss of counts test"                       back into the procedure.
: 2.         Maintenance                 procedure           personnel were counseled on this incident to provide emphasis             on the importance               of understanding surveillance requirements in MST procedures.
: 3.         Radiation                 Monitor gRITM-21WS-3542 will be                           tested       upon     completion           of maintenance                 and returned to operable status.
EISS       CODE IMFORMATION:
Radiation Monitoring System                                                   IL NRC Form 355A (559)}}

Latest revision as of 01:51, 10 November 2019

LER 90-022-00:on 901108,missed Surveillance Test for Secondary Waste Sample Tank Due to Incorrect Procedure Rev
ML18009A743
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/06/1990
From: Richey R, Verrilli M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-900202-(O), LER-90-022-01, LER-90-22-1, NUDOCS 9012120132
Download: ML18009A743 (5)


Text

ACCELERATED DISTR BUTION DEMONSTRATION SVS>aiVI REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9012120132 DOC.DATE: 90/12/06 NOTARIZED: NO DOCKET N FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION VERRILLI,M. 'arolina Power 6 Light Co.

Carolina Power 6 Light Co.

RICHEY,R.B.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 90-022-00:on 901108,missed surveillance test for secondary waste sample tank due to incorrect procedure rev.

DXSTRIBUTION CODE: IE22T COPXES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden Rpt, etc.

NOTES:Application for permit renewal filed. 05000400 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 LA 1 1 PD2-1 PD 1 1 BECKER, D, 1 1 D INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 '

1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DS P 2 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 7E 1 1. NRR/DLPQ/LHFBll 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 . 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/ BBDl 1 1 NRR/DST/SRXB 8E 1 1 REG FILE 02 1 1 RES/DSIR/EIB 1 1 RGN2 01 1 1 EXTERNAL EG&G BRYCE i J H 3 3 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY,G.A 1 1 NUDOCS FULL TXT 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUXRED: LTTR 33 ENCL 33

CNIL Carolina Power 8 Ljght Company P. O. Box 165 ~ New Hill, N. C. 27562 DEC 0 6 1990 R. 8. AICHEY Vice Preaideflt Harria Nuclear Project Letter Number.'H0-900202 (0)

U.S. Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO NPF-63 LICENSEE EVENT REPORT 90-022-00 Gentlemen.'I In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30) days of a reportable occurrence and is in accordance with the format set forth in NUREG-1022, September 1983.

Very truly yours, p/, /iR. B. Richey Vice President Harris Nuclear Project RBR:msb Enclosu're cc: Mr. R. A. Becker (NRR)

Mr. S. D. Ebneter (NRC RII)

Mr. J. E. Tedrow (NRC SHNPP) 90i2i20132 90i206

.PDR ADOCK 05000400 8 PDC MEM/LER-90-022/1/Osl

l~iilC FORM 355 US. NUCLEAR REGULATORY COMMISSION PPROVED OMB NO. 3)504)OC (549) EXPIRES: C/30/9'2 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REGUESTr 50.0 HRS. FORWARD LICENSEE EVENT REPORT (LERI COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS ANO REPORTS MANAGEMENT BRANCH IP430). U.S. NUCLEAR REGULATORY COMMISSION. WASHINGTON, OC 20555. AND TO THE PAPERWORK REDUCTION PROJECT (3150410CI. OFFICE OF MANAGEMENTANO BUDGET, WASHINGTON. OC 20503.

DOCKET NUMBER (2) PA 5 3 FACILITY NAME (1)

Shearon Harris Nuclear Power Plant Unit //1 0 5 0 0 04 0 0 1 OFO 3 TITLK Iel Missed Surveillance Test Due to Incorrect Procedure Revision EVENT DATE (5) I.ER NUMBER (Sl REPORT OATK (7) OTHER FACILITIES INVOLVED IS)

SSOVSNTIAL REVISION MONTH OAY YEAR FACILITYNAMES OOCKFT NUMBER(s)

MONTH OAY YEAR YEAR NVMSSR rrvMBSR 0 5 0 0 0 0 8 909 0 022 0 0 12 069 0 0 5 0 0 0 THIS REPORT IS SUBMITTED PURSUANT T 0 THE RLGUIRKMENTS OF 10 CFR (): IChecrr one or more o/ the /orrorrin/I (11 OPERATING MODE (Sl 20A02(bl 20AOSIcl 50.73(e I (2) I Ie) 73.71(SI 20AOS(el(1)(i) SOM(cl(II 50,73(el(2)(e) 73.71(cl POWER LEYEL OTHER /Speclly /n AOrtrect 1 0 0 20AOSI ~ )(1)(SI SOM(cl(2) 50.73(el(2)(eSI Oererrenr/ ln Teer, //RC FOrm r " 'r+a 20 ASS(e) llI ()BI 50.73(ell2) li) 50,73(e I (2) (riii)(A) 3661/

20AOS(el(1)(ie) 50.73(el(2) (9) 50.73(e) 12) lriS) (5) e4kk< 20.COS(el(1 l(el 50.73(el(2) IIII) 50.73( ~ l(2)(el LICENSEE CONTACT FOR THIS LER H2)

TELEPHONE NUMBER NAME Michael Verrilli Regulatory Compliance Technician AREA CODE 91 936 2- 230 3 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE OKSCRIBED IN THIS REPORT (13)

CAUSE SYSTEM COMPONENT MANUFAC.

TURKR CAUSE SYSTEM COMPONENT MANUFAC.

TURER F.PORTABLE TO NPRDS A&k MONTH OAY YEAR SUPPLEMENTAL REPORT EXPECTED (ICI EXPECTED SU 5 MISSION OATS IISl YES II/ yer, complete EXPECTED Sr/8M/SS/D// DATE/ X NO ABsTRAcT IL/mlt to /coo rp>>cct, /.A. epproelmerely /llrecn rrnprccpece typcrrrrtrcn /incr/ llsl On November 8, 1990, the plant was operating in Mode 1 at 100K power. Upon evaluation of a Significant Operational Occurrence Report (SOOR) it was determined that part of the required surveillance test for the Secondary Waste Sample Tank (SWST) Radiation Monitor HAREM"21WS-3542 had not been performed within its quarterly time interval. This was due to a revisi."n of the applicable maintenance surveillance test procedure (MST-I0330 Secondary Waste Tank Dx,scharge Monitor Operational Test). This revision incorrectly deleted the "loss of counts test" portion of the procedure that was required by Technical Specification (TS)

Section 4.3.3.10 table 4.3-8 item l.a.3 table notation (1) b. As a result, the "loss of counts test" was not performed within its 92 day frequency (plus 23-days for 25K margin) and violated TS Section 4.3.3.10 for a period of 25 days. The cause of this incident was a misinterpretation of TS requirements on the part of maintenance procedure personnel. The following corrective actions were taken'.

MST-I0330 was revised to re-insert the "loss of counts test" into the procedure and maintenance procedure personnel were counseled on the incident to provide emphasis on the importance of understanding surveillance requirements in MST procedures to prevent future recurrence. In addition, Radiation Monitor HAREM-21WS-3542 will be tested upon completion of maintenance and returned to operable status. A review of composite samples taken revealed no non-natural activity present in the SWST release; therefore, no significant safety consequences resulted from this event.

This event is being reported in accordance with 10CFR50.73 (a) (2) (i) (B) as a TS violation.

NRC Form 355 (549)

NRC FORM366A US. NUCLEAR REGULATORY COMMISSION APPROVED 0 M 0 NO. 31504)04 I~o$ 9)

EXPIRES: a/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS LICENSEE EVENT REPORT (LER) INFORMATION COLLECTION REOUEST: 50J) HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS TEXT CONTINUATION AND REPORTS MANAGEMENT BRANCH (F430), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (3150410al. OFFICE OF MANAGEMENTAND BUDGET,WASHINGTON, DC 20503.

FACILITYNAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE (3)

SEOVENTIAL AEVISION Shearon Harris Nuclear Power Plant YEAR k.: NVMSEA (@ NVMSEA Unit 81 40 0 2 2 0 0 02 oFO 3 o s o o o TEXT ///more space /s IeEIa)ed, use ddd/dona/HRC ferns 3564's/ OT)

EVEHT DESCRIPTION:

On November 6, 1990, the plant was operating in Mode 1 at 100X power.

Maintenance procedure personnel submitted a SOOR to the Shift Foreman in the Main Control Room. This was in regard to the requirements of TS Table 4.3-8. Upon evaluation by the Regulatory Compliance group on November 8, 1990, it was determined that section 4.3.3.10 table 4.3-8 item l.a.3 table notation (1)

b. required a quarterly (once per 92 days) "loss of counts test" for Radiation Monitor REM-21WS-3542. This test had last been performed satisfactorily on April 26, 1990, as a part of MST-I0330 (Secondary Waste Tank Discharge Monitor Operational Test). A revision to this procedure was issued on July 7, 1990, to comply with corrective action number 5 of LER-90-005. This corrective action required the deletion of steps in procedure MST-Z0356 that disconnected and subsequently reconnected coaxial cables. This revision was to prevent pin breakage in these cables, specifically for Radiation Monitor REM-1LT-3502A (RCS Leak Detection System). The corrective action also stated that this revision would apply to other applicable maintenance procedures. This corrective action was incorrectly applied to MST-I0330.

Therefore, a time period of 140 days elapsed between the last satisfactory "loss of counts test", which occurred on April 26, 1990, and the day that the monitor was declared inoperable (for maintenance) on September 13, 1990. The 92 day frequency plus 23 days (25X margin) would have elapsed on August 20, 1990. This resulted in violation of TS section 4.3.3.10 for a period of 25 days.

CAUSE:

The cause of this event was a misinterpretation of TS requirements on the part of the individuals revising and reviewing the MST procedure while attempting to comply with the intent of LER 90-005-00 corrective action number 5.

SAPETY SIGNIFICANCE:

There were no significant safety consequences as a result of this event.

Although the "loss of counts" surveillance test was not performed within the required frequency, the monitor was verified twice a day to be operating properly by the performance of a trend check. This check is conducted and documented by Health Physics radiation monitoring system personnel. Additionally, a composite sample is collected and analyzed on a weekly basis when continuous releases are made from the SWST. A review of these samples for the time period during which the surveillance interval was exceeded, revealed no non-natural activity present in the SWST release.

NRC Foam 366A (669)

NRC FORM 355A ILS. NUCLEAR REGULATORY COMMISSION APPROVED OMB NO. 31500)0l etYT49)

LICENSEE EVENT REPORT ILER)

O EXPIRES: e/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUEST1 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS TEXT CONTINUATION AND REPORTS MANAGEMENT BRANCH (P430), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON. OC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500104), OFFICE, OF MANAGEMENTAND BUDGET, WASHINGTON, DC 20503.

FACILITY NAME (I) DOCKET NUMBER (2) LER NUMBER (BI PAGE (3)

Shearon Harris Nuclear Power Plant YEAR +%5 SECVENTIAL '+@ REVISION YRB NUMBER ~?Nr NUMBEII Unit I/1 o e o o o 4 o 9 0 0 22 00 03 DF 0 3 TEXT /// more epece /e relrrkaL rree er///1/rme/HRC Fomr 3/l//49/ (17)

CORRECTIVE ACTIOHS:

1. Procedure MST"I0330 was revised to re-insert the "loss of counts test" back into the procedure.
2. Maintenance procedure personnel were counseled on this incident to provide emphasis on the importance of understanding surveillance requirements in MST procedures.
3. Radiation Monitor gRITM-21WS-3542 will be tested upon completion of maintenance and returned to operable status.

EISS CODE IMFORMATION:

Radiation Monitoring System IL NRC Form 355A (559)