ML18022A558: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1987
| issue date = 07/31/1987
| title = Monthly Operating Rept for Jul 1987.W/870813 Ltr
| title = Monthly Operating Rept for Jul 1987.W/870813 Ltr
| author name = HALE M W, WATSON R A
| author name = Hale M, Watson R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~                                      ~ ~
CPKK Carolinapower S Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New  Hill, North    Carolina    27562 AUG  33 1987 File Number: SHF/10-15505 Letter Number'HO-875011 (0)
Document  Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRIS''NUCLEAR PROJECT DEPARTMENT UNIT NO.        1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
 
==Dear  Sirs:==
 
In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1987.
Yours very    truly, R. A. Watson Vice President Harris Nuclear Project MWH:gmw Enclosure cc:  Dr. J. Nelson Grace (NRC)
Messrs. J. M. Taylor (NRC)
G. F. Maxwell (NRC-SHNPP)
R. G. Oehl (DOE) 8708170392 87073i PDR  ADOCK 05000400 PDR MEM/HO-875011/Page  1/OS3
                                                                  /p
 
              ~ ~
OPERATING DATA REPORT DOCKET NO. 050"400 DATE 8/6/87 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 OPERATING STATUS Notes.'.
Unit Name'. Shearon Harris Unit    1 2 1  Reporting Period: July 1987 3 ~ ,Licensed Thermal Power (MWt): 2775 4 ~  Nameplate Rating (Gross MWe):      950 5 ~  Design  Electrical  Rating (Net-MWe):  900 6;  Maximum Dependable  Capacity (Gross-MWe): 920 7.'aximum    Dependable Capacity (Net-MWe): 860
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:    N/A
: 9. Power Level to Which Restricted,    if any (Net-MWe): None
: 10. Reasons for Restrictions,    if any: N/A This Month            Yr.-to-Date    Cumulative
: 11. Hours  in Report Period                          744.00                2184.00      2184.00
: 12. Number  of Hours Reactor  Was Critical          597 F 10              1813.22      1813.22
: 13. Reactor Reserve Shutdown Hours                              0.00          0.00          0.00
: 14. Hours Generator On-Line                          586.95                1770.80      1770.80
: 15. Unit Reserve Shutdown Hours                                  0.00          0.00            .00
: 16. Gross Thermal Energy Generated (MWH)        1453711.50            4455500.04    4455500.04
: 17. Gross Electrical Energy Generated (MWH)      471233.00            1450568.00    1450568.00
: 18. Net Electrical Energy Generated (MWH)        431956.00            1334785 00    1334785 F 00
: 19. Unit Service Factor                                        78. 89        81.08          81.08
: 20. Unit Availability Factor                                    78.89        81.08          81 F 08
: 21. Unit Capacity Factor (Using    MDC Net)                  67.51          71.07          71.07
: 22. Unit Capacity Factor (Using    DER Net)                    64.51        67.91          67.91
: 23. Unit Forced Outage Rate                                      1.89          5.16          5.16
: 24. Shutdowns  Scheduled Over Next 6 Months (Type, Date, and Duration              of Each):
Surveillance Test Outage / October 10, 1987 / Two Weeks
: 25. If Shut  Down at  end of Report Period, Estimated Date of          Startup'N/A
: 26. Units in Test  Status  (Prior to Commercial Operation):
Forecast              Achieved INITIAL CRITICALITY      12/30/86              1/3/87 INITIAL ELECTRICITY      1/11/87                1/19/87 COMMERCIAL OPERATION    4/25/87                5/2/87 MEM/DATAREPa/Page 1/OS3
 
            ~ ~
PLANT PERFORMANCE DATA SYSTEM, APPENDIX B -'VERAGE DAILY POWER LEVEL HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 July  1987 DAY          AVG. DAILY POWER LEVEL          DAY      AVG. DAILY POWER LEVEL (MWE-NET)                                (MWE-NET) 810                    17                -32 839                    18                -32 432                    19                -35 404                    20                -39 5                    732                    21                -39 846                    22                248 846                    23                815 848                    24                835 352                    25                823 10                    647                    26                833 840                    27                836 12                    844                    28                837 13                    840                    29                847 14                    798                    30                846 15                    306                    31                841 16                    30 MEM/DATAREPa/Page 2/OS3
 
UNIT SHUTDOWNS AND POWER REDUCTION                              DOCKET  NO,:    050-400 UNIT NAME:  -  Harris DATE:    8/6/87 COMPLETED BY:      M, W. Hale TELEPHONE:      (919) 362-2944 REPORT MONTH:  JULY 1987 Tl                      R      Method Date      y        Duration                of        Licensee        System    Component          Cause 6  Corrective P        (Hours)            Shutting      Event        Code 4    Code 5                  Action to e                              Down      Report If                                    Prevent Recurrence Reactor 87-028        870703                                                  N/A            HH      PUMPXX  Load reduction to repair the Main Feedpump IA outboard pump seal.      The pump was removed from service and the seal was  replaced'n      addition, the motor bearings were replaced, a new lube oil pump and lube o(l hose was Installed. Unit was returned to full service after the repairs-.
Reason:                                              Method:                        Exhibit G-Instructions F:    Forced Scheduled        A-Equipment Failure (Explain)                        1-Manual                        for Preparation of Data S:
B&alntenance or Test                                  2-Manual Scram                  Entry Sheets for Licensee C-Refueling                                          3-Automatic Scram.              Event Report (LER)    File 4-Continued                    (NUREGW161 )
regulatory Restriction E-Operator Training d License Examination            5-Reduced  Load F-Administrative                                      60thef G-Operational Error (Explain)                                                        Exhibit  I - Same  Source H-Other (Explain)
MEM/DATAREPa/Page 3/OS3
 
UNIT SHUTDOWNS AND POWER REDUCTION                                DOCKET  NO,:    050-400 UNIT NAME:    Harris DATE:    8/6/87 COMPLETED BY:    M. W  Hale TELEPHONE:      (919) 362-2944 REPORT MONTH:  JULY 1987 Tl                          R      Method Date      y        Duration                    of        Licensee        System    Component            Cause 4  Corrective (Hours)                Shutting,      Event        Code 4    Code 5                    Action to P
e                                  Down      Report  l                                    Prevent Recurrence Reactor 87&29          870709                I I ~ 30                              87-042          SD      VALVEX    Reactor/Turbine Trip from    full power due  to Low-Low Level on 1C steam generator. This occurred when a clearance tag was hung on an. ammonia chemical addition valve for feedwater and the control fuse for the IC feed-water isolation valve was mistakenly removed. This caused isolation valve to close and lead to the Low-Low Level trip. Operations personnel will be retralned on interpretting control wiring diagrams, Unit was returned to service.
Reason:                                                  Method:                          Exhibit G-Instructions F:  Forced Scheduled        A-Equipment  Failure (Explain)                            1-Manual                        for Preparation of Data S:
B-Maintenance or Test                                    2-Manual Scram                  Entry Sheets for Licensee C-Refueling                                              3-Automatic Scram,              Event Report (LER)    File 4-Continued                      (NUREG-0161)
D-Regulatory Restriction EWperator Training II License Examination                5-Reduced  Load F-Administrative                                          6-Other G-Operational Error    (Explain )
Exhibit  I -  Same  Source H-Other (Explain)
                                                                                " Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 4/OS3
 
UNIT SHUTDOWNS AND POWER REDUCTION                                DOCKET    NO,:    050-400 UNIT NAME:      Harris DATE:      8/6/87 COMPLETED    8Y:    M. W  Hale TELEPHONE:        (919) 362-2944 REPORT MONTH:  JULY 1987 Tl                      R      Method Date      y        Duration                of        Licensee      System    Component              Cause  II  Col recilve P          (Hours)              Shutting      Event        Code 4    Code 5                      Action to e                                Down      Report S                                        Prevent Recurrence Reactor 87-030          870714                                                      N/A                  PIPEXX      Load reduction to repair 18 main feedpump hot bleed off and seal water injection lines and to clean and inspect the condenser <<ater.boxes.
Repairs and inspections were implemented, Unit was returned to service.
F:  Forced            Reason:                                                Method:                          Exhibit G-Instructions S:  Scheduled          A-Equipment  Failure (Explain)                        I-Manual                          for Preparation of Data 8-Maintenance or Test                                  2-Manual Scram                    Entry Sheets for Licensee C-Refueling                                            3-Automatic Scram,                Event Report (LER)      File C Regulatory Restriction                              4Contlnued                        (NUREG&161 )
E-Operator Training 8, License Examination            5-Reduced Load F-Administrative                                      6-Other                      . 5 G-Operational Error (Explain)                                                            Exhibit  I  - Same    Source H-Other (Explain)
                                                                              "Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 5/OS3
 
UNIT SHUTDOWNS AND POWER REDUCTION                                  DOCKET  NO,:    050-400 UNIT NAME:    Harris DATE:    8/6/87 COMPLETED BY:    M. W  Hale TELEPHONE:    (9I9) 362-2944 REPORT MONTH:  JULY 1987 Tl                      R2    Method No,          Date        y        Duration                of        Licensee        System    Component            Cause II Corrective P        (Hours)            Shutting      Event          Code 4    Code 5                    Action to e                                Down      Report    I                                      Prevent Recurrence Reactor 8731            870716                145,75                            N/A              Hl        VALVE    Unit  removed from service to repair leaking steam generator blowdown valves and to perform inspections of production equipment, Repairs were implemented to the condenser and 5AKB.
feedwater heaters, Temporary repairs Implemented on the steam generator blowdown valves with permanent repairs scheduled for the fall outage      Unit was returned to service, 4
F:  Forced            Reason:                                                Method:                          Exhibit G-Instructions S:  Scheduled          A-Equipment  Failure (Explain[                      ~  I-Manual                          for Preparation of Data 8-Maintenance or Test                                  2-Manual Scram                    Entry Sheets for Licensee C-Refueling                                            3-Automatic Scram,                Event Report (LER)  File D-Regulatory Restriction                                4-Continued                      (NUREG-0161)
E-Operator Training II License Examination              5-Reduced  Load F-Administrative                                      . 6&ther G-Operational Error (Explain)                                                            Exhibit  I  Same Source H-Other (Explain)
MEM/DATAREPa/Page 6/OS3
 
September  3, 1987        DISTR ENCLOSURES I BUT ION        '/0 PDII-1 R/F id                                                    PAnderson lD.o,c.k:e't-N        o. 5'0=40.0M DOCKET- NO(S) .        50-400
 
==SUBJECT:==
BI-WEEKLY NOTICE APPLICATIONS AND AMENDMENTS TO OPERATING LICENSE INVOLVING NO SIGNIFICANT. HAZARDS CONSIDERATIONS-SHEARON HARRIS NUCLEAR POWER PLANT ~ UNIT 1 The    following documents concerning our review of the subject                              facility are              transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q    Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                      dated
                                                                                      ~
Environmental Assessment and Finding of No Significant Impact, dated Q    Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated
[jg Hi-Weekly Notice; Applications and Amendments to Operating Licenses                                          Involving No d d id            li
* d d                    id                  , d  d            d        d  i]
Exemption, dated Construction Permit No. CPPR-                                        , Amendment No.                        dated Facility Operating License No.                                          , Amendment No.                          dated Order Extending Construction Completion Date, dated Monthly Operating Report for                                                  transmitted by letter dated dd Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As  stated cc: See Next Page i
OFFICE/ ~
P, o
P D$
J SURN*MEP DATE)I PP  nd p 9/3    7
                            ~ j SA o~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~  ~ ~ ~ ~ ~ ~ ~ ~ ~
                                                                                                                ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ d ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
'RC FORM 3 I 8 IIOIBOI NRCM 0240                              OFFICIAL RECORD COPY
 
~
Mr. D. A. Nauman South Carolina Electric 5 Gas Company    Virgil C. Summer Nuclear Station CC:
Mr. William A. Williams,  Jr.
Technical Assistant - Nuclear Operations Santee Cooper P.O. Box 764 (Mail Code 167)
Columbia, South Carolina 29218 J. B. Knotts, Jr., Esq.
Bishop, Liberman, Cook, Purcell and Reynolds 1200 17th Street, N.W.
Washington, D. C. 20036 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, South Carolina 29065 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Chairman, Fairfield County Council P.O. Box 293 Winnsboro, South Carolina 29180 Attorney General Box 11549 Columbia, South Carolina    29211 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental  Control 2600 Bull Street Columbia, South Carolina    29201
 
~  o y  ~ l
          ~ ~
 
August 19, 1987              DISTR  I BUTI'ON:    M/0 ENCLOSURES
                                                                                                    ~Docke.t No.. 5.0    4003 PDI I-I r/f DOCKET        NO(S).            50 400                                                  PAnderson Corrected. Monthly operating Report for June 1987 Shearon Harris Nuclear Power Plant, Unit 1 The    following                documents      concerning our review of the subject    facility are    transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q      Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                dated Environmental Assessment and Finding of No Significant Impact, dated Q    Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q    Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                      [see page(s) 3 Exemption, dated Construction Permit No. CPPR-                                  , Amendment No.                da'ted
          +      Facility Operating License No.                                    , Amendment No.                dated Order Extending Construction Completion Date, dated CorrGkMonthly Operating Report for Shearon Harris transmitted by letter dated Jul 8                                  ~98        9
-'c ted
          +    Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation Encl osures:
As  stated See          Next Blge OFFICE)
              .'J.A.'P. RI 5,;.
SURNAME) 3!Andarsan.                      ~~~~  ~ ~ ~ ~ ~ ~ ~
OAVES P      8/19/87
              ~ ~~ ~~~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~
NRC FORM 3IB ROIBOI NRCM 0240                                    OFFICIAL RECORD COPY
 
~ 0    ~
A 1
I 7,
I
 
Shearon Harris CC: Chief Division of Ecological'ervices Bureau of Sport Fisheries 5. Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,  NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,  MD  20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street,  NE Atlanta,  GA  30365
 
t August 17, 1987                            DISTRIBUTION:                W/0 ENCLOSURES PDI        I-I R/F PAnderson DOCKET    NO(S).      50 400                                                                              ~Docket No. 50-4003 SUBJECT-      Bi-Weekly Notice Appl ications and Amendments to Operating Licensee. Involving No Significant Hazards Considerations Shear on Harr                    is Nuclear        Power    Plant, Unit            1 The  following documents concerning our review of the subject                                        facility are              transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                                            dated
                                                                                  ~
Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci 1 i ty Operating License, dated
      +XBi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No dig id'                      d        C            dd    d  . d    d                    g                d d]
Exemption, dated Construction Permit No. CPPR-Facility Operating License Order Extending Construction Completion Date, dated No.,          , Amendment No.
Amendment No.
dated dated Monthly Operating Report for                                                      transmitted by letter dated
      +    Annual/Semi-Annual Report-transmitted by    letter    dated..
Office of Nuclear Reactor Regulation Encl osures:
As  stated See    Next Page OFFICE)  :LA:PDII-I SURNAME)
          .P.hndar.san.      J) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
DATE)    8/17/87 ",                                                        ~~  ~~  ~~~~~~~~~~~~~ ~~~~~~~~~~~~~ I~ ~ ~ ~ ~ ~ ~
NRC FORM  3I8 IIO/80I NRCM 0240                                  OFFICIAL RECORD 'COPY
 
        ~ ~    ~ ~
J a  I J  il          ~  t r
7 ~
 
Mr. E. E. Utley Carolina Power  8  Light Company      Shearon Harris CC:
Thomas A. Baxter, Esq.                Ms. Carol Love Shaw, Pittman, Potts 8    Trowbridge  100 Park Drive 2300 N Street,  NW                    P.O. Box 12276 Washington,  DC    20037              Research  Triangle Park,  NC  27709 Mr. D. E. Hollar                      Regional Administrator, Region II Associate General Council              U.S. Nuclear Regulatory Commission Carolina Power  8  Light Company      101 Marietta Street P.O. Box 1551                          Suite 2900 Raleigh, North Carolina    27602      Atlanta, Georgia  30303 Resident Inspector/Harris NPS          Mr. J. L. Willis c/o U.S. Nuclear Regulatory Commission Plant General Manager Route 1, Box 315B                      Harris Nuclear Plant New  Hill, North  Carolina  27562    P.O. Box 165 New  Hill North Carolina  27562 Mr. R. A. Watson                      Mr. Dayne H. Brown, Chief Vice President                        Radiation Protection Section Harris Nuclear Plant                  Division of Facility Services P.O. Box 165                          N.C. Department  of Human  Resources New  Hill, North  Carolina  27562    701 Barbour  Drive Raleigh, North Carolina 27603-2008
 
r, 4
I 1
0 d
 
July 31,                  1987                                  DISTRIBUTION: W/0 ENCLOSURES P D I I - I R/F PAnderson (2)
DOCKET      NO(S).        5O qOO                                                                                              ~Docket No. 50=4003
 
==SUBJECT:==
Monthly Report                      for  June 1987, Shearon            Harris Nuclear                Power            Plant, Unit                      1 The following documents concerning our review of the subject                                                            facility are        transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                                                  dated Environmental. Assessment and Finding of No Significant Impact, dated f;
Q    Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating Li cense, dated Q~ Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                                                  teee page(e) ]
Exemption, dated Construction Permit No. CPPR-                                          , Amendment No.                                              da'ted d~
Facility Operating License No.                                                , Amendment No.                                        dated Order Extending Construction Completion Date, dated ejM llyap Annual/Semi-Annual Report-i      Rp Un 'i t 1
                                                                                                        <<i                  dtyl              d transmitted by letter dated Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As  stated Service List OFFICEP
          . r'.L.A.'.P.P.l,t.-..                                              ~~    ~~  \~~~~~~~~~~~~~~~                                                                    ~  ~
SURNAME/    PAnderson            sh
                                  ~~~~~~    ~~~ ~~ ~ ~ ~ ~ ~        ~~          ~ ~ ~ ~ ~ ~~~~ ~~~~~                      ~ ~~ ~~~~~~~~~ ~~~~~~~~~~~
I
  ~ DATE P  7/3l/87.            I~~~~~~~~~ ~~~~ ~~~~~~~                    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~                                  ~ ~~~~~~~~~~~~~ ~~~~~ 0 NRC FORM 3181'ID/80) NRCM 0240                                OFFICIAL RECORD COPY
 
  ~ 0        ~
II
                ~,
          ~ ~
E, k
 
Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the    Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,    NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,  MD  20899 U.S. Environmental Protection Agency Region IV Office ATTN:  Regional Radiation Representative 345  Courtland Street, NE Atlanta,  GA  30365
 
Ju1y 8,, 1987      DISTRIBUTION: w/0 ENCLOSURES IDocket No. 50=400+I:
PDII-I        R/F PAnderson            (2)
DOCKET NO(S)              ~  50-400
 
==SUBJECT:==
Monthly Operating Report for Nay 1987 Shearon                  Harris Nuclear Po'wer Plant, Unit                    1 e
The following documents concerning our review of the subject                                          facility are        transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability, of Draft/Final Environmental Statement, dated Safety Evaluation Repo'rt, or Supplement No.                                                                  dated Environmental Assessment and Finding of No Significant Impact, dated Q      Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                              Lsee page(s) j Exemption, dated Construction Permit No. CPPR-                                              , Amendment No.                        dated Facility Operating License No.                                              , Amendment No.                        dated Order Extending Construction Completion Date, dated Q] monthly Operating Report fors                                                          transmitted by letter dated
        +      Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As    stated Serv ce            List OsslCEIk :.P.A:    P D  I I- I SURNAME/
            .An,der.s.an/. h              ~ ~ ~ ~ ~ ~ ~  ~ ~~ ~ ~ ~ ~    ~~~~ ~  ~ ~~ ~~                  ~ ~  ~ ~ ~ ~ ~ ~
DATE P 7/8/87
            ~ ~<~ ~ e  ~~~~ ~~ ~ ~ ~ ~ ~ ~  ~~~~~ ~~~~  ~ ~ ~~~ ~  ~~~ ~
NRC FORM  3l8 IIOI80) NRCM 0240                                        OFF I C IAL R ECOR D COPY
 
~ ~
Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,  DC  20240 Chief (NOAA/BF/ECD/H6814)
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,    NW Washington, DC 20230 Dr. William B. Stroube,    Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,    MD  20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional- Radiation Representative 345 Courtland Street,    NE Atlanta,  GA  30365
 
tune 9, 1987 DOCKET NO(S)    gO'OO                                                DISTRIBUTION:
( Docket No. 50-400 -,
PD21  r/f PAnderson
 
==SUBJECT:==
Technical Specification Change to Table 3.3-11 and
                    .Table 4.3-8, Shearon Harris Nuclear Power Plant The following documents concerning our review of the subject          facility are  transmitted for your in formati on.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                              dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to li    if'*
Facil i ty Operating Li cense, dated Exemption, dated d  C    id      i,d      d~f
[jQ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Sl]
Construction Permit No. CPPR-                  , Amendment No.                dated Facility Operating License No.                    , Amendment No.              dated Order Extending Construction Completion Date, dated monthly Operating Report for                          transmitted by  letter dated
      + Annual/Semi-Annual        Repor t-transmitted by letter dated Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As  stated Service    List N
OFFICE/
LA:.PD SURNAME/  PAnder o OATE P NRC FORM 3IB IIOl Ol N CM 0240              OFFICIAL RECORD COPY
 
~0 5
1
 
                          ~
Mr. E. E. Utley Carolina Power    & Light  Company      Shearon Harris CC:
Thomas A. Baxter, Esq.              Mr. Travis Payne, Esq.
Shaw,  Pittman, Potts & Trowbridge    723 W. Johnson Street 2300  N  Street,  NW                    Post Office Box 12643 Washington,    DC  20037                Raleigh, North Carolina    27605 Mr. D. E. Hollar                    Mr. Daniel F. Read Associate General Counsel              CHANGE Carolina Power and Light    Company    Post Office Box 2151 P.O. Box 1551                          Raleigh, North Carolina    27602 Raleigh, North Carolina      27602 Bradley W. Jones, Esq.
Mr. H. A. Cole                          U.S. Nuclear Regulatory  Comm.
Special Deputy Attorney General        Region II State of North Carolina                101 Marietta Street Post Office Box 629                    Atlanta, Georgia 30303 Raleigh, North Carolina      27602 Richard D. Wilson', M.D.
Resident Inspector/Harris NPS          725 Hunter  Street c/o U.S. Nuclear Regulatory Commission  Apex, North Carolina    27502 Route 1, Box 315B New Hill, North Carolina      27562    Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. R. A. Watson                        101 Marietta Street Vice President                          Suite 2900 Harris Nuclear Plant                    Atlanta, Georgia  30303 P.O. Box 165 New  Hill, North  Carolina  27562    Mr. Robert P. Gruber Executive Director Mr. John Runkle, Executive Coordinator  Public Staff - NCUC Conservation Council of North Carolina  Post Office Box 29520 307 Granville Road                      Raleigh, North Carolina    27626-0520 Chapel  Hill,  North Carolina    27514 Mr. J. L. Willis Mr. Wells Eddleman                      Plant General Manager 812 Yancey Street                      Harris Nuclear Plant Durham, North Carolina      27701      P.O. Box 165 New Hill, North  Carolina  27562 Dr. Linda Little Governor's Waste Management Board      Mr. Dayne H. Brown, Chief 513 Albemarle Building                  Radiation Protection Section 325 North Salisbury Street              Division of Facility Services Raleigh, North Carolina 27611          N.C. Department of Human Resources 701 Barbour  Drive Raleigh, North Carolina    27603-2008
 
DISTRIBUTION:
MAY    29 lS8l                                                                    I ~400 PD21  r/f PAnderson DOCKET NO(S) . 50-400 SUBJECT-Monthly        Operating Report for April 1987 Shearon    Harris Nuclear Power Plant, Unit                            1 The following documents concerning our review of the subject                                    facility are            transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                          dated Environmental Assessment and Finding of No Significant Impact, dated f
Notice of Consideration of Issuance of Facility Operating License or Amendmen't Operating License, dated                                                                                                    to'acility Q    Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                    [see page(s) j Exemption, dated Construction Permit No. CPPR-                , Amendment No.                                                  dated
      +    Faci1 i ty Operating License No.                  , Amendment No.                                              dated Order Extending Construction Completion Date, dated Q    Monthly Operating Report for Shearon Harr is transmitted by letter dated 5 14/87                                                                          .
Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As  stated CC:
OFFICE Q SURNAME/
LA'A'n-
                    'on
                  '8'7"'R
          '&#xc3;'/                                      ~ ~ ~  ~ ~~~~ ~ ~ ~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~ ~~  ~~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~~~ ~~~ ~      ~~~ ~~ ~~ ~~~~~~~~ 1~~~~
DATE P NRC FORM 3LS ROI80) NRCM 0240            OFFIClAL RECORD COPY
 
OO            ~ g x      't
              ; I C                  a
                          ~ ~
4 l ~
g,    'L
                                  > ~
                                      ~ ~
 
c Shearon Harris Nuclear Power Plant, Unit 1
CC: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,  DC  20240 Chief (NOAA/BF/ECD/H6814)
Ecol ogy and Con servati on Di v i s i on National Oceanic    8  Atmospheric Administration 14th and Constitution Ave.,    NW Washington,  DC  20230 Dr. William B. Stroube, Jr.
FDA  Research  Chemist National Bureau of Standards Reactor Building 235,    Room B-108-Gaithersburg,  MD    20899 U.S. Environmental Protection Agency Region IV Office ATTN:  Regional Radiation Representative 345 Courtland  Street,  NE Atlanta,  GA  30365
 
A May  ll, 1987 DISTRIBUTION:
                                                                                                          ~Docket-No. 50-400 PD II r/f PAnderson DOCKET        NO(S).      50-400
 
==SUBJECT:==
Shearon            Harris Nuclear Power Plant, Unit 1, Annua1..Environmenta1 (Nonradiologica1)
Operating Report The
                                          \ g following documents concerning our review of the subject
                                                                          ~                                  .. are facility      transmitted for
                                                                                                                              ~
your information.
      +Notice of                Receipt of Application, dated Draft/Final Environmental Statement, dated Q      Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                        dated Environmental Assessment and Finding of No Significant Impact, dated Q      Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q      Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                              [see page(s) j Exemption, dated Construction Permit No. CPPR-Facility Operating License          No.,
Order Extending Construction Completion Date, dated
                                                                            , Amendment No.
Amendment No.
dated dated Monthly Operating Report for                                                    transmitted by letter dated x Annual/Semi-Annual Report-861024-1231                        transmitted by letter dated J2!3llW-.
Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As    stated CC-0FF<cEI1 .LA: PD              P
            ~ ~~~~~      ~ ~~ ~ ~~                                        ~~ ~~ ~ ~~ ~ ~ ~ ~~~~ ~~ ~                              ~~~~~ ~ ~ ~~ ~~~ ~ ~~ ~~~
SURNAME/    PAnde                              ~  ~~ ~~~ ~~ ~~~ 0 ~~~~~
DATE P    05/Ii ( /87
            ~ ~~~ ~1 ~~~~~~~~~~~
NRC FORM 318110/80) NRCM 0240                      OFFICIAL RECORD COPY
 
  ~ ~
yt g
 
Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,  DC  20240 Chief (NOAA/BF/ECD/H6814)
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,    NW Washington, DC 20230 Dr. William B. Stroube,    Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,  HD  20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation    Representative 345 Courtland Street, NE Atlanta,  GA  30365
 
April 28, 1987 DISTRIBUTION: W/0 Enclosures
                                                                              ~Docket-- No.-50:400:~
PDI  I-I R/F DOCKET        NO(S). 50-400                                              PAnderson (2)
 
==SUBJECT:==
Shearon Harris Nuclear Pouter Plant, Unit No. 1 Monthly Operating Report for March 1987 The      following documents concerning our review of the subject      facility are    transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 i ty Operating Li cense, dated Q Bi-Weekly        Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                    [see page(s) ]
Exemption, dated Construction Permit No. CPPR-                , Amendment No.                    da'ted Facility Operating License No.                  , Amendment No.                    dated Order Extending Construction Completion Date, dated KM t1 Op i                    p Annual/Semi-Annual Report-I    M  hlg7              *'b          1        d transmitted by letter  dated Office of Nuclear Reactor Regulation
 
==Enclosures:==
 
As  stated CC:
OFFICE/ LA:P
          ~ ~ ~  0 ~
SURNAME/
PAn 0ATEt) 94/g .K?......
NRC FORM 318 (10/801 NRCM  0240            OFFICIAL RECORD COPY
 
II
      ,a P
            ~ '-
0 g$
h
                        ~
                          \'
g l
 
Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,  DC  20240 Chief (NOAA/BF/ECD/H6814)
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,    NW Washington, DC 20230 Dr. William B. Stroube,    Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,    MD  20899 U.S. Environmental Protection Agency Region IV Office ATTN:  Regional Radiation Representative 345 Courtland Street,    NE Atlanta,  GA  30365}}

Latest revision as of 18:58, 3 February 2020

Monthly Operating Rept for Jul 1987.W/870813 Ltr
ML18022A558
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1987
From: Hale M, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-875011-(), HO-875011-(0), NUDOCS 8708170392
Download: ML18022A558 (38)


Text

~ ~ ~

CPKK Carolinapower S Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 AUG 33 1987 File Number: SHF/10-15505 Letter Number'HO-875011 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRISNUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1987.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:gmw Enclosure cc: Dr. J. Nelson Grace (NRC)

Messrs. J. M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP)

R. G. Oehl (DOE) 8708170392 87073i PDR ADOCK 05000400 PDR MEM/HO-875011/Page 1/OS3

/p

~ ~

OPERATING DATA REPORT DOCKET NO. 050"400 DATE 8/6/87 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 OPERATING STATUS Notes.'.

Unit Name'. Shearon Harris Unit 1 2 1 Reporting Period: July 1987 3 ~ ,Licensed Thermal Power (MWt): 2775 4 ~ Nameplate Rating (Gross MWe): 950 5 ~ Design Electrical Rating (Net-MWe): 900 6; Maximum Dependable Capacity (Gross-MWe): 920 7.'aximum Dependable Capacity (Net-MWe): 860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level to Which Restricted, if any (Net-MWe): None
10. Reasons for Restrictions, if any: N/A This Month Yr.-to-Date Cumulative
11. Hours in Report Period 744.00 2184.00 2184.00
12. Number of Hours Reactor Was Critical 597 F 10 1813.22 1813.22
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 586.95 1770.80 1770.80
15. Unit Reserve Shutdown Hours 0.00 0.00 .00
16. Gross Thermal Energy Generated (MWH) 1453711.50 4455500.04 4455500.04
17. Gross Electrical Energy Generated (MWH) 471233.00 1450568.00 1450568.00
18. Net Electrical Energy Generated (MWH) 431956.00 1334785 00 1334785 F 00
19. Unit Service Factor 78. 89 81.08 81.08
20. Unit Availability Factor 78.89 81.08 81 F 08
21. Unit Capacity Factor (Using MDC Net) 67.51 71.07 71.07
22. Unit Capacity Factor (Using DER Net) 64.51 67.91 67.91
23. Unit Forced Outage Rate 1.89 5.16 5.16
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Surveillance Test Outage / October 10, 1987 / Two Weeks

25. If Shut Down at end of Report Period, Estimated Date of Startup'N/A
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 12/30/86 1/3/87 INITIAL ELECTRICITY 1/11/87 1/19/87 COMMERCIAL OPERATION 4/25/87 5/2/87 MEM/DATAREPa/Page 1/OS3

~ ~

PLANT PERFORMANCE DATA SYSTEM, APPENDIX B -'VERAGE DAILY POWER LEVEL HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 July 1987 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 810 17 -32 839 18 -32 432 19 -35 404 20 -39 5 732 21 -39 846 22 248 846 23 815 848 24 835 352 25 823 10 647 26 833 840 27 836 12 844 28 837 13 840 29 847 14 798 30 846 15 306 31 841 16 30 MEM/DATAREPa/Page 2/OS3

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: - Harris DATE: 8/6/87 COMPLETED BY: M, W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: JULY 1987 Tl R Method Date y Duration of Licensee System Component Cause 6 Corrective P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report If Prevent Recurrence Reactor 87-028 870703 N/A HH PUMPXX Load reduction to repair the Main Feedpump IA outboard pump seal. The pump was removed from service and the seal was replaced'n addition, the motor bearings were replaced, a new lube oil pump and lube o(l hose was Installed. Unit was returned to full service after the repairs-.

Reason: Method: Exhibit G-Instructions F: Forced Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data S:

B&alntenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File 4-Continued (NUREGW161 )

regulatory Restriction E-Operator Training d License Examination 5-Reduced Load F-Administrative 60thef G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

MEM/DATAREPa/Page 3/OS3

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 8/6/87 COMPLETED BY: M. W Hale TELEPHONE: (919) 362-2944 REPORT MONTH: JULY 1987 Tl R Method Date y Duration of Licensee System Component Cause 4 Corrective (Hours) Shutting, Event Code 4 Code 5 Action to P

e Down Report l Prevent Recurrence Reactor 87&29 870709 I I ~ 30 87-042 SD VALVEX Reactor/Turbine Trip from full power due to Low-Low Level on 1C steam generator. This occurred when a clearance tag was hung on an. ammonia chemical addition valve for feedwater and the control fuse for the IC feed-water isolation valve was mistakenly removed. This caused isolation valve to close and lead to the Low-Low Level trip. Operations personnel will be retralned on interpretting control wiring diagrams, Unit was returned to service.

Reason: Method: Exhibit G-Instructions F: Forced Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data S:

B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram, Event Report (LER) File 4-Continued (NUREG-0161)

D-Regulatory Restriction EWperator Training II License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain )

Exhibit I - Same Source H-Other (Explain)

" Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 4/OS3

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 8/6/87 COMPLETED 8Y: M. W Hale TELEPHONE: (919) 362-2944 REPORT MONTH: JULY 1987 Tl R Method Date y Duration of Licensee System Component Cause II Col recilve P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report S Prevent Recurrence Reactor 87-030 870714 N/A PIPEXX Load reduction to repair 18 main feedpump hot bleed off and seal water injection lines and to clean and inspect the condenser <<ater.boxes.

Repairs and inspections were implemented, Unit was returned to service.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram, Event Report (LER) File C Regulatory Restriction 4Contlnued (NUREG&161 )

E-Operator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other . 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

"Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 5/OS3

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 8/6/87 COMPLETED BY: M. W Hale TELEPHONE: (9I9) 362-2944 REPORT MONTH: JULY 1987 Tl R2 Method No, Date y Duration of Licensee System Component Cause II Corrective P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report I Prevent Recurrence Reactor 8731 870716 145,75 N/A Hl VALVE Unit removed from service to repair leaking steam generator blowdown valves and to perform inspections of production equipment, Repairs were implemented to the condenser and 5AKB.

feedwater heaters, Temporary repairs Implemented on the steam generator blowdown valves with permanent repairs scheduled for the fall outage Unit was returned to service, 4

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain[ ~ I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram, Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training II License Examination 5-Reduced Load F-Administrative . 6&ther G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain)

MEM/DATAREPa/Page 6/OS3

September 3, 1987 DISTR ENCLOSURES I BUT ION '/0 PDII-1 R/F id PAnderson lD.o,c.k:e't-N o. 5'0=40.0M DOCKET- NO(S) . 50-400

SUBJECT:

BI-WEEKLY NOTICE APPLICATIONS AND AMENDMENTS TO OPERATING LICENSE INVOLVING NO SIGNIFICANT. HAZARDS CONSIDERATIONS-SHEARON HARRIS NUCLEAR POWER PLANT ~ UNIT 1 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated

~

Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated

[jg Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No d d id li

  • d d id , d d d d i]

Exemption, dated Construction Permit No. CPPR- , Amendment No. dated Facility Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated dd Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation

Enclosures:

As stated cc: See Next Page i

OFFICE/ ~

P, o

P D$

J SURN*MEP DATE)I PP nd p 9/3 7

~ j SA o~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ d ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

'RC FORM 3 I 8 IIOIBOI NRCM 0240 OFFICIAL RECORD COPY

~

Mr. D. A. Nauman South Carolina Electric 5 Gas Company Virgil C. Summer Nuclear Station CC:

Mr. William A. Williams, Jr.

Technical Assistant - Nuclear Operations Santee Cooper P.O. Box 764 (Mail Code 167)

Columbia, South Carolina 29218 J. B. Knotts, Jr., Esq.

Bishop, Liberman, Cook, Purcell and Reynolds 1200 17th Street, N.W.

Washington, D. C. 20036 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, South Carolina 29065 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Chairman, Fairfield County Council P.O. Box 293 Winnsboro, South Carolina 29180 Attorney General Box 11549 Columbia, South Carolina 29211 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201

~ o y ~ l

~ ~

August 19, 1987 DISTR I BUTI'ON: M/0 ENCLOSURES

~Docke.t No.. 5.0 4003 PDI I-I r/f DOCKET NO(S). 50 400 PAnderson Corrected. Monthly operating Report for June 1987 Shearon Harris Nuclear Power Plant, Unit 1 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated [see page(s) 3 Exemption, dated Construction Permit No. CPPR- , Amendment No. da'ted

+ Facility Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated CorrGkMonthly Operating Report for Shearon Harris transmitted by letter dated Jul 8 ~98 9

-'c ted

+ Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation Encl osures:

As stated See Next Blge OFFICE)

.'J.A.'P. RI 5,;.

SURNAME) 3!Andarsan. ~~~~ ~ ~ ~ ~ ~ ~ ~

OAVES P 8/19/87

~ ~~ ~~~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~

NRC FORM 3IB ROIBOI NRCM 0240 OFFICIAL RECORD COPY

~ 0 ~

A 1

I 7,

I

Shearon Harris CC: Chief Division of Ecological'ervices Bureau of Sport Fisheries 5. Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365

t August 17, 1987 DISTRIBUTION: W/0 ENCLOSURES PDI I-I R/F PAnderson DOCKET NO(S). 50 400 ~Docket No. 50-4003 SUBJECT- Bi-Weekly Notice Appl ications and Amendments to Operating Licensee. Involving No Significant Hazards Considerations Shear on Harr is Nuclear Power Plant, Unit 1 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated

~

Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci 1 i ty Operating License, dated

+XBi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No dig id' d C dd d . d d g d d]

Exemption, dated Construction Permit No. CPPR-Facility Operating License Order Extending Construction Completion Date, dated No., , Amendment No.

Amendment No.

dated dated Monthly Operating Report for transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated..

Office of Nuclear Reactor Regulation Encl osures:

As stated See Next Page OFFICE) :LA:PDII-I SURNAME)

.P.hndar.san. J) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

DATE) 8/17/87 ", ~~ ~~ ~~~~~~~~~~~~~ ~~~~~~~~~~~~~ I~ ~ ~ ~ ~ ~ ~

NRC FORM 3I8 IIO/80I NRCM 0240 OFFICIAL RECORD 'COPY

~ ~ ~ ~

J a I J il ~ t r

7 ~

Mr. E. E. Utley Carolina Power 8 Light Company Shearon Harris CC:

Thomas A. Baxter, Esq. Ms. Carol Love Shaw, Pittman, Potts 8 Trowbridge 100 Park Drive 2300 N Street, NW P.O. Box 12276 Washington, DC 20037 Research Triangle Park, NC 27709 Mr. D. E. Hollar Regional Administrator, Region II Associate General Council U.S. Nuclear Regulatory Commission Carolina Power 8 Light Company 101 Marietta Street P.O. Box 1551 Suite 2900 Raleigh, North Carolina 27602 Atlanta, Georgia 30303 Resident Inspector/Harris NPS Mr. J. L. Willis c/o U.S. Nuclear Regulatory Commission Plant General Manager Route 1, Box 315B Harris Nuclear Plant New Hill, North Carolina 27562 P.O. Box 165 New Hill North Carolina 27562 Mr. R. A. Watson Mr. Dayne H. Brown, Chief Vice President Radiation Protection Section Harris Nuclear Plant Division of Facility Services P.O. Box 165 N.C. Department of Human Resources New Hill, North Carolina 27562 701 Barbour Drive Raleigh, North Carolina 27603-2008

r, 4

I 1

0 d

July 31, 1987 DISTRIBUTION: W/0 ENCLOSURES P D I I - I R/F PAnderson (2)

DOCKET NO(S). 5O qOO ~Docket No. 50=4003

SUBJECT:

Monthly Report for June 1987, Shearon Harris Nuclear Power Plant, Unit 1 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated Environmental. Assessment and Finding of No Significant Impact, dated f;

Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating Li cense, dated Q~ Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated teee page(e) ]

Exemption, dated Construction Permit No. CPPR- , Amendment No. da'ted d~

Facility Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated ejM llyap Annual/Semi-Annual Report-i Rp Un 'i t 1

<<i dtyl d transmitted by letter dated Office of Nuclear Reactor Regulation

Enclosures:

As stated Service List OFFICEP

. r'.L.A.'.P.P.l,t.-.. ~~ ~~ \~~~~~~~~~~~~~~~ ~ ~

SURNAME/ PAnderson sh

~~~~~~ ~~~ ~~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~~~~ ~~~~~ ~ ~~ ~~~~~~~~~ ~~~~~~~~~~~

I

~ DATE P 7/3l/87. I~~~~~~~~~ ~~~~ ~~~~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~ ~~~~~ 0 NRC FORM 3181'ID/80) NRCM 0240 OFFICIAL RECORD COPY

~ 0 ~

II

~,

~ ~

E, k

Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365

Ju1y 8,, 1987 DISTRIBUTION: w/0 ENCLOSURES IDocket No. 50=400+I:

PDII-I R/F PAnderson (2)

DOCKET NO(S) ~ 50-400

SUBJECT:

Monthly Operating Report for Nay 1987 Shearon Harris Nuclear Po'wer Plant, Unit 1 e

The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability, of Draft/Final Environmental Statement, dated Safety Evaluation Repo'rt, or Supplement No. dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated Lsee page(s) j Exemption, dated Construction Permit No. CPPR- , Amendment No. dated Facility Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated Q] monthly Operating Report fors transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation

Enclosures:

As stated Serv ce List OsslCEIk :.P.A: P D I I- I SURNAME/

.An,der.s.an/. h ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~~~~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~

DATE P 7/8/87

~ ~<~ ~ e ~~~~ ~~ ~ ~ ~ ~ ~ ~ ~~~~~ ~~~~ ~ ~ ~~~ ~ ~~~ ~

NRC FORM 3l8 IIOI80) NRCM 0240 OFF I C IAL R ECOR D COPY

~ ~

Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional- Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365

tune 9, 1987 DOCKET NO(S) gO'OO DISTRIBUTION:

( Docket No. 50-400 -,

PD21 r/f PAnderson

SUBJECT:

Technical Specification Change to Table 3.3-11 and

.Table 4.3-8, Shearon Harris Nuclear Power Plant The following documents concerning our review of the subject facility are transmitted for your in formati on.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to li if'*

Facil i ty Operating Li cense, dated Exemption, dated d C id i,d d~f

[jQ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Sl]

Construction Permit No. CPPR- , Amendment No. dated Facility Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated monthly Operating Report for transmitted by letter dated

+ Annual/Semi-Annual Repor t-transmitted by letter dated Office of Nuclear Reactor Regulation

Enclosures:

As stated Service List N

OFFICE/

LA:.PD SURNAME/ PAnder o OATE P NRC FORM 3IB IIOl Ol N CM 0240 OFFICIAL RECORD COPY

~0 5

1

~

Mr. E. E. Utley Carolina Power & Light Company Shearon Harris CC:

Thomas A. Baxter, Esq. Mr. Travis Payne, Esq.

Shaw, Pittman, Potts & Trowbridge 723 W. Johnson Street 2300 N Street, NW Post Office Box 12643 Washington, DC 20037 Raleigh, North Carolina 27605 Mr. D. E. Hollar Mr. Daniel F. Read Associate General Counsel CHANGE Carolina Power and Light Company Post Office Box 2151 P.O. Box 1551 Raleigh, North Carolina 27602 Raleigh, North Carolina 27602 Bradley W. Jones, Esq.

Mr. H. A. Cole U.S. Nuclear Regulatory Comm.

Special Deputy Attorney General Region II State of North Carolina 101 Marietta Street Post Office Box 629 Atlanta, Georgia 30303 Raleigh, North Carolina 27602 Richard D. Wilson', M.D.

Resident Inspector/Harris NPS 725 Hunter Street c/o U.S. Nuclear Regulatory Commission Apex, North Carolina 27502 Route 1, Box 315B New Hill, North Carolina 27562 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. R. A. Watson 101 Marietta Street Vice President Suite 2900 Harris Nuclear Plant Atlanta, Georgia 30303 P.O. Box 165 New Hill, North Carolina 27562 Mr. Robert P. Gruber Executive Director Mr. John Runkle, Executive Coordinator Public Staff - NCUC Conservation Council of North Carolina Post Office Box 29520 307 Granville Road Raleigh, North Carolina 27626-0520 Chapel Hill, North Carolina 27514 Mr. J. L. Willis Mr. Wells Eddleman Plant General Manager 812 Yancey Street Harris Nuclear Plant Durham, North Carolina 27701 P.O. Box 165 New Hill, North Carolina 27562 Dr. Linda Little Governor's Waste Management Board Mr. Dayne H. Brown, Chief 513 Albemarle Building Radiation Protection Section 325 North Salisbury Street Division of Facility Services Raleigh, North Carolina 27611 N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008

DISTRIBUTION:

MAY 29 lS8l I ~400 PD21 r/f PAnderson DOCKET NO(S) . 50-400 SUBJECT-Monthly Operating Report for April 1987 Shearon Harris Nuclear Power Plant, Unit 1 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated Environmental Assessment and Finding of No Significant Impact, dated f

Notice of Consideration of Issuance of Facility Operating License or Amendmen't Operating License, dated to'acility Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated [see page(s) j Exemption, dated Construction Permit No. CPPR- , Amendment No. dated

+ Faci1 i ty Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated Q Monthly Operating Report for Shearon Harr is transmitted by letter dated 5 14/87 .

Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation

Enclosures:

As stated CC:

OFFICE Q SURNAME/

LA'A'n-

'on

'8'7"'R

'Ã'/ ~ ~ ~ ~ ~~~~ ~ ~ ~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~~~ ~~~ ~ ~~~ ~~ ~~ ~~~~~~~~ 1~~~~

DATE P NRC FORM 3LS ROI80) NRCM 0240 OFFIClAL RECORD COPY

OO ~ g x 't

I C a

~ ~

4 l ~

g, 'L

> ~

~ ~

c Shearon Harris Nuclear Power Plant, Unit 1

CC: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecol ogy and Con servati on Di v i s i on National Oceanic 8 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108-Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365

A May ll, 1987 DISTRIBUTION:

~Docket-No. 50-400 PD II r/f PAnderson DOCKET NO(S). 50-400

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit 1, Annua1..Environmenta1 (Nonradiologica1)

Operating Report The

\ g following documents concerning our review of the subject

~ .. are facility transmitted for

~

your information.

+Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated [see page(s) j Exemption, dated Construction Permit No. CPPR-Facility Operating License No.,

Order Extending Construction Completion Date, dated

, Amendment No.

Amendment No.

dated dated Monthly Operating Report for transmitted by letter dated x Annual/Semi-Annual Report-861024-1231 transmitted by letter dated J2!3llW-.

Office of Nuclear Reactor Regulation

Enclosures:

As stated CC-0FF<cEI1 .LA: PD P

~ ~~~~~ ~ ~~ ~ ~~ ~~ ~~ ~ ~~ ~ ~ ~ ~~~~ ~~ ~ ~~~~~ ~ ~ ~~ ~~~ ~ ~~ ~~~

SURNAME/ PAnde ~ ~~ ~~~ ~~ ~~~ 0 ~~~~~

DATE P 05/Ii ( /87

~ ~~~ ~1 ~~~~~~~~~~~

NRC FORM 318110/80) NRCM 0240 OFFICIAL RECORD COPY

~ ~

yt g

Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, HD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365

April 28, 1987 DISTRIBUTION: W/0 Enclosures

~Docket-- No.-50:400:~

PDI I-I R/F DOCKET NO(S). 50-400 PAnderson (2)

SUBJECT:

Shearon Harris Nuclear Pouter Plant, Unit No. 1 Monthly Operating Report for March 1987 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No. dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 i ty Operating Li cense, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated [see page(s) ]

Exemption, dated Construction Permit No. CPPR- , Amendment No. da'ted Facility Operating License No. , Amendment No. dated Order Extending Construction Completion Date, dated KM t1 Op i p Annual/Semi-Annual Report-I M hlg7 *'b 1 d transmitted by letter dated Office of Nuclear Reactor Regulation

Enclosures:

As stated CC:

OFFICE/ LA:P

~ ~ ~ 0 ~

SURNAME/

PAn 0ATEt) 94/g .K?......

NRC FORM 318 (10/801 NRCM 0240 OFFICIAL RECORD COPY

II

,a P

~ '-

0 g$

h

~

\'

g l

Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365