| | {{#Wiki_filter:Riley (OCA), Timothy From: Riley (OCA), Timothy Sent: Tuesday, May 08, 2012 5:02 PM To: 'Steyer, Ryan'; 'DougBabcock@brown.senate.gov'; |
| | 'nick-butterfield@portman. |
| | senate.gov'; |
| | 'Schulman, Howard' |
| | |
| | ==Subject:== |
| | NRC Inspection Report for Davis-Besse Attachments: |
| | Davis Besse Shield Building Operability and Licensing Basis Inspection Report ML12128A4430.pdf Good afternoon, Please see the attached Davis Besse Shield Building Operability and Licensing Basis Inspection Report.Please contact me with any questions or concerns regarding this inspection report; there's significant nuance to how these are written and they won't win awards for Plain Writing.This report documents the NRC's actions from July 18, 2011 to April 17, 2012 to make sure the shield building at Davis-Besse could operate with an opening during the reactor vessel head replacement process; the discovery of the cracks in the shield building; the wide range of actions after the discovery of the cracks to evaluate the shield building safety; and how the determination was made that the shield building was capable of fulfilling its safety function.Nearly all of this was discussed at the January 5, 2012 Public Meeting.One section I would like to call attention to in this report is on page 10 of the report (PDF page 13): Therefore, the [NRC] inspectors, after consultation with the NRC technical review team, questioned if laminar cracking in proximity to the outer face reinforcement was a condition not in conformance with the current design basis. The inspectors noted that revised calculations provided on December 1, 2011, did not include such a claim, and instead the licensee continued to review the previous conclusion. |
| | After additional evaluation and interactions with the inspectors, the licensee concluded in its.Shield.Building Root Cause Report dated February 27,;:2012,that the SB [Shield Buiiding], with thelaminar cracking in its walls, was operable but non-conformriing to the current design and licensing bases with regard to the design stress analysis methodology, and the tornado allowable stress values.9 Davis-Besse's Updated Safety Analysis Report (USAR) Section 3.8.2.2.5 and Design Criteria Manual (DCM)Section II.H.2.5.1.5 specified the analysis methodologies used for the SB design. These documents stated that the SB wall was designed using, "Analysis of Spherical Shells" from Section III of the 1968 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. In the initial condition assessment, Calculations C-CSS-099.20-054 and C-CSS-099.20-056 used the "ANSYS" computer software to study the effect of the laminar cracks on the function of the SB.* The USAR Section 3.8.2.2.6 and Design Criteria Manual (DCM) Section II.H.2.5.1.5 defined the load combinations and allowed stresses for the SB design. Study Calculation C-CSS-099.20-056 documented that the calculated stress for the tornado wind and differential pressure load exceeded the allowable stress value in the design and licensing basis, but was within the allowable limit using the alternative differential pressure design load of Regulatory Guide 1.76, "Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants," Revision 1.The inspectors noted that any future calculations used to evaluate the SB with the concrete laminar cracking will have to conform to the design and licensing bases. The licensee documented in its Root Cause Report its intentiontosgenrate an engineering plan by December 1, 2012, to re-establish the SB licensing basis.What is significant about these highlighted |
| | 'Pieces is that a) since the public meeting FENOC has concluded that the shield building does not meet design basis [at the time of the public meeting, this issue was disputed I between NRC and FENOC] and b) FENOC has proposed corrective action to return the Shield Building to licensing basis.The root cause report referenced above is currently under review (with accompanying inspections). |
| | The NRC response (Davis Besse Shield Building Root Cause and Corrective Action inspection Report) is expected to be completed within two months.Please contact me with questions, Timothy Riley Congressional Affairs Officer U. S. Nuclear Regulatory Commission Office of Congressional Affairs Phone: 301-415-8492 Blackberry: (b)(6)2}} |
Revision as of 23:22, 1 August 2018
|
---|
Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] Category:Congressional Correspondence
MONTHYEARML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station ML12314A1742012-11-0505 November 2012 Kucinich Limited Appearance Statement ML12187A4782012-05-15015 May 2012 E-mail from Timothy Riley - Oral Arguments Before the ASLB Cancelled/Rescheduled 5/15 Davis Besse Order ML12187A4762012-05-0808 May 2012 E-mail from Timothy Riley on NRC Inspection Report for Davis Besse ML12187A4752012-05-0202 May 2012 E-mail from Timothy Riley on Davis Besse ASLB Hearing May 18 ML12187A4712012-02-28028 February 2012 E-mail from Timothy Riley on NRC Begins Review of Fenoc'S Root ML12187A4692011-12-29029 December 2011 E-mail from Timothy Riley on Davis Besse Public Meeting Press Release ML12187A4672011-12-22022 December 2011 E-mail from Timothy Riley on Davis Besse Public Meeting Jan 5 1012 6-10 Pm ML12187A4632011-12-20020 December 2011 E-mail from Timothy Riley on Davis Besse Public Meeting Jan 5 ML11347A3412011-12-12012 December 2011 12-12-11 Letter to Honorable Dennis Kucinich Providing Documents That First Energy Nuclear Operating Company Provided to the NRC ML12187A4602011-12-0202 December 2011 E-mail from Timothy Riley on NRC Update 12/22 - Davis Besse ML12187A4592011-11-28028 November 2011 E-mail from Timothy Riley on NRC Update - Davis Besse ML11347A3362011-11-28028 November 2011 11-28-11 E-Mail Davis-Besse Public Meeting ML12187A4572011-11-22022 November 2011 E-mail from Timothy Riley on Davis Besse Public Meeting ML12187A4562011-11-22022 November 2011 E-mail from Timothy Riley on Davis Besse Public Meeting ML12187A4542011-11-16016 November 2011 E-mail Form Timothy Riley on Davis Besse Alert Declared and Exited ML12187A4532011-11-16016 November 2011 E-mail from Timothy Riley on NRC Press Release - Davis Besse Alert ML12187A4622011-11-0202 November 2011 E-mail from Timothy Riley on NRC Concludes Davis Besse Safe to Restart CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 ML1106805182010-11-0404 November 2010 Comment (10) of Dennis J. Kucinich on Behalf of Us House of Representatives, Opposing Davis-Besse for 20-year License Extension ML0925701512009-09-10010 September 2009 G20090512/LTR-09-0446/EDATS: SECY-2009-0438 - Ltr. Representative Dennis J. Kucinich Re Expresses That NRC Maintain Independent and Intensified Scrutiny Over Firstenergy'S Management of Davis-Besse ML0713804282007-05-21021 May 2007 G20070318/LTR-07-0322 - Safety Related Actions to Ensure Reactor Heads to Not Degrade - Letter to Honorable Dennis Kucinich from Luis Reyes ML0712803852007-05-0101 May 2007 G20070318/LTR-07-0322 - Ltr. Representative Dennis J. Kucinich 2.206 Petition Requesting the NRC Take Safety Related Actions to Ensure That Reactor Heads Do Not Degrade to the Point of Failure - Document Request - 2.206/FirstEnergy ML0710205132007-04-18018 April 2007 G20070202/LTR-07-0203 - Rep. Dennis Kucinich Ltr FENOC Request to Be Relieved from Independent Oversight at the Davis-Besse Nuclear Facility ML0707806732007-03-0909 March 2007 Firstenergy Nuclear Operating Company'S (FENOC) Request to Be Relieved from Independent Oversight Mandated by the NRC ML0421004282004-07-23023 July 2004 LTR-04-0472 - Ltr. from Rep. Marcy Kaptur Davis Besse Nuclear Power Plant ML0406201962004-02-12012 February 2004 Public Comments from Congressman Dennis J. Kucinich at the Restart Hearing of the Davis-Besse Nuclear Power Plant ML0329400602003-12-18018 December 2003 G20030624/LTR-03-0680 - Rep. Dennis J. Kucinich Ltr. Re Concerns with Final Director'S Decision on 2.206 Petition Regarding Davis-Besse ML0326001062003-10-24024 October 2003 G20030548/LTR-03-0592 - Senator Mike Dewine and Senator George Voinovich Ltr Re Davis Besse (Karl/Cassa Brodbeck) ML0329701342003-10-20020 October 2003 G20030637/LTR-03-0695 - Rep. Markey Ltr Re Infection of Davis Besse Nuclear Plant by Slammer Worm Computer Virus - Follow-up Questions ML0328202012003-10-0909 October 2003 Letter from Andrew L. Bates to Congressman Dennis J. Kucinich Re DD-03-03 ML0324001092003-10-0606 October 2003 G20030499/LTR 03-0546 - Sen. Charles E. Grassley Ltr. Re Request for Assistance Regarding a Communication from Mr. Robert Roethig About the Davis-Besse Nuclear Power Station ML0324807512003-09-12012 September 2003 Directors Decision Under 10 CFR Sec. 2.206 ML0324806752003-09-12012 September 2003 G20030048/LTR-03-0059 - Rep. Dennis J. Kucinich Ltr Re Petition Pursuant to 10 CFR 2.206 Requesting the NRC Revoke Firstenergy Nuclear Operating Company'S License to Operate the Davis Besse Nuclear Power Station ML0323704762003-08-22022 August 2003 G20030501/LTR-03-0548 - Rep. Edward J. Markey Ltr Re Press Report That in January a Computer Virus Penetrated a Private Computer Network at First Energy'S Davis Besse Nuclear Power Plant ML0323704712003-07-0303 July 2003 G20030499/LTR-03-0546 - Sen. Charles E. Grassley Ltr Davis Besse (Robert Roethig) ML0311305302003-06-13013 June 2003 G20030197 - Ltrs to Congress Re Current Davis Besse Issues ML0313900672003-06-0606 June 2003 G20030048/LTR-03-0059 - Rep. Dennis J. Kucinich Ltr Re Petition Pursuant to 10 CFR 2.206 Requesting the NRC Revoke Firstenergy Nuclear Operating Company'S License to Operate the Davis Besse Nuclear Power Station ML0313901122003-06-0606 June 2003 Proposed Director'S Decision - Petitioner Request for Comment Regarding Congressman Kucinich Petition to Revoke Davis-Besse Operating License ML0319107372003-06-0303 June 2003 LTR-03-0370 - Ltr. Rep. Dennis Kucinich Request for Unredacted Documents on Davis-Besse ML0313202922003-05-0707 May 2003 G20030231/LTR-03-0282 - Rep. James C. Greenwood Ltr Davis-Besse Lessons Learned ML0312500822003-04-29029 April 2003 G20030221/LTR-03-0262 - Rep. Dennis J. Kucinich Ltr. Safety Culture at Davis Besse ML0303606472003-02-10010 February 2003 G20030048/LTR-03-0059 - Rep. Dennis J. Kucinich Ltr. Re Davis-Besse, 2.206 Acknowledgment Letter, Request to Revoke the Operating License for Davis-Besse ML0306307762003-02-0606 February 2003 Comment Regarding Proposal to Pull the License to Operate Davis-Besse Nuclear Power Plant in Ottawa County, Ohio ML0303700672003-02-0303 February 2003 G20030048/LTR-03-0059 - Rep. Dennis J. Kucinich Ltr Re Petition Pursuant to 10 CFR 2.206 Requesting the NRC Revoke Firstenergy Nuclear Operating Company'S License to Operate the Davis Besse Nuclear Power Station ML0224103082002-12-16016 December 2002 G20020265/LTR-02-0323 - Rep. Edward J. Markey and Rep. Marcy Kaptur Ltr Safety Issues at Davis-Besse Nuclear Power Plant - Licensee Inspections and Safety Procedures ML0229102992002-10-23023 October 2002 G20020555-G20020592/LTR-02-0617-LTR-02-0659 - Rep. Dennis J. Kucinich Ltr. Request Documents Concerning Davis-Besse Nuclear Power Plant ML0229603122002-10-10010 October 2002 G20020600/LTR-02-0668 - Sen. George V. Voinovich Ltr. Concerns Expressed During Meeting with Chairman on October 9, 2002 ML0310500422002-07-19019 July 2002 Letter to W Tauzin from R Meserve Enclosing Final Set of Documents in Response to Letter Dated 05/24/2002 2023-08-01
[Table view] |
Text
Riley (OCA), Timothy From: Riley (OCA), Timothy Sent: Tuesday, May 08, 2012 5:02 PM To: 'Steyer, Ryan'; 'DougBabcock@brown.senate.gov';
'nick-butterfield@portman.
senate.gov';
'Schulman, Howard'
Subject:
NRC Inspection Report for Davis-Besse Attachments:
Davis Besse Shield Building Operability and Licensing Basis Inspection Report ML12128A4430.pdf Good afternoon, Please see the attached Davis Besse Shield Building Operability and Licensing Basis Inspection Report.Please contact me with any questions or concerns regarding this inspection report; there's significant nuance to how these are written and they won't win awards for Plain Writing.This report documents the NRC's actions from July 18, 2011 to April 17, 2012 to make sure the shield building at Davis-Besse could operate with an opening during the reactor vessel head replacement process; the discovery of the cracks in the shield building; the wide range of actions after the discovery of the cracks to evaluate the shield building safety; and how the determination was made that the shield building was capable of fulfilling its safety function.Nearly all of this was discussed at the January 5, 2012 Public Meeting.One section I would like to call attention to in this report is on page 10 of the report (PDF page 13): Therefore, the [NRC] inspectors, after consultation with the NRC technical review team, questioned if laminar cracking in proximity to the outer face reinforcement was a condition not in conformance with the current design basis. The inspectors noted that revised calculations provided on December 1, 2011, did not include such a claim, and instead the licensee continued to review the previous conclusion.
After additional evaluation and interactions with the inspectors, the licensee concluded in its.Shield.Building Root Cause Report dated February 27,;:2012,that the SB [Shield Buiiding], with thelaminar cracking in its walls, was operable but non-conformriing to the current design and licensing bases with regard to the design stress analysis methodology, and the tornado allowable stress values.9 Davis-Besse's Updated Safety Analysis Report (USAR) Section 3.8.2.2.5 and Design Criteria Manual (DCM)Section II.H.2.5.1.5 specified the analysis methodologies used for the SB design. These documents stated that the SB wall was designed using, "Analysis of Spherical Shells" from Section III of the 1968 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. In the initial condition assessment, Calculations C-CSS-099.20-054 and C-CSS-099.20-056 used the "ANSYS" computer software to study the effect of the laminar cracks on the function of the SB.* The USAR Section 3.8.2.2.6 and Design Criteria Manual (DCM)Section II.H.2.5.1.5 defined the load combinations and allowed stresses for the SB design. Study Calculation C-CSS-099.20-056 documented that the calculated stress for the tornado wind and differential pressure load exceeded the allowable stress value in the design and licensing basis, but was within the allowable limit using the alternative differential pressure design load of Regulatory Guide 1.76, "Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants," Revision 1.The inspectors noted that any future calculations used to evaluate the SB with the concrete laminar cracking will have to conform to the design and licensing bases. The licensee documented in its Root Cause Report its intentiontosgenrate an engineering plan by December 1, 2012, to re-establish the SB licensing basis.What is significant about these highlighted
'Pieces is that a) since the public meeting FENOC has concluded that the shield building does not meet design basis [at the time of the public meeting, this issue was disputed I between NRC and FENOC] and b) FENOC has proposed corrective action to return the Shield Building to licensing basis.The root cause report referenced above is currently under review (with accompanying inspections).
The NRC response (Davis Besse Shield Building Root Cause and Corrective Action inspection Report) is expected to be completed within two months.Please contact me with questions, Timothy Riley Congressional Affairs Officer U. S. Nuclear Regulatory Commission Office of Congressional Affairs Phone: 301-415-8492 Blackberry: (b)(6)2