Riley (OCA), Timothy From: Riley (OCA), Timothy Sent: Tuesday, February 28, 2012 12:37 PM To: 'Schulman, Howard'; 'Steyer, Ryan'; 'DougBabcock@brown.senate.gov';

'nickbutterfield@portman. senate.gov'; Abby Pinkele; 'Alison Cassady'; 'Andrew Herther';

annie-caputo@epw.senate.gov; 'Brian Clifford (Barrasso)'; 'Chris Sarley'; 'David McCarthy';

'Grant Cope'; 'Greg Dotson'; isaac edwards@energy.senate.gov; jeff.baran@mail.house.gov; John Marshall; jonathan epstein@bingaman.senate.gov; 'Jones, Andrea";

karenbillups@energy.senate.gov; laura haynes@carper.senate.gov; 'Mary Neumayr';

'Maryam Brown'; michael.beckerman@mail.house.gov; 'Ruth Van Mark';

sam-fowler@energy.senate.gov; 'Terrance Homer'

Subject:

NRC BEGINS REVIEW OF FENOC'S ROOT CAUSE ANALYSIS Attachments: DB root cause pr FINAL.DOCX Please see attached press release regarding today's submittal of a root cause analysis of cracks in the shield building at Davis-Besse. The report submitted by FENOC is expected to be publicly available this afternoon or tomorrow. Please contact me if you would like a copy.

I will be happy to answer any questions.

Timothy Riley Congressional Affairs Officer U. S. Nuclear Regulatory Commission Office of Congressional Affairs Phone: 301-415-8492 Blackberryf/(6)

vb , , ý.

SNRC NEWS

  • ,U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region III

,-2443 Warrenville Road Lisle IL 60532 Site: www.nrc.gov Blog: httrp://public-blog.nrc-gatewav.gov No. 111-12-007 February 28, 2012

Contact:

Viktoria Mitlyng (630) 829-9662 E-Mail: OPA3(@nrc.gov Prema Chandrathil (630) 829-9663 NRC BEGINS REVIEW OF FENOC'S ROOT CAUSE ANALYSIS OF DAVIS-BESSE SHIELD BUILDING CRACKS The Nuclear Regulatory Commission has initiated its rigorous review of FirstEnergy Nuclear Operating Co.'s (FENOC) causal analysis of cracks in the shield building at the Davis-Besse Nuclear Power Station, and will schedule a public meeting and issue an inspection report to communicate its conclusions to the public once the review is complete.

FENOC submitted the root cause analysis of shield building cracks Feb. 28 in compliance with commitments the company made to the NRC. The root cause analysis will be publicly available online through the NRC's ADAMS document database. The Davis-Besse plant is located in Oak Harbor, Ohio, approximately 21 miles southeast of Toledo.

In addition to reviewing FENOC's root cause submittal, the agency will assess the company's proposed corrective actions and long-term monitoring program of the shield building. Four NRC inspectors have been monitoring FENOC's investigation of the root cause since it started.

On Oct. 10, 201 ],'the NRC was informed by FENOC that its workers identified cracks in the shield building while the plant was shut down to replace the reactor vessel head. The shield building is a 2.5-foot thick reinforced concrete building that surrounds a 1.5-inch thick steel containment vessel that encloses the reactor. The two buildings are separated by a 4.5-foot space.

The NRC thoroughly reviewed the cracks after they were discovered and determined that they did not pose an imminent safety issue. However, before the plant returned to service, the NRC issued a Confirmatory Action Letter to FENOC documenting its commitments to determine the cause of the shield building cracks by Feb. 28 and to implement long-term measures to ensure that the shield building continues to fulfill its safety function.

News releases are available through a free listserv subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's website.