G20020555-G20020592/LTR-02-0617-LTR-02-0659 - Rep. Dennis J. Kucinich Ltr. Request Documents Concerning Davis-Besse Nuclear Power Plant
ML022910299
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/23/2002
From: Rathbun D
Office of Congressional Affairs
To: Kucinich D
US HR (House of Representatives)
Banerjee, M. NRR/DLPM/LPD3-2, 415-2277
Shared Package
ML022910317 List:
References
G20020555, G20020592, LTR-02-0617, LTR-02-0659, TAC MB6371
Download: ML022910299 (7)


Text

October 23, 2002 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515

Dear Congressman Kucinich:

Enclosed are additional documents in response to your September 24, 2002 request and discussed in your October 9, 2002 letter pertaining to the Davis-Besse Nuclear Power Plant.

The enclosed documents complete our response to your request.

If you have any further questions, please feel free to contact my office.

Sincerely,

/RA/

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosures:

As stated

Incomings: ML022690037 and ML022910035 Response: ML022910299 Package: ML022910317

  • See previous concurrence OFFICE PM:LPD3-2
  • LA:LPD3-2
  • Tech Editor
  • SC:LPD3-2
  • PD:LPD3-2
  • NAME MBanerjee THarris PKleene GDick for AMendiola SBajwa DATE 10/18/02 10/18/02 10/21/02 10/18/02 10/18/02 OFFICE OGC
  • D:DLPM*

D:NRR*

IG*

EDO NAME SBurns JZwolinski SCollins (JJohnson for)

GMulley WTravers DATE 10/23/02 10/23/02 10/23/02 10/23/02 10/23/02 OFFICE OCA NAME DRathbun DATE 10/ 23 /02

DISTRIBUTION FOR EDO NO. G20020555/G20020592 - REQUEST DOCUMENTS CONCERNING THE DAVIS-BESSE NUCLEAR POWER PLANT DATED: October 23, 2002 PUBLIC PDIII-2 r/f EDO #G20020555/G20020592 EDO r/f W. Travers (RidsEdoMailCenter)

C. Paperiello W. Kane P. Norry J. Craig S. Burns/K. Cyr G. Mulley J. Dyer, RIII S. Collins/J. Johnson (RidsNrrOd)

B. Sheron/K. Johnson (RidsNrrAdpt)

J. Zwolinski/TMarsh (RidsNrrDlpm)

OGC (RidsOgcRp)

OPA (RidsOpaMailCenter)

OCA (RidsOcaMailCenter)

M. Banerjee (RidsNrrPMMBanerjee)

T. Harris (RidsNrrLATHarris)

S. Bajwa (RidsNrrDlpmLpdiii)

A. Mendiola (RidsNrrDlpmLpdiii2)

T J Gorham, EDO #G20020555/G20020592 (RidsNrrWpc)

W. Bateman D. Rathbun J. Reiter, CIO

Page 1 of 4 List of Enclosed Documents Some material is redacted per FOIA exemptions.

Document Number Date Description A-0036a 10/31/01 Note from J. Craig, OEDO, to Commissioner Assistants, Re: Status of Dialogue between NRC and Licensee regarding circumferential cracking of RPV Head Penetration Nozzles (5 pages) Ex. 4 A-0040 03/18/02 SECY-02-0046, from W. Travers to the Commissioners, Re: Proposed Bulletin: Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity (15 pages)

A-0041 03/25/02 Note from J. Craig, OEDO, to Commissioner Assistants, Re: Davis-Besse Reactor Vessel Head w/att 03/22/02 FENOC Internal Memo (6 pages)

A-0122 03/14/02 Talking points for TA Briefing on 03/14/02 (1 page)

A-0300 Unknown Draft 2002-xx Bulletin on Reactor Pressure Vessel Head and Vessel Head Penetration Inspection Program (12 pages)

A-0301 12/06/01 Memorandum from W. Travers to Commission, Re: Status of FirstEnergy Response to NRC Bulletin 2001-01 (1 page)

A-0302 03/21/02 C-Note from J. Craig, OEDO, to Commissioner Assistants, INES Rating of Davis-Besse Reactor Head Degradation Event (6 pages)

A-0303 04/16/02 Commissioner Merrifields vote on CORR: 02-0076 with edits, Re: Letter to Congresswoman M. Kaptur, concerning recent discovery of a cavity in the reactor pressure vessel head at Devis-Besse (3 pages)

A-0304 04/17/02 Appointment Schedule for Comm. Diazs office (1 page)

A-0305 04/11/02 Memo from A. Mendiola, NRR, to J. Shea, OEDO, Re: Visit by FEC, FESC, and FENOC officials with Commissioners (10 pages)

B-0369 10/12/01 E-mail from D. Roberts to S. Rosenberg, Re: CRDMs (10 pages)

B-0371 11/05/01 E-mail from B. McCabe to J. Craig and S. Rosenberg, Re:

October 31st Note Regarding CRDM Cracking (1 page)

Document Number Date Description Page 2 of 4 B-0432a 11/13/01 E-mail from J. Zimmerman to A. Hiser, A. Lei, Re:

Commissioners TA Briefing (12 pages) Ex. 4 B-0916a 04/04/02 E-mail from H. Nieh, OEDO, to A. Levin, OCM, et al.,

Issuance of Information Notice 2002-13, Fwd: E-mail from D. Pickett to Davis-Besse Communication Plan (6 pages)

B-1840 04/29/02 E-mail from J. Colaccino, NRR, to H. Nieh, OEDO, et al.,

Re: Davis-Besse (1 page)

B-1846 03/27/02 E-mail from D. Pickett to A. Hiser et al., Re: Latest Davis-Besse Communication Plan (40 pages)

B-1855 03/18/02 E-mail from B. McCabe to H. Neih et al., Re: Fwd: DRAFT Bulletin (1 Page)

B-1856 11/27/01 E-mail from S. Rosenberg to B. McCabe et al., Re: Your Questions (1 page)

B-1857 11/27/01 E-mail from T. Hiltz to B. Jones et al.,

Subject:

Your Question (1 page)

B-1858 11/29/01 E-mail from T. Hiltz to B. Jones et al., Re: Feedback from FENOC Meeting on CRDM and Shutdown (1 page)

B-1866 03/26/02 E-mail from H. Nieh, OEDO, to A. Levin, OCM, et al., Re:

Fwd: Davis-Besse RVH Repair w/att 03/25/02 FENOC e-mail Re: DB RVH Repair (9 pages)

B-1867 03/27/02 E-mail from J. Sharkey to J. Beall et al., Re: Latest Davis-Besse Communication Plan (2 pages)

B-1868 03/27/02 E-mail from H. Nieh, OEDO, to A. Levin, OCM, et al., Re:

Fwd: latest Davis-Besse Communications Plan w/att 03/27/02 e-mail from D. Pickett, NRR, to A. Hiser, NRR, et al., (40 pages)

B-1869 03/29/02 E-mail from H. Nieh, OEDO, to B. McCabe, OCM, et al.,

Re: Fwd: latest Davis-Besse Communications Plan w/att 03/28/02 e-mail D. Pickett, NRR, to A. Hiser, NRR, et al.,

(40 pages)

B-1870 04/05/02 E-mail from B. Gabriel to Chairman Meserves office staff, Fwd: PNO-III-02-006B, Davis-Besse (4 pages)

B-1871 04/05/02 E-mail from H. Nieh, OEDO, to A. Levin, OCM, et al., Re:

Fwd: PN302006B; Davis-Besse-Reactor Vessel...(2nd update) w/att 04/05/02 e-mail from PN1 to ASIB et al. (4 pages)

Document Number Date Description Page 3 of 4 B-1873 04/24/02 E-mail from H. Neih, OEDO, to Reactor TAs, Re: Fwd:

Davis-Besse Petition w/att 04/24/02 e-mail from D.

Lochbaum, UCS, to wdt @nrc.gov. (22 pages)

B-1875a 04/30/02 E-mail from H. Nieh to A. Levin et al., Re: Davis-Besse (Ex. 4) (1 page)

B-1877 05/06/02 E-mail from H. Nieh, OEDO, to Reactor TAs, Re: Fwd:

Davis-Besse Head Update w/att 05/03/02 e-mail from D.

Pickett, NRR, to A. Hiser, NRR, et al. (2 pages)

B-1878 05/06/02 E-mail from H. Nieh, OEDO, to Reactor TAs, Re: Fwd:

DBes AIT w/att 05/03/02 e-mail from P. Buckley, RIII, to B.

Sheron, NRR, et al. (42 pages)

B-1879 05/08/02 E-mail from H. Nieh, OEDO, to Reactor TAs, Re: Fwd 05/20/02 meeting notice, meeting w/FirstEnergy w/att 05/20/02 e-mail from J. Chimood, NRR, to A. Hiser, NRR, et al. (3 pages)

B-1881 05/24/02 E-mail from H. Nieh, OEDO, to D. Simpkins, Reactor TAs, Re: Fwd: 06/04/02 meeting w/FirstEnergy. (1 page)

B-2360 11/26/01 E-mail from B. McCabe to S. Rosenberg, Re: Davis-Besse Order (2 pages)

B-2378 04/10/01 E-mail from H. Nieh, OEDO to A. Levin, OCM, et al.,

Davis-Besse Links for your info (1 page)

B-2383 03/18/02 E-mail from PN1 to EVENTS, FRONT, PN1, Re:

PN302006A, Davis-Besse - Update - Significant Metal Loss Observed in Reactor Vessel Head (3 pages)

B-2384 04/05/02 E-mail from PN1 to ASIB, EVENTS, FRONT, PN1, Re:

PN302006B, Davis-Besse - Reactor Vessel Head Degradation (2nd Update) (3 pages)

B-2386 03/29/02 E-mail from H. Nieh, OEDO, to B. McCabe, OCM, et al.,

Subject:

NEI response to NRC questions on RPVH degradation (1 page)

B-2387 03/29/02 E-mail from H. Nieh, OEDO, to B. McCabe, OCM et al.,

Subject:

Toledo Blade article on Davis-Besse (1 page)

B-2388 03/29/02 E-mail from H. Nieh, OEDO, to B. McCabe, OCM, et al.,

Subject:

Fwd: Davis-Besse Communications Plan (1 page)

B-2393 10/05/01 E-mail from T. Hiltz to A. Levin et al., Re: First Energy Brief (1 page)

C-0160 10/25/01 Letter to R. Meserve from J. Greenwood (2 pages)

Document Number Date Description Page 4 of 4 C-0161 03/21/02 Letter to Chairman Meserve from C. Patronik-Holder, Safe Energy Communication Council et al., Re: Davis-Besse (2 pages)

C-0162 03/28/02 Letter to Chairman Meserve from Marcy Kaptur, Member of Congress, Re: Safety and Operating Concerns at the Davis-Besse Plant (5 pages)

D-0054 03/11/02 E-mail from PN1 to EVENTS, FRONT, PN1, Re:

PN302006, Davis-Besse - Update - Significant Metal Loss Observed in Reactor Vessel Head (2 pages)

D-0115a Undated NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, with handwritten notes (17 pages)

D-0118 04/24/02 Letter to Congresswoman M. Kaptur from Chairman Meserve responding to her 03/28/02 letter concerning RPV head at Davis-Besse (2 pages)

E-0018a 11/29/01 Status of NRC Staff Review of FENOCsBulletin 2001-01 Response for Davis-Besse (5 pages)

E-0019a 11/30/01 Slides - Status of NRC Staff Review of FENOCsBulletin 2001-01 Response for Davis-Besse (6 pages)

E-0032 10/11/01 Commissioners TA Briefing (4 pages)

E-0396 10/11/01 FENOC Briefing Slides for Meeting with TAs, NRC Bulletin 2001-01, Circumferential Cracking..., with handwritten notes by R. Croteau (17 pages)

E-0398 05/13/02 Telephone message from Comm. Diaz to L. Meyers, FENOC (1 page)

E-0418 10/05/01 Hiltz telecon briefing notes (2 pages)

I-009 03/14/02 Commissioners TA Briefing on Davis-Besse Reactor Vessel Head Agenda (8 pages)

I-009a 03/14/02 Commissioners TA Briefing on Davis-Besse Reactor Vessel Head (15 pages)

I-0017a 10/3/01 Commissioners Technical Assistants Brief with handwritten notes (14 pages) Ex. 4 I-066 04/17/02 FENOC Meeting Handout for meetings with individual Commissioners (10 pages)