ML19273A113
| ML19273A113 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/27/2019 |
| From: | Blake Purnell Plant Licensing Branch III |
| To: | Lashley P FirstEnergy Nuclear Operating Co |
| References | |
| L-2019-LLA-0186 | |
| Download: ML19273A113 (3) | |
Text
1 NRR-DRMAPEm Resource From:
Purnell, Blake Sent:
Friday, September 27, 2019 9:18 AM To:
Lashley, Phil H.
Cc:
Regner, Lisa; talentz@firstenergycorp.com
Subject:
Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval (EPID: L-2019-LLA-0186)
Mr. Lashley, By application dated August 26, 2019 (Agencywide Documents Access and Management System Package Accession No. ML19241A267), FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). The proposed amendment would revise the Davis-Besse technical specification requirements for the containment leakage rate testing program and allow extension of the Type A test interval up to one test in 15 years, based on acceptable performance history.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that the review of this licensing request will take approximately 675 hours0.00781 days <br />0.188 hours <br />0.00112 weeks <br />2.568375e-4 months <br /> to complete. The NRC staff expects to complete this review by September 30, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me at (301) 415-1380.
2 Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket No. 50-346
Hearing Identifier:
NRR_DRMA Email Number:
229 Mail Envelope Properties (MWHPR09MB153378EAEECB9AD411F46AFCE6810)
Subject:
Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval (EPID: L-2019-LLA-0186)
Sent Date:
9/27/2019 9:17:52 AM Received Date:
9/27/2019 9:17:00 AM From:
Purnell, Blake Created By:
Blake.Purnell@nrc.gov Recipients:
"Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "talentz@firstenergycorp.com" <talentz@firstenergycorp.com>
Tracking Status: None "Lashley, Phil H." <phlashley@firstenergycorp.com>
Tracking Status: None Post Office:
MWHPR09MB1533.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3666 9/27/2019 9:17:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: