ML17308A109: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCE1ZRATED D1STKBUTION DEMONSXTIONSYSTEMREGULA10l INFORMATION DISTRIBUTIO YSTEM(RIDE)ACCESSION NBR:.8907310144 DOC.DATE:
{{#Wiki_filter:AC CE1ZRATED D1STKBUTION DEMONS XTION SYSTEM REGULA10l INFORMATION DISTRIBUTIO YSTEM (RIDE)ACCESSION NBR:.8907310144 DOC.DATE: 89/07/18 NOTARIZED:
89/07/18NOTARIZED:
NO DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
NODOCKETNFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
ForwardsrevisedEPIPs,nuclear emergency responseoffsiteprocedures 6revised"NuclearEmergency InfoPlan."DISTRIBUTION CODE:A045DCOPIESRECEIVED:LTR (ENCL/SIZE:/+'OgTITLE:ORSubmittal:
Forwards revised EPIPs,nuclear emergency response offsite procedures 6 revised"Nuclear Emergency Info Plan." DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR (ENCL/SIZE:/+'Og TITLE: OR Submittal:
Emergency Preparedness Plans,Implement'g Procedures, CNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Emergency Preparedness Plans, Implement'g Procedures, C NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244RECIPIENT IDCODE/NAME PD1-3PDINTERNAL:
05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSONFA BEP EPB 10 REG FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D'R gOZE IO ALL i RIDSII RECIPIENIS PIEASE HELP US'IO RIXXJCE HASTE!CGMI'ACI'IHE DOCXMKI'ONTROL DESK, RXN Pl-37 (EXT.20079)I ELZK2VZE RKR MMB HKH DISTRIBUTION LISTS KlR DOCXIMEHZS YOU DCRPT NEZDf D D, TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 sszsrsuz zsmizz R hrD IIIII II eZIm S 101K I STASS I rz(rrrII inrush ZK ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649.0001 QCS.CPHONE ARCA COOK 7SSS 546-2700 July 18, 1989 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Allen Johnson PWR Project Directorate No.1 Washington, D.C.20555  
AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL:
LPDRNSICCOPIESLTTRENCL1111111111RECIPIENT IDCODE/NAME JOHNSONFA BEPEPB10REGFILE01NRCPDRCOPIESLTTRENCL11111111D'RgOZEIOALLiRIDSIIRECIPIENIS PIEASEHELPUS'IORIXXJCEHASTE!CGMI'ACI'IHE DOCXMKI'ONTROL DESK,RXNPl-37(EXT.20079)IELZK2VZERKRMMBHKHDISTRIBUTION LISTSKlRDOCXIMEHZS YOUDCRPTNEZDfDD,TOTALNUMBEROFCOPIESREQUIRED:
LTTR9ENCL9 sszsrsuzzsmizzRhrDIIIIIIIeZImS101KISTASSIrz(rrrIIinrushZKROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649.0001 QCS.CPHONE ARCACOOK7SSS546-2700July18,1989U.S.NuclearRegulatory Commission DocumentControlDeskAttn:Mr.AllenJohnsonPWRProjectDirectorate No.1Washington, D.C.20555


==Subject:==
==Subject:==
Revisions toEmergency PlanImplementing Procedures, NuclearEmergency ResponseOffsiteProcedures andNuclearEmergency Information PlanR.E.GinnaNuclearPowerPlantDocketNo.50-244Gentlemen:
Revisions to Emergency Plan Implementing Procedures, Nuclear Emergency Response Offsite Procedures and Nuclear Emergency Information Plan R.E.Ginna Nuclear Power Plant Docket No.50-244 Gentlemen:
Inaccordance with10CFR50.54,enclosedarerevisions toGinnaStationEmergency PlanImplementing Procedures, NuclearEmergency ResponseOffsiteProcedures andNuclearEmergency Information Plan.Verytrulyyours,Enclosures RobertC.MecredGeneralManagerNuclearProduction zc:USNRC,RegionI(2copies)ResidentInspector, GinnaStation8qP7+$0i448950<<02IPDRADOCK0PNUF ROCHESTER GASANDELECTRICCORPORATION InterOfficeCorrespondence June9,1989
In accordance with 10 CFR 50.54, enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures, Nuclear Emergency Response Offsite Procedures and Nuclear Emergency Information Plan.Very truly yours, Enclosures Robert C.Mecred General Manager Nuclear Production zc: USNRC, Region I (2 copies)Resident Inspector, Ginna Station 8qP7+$0i44 8950<<02 I PDR ADOCK 0 PNU F ROCHESTER GAS AND ELECTRIC CORPORATION Inter Office Correspondence June 9, 1989  


==SUBJECT:==
==SUBJECT:==
NuclearEmergency ResponseOffsiteProcedures (NEORP)Revision20TO:HoldersofControlled CopiesPleaseupdateyourmanualasfollows:REMOVETitlePage/ESP2/42/6,7,8~)~
Nuclear Emergency Response Offsite Procedures (NEORP)Revision 20 TO: Holders of Controlled Copies Please update your manual as follows: REMOVE Title Page/ESP 2/4 2/6,7,8~)~
4/3,4Section56/1,~27/4ll/1)2)315/1,2,5,6 16/2I3I4I5I6I720I20/1I2IAttI21/122/124/1,2,325/3,426/3i4/5INSERTTitlePageESP2/42/6,7,8,93/14/3,4Section56/1,27/4ll/l)2)315/1)2)5) 616/2)3)4)5)6)7 17/220/1,221/122/124/1,2,325/3,426/3,4,5\DavidW.BurkeCorporate NuclearEmergency Planneras/dwbneorp C4 ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERGINNASTATICUNIT01COMPLETOATE:-TIME:-PROCEDURE NO.SC-323REV.NO.1MERGENCYOFF-SITEDXATXONSVEYTEAMSPORCREVIEWDATETECHNICAL REVIEW-8)PLANTSUPERINENT9-to-F1EFFECTIVE DATEQAANON-QACAEGORY1.0REVIEWEDBY:THISPROCEDURE CONTAINS32PAGES
4/3,4 Section 5 6/1,~2 7/4 ll/1)2)3 15/1,2,5,6 1 6/2 I 3 I 4 I 5 I 6 I 7 2 0 I 2 0/1 I 2 I Att I 2 1/1 22/1 24/1, 2, 3 25/3,4 26/3 i 4/5 INSERT Title Page ESP 2/4 2/6,7,8, 9 3/1 4/3,4 Section 5 6/1, 2 7/4 ll/l)2)3 15/1)2)5)6 16/2)3)4)5)6)7 17/2 20/1, 2 2 1/1 22/1 24/1,2,3 25/3,4 26/3,4,5\David W.Burke Corporate Nuclear Emergency Planner as/dwb neorp C4 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER GINNA STATIC UNIT 01 COMPLET OATE:-TIME:-PROCEDURE NO.SC-323 REV.NO.1 MERGENCY OFF-SITE DXATXON S VEY TEAMS PORC REVIEW DATE TECHNICAL REVIEW-8)PLANT SUPERIN E NT 9-to-F1 EFFECTIVE DATE QA A NON-QA CA EGORY 1.0 REVIEWED BY: THIS PROCEDURE CONTAINS 32 PAGES


C-323EMERGENCY OFF-SIRADIATION SURVEYTEAMS1~0PURPOSE:Theprimeobjective oftheEmergency.Off-Site Radiation SurveyTeamsistorapidlysurveyareasdownwindoftheplant'siteinordertodetermine theextentandmagnitude ofanyuncontrolled releaseofradioactive materials following anincident.
C-323 EMERGENCY OFF-SI RADIATION SURVEY TEAMS 1~0 PURPOSE: The prime objective of the Emergency.Off-Site Radiation Survey Teams is to rapidly survey areas downwind of the plant'site in order to determine the extent and magnitude of any uncontrolled release of radioactive materials following an incident.It should be stressed that the initial off-site survey is of great importance.
Itshouldbestressedthattheinitialoff-sitesurveyisofgreatimportance.
Decisions regarding the extent and types of protective actions required will be based upon data reported by the survey teams.2'
Decisions regarding theextentandtypesofprotective actionsrequiredwillbebasedupondatareportedbythesurveyteams.2'


==REFERENCES:==
==REFERENCES:==


2~12.2SC-421,Determination ofIodineorParticulate SC-232Voluntary Acceptance ofEmergency Exposure3.0INSTRUCTIONS:
2~1 2.2 SC-421, Determination of Iodine or Particulate SC-232 Voluntary Acceptance of Emergency Exposure 3.0 INSTRUCTIONS:
3'3'Obtainappropriate Off-SiteSurveyTeamfootlocker asdirectedbyTagBoardassignment.
3'3'Obtain appropriate Off-Site Survey Team footlocker as directed by Tag Board assignment.
Ifsealisbroken,useequipment listinsidefootlocker toinventory equipment.
If seal is broken, use equipment list inside footlocker to inventory equipment.
Requesttheassistance oftheSurveyCenterManagerinobtaining replacement equipment ifnecessary.
Request the assistance of the Survey Center Manager in obtaining replacement equipment if necessary.
Obtainthefollowing equipment whichisnotstoredinfootlocker.
Obtain the following equipment which is not stored in footlocker.
3~2~1Personalthermal.luminescent dosimeter
3~2~1 Personal thermal.luminescent dosimeter-(TLD)for each team member.3''3''3'.4 One full-face mask with voice emitter and iodine filter for each team member.One 0-500 mR dosimeter and one 0-5 R dosimeter for each team member.Sign-in on dosimeter log sheet.Pack o f 6 environmental TLD'f rom lead storage container.
-(TLD)foreachteammember.3''3''3'.4Onefull-face maskwithvoiceemitterandiodinefilterforeachteammember.One0-500mRdosimeter andone0-5Rdosimeter foreachteammember.Sign-inondosimeter logsheet.Packof6environmental TLD'fromleadstoragecontainer.
3.2'Porta-Mobil II radio and magnetic mount car antenna.  
3.2'Porta-Mobil IIradioandmagneticmountcarantenna.  


SC-323:23.2.6RADECOH-809CPortableHighVolumeAirSamplerwithfilterholder.3''3'.83''3'3~3~13~3~2RM-14Radiation MonitorwithHP-190Probe.Auto-Digimaster orRO-2doseratemeter.LowVolumeAirSamplerwithfilterholder.Completethefollowing itemspriortodeparting ontheassignedsurveyroute.Checkoperation ofradiosystem,portableairsampler,radiation countratemonitor,anddoseratemeterusingequipment check-out procedures inAppendixZ.Obtaintransportation andcheckvehicleforcontamin-ationbytakingswipesurveyorendwindowsurveyonthehorizontal surfaceswithanHP-190probeandcountratemeter.Ifsurveyindicates surfacecontamination ofmorethan250CPMabovebackground contacttheSurveyCenterManagerfordecontamination instructions.
SC-323:2 3.2.6 RADECO H-809C Portable High Volume Air Sampler with filter holder.3''3'.8 3''3'3~3~1 3~3~2 RM-14 Radiation Monitor with HP-190 Probe.Auto-Digimaster or RO-2 dose rate meter.Low Volume Air Sampler with filter holder.Complete the following items prior to departing on the assigned survey route.Check operation of radio system, portable air sampler, radiation count rate monitor, and dose rate meter using equipment check-out procedures in Appendix Z.Obtain transportation and check vehicle for contamin-ation by taking swipe survey or end window survey on the horizontal surfaces with an HP-190 probe and count rate meter.If survey indicates surface contamination of more than 250 CPM above background contact the Survey Center Manager for decontamination instructions.
3~3~33''3''3~43~4~1Loadsurveyequipment intovehicle,fillinSurveyTeamStatusBoard,andinformSurveyCenterManageryouarereadyfordeparture.
3~3~3 3''3''3~4 3~4~1 Load survey equipment into vehicle, fill in Survey Team Status Board, and inform Survey Center Manager you are ready for departure.
Obtainwind.direction andspeeddata.Logtime,date,andsurveyteammembersonsurveymap.Establish radiocommunications withTechnical SupportCenterRadioOperatorandadviseofteamsdeparture.
Obtain wind.direction and speed data.Log time, date, and survey team members on survey map.Establish radio communications with Technical Support Center Radio Operator and advise of teams departure.
Performradiation surveysusingtheappropriate instructions ofAppendixZZwhilefollowing thePrimarySurveyRouteinstructions contained inAppendixIII.Donotenterareaswhereradiation levelsaregreaterthan2RperhourunlessdirectedbyaHealthPhysi-cist.3''3.4.33''Thedoselimitation ofthesurveyteamislimitedto1REMunlesstheHealthPhysicist orEmergency Coordin-atorauthorizes ahigherlimit.Aonetimedoselimitof75REMmaybeusedtosavethelifeofanindividual
Per f orm radiation surveys using the appropriate instructions of Appendix ZZ while following the Primary Survey Route instructions contained in Appendix III.Do not enter areas where radiation levels are greater than 2 R per hour unless directed by a Health Physi-cist.3''3.4.3 3''The dose limitation of the survey team is limited to 1 REM unless the Health Physicist or Emergency Coordin-ator authorizes a higher limit.A one time dose limit of 75 REM may be used to save the life of an individual-on a voluntary basis (SC-232).A one time dose limit of 25 REM may be used to insure
-onavoluntary basis(SC-232).
Aonetimedoselimitof25REMmaybeusedtoinsure


SC-323:3~3.4'3.4.6equipment isoperational orsecuredinordertopreventagreaterpossiblehazardtothegeneralpublic.Ateachassigned, surveypointtheteamshouldreportthefollowing information totheRadioOperator:
SC-323:3~3.4'3.4.6 equipment is operational or secured in order to prevent a greater possible hazard to the general public.At each assigned, survey point the team should report the following information to the Radio Operator:>>Location-Completed Actions-Results of Surveys-Departure for next Survey Point If radio contact cannot be made, report.using a telephone.
>>Location
Call collect on one of these numbers.GINNA 315-524-4446 315-524-4984 315-524-4973 716-546-7845 716-546-4015 E.O.F.716-262-5798 716-262-5799 3.4'3'3'.Upon completion of Primary Survey Route inform radio operator at the Tech Support Center.The Dose Assessment Manager will assign an Alternate Survey Route or direct you to return to the Survey Center.Full face masks with charcoal filters will be worn as directed by the Dose Assessment Manager.Potential internal contamination will be determined by a Whole Body Count after the'survey.Upon returning to the Survey Center perform a survey of team personnel for contamination.
-Completed Actions-ResultsofSurveys-Departure fornextSurveyPointIfradiocontactcannotbemade,report.usingatelephone.
If any contamin-ation greater than 100 CPM above background is found, contact the Survey Center Manager for decontamination instructions.
Callcollectononeofthesenumbers.GINNA315-524-4446 315-524-4984 315-524-4973 716-546-7845 716-546-4015 E.O.F.716-262-5798 716-262-5799 3.4'3'3'.Uponcompletion ofPrimarySurveyRouteinformradiooperatorattheTechSupportCenter.TheDoseAssessment ManagerwillassignanAlternate SurveyRouteordirectyoutoreturntotheSurveyCenter.FullfacemaskswithcharcoalfilterswillbewornasdirectedbytheDoseAssessment Manager.Potential internalcontamination willbedetermined byaWholeBodyCountafterthe'survey.Uponreturning totheSurveyCenterperformasurveyofteampersonnel forcontamination.
3~6~1 Conduct a survey o f the vehicle for contamination.-
Ifanycontamin-ationgreaterthan100CPMabovebackground isfound,contacttheSurveyCenterManagerfordecontamination instructions.
If any contamination greater than 250 CPM above background is found contact the Survey Center Manager for decontamination instructions.
3~6~1Conductasurveyofthevehicleforcontamination.-
3''3'.3 3''Give all iodine filters, particulate filters, survey maps, and data records to Survey Center Manager.Dispose of contaminated and potentially contaminated waste in an approved manner.Restock,.inventory, and seal Survey Team Equipment Footlocker, stow in an approved manner.
Ifanycontamination greaterthan250CPMabovebackground isfoundcontacttheSurveyCenterManagerfordecontamination instructions.
0 SC-323:4 Return radio system, portable air sampler, radiation count rate meter, and dose rate meter to the Survey Team Room and place on charge as appropriate.
3''3'.33''Givealliodinefilters,particulate filters,surveymaps,anddatarecordstoSurveyCenterManager.Disposeofcontaminated andpotentially contaminated wasteinanapprovedmanner.Restock,.
Return 0-500 mr and 0-5 R dosimeters and sign-out on dosimeter log sheet.Fill out Survey Team Status Board and inform Survey Center Manager of teams return.  
inventory, andsealSurveyTeamEquipment Footlocker, stowinanapprovedmanner.
0 SC-323:4Returnradiosystem,portableairsampler,radiation countratemeter,anddoseratemetertotheSurveyTeamRoomandplaceonchargeasappropriate.
Return0-500mrand0-5Rdosimeters andsign-outondosimeter logsheet.FilloutSurveyTeamStatusBoardandinformSurveyCenterManagerofteamsreturn.  


SC-323:5APPENDIXIEMERGENCY OFF-SITERADIATION SURVEYTEAMEQUIPMENT CHECKOUTANDOPERATION
SC-323:5 APPENDIX I EMERGENCY OFF-SITE RADIATION SURVEY TEAM EQUIPMENT CHECKOUT AND OPERATION


SC-323:6RADIOSYSTEMTheradiosystemconsistsofahand-held radioandmagneticmountcarantenna.Tocheckoutandoperatethesystem,completethefollowing steps.TurnONRadio.1.Removecharger)ackfromlowerside'oftheradio.2.TurntheOFF-VOLUME controlabouthalfwaytotheright.3.TurntheSQUELCH(SQ)controltotherightasfaraspossible.
SC-323:6 RADIO SYSTEM The radio system consists of a hand-held radio and magnetic mount car antenna.To checkout and operate the system, complete the following steps.Turn ON Radio.1.Remove charger)ack from lower side'of the radio.2.Turn the OFF-VOLUME control about half way to the right.3.Turn the SQUELCH (SQ)control to the right as far as possible.A hissing sound will be heard from the speaker.4.Adjust the VOLUME.control until the hissing sound is easily heard but not annoyingly loud.5.Turn the SQUELCH control slowly to the left until the hissing noise gust fades out.This ad)ustment is very important, as it eliminates annoying noise when no one is calling you.Zt also determined how sensitive your radio will be to incoming calls.6.Zn multi-frequency units, select the proper frequency.
Ahissingsoundwillbeheardfromthespeaker.4.AdjusttheVOLUME.controluntilthehissingsoundiseasilyheardbutnotannoyingly loud.5.TurntheSQUELCHcontrolslowlytotheleftuntilthehissingnoisegustfadesout.Thisad)ustment isveryimportant, asiteliminates annoyingnoisewhennooneiscallingyou.Ztalsodetermined howsensitive yourradiowillbetoincomingcalls.6.Znmulti-frequency units,selecttheproperfrequency.
You are now ready to receive messages from other radios in your system.7.If radio is to be used with car antenna see mounting instruc-tions.Mount Antenna on Car l.Ensure the vehicles metal roof is free of ice and snow.2.Hold the magnetic mount antenna in the palm'of your hand with the antenna wire pointed towards the rear or the vehicle and the base of the mount at an angle of about 45 degrees to the vehicle roof.3.Position the front edge of the mount in the approximate center of vehicle roof.4.Lower the mount onto the vehicle roof.It will be held in place by the magnetic force.***************CAUTION**************DO NOT ATTEMPT TO MOVE THE ANTENNA BY SLIDING IT.YOU WILL SCRATCH THE SURFACE OF THE VEHICLE.ALWAYS REMOVE THE MOUNT BY LIFTING FROM THE REARl**************.*CAUTION**************  
Youarenowreadytoreceivemessagesfromotherradiosinyoursystem.7.Ifradioistobeusedwithcarantennaseemountinginstruc-tions.MountAntennaonCarl.Ensurethevehiclesmetalroofisfreeoficeandsnow.2.Holdthemagneticmountantennainthepalm'ofyourhandwiththeantennawirepointedtowardstherearorthevehicleandthebaseofthemountatanangleofabout45degreestothevehicleroof.3.Positionthefrontedgeofthemountintheapproximate centerofvehicleroof.4.Lowerthemountontothevehicleroof.Itwillbeheldinplacebythemagneticforce.***************CAUTION**************DONOTATTEMPTTOMOVETHEANTENNABYSLIDINGIT.YOUWILLSCRATCHTHESURFACEOFTHEVEHICLE.ALWAYSREMOVETHEMOUNTBYLIFTINGFROMTHEREARl**************.*CAUTION**************  


SC-323:75~6.Routetheantennaleadwireintothevehiclebetweenthedoorgamb.WithanyamountofweatherstripPing theleadshouldnotbedamaged.Affixtheleadwireneartheheadlinerwithapieceoftape.Inserttheantennaconnection plugintothesideoftheradioandtightenthelockingscrewinplace.Donotremovetheshortantenna.PROCEDURE 1~Thegeneralprocedure forcommunicating ontheradioshouldbeasfollows:a)Stationcalledb)Red/Green/Orange Teamc)Messaged)"Over"Duringadrillorexerciseallfictitious datawillbeprecededwiththewords"Thisisadrill...."
SC-323:7 5~6.Route the antenna lead wire into the vehicle between the door gamb.With any amount of weather stripPing the lead should not be damaged.Affix the lead wire near the head liner with a piece of tape.Insert the antenna connection plug into the side of the radio and tighten the locking screw in place.Do not remove the short antenna.PROCEDURE 1~The general procedure for communicating on the radio should be as follows: a)Station called b)Red/Green/Orange Team c)Message d)"Over" During a drill or exercise all fictitious data will be preceded with the words"This is a drill...." 2~3~5.6~Examples: "Tech Support Center, This is the Red team, at location number 1, Over""Tech Support Center, This is the Green team, t is is d i g-Results of the general area survey at location 36 are 6,500 counts per minute above background, Over" To transmit, depress the push-to-talk switch on the micro-phone.Speak in a normal voice across the microphone.
2~3~5.6~Examples:
To receive, release the push-to-talk switch.There may be time that the TSC or EOF will be receiving communications from a team that you cannot hear.Zf this happens the Radio Operator will tell you to wait or standby.After he has completed his traffic he will ask you to transmit your information.
"TechSupportCenter,ThisistheRedteam,atlocationnumber1,Over""TechSupportCenter,ThisistheGreenteam,tisisdig-Resultsofthegeneralareasurveyatlocation36are6,500countsperminuteabovebackground, Over"Totransmit, depressthepush-to-talk switchonthemicro-phone.Speakinanormalvoiceacrossthemicrophone.
Remember this is one big party line;everyone can't talk at.once.When you have been directed to secure your Survey Team, turn the radio off, disconnect the antenna plug from the radio and remove the magnetic mount antenna from the vehicle by lifting up at the rear of the mount.Connect the, radio to the charger located in the Survey Team Room at the Survey Center, and place the magnetic mount antenna on the bench.  
Toreceive,releasethepush-to-talk switch.TheremaybetimethattheTSCorEOFwillbereceiving communications fromateamthatyoucannothear.ZfthishappenstheRadioOperatorwilltellyoutowaitorstandby.Afterhehascompleted histraffichewillaskyoutotransmityourinformation.
Rememberthisisonebigpartyline;everyonecan'ttalkat.once.WhenyouhavebeendirectedtosecureyourSurveyTeam,turntheradiooff,disconnect theantennaplugfromtheradioandremovethemagneticmountantennafromthevehiclebyliftingupattherearofthemount.Connectthe,radiotothechargerlocatedintheSurveyTeamRoomattheSurveyCenter,andplacethemagneticmountantennaonthebench.  


SC-323:8RADECOH809CHIGHVOLUMEAIRSAMPLEREQUIPMENT CHECKl.Ensurepowerswitchonairsamplerisoff.2.Ensurebatterychargerisnotpluggedinandonthe12voltposition.
SC-323:8 RADECO H 809C HIGH VOLUME AIR SAMPLER EQUIPMENT CHECK l.Ensure power switch on air sampler is off.2.Ensure battery charger is not plugged in and on the 12 volt position.Black and red clips of battery charger are not touching.3.Connect air sampler power cables to the battery charger, RED clip to positive and BLACK clip to negative.4.Plug in battery charger.5.Turn power switch on air sampler on.6.Check flow meter on air sampler.Flow meter should be off scale high with no filters in place.7.Turn power switch on air sampler off.8.Unplug battery charger and disconnect air sampler power cables.9.Separate clips of battery charger and clamp onto cabinet.EQUIPMENT OPERATION FROM VEHICLE 1.Ensure power switch on air sampler is off.2.Connect BLACK power clip to vehicle ground (engine block, chassis, etc.)and RED power clip to positive post of vehicle battery.3.Ensure the filter assembly contains a GY-130 silverzeolite cartridge and a particulate filter.4.Turn air sampler on and record the sample date, time, location, and air flow rate (normal is 30 lpm)on a sample envelope.5.Run sampler for approximately 10 minutes.6.Record air flow rate of air sampler in lpm and time sampler turned off.7.Turn air sampler off.  
Blackandredclipsofbatterychargerarenottouching.
3.Connectairsamplerpowercablestothebatterycharger,REDcliptopositiveandBLACKcliptonegative.
4.Pluginbatterycharger.5.Turnpowerswitchonairsampleron.6.Checkflowmeteronairsampler.Flowmetershouldbeoffscalehighwithnofiltersinplace.7.Turnpowerswitchonairsampleroff.8.Unplugbatterychargeranddisconnect airsamplerpowercables.9.Separateclipsofbatterychargerandclampontocabinet.EQUIPMENT OPERATION FROMVEHICLE1.Ensurepowerswitchonairsamplerisoff.2.ConnectBLACKpowercliptovehicleground(engineblock,chassis,etc.)andREDpowercliptopositivepostofvehiclebattery.3.EnsurethefilterassemblycontainsaGY-130silverzeolitecartridge andaparticulate filter.4.Turnairsampleronandrecordthesampledate,time,location, andairflowrate(normalis30lpm)onasampleenvelope.
5.Runsamplerforapproximately 10minutes.6.Recordairflowrateofairsamplerinlpmandtimesamplerturnedoff.7.Turnairsampleroff.  


SC-323:9RM-14RADIATION SURVEYMETEREQUIPMENT CHECK:Disconnect powercordfrombackofmetertakingcarenottoturntestswitchon.2.EnsurethatanHP-190probeisconnected tothedetector)ack.3~Turnrangeswitchtobattery.Metershouldreadinthe<<BATT-OK" area.4.Performinstrument sourcecheck.Obtainsourcefromsafeandverifymeterreadingcorresponds toattachedcardthenlogmeterreadingontosourcechecklog.5.Turnrangeswitchoff.EQUIPMENT OPERATION:
SC-323:9 RM-14 RADIATION SURVEY METER EQUIPMENT CHECK: Disconnect power cord from back of meter taking care not to turn test switch on.2.Ensure that an HP-190 probe is connected to the detector)ack.3~Turn range switch to battery.Meter should read in the<<BATT-OK" area.4.Perform instrument source check.Obtain source from safe and verify meter reading corresponds to attached card then log meter reading onto source check log.5.Turn range switch off.EQUIPMENT OPERATION:
1.TurnrangeswitchtoXl.2~Placeresponseswitchinthe"SLOW"position.
1.Turn range switch to Xl.2~Place response switch in the"SLOW" position.3.Adjust the volume control so that the audio indication (a click)can be heard.4.The range switch should be ad)usted such that the highest reading gives a mid-scale deflection.
3.Adjustthevolumecontrolsothattheaudioindication (aclick)canbeheard.4.Therangeswitchshouldbead)ustedsuchthatthehighestreadinggivesamid-scale deflection.
5.All readings must be multiplied by the range switch setting (Xl)X10~X100)'.2, 200 CPM is approximately 1 mrem/hour.
5.Allreadingsmustbemultiplied bytherangeswitchsetting(Xl)X10~X100)'.2,200CPMisapproximately 1mrem/hour.
Maximum scale is 50,000 cpm or 23 mr per hour.7.Upon completion of the survey turn the unit off and return to the Survey Team Room.Unit should be recharged before the next use.  
Maximumscaleis50,000cpmor23mrperhour.7.Uponcompletion ofthesurveyturntheunitoffandreturntotheSurveyTeamRoom.Unitshouldberecharged beforethenextuse.  


SC-323:10 AUTODIGI-,MASTER DOSEMETEREQUIPMENT CHECK:Turnunitontobesurethatthedigitaldisplaylights.2.Performinstrument sourcecheck.Obtainsourcefromsafeandverifythatmeterreadingcorresponds toattachedcardthenlogmeterreadingintosourcechecklog.EQUIPMENT OPERATION:
SC-323:10 AUTO DIGI-,MASTER DOSE METER EQUIPMENT CHECK: Turn unit on to be sure that the digital display lights.2.Perform instrument source check.Obtain source from safe and verify that meter reading corresponds to attached card then log meter reading into source check log.EQUIPMENT OPERATION:
l.Allowunittocompleteonecycle(displaywillblink)beforereadingwhenturningunitonorwhenradiation levelchangessignificantly.
l.Allow unit to complete one cycle (display will blink)before reading when turning unit on or when radiation level changes significantly.
2.Unitwillautomatically changefromonerangetothenext.Thereadingisalwaysdirect.3.TheDigi-Master maybeusedtodetectthepresenceofBetabutcannotbeusedfordosemeasurement ofBeta.Also,Betadetection isonlyeffective whentheunitisoperating inthemrem/hour range.a.TakeareadingwiththeBetawindowclosedandrecord.b.TakeareadingwiththeBetawindowopenedandrecord.c.IfthereadingwiththeBetawindowopenisgreaterthanthereadingwiththeBetawindowclosedthereisBeta~radiation present.d.IfaBetadoserateisneededasurveywithanRO-2orequivalent instrument mustbemade.4.Uponcompletion ofthesurvey,turnoffandreturntotheSurveyTeamRoom.Unitshouldberecharged beforethenextuse~  
2.Unit will automatically change from one range to the next.The reading is always direct.3.The Digi-Master may be used to detect the presence of Beta but cannot be used for dose measurement of Beta.Also, Beta detection is only effective when the unit is operating in the mrem/hour range.a.Take a reading with the Beta window closed and record.b.Take a reading with the Beta window opened and record.c.If the reading with the Beta window open is greater than the reading with the Beta window closed there is Beta~radiation present.d.If a Beta dose rate is needed a survey with an RO-2 or equivalent instrument must be made.4.Upon completion of the survey, turn off and return to the Survey Team Room.Unit should be recharged before the next use~  


SC-323:11 RO-2DOSERATEMETEREQUIPMENT CHECKTurnthefunctionselectorswitchtothe"BATT1"and"BATT2'~positions.
SC-323:11 RO-2 DOSE RATE METER EQUIPMENT CHECK Turn the function selector switch to the"BATT 1" and"BATT 2'~positions.
Metershouldindicateabovethebatterycut-offline.2.Performinstrument sourcecheck.Obtainsourcefromsafeandverifythatmeterreadingcorresponds toattachedcardthenlogmeterreadingontosource'check log.EQUIPMENT OPERATION l.Zerothemeterbyturningthefunctionselectorswitchto"ZERO"andturningthe"ZEROADJ"knobasnecessary.
Meter should indicate above the battery cut-off line.2.Perform instrument source check.Obtain source from safe and verify that meter reading corresponds to attached card then log meter reading onto source'check log.EQUIPMENT OPERATION l.Zero the meter by turning the function selector switch to"ZERO" and turning the"ZERO ADJ" knob as necessary.
Thezeroadjustmaybemadeinaradiation fieldbyplacingthefunctionselectorswitchat"ZEROADJ".2.Tomeasuretheradiation fieldpositionthefunctionselectorswitchtothelowestrangewhichprovidesamid-scale deflec-tionofthemeter.3~WiththeBetashieldclosedthemeterwillreadthewholebodyGammadoserate..4.ToobtainaBetadoseratemeasurement performthefollowing:
The zero adjust may be made in a radiation field by placing the function selector switch at"ZERO ADJ".2.To measure the radiation field position the function selector switch to the lowest range which provides a mid-scale deflec-tion of the meter.3~With the Beta shield closed the meter will read the whole body Gamma dose rate..4.To obtain a Beta dose rate measurement perform the following:
CAUTION:Thefaceofthebetawindowisverythin.WhenevertheBetashieldisopen,guardtheshieldagainstdamagebypunctureorcontamination bydustordirt.Takeanareameasurement withtheBetashieldclosed.b.OpentheslidingBetashieldonthebottomofthecaseandtakeanareameasurement.
CAUTION: The f ace o f the beta window is very thin.Whenever the Beta shield is open, guard the shield against damage by puncture or contamination by dust or dirt.Take an area measurement with the Beta shield closed.b.Open the sliding Beta shield on the bottom of the case and take an area measurement.
c.SubtracttheclosedshieldreadingfromtheopenshieldreadingandmultiplybytheBetacorrection factormarkedontheinstrument.
c.Subtract the closed shield reading from the open shield reading and multiply by the Beta correction factor marked on the instrument.
d.ThisnumberistheBetadoserateforthatarea.5.Whenthesurveyiscompleted turnthefunctionselectorswitchtoOFF.  
d.This number is the Beta dose rate for that area.5.When the survey is completed turn the function selector switch to OFF.  


SC-323:12 MODELVAS-21UQIMARK+LOUDMOUTH>>VOXCEAMPLXFXCATXON SYSTEMThe>>LoudMouth"Systemisdesignedtoprovidevoiceamplification forindividuals wearingrespiratory protection devices.Equipment Check:A.EarmarkThroatMicrophone ModelTM-1Figure1(attached) showstheproper>>at rest"positionforthemicrophone.
SC-323:12 MODEL VAS-2 1UQIMARK+LOUD MOUTH>>VOXCE AMPLXFXCATXON SYSTEM The>>Loud Mouth" System is designed to provide voice amplification for individuals wearing respiratory protection devices.Equipment Check: A.Earmark Throat Microphone Model TM-1 Figure 1 (attached) shows the proper>>at rest" position for the microphone.
Ifitisnecessary to.reformthespringtension,holdthemicrophone, startingtwoinchesbehindthemicrophone head,between-thethumbandforefinger andbendthecablesmallamountswhileprogressing downthecableuntil'heendofthespringisfelt.Checkthediameterofthecoilandrepeatifnecessary.
If it is necessary to.reform the spring tension, hold the microphone, starting two inches behind the microphone head, between-the thumb and forefinger and bend the cable small amounts while progressing down the cable until'he end of the spring is felt.Check the diameter of the coil and repeat if necessary.
Notethatthemicrophone headshouldtiltupfromaflatsurfaceabout1/4inch.Ifnecessary, formthespringtogivethisdimension.
Note that the microphone head should tilt up from a flat surface about 1/4 inch.If necessary, form the spring to give this dimension.
Equipment Operation:
Equipment Operation:
A.'.C.D.Ensuremicrophone cableissecurelyconnected tojackonvoiceamplifier.
A.'.C.D.Ensure microphone cable is securely connected to jack on voice amplifier.
Themicrophone isdesignedtobelocatedontherightsideofthethroat(seefigure2).Themicrophone mustlayflatontheneckandpressfirmlyintothethroat.Securelyfastenamplifier unittobelt.Tooperateunit,turnvolumecontrol'lockwise.
The microphone is designed to be located on the right side of the throat (see figure 2).The microphone must lay flat on the neck and press firmly into the throat.Securely fasten amplifier unit to belt.To operate unit, turn volume control'lockwise.
Talkswitchinuppositionisinstandbymode.Slideswitchtodownposition'totalk.Adjustvolumetodesiredlevelwithvolumecontrol.NOTE:Whencommunicating throughradio,telephone, etc.,speakprecisely.
Talk switch in up position is in standby mode.Slide switch to down position'to talk.Adjust volume to desired level with volume control.NOTE: When communicating through radio, telephone, etc., speak precisely.
Keepspeakeratleast12>>fromthethroatmic.Keepthemeansofcommunication 12>>fromthethroatmic.Holdthemeansofcommunication offtothesideofthespeaker.Ifanyfeedbackisapparent, lowervolume.~EDF.Turnunitoffbyturningvolumecontrolcounterclockwise asfarasitwillturn.Leave'talkswitchin-thestandbyposition.
Keep speaker at least 12>>from the throat mic.Keep the means of communication 12>>from the throat mic.Hold the means of communication off to the side of the speaker.If any feedback is apparent, lower volume.~ED F.Turn unit off by turning volume control counter clockwise as far as it will turn.Leave'talk switch in-the standby position.Batteries:
Batteries:
A 9-volt Alkaline Battery is the required power source.The battery is located in the amplifier unit.To replace battery, remove cover plate to battery compartment.
A9-voltAlkalineBatteryistherequiredpowersource.Thebatteryislocatedintheamplifier unit.Toreplacebattery,removecoverplatetobatterycompartment.
Pull plastic tab, remove and replace battery.Note: Small terminal (+)in first.  
Pullplastictab,removeandreplacebattery.Note:Smallterminal(+)infirst.  


SC-323:13 SlightbendhereOnaflatsurfacethemicshouldrestabout1/4"abovesaidsurface~2-'21'/2"Whenmicislaidonaflatsurfaceitshouldformacircle2to21/2"india.depending onusersize.Ifithasbeenstretched toformalargercircletheinbuiltspringwireshould.bereformedtoproducethediameters indicated.
SC-323:13 Slight bend here On a flat surface the mic should rest about 1/4" above said surface~2-'2 1'/2" When mic is laid on a flat surface it should form a circle 2 to 2 1/2" in dia.depending on user size.If it has been stretched to form a larger circle the inbuilt spring wire should.be reformed to produce the diameters indicated.
Thisinsuresproperthroatpress-.ur'eforoptimumsoundquality.Fig.1MictopressonrightsideofwearersvoiceboxFig.2  
This insures proper throat press-.ur'e for optimum sound quality.Fig.1 Mic to press on right side of wearers voice box Fig.2  


SC-323:14 APPENDIXIIRADIATION SURVEYINSTRUCTIONS
SC-323:14 APPENDIX II RADIATION SURVEY INSTRUCTIONS


IGENERALAREARADIATION SURVEYSC-323:15 1.Ageneralradiation areasurveyshouldbeconducted whilemovingbetweendefinedsurveypoints,andatthespecificsurveypoints.2.Thesurvey.shouldbeconducted usinganRM-14Radiation MonitorwithanHP-190probe.3.Whenconducting amovingsurvey,theHP-190probeshouldbeinstalled inthemountingbracketandpositioned outsideavehiclewindow.Thedetection windowoftheHP-190probeshouldbehorizontal positionandpointedtotherearofthevehicletoprotected thedetectorfromtheelementsandwind.4.Vehiclespeedshouldnotexceed15mphduringamobilesurvey.5.IftheRM-14readingchangesmorethan1,000CPMstopandconductasurveyforBetausingtheAutoDigi-Master orR0-2.6.ReporttheresultsofthemobilesurveytotheRadioOperatoratthenextsurveypoint,oraftercompletion oftheBetasurvey.'  
I GENERAL AREA RADIATION SURVEY SC-323:15 1.A general radiation area survey should be conducted while moving between defined survey points, and at the specific survey points.2.The survey.should be conducted using an RM-14 Radiation Monitor with an HP-190 probe.3.When conducting a moving survey, the HP-190 probe should be installed in the mounting bracket and positioned outside a vehicle window.The detection window of the HP-190 probe should be horizontal position and pointed to the rear of the vehicle to protected the detector from the elements and wind.4.Vehicle speed should not exceed 15 mph during a mobile survey.5.If the RM-14 reading changes more than 1,000 CPM stop and conduct a survey for Beta using the Auto Digi-Master or R0-2.6.Report the results of the mobile survey to the Radio Operator at the next survey point, or after completion of the Beta survey.'  


SC-323:16 SURVEYTODETERMINE
SC-323:16 SURVEY TO DETERMINE.PRESENCE OF BETA RADIATION 1.If the General Area Radiation Survey shows a change of 1000 CPM on the RM-14, or if the"plume" is suspected to be in your area, a survey to detect the presence of Beta radiation should be conducted.
.PRESENCE OFBETARADIATION 1.IftheGeneralAreaRadiation Surveyshowsachangeof1000CPMontheRM-14,orifthe"plume"issuspected tobeinyourarea,asurveytodetectthepresenceofBetaradiation shouldbeconducted.
2.Using an Auto Digi-Master, or RO-2 dose rate meter conduct the following surveys.a.With the detector window aimed up: Beta shield open Beta shield closed Difference gl=(open reading-closed reading)b.With the detector window aimed down: Beta shield open Beta shield closed Difference g2 (open reading-closed reading)3.If either difference gl or difference 42 from Step 2 is positive this is an indication that Beta radiation is present.a.If both difference gl and 52 are positive, this is an indication that you are in the plume.b.If only difference 41 is positive, this is an indication that the plume is overhead.4.Repeat the results of the survey to the Radio Operator and await further instructions from the Dose Assessment Manager.  
2.UsinganAutoDigi-Master, orRO-2doseratemeterconductthefollowing surveys.a.Withthedetectorwindowaimedup:BetashieldopenBetashieldclosedDifference gl=(openreading-closedreading)b.Withthedetectorwindowaimeddown:BetashieldopenBetashieldclosedDifference g2(openreading-closedreading)3.Ifeitherdifference glordifference 42fromStep2ispositivethisisanindication thatBetaradiation ispresent.a.Ifbothdifference gland52arepositive, thisisanindication thatyouareintheplume.b.Ifonlydifference 41ispositive, thisisanindication thattheplumeisoverhead.
4.RepeattheresultsofthesurveytotheRadioOperatorandawaitfurtherinstructions fromtheDoseAssessment Manager.  


SC-323:17INSTALLATION OFTLD1.Specificlocations forTLD'swillbelistedonthesurveyrouteinstructions orwillbegivenbytheDoseAssessment Manager.2.Hammeranailintoautilitypoleatthespecified location.
SC-323: 17 INSTALLATION OF TLD 1.Specific locations for TLD's will be listed on the survey route instructions or will be given by the Dose Assessment Manager.2.Hammer a nail into a utility pole at the specified location.The nail, should be positioned on the pole.at head height and on the side closest to the site.3.Affix a TLD to the nail using tape.Ensure the TLD window is oriented towards the site.4.Record the location (either survey point number or road intersections)', utility pole number, date time, and TLD number on the back of the survey map.  
Thenail,shouldbepositioned onthepole.atheadheightandonthesideclosesttothesite.3.AffixaTLDtothenailusingtape.EnsuretheTLDwindowisorientedtowardsthesite.4.Recordthelocation(eithersurveypointnumberorroadintersections)',
utilitypolenumber,datetime,andTLDnumberonthebackofthesurveymap.  


SC-323:18 HIGHVOLUMEAIRSAMPLEDrawapproximately 300litersofairthroughaGY-130silverzeolitecartridge andparticulate filterusingaRADECOH809CHighvolumeairsampler.Thiswilltakeapproximately 10minutes.2.Recordthesampledate,time,andlocation(eithersurveypointnumberorroadintersections) ontwosampleenvelopes andonthebackofthesurveymap.3.Determine thebackground radiation levelusingtheRM-14Radiation MonitorandHP-190probe.Recordthereadingoneachenvelope, andonthesurveymap.Ifbackground readingisgreaterthan200CPMmovetolowerbackground priortotakingreadings.
SC-323:18 HIGH VOLUME AIR SAMPLE Draw approximately 300 liters of air through a GY-130 silver zeolite cartridge and particulate filter using a RADECO H 809C High volume air sampler.This will take approximately 10 minutes.2.Record the sample date, time, and location (either survey point number or road intersections) on two sample envelopes and on the back of the survey map.3.Determine the background radiation level using the RM-14 Radiation Monitor and HP-190 probe.Record the reading on each envelope, and on the survey map.If background reading is greater than 200 CPM move to lower background prior to taking readings.If background of 200 cpm cannot be located contact Dose Assessment fo'r further instructions.
Ifbackground of200cpmcannotbelocatedcontactDoseAssessment fo'rfurtherinstructions.
4.Using onion skins remove the GY-130 silver zeolite cartridge from the sample holder and read the activity level with the RM-14 Radiation Monitor and HP-190 probe by holding the probe window on the inlet side of the cartridge filter.DO NOT TOUCH THE PROBE WINDOW WITH THE CARTRIDGE.
4.UsingonionskinsremovetheGY-130silverzeolitecartridge fromthesampleholderandreadtheactivitylevelwiththeRM-14Radiation MonitorandHP-190probebyholdingtheprobewindowontheinletsideofthecartridge filter.DONOTTOUCHTHEPROBEWINDOWWITHTHECARTRIDGE.
Record the reading on one envelope and place the cartridge.
Recordthereadingononeenvelopeandplacethecartridge.
in the envelope.Record the reading on the back of the survey map.NOTE: If cartridge is reading off scale move probe approxi-mately 1" from cartridge.
intheenvelope.
Report and log data as being taken at 1".5.Read the activity level of the particulate filter using the RM-14 Radiation Monitor and HP-190 probe.DO NOT TOUCH THE PROBE WINDOW WITH THE PARTICULATE FILTER.Record the reading on the other envelope and place the particulate filter in the envelope.Record the reading on the back of the survey map..6.Remove the onion skins and discard in a plastic bag.Treat as contaminated material.7.Report the following information to the Radio Operator: a.Sample location b.Date and time sample was taken c.Volume of air sample in liters (See page 16 for calcula-tions)d.Background count rate in cpm e.GY-130 silver zeolite cartridge count rate in cpm f.Particulate filter count rate in cpm
Recordthereadingonthebackofthesurveymap.NOTE:Ifcartridge isreadingoffscalemoveprobeapproxi-mately1"fromcartridge.
Reportandlogdataasbeingtakenat1".5.Readtheactivityleveloftheparticulate filterusingtheRM-14Radiation MonitorandHP-190probe.DONOTTOUCHTHEPROBEWINDOWWITHTHEPARTICULATE FILTER.Recordthereadingontheotherenvelopeandplacetheparticulate filterintheenvelope.
Recordthereadingonthebackofthesurveymap..6.Removetheonionskinsanddiscardinaplasticbag.Treatascontaminated material.
7.Reportthefollowing information totheRadioOperator:
a.Samplelocationb.Dateandtimesamplewastakenc.Volumeofairsampleinliters(Seepage16forcalcula-tions)d.Background countrateincpme.GY-130silverzeolitecartridge countrateincpmf.Particulate filtercountrateincpm


SC-323:19NOTE:I~Fieldcalculations oftheairborneactivitylevelmaybeperformed asfollows(SC-421):
SC-323: 19 NOTE: I~Field calculations of the airborne activity level may be performed as follows (SC-421): Sampler=volume in liters equals the flow rate of the sampler in lpm times minutes the sampler operated.Iodine-131 (GY-130 cartridge)
Sampler=volume inlitersequalstheflowrateofthesamplerinlpmtimesminutesthesampleroperated.
CPM Sam le-CPM Back round 8.34 x lO=J (Volume of Sample in Liters)Particulate uCi/cc Iodine-131 CPM Sam le-CPM Back round 2.37 x 10=/(Volume of Sample in Liters)uci/cc Particulate
Iodine-131 (GY-130cartridge)
CPMSamle-CPMBackround8.34xlO=J(VolumeofSampleinLiters)Particulate uCi/ccIodine-131 CPMSamle-CPMBackround2.37x10=/(VolumeofSampleinLiters)uci/ccParticulate


SC-323:20 LOWVOLUMEAIRSAMPLE1.DrawairthroughaGY-130silverzeolitecartridge andparticulat'e filterusingalowvolumeairsamplerforapprox-imately30minutes.2.Recordthesampledate,time,andlocationontwosampleenvelopes andonthebackofthesurveymap.3~Determine thebackground radiation levelusingtheRM-14Radiation MonitorandHP-190probe.Recordthereadingoneachenvelope, andonthesurveymap.4.UsingonionskinglovesremovetheGY-130silverzeolitecartridge fromthesampleholderandreadtheactivitylevelwiththeRM-14Radiation MonitorandHP-190probe,byholdingtheprobewindowontheinletsideofthesilverzeolitecartridge.
SC-323:20 LOW VOLUME AIR SAMPLE 1.Draw air through a GY-130 silver zeolite cartridge and particulat'e filter using a low volume air sampler for approx-imately 30 minutes.2.Record the sample date, time, and location on two sample envelopes and on the back of the survey map.3~Determine the background radiation level using the RM-14 Radiation Monitor and HP-190 probe.Record the reading on each envelope, and on the survey map.4.Using onion skin gloves remove the GY-130 silver zeolite cartridge from the sample holder and read the activity level with the RM-14 Radiation Monitor and HP-190 probe, by holding the probe window on the inlet side of the silver zeolite cartridge.
DONOTTOUCHTHEPROBEWINDOWWITHTHECARTRIDGE.
DO NOT TOUCH THE PROBE WINDOW WITH THE CARTRIDGE.
Recordthereadingononeenvelopeandplacethecartridge inthatenvelope.
Record the reading on one envelope and place the cartridge in that envelope.Record the reading on the back of the survey map.5.Read the activity level of the particulate filter using the RM-14 Radiation Monitor and HP-190 probe.DO NOT TOUCH THE PROBE WINDOW WITH THE PARTICULATE FILTER.Record the reading on the other envelope and place the particulate
Recordthereadingonthebackofthesurveymap.5.Readtheactivityleveloftheparticulate filterusingtheRM-14Radiation MonitorandHP-190probe.DONOTTOUCHTHEPROBEWINDOWWITHTHEPARTICULATE FILTER.Recordthereadingontheotherenvelopeandplacetheparticulate
.filter in the envelope.Record the reading on the back of the survey map.6.Remove the onion skins and discard in a plastic bag.Treat as contaminated material.7.Report the following information to the Radio Operator: a.Sample location b.Date and Time sample was taken c.Volume of air sample in liters (See page,13 for calcula-tions)d.Background count rate in cpm e.GY-130 silver zeolite cartridge count rate in cpm f.Particulate filter count rate in cpm NOTE: Field calculations of the airborne activity level may be performed as follows: (SC-421)Sample volume in liters equals the flow rate (4 LPM)times minutes the sampler operated.  
.filterintheenvelope.
Recordthereadingonthebackofthesurveymap.6.Removetheonionskinsanddiscardinaplasticbag.Treatascontaminated material.
7.Reportthefollowing information totheRadioOperator:
a.Samplelocationb.DateandTimesamplewastakenc.Volumeofairsampleinliters(Seepage,13forcalcula-tions)d.Background countrateincpme.GY-130silverzeolitecartridge countrateincpmf.Particulate filtercountrateincpmNOTE:Fieldcalculations oftheairborneactivitylevelmaybeperformed asfollows:(SC-421)Samplevolumeinlitersequalstheflowrate(4LPM)timesminutesthesampleroperated.  


SC-323:21 LONVOLUME.AIRSAMPLE(CONT)Iodine-131 (GY-130cartridge)
SC-323:21 LON VOLUME.AIR SAMPLE (CONT)Iodine-131 (GY-130 cartridge)
CPMSamle-CPMBackround8.3x10-8(VolumeofSampleinLiters)Particulate CPMSamle-CPMBackround2.4x10-8(VolumeofSampleinLiters)uCi/ccIodine-131 uci/ccParticulate
CPM Sam le-CPM Back round 8.3 x 10-8 (Volume of Sample in Liters)Particulate CPM Sam le-CPM Back round 2.4 x 10-8 (Volume of Sample in Liters)uCi/cc Iodine-131 uci/cc Particulate


SC-323:22 CHANGINGFILTERSATFIXEDENVIRONMENTAL STATIONS1.Recordthefollowing information onthesampleenvelopeleftfromthepreviousfilterchange:a.Dateb.Timec.SystemVacuum(inches)d.Gasmeterreading(cubicfeet)e.Totalhourmeter(recordincolumnmarked"OFF")2.Turnpump,off3~Usingonionskinsremovethefilterholderatthequickdisconnect joint.4.Unscrewtheoutsideretaining ringandremovetheparticulate filterfromtheholderandplaceinthesampleenvelope.
SC-323:22 CHANGING FILTERS AT FIXED ENVIRONMENTAL STATIONS 1.Record the following information on the sample envelope left from the previous filter change: a.Date b.Time c.System Vacuum (inches)d.Gasmeter reading (cubic feet)e.Total hour meter (record in column marked"OFF")2.Turn pump,off 3~Using onion skins remove the filter holder at the quick disconnect joint.4.Unscrew the outside retaining ring and remove the particulate filter from the holder and place in the sample envelope.5.If a charcoal cartridge was in use transfer the information on the particulate filter envelope to a new envelope and place the charcoal cartridge in the envelope.6.Place a new GY-130 silver zeolite cartridge in the sample head.7.Place a new particulate filter in the holder, replace the~retaining ring and reconnect holder to the pump at the quick disconnect joint.8.Remove onion skins and place in a plastic bag.Treat as contaminated.
5.Ifacharcoalcartridge wasinusetransfertheinformation ontheparticulate filterenvelopetoanewenvelopeandplacethecharcoalcartridge intheenvelope.
9.Turn the pump on.10.Record the following information to two new envelopes.
6.PlaceanewGY-130silverzeolitecartridge inthesamplehead.7.Placeanewparticulate filterintheholder,replacethe~retaining ringandreconnect holdertothepumpatthequickdisconnect joint.8.Removeonionskinsandplaceinaplasticbag.Treatascontaminated.
Mark one envelope"GY-130 silver zeolite".a.Station number b.Date c.Time d.System vacuum (inches)e.Gasmeter reading (cubic feet)f.Total hour meter (record in the"ON" column)ll.Place the new envelopes inside the monitor cabinet.12.Bring the envelopes containing the cartridge/filter removed to the Survey Center at the completion of your assigned route or.when directed by the Dose Assessment Manager.  
9.Turnthepumpon.10.Recordthefollowing information totwonewenvelopes.
Markoneenvelope"GY-130silverzeolite".
a.Stationnumberb.Datec.Timed.Systemvacuum(inches)e.Gasmeterreading(cubicfeet)f.Totalhourmeter(recordinthe"ON"column)ll.Placethenewenvelopes insidethemonitorcabinet.12.Bringtheenvelopes containing thecartridge/filter removedtotheSurveyCenteratthecompletion ofyourassignedrouteor.whendirectedbytheDoseAssessment Manager.  


SC-323:23 APPENDIXIIIOFFSITERADIATION SURVEYTEAMINSTRUCTION
SC-323:23 APPENDIX III OFF SITE RADIATION SURVEY TEAM INSTRUCTION


SC-323:24 RED-TEAMPRIMARYSURVEYROUTEINSTRUCTIONS
SC-323:24 RED-TEAM PRIMARY SURVEY ROUTE INSTRUCTIONS
~OT:Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
~OT: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.FromtheTrainingCenterdrivewaytraveleastonLakeRoadtoKnickerbocker Road(1.1miles).PlaceaTLDneartheinter-sectionofLakeRoadandKnickerbocker Road(gl).2.GosouthonKnickerbocker Road..toBrickChurchRoad(1.0miles).PlaceaTLDneartheintersection ofKnickerbocker RoadandBrickChurchRoad(52).3.Continuesouthon'nickerbocker RoadtoKenyonRoad(1.3miles).PlaceaTLDneartheintersection ofKnickerbocker RoadandKenyonRoad(49).Takeahighvolumeairsampleatthisintersection (49)asperinstructions inAppendixII.4.GowestonKenyonRoadtoSlocumRoad(1.9miles).5.GonorthonSlocumRoadtoBrickChurchRoad(1.3miles).PlaceaTLDneartheintersection ofSlocumRoadandBrickChurchRoad(44).6.ContinuenorthonSlocumRoadtoLakeRoad(1.0miles).7.ReporttoRadioOperatorforfurtherinstructions.  
1.From the Training Center driveway travel east on Lake Road to Knickerbocker Road (1.1 miles).Place a TLD near the inter-section of Lake Road and Knickerbocker Road (gl).2.Go south on Knickerbocker Road..to Brick Church Road (1.0 miles).Place a TLD near the intersection of Knickerbocker Road and Brick Church Road (52).3.Continue south on'nickerbocker Road to Kenyon Road (1.3 miles).Place a TLD near the intersection of Knickerbocker Road and Kenyon Road (49).Take a high volume air sample at this intersection (49)as per instructions in Appendix II.4.Go west on Kenyon Road to Slocum Road (1.9 miles).5.Go north on Slocum Road to Brick Church Road (1.3 miles).Place a TLD near the intersection of Slocum Road and Brick Church Road (44).6.Continue north on Slocum Road to Lake Road (1.0 miles).7.Report to Radio Operator for further instructions.  


SC-323:25 REDTEAMSECONDARY SURVEYROUTE(WESTORNORTHWEST WINDS)INSTRUCTIONS
SC-323:25 RED TEAM SECONDARY SURVEY ROUTE (WEST OR NORTHWEST WINDS)INSTRUCTIONS
~OTeNumbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
~OT e Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.Fromtheintersection ofLakeandSlocumRoad.2.GoeastonLakeRoadtoOntarioCenterRoad(1.0mile)a.SosouthonOntarioCenterRoadtoRidgeRoad/Ontario Center(3.1miles)4.ContinuesouthonOntarioCenterRoad/Route 350toRoute441/Walworth Road(6.3miles).5.GoeastonRoute441/Walworth Roadtomainintersection inVillageofWalworth(Walworth-Ontario Road,1.0miles).PlaceaTLDneartheintersection (f26).6.ReporttotheRadioOperatorforfurtherinstructions.  
1.From the intersection of Lake and Slocum Road.2.Go east on Lake Road to Ontario Center Road (1.0 mile)a.So south on Ontario Center Road to Ridge Road/Ontario Center (3.1 miles)4.Continue south on Ontario Center Road/Route 350 to Route 441/Walworth Road (6.3 miles).5.Go east on Route 441/Walworth Road to main intersection in Village of Walworth (Walworth-Ontario Road, 1.0 miles).Place a TLD near the intersection (f26).6.Report to the Radio Operator for further instructions.  


SC-323:26 REDTEAMSECONDARY SURVEYROUTE(EASTORNORTHEAST WINDS)INSTRUCTIONS NOTE:Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
SC-323:26 RED TEAM SECONDARY SURVEY ROUTE (EAST OR NORTHEAST WINDS)INSTRUCTIONS NOTE: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.Fromtheintersection ofLakeandSlocumRoad.2.GosouthonSlocumRoadtoRidgeRoad(3.1miles).3.GoeastonRidgeRoadtoStateRoute350/Ontario CenterRoad(1.0miles).4.GosouthonState.Route350toPlankRoad(3.2miles).5.GowestonPlankRoadtoCountyLineRoad(4.1miles).PlaceaTLDneartheintersection ofPlankRoadandCountyLineRoad(046)~6.ContinuewestonPlankRoadtoSaltRoad(1.5miles).PlaceaTLDneartheintersections ofPlankRoadandSaltRoad(f39).7.GonorthonSaltRoadtoSchlegelRoad(4.1miles).Placea.TLDneartheintersection ofSaltRoadandSchlegelRoad(542).8.ContinuenorthonSaltRoadtoLakeRoadandreporttoRadioOperatorforfurtherinstructions.  
1.From the intersection of Lake and Slocum Road.2.Go south on Slocum Road to Ridge Road (3.1 miles).3.Go east on Ridge Road to State Route 350/Ontario Center Road (1.0 miles).4.Go south on State.Route 350 to Plank Road (3.2 miles).5.Go west on Plank Road to County Line Road (4.1 miles).Place a TLD near the intersection of Plank Road and County Line Road (046)~6.Continue west on Plank Road to Salt Road (1.5 miles).Place a TLD near the intersections of Plank Road and Salt Road (f39).7.Go north on Salt Road to Schlegel Road (4.1 miles).Place a.TLD near the intersection of Salt Road and Schlegel Road (542).8.Continue north on Salt Road to Lake Road and report to Radio Operator for further instructions.  


SC-323'27 GIVENTEAMPRIMARYSURVEYROUTEINSTRUCTIONS
SC-323'27 GIVEN TEAM PRIMARY SURVEY ROUTE INSTRUCTIONS
~NO:Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
~NO: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.TravelwestonLakeRoadtoLakesideRoad(1.7miles).PlaceaTLDneartheintersection ofLakeRoadandLakesideRoad(gl7)~2.GosouthonLakesideRoadtoBostonRoad(1.0miles).Takeahighvolumeairsampleneartheintersection ofLakesideRoadandBostonRoad(516)asperinstructions inAppendixII.PlaceaTLDneartheintersection ofLakesideandBostonRoadi(f16).3.ContinuesouthonLakesideRoadtoRidgeRoad(2.0miles).4.GoeastonRidgeRoadtoOntarioCenterRoad(1.6miles).5.GonorthonOntarioCenterRoadtoBrickChurchRoad(2.1miles).PlaceaTLDnearthe,intersection ofOntarioCenterRoadandBrickChurchRoad(g3).6.ContinuenorthtoLakeRoad.7.ReporttoRadioOperatorforfurtherinstructions.
1.Travel west on Lake Road to Lakeside Road (1.7 miles).Place a TLD near the intersection of Lake Road and Lakeside Road (gl7)~2.Go south on Lakeside Road to Boston Road (1.0 miles).Take a high volume air sample near the intersection of Lakeside Road and Boston Road (516)as per instructions in Appendix II.Place a TLD near the intersection of Lakeside and Boston Road i (f16).3.Continue south on Lakeside Road to Ridge Road (2.0 miles).4.Go east on Ridge Road to Ontario Center Road (1.6 miles).5.Go north on Ontario Center Road to Brick Church Road (2.1 miles).Place a TLD near the, intersection of Ontario Center Road and Brick Church Road (g3).6.Continue north to Lake Road.7.Report to Radio Operator for further instructions.
0 SC-323:28 GREENTEAMSECONDARY SURVEYROUTE(WESTORNORTHWEST WINDS)INSTRUCTIONS Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
0 SC-323:28 GREEN TEAM SECONDARY SURVEY ROUTE (WEST OR NORTHWEST WINDS)INSTRUCTIONS Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.FromLakeRoadandOntarioCenterRoad,goeasttoPultneyville (7..0miles).PlaceaTLDinthePultneyville area(428)nearwhitesettlermonumentattheLake.2.GosouthfromPultneyville onStateRoute21toPoundRoad(3.4miles).PlaceaTLDalongStateRoute21southofPoundRoad(548).3~ContinuesouthonStateRoute21toFarnsworth Road(4.6miles).PlaceaTLDneartheintersection ofStateRoute21andFarnsworth Road(447).4.ContinuesouthonStateRoute21andintotheVillageofMarion(3.0miles).5.ReturntoMainStreetintheVillageofWilliamson onStateRoute21(5.3miles).6.ReporttoRadioOperatorforfurtherinstructions.
1.From Lake Road and Ontario Center Road, go east to Pultneyville (7..0 miles).Place a TLD in the Pultneyville area (428)near white settler monument at the Lake.2.Go south from Pultneyville on State Route 21 to Pound Road (3.4 miles).Place a TLD along State Route 21 south of Pound Road (548).3~Continue south on State Route 21 to Farnsworth Road (4.6 miles).Place a TLD near the intersection of State Route 21 and Farnsworth Road (447).4.Continue south on State Route 21 and into the Village of Marion (3.0 miles).5.Return to Main Street in the Village of Williamson on State Route 21 (5.3 miles).6.Report to Radio Operator for further instructions.
I111~~l5
I 1 1 1~~l 5


SC-323'29 G~ENTEAMSECONDARY SURVEYROUTE(EASTORNORTHEAST HINDS)INSTRUCTIONS
SC-323'29 G~EN TEAM SECONDARY SURVEY ROUTE (EAST OR NORTHEAST HINDS)INSTRUCTIONS
~TNumbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
~T Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.FromLakeRoadandOntarioCenterRoad,gowesttoStateRoute250.PlaceaTLDnearintersection ofLakeRoadandStateRoute250(445)(6.0miles).2.ContinuewestonLakeRoadtoWhitingRoad(1.8miles).3.GosouthonWhitingRoadtoKlemRoad(1.8miles).4.GowestonKlemRoadtoFiveMileLineRoad(0.4miles).5.GosouthonFiveMileLineRoadtoPlankRoad(3.4miles).PlaceaTLDneartheintersection ofFiveMileLineRoadandPlankRoad(551).6.ContinuesouthonFiveMileLineRoadtoPenfieldFourCorners(intersection withPenfieldRoad,StateRoute441)(3.6miles).PlaceaTLDnearbackofBaptistChurchparkinglot,500~eastofintersection onnorthsideofPenfieldRoad($41).7.ReporttoRadioOperatorforfurtherinstructions.  
1.From Lake Road and Ontario Center Road, go west to State Route 250.Place a TLD near intersection of Lake Road and State Route 250 (445)(6.0 miles).2.Continue west on Lake Road to Whiting Road (1.8 miles).3.Go south on Whiting Road to Klem Road (1.8 miles).4.Go west on Klem Road to Five Mile Line Road (0.4 miles).5.Go south on Five Mile Line Road to Plank Road (3.4 miles).Place a TLD near the intersection of Five Mile Line Road and Plank Road (551).6.Continue south on Five Mile Line Road to Penfield Four Corners (intersection with Penfield Road, State Route 441)(3.6 miles).Place a TLD near back of Baptist Church parking lot, 500~east of intersection on north side of Penfield Road ($41).7.Report to Radio Operator for further instructions.  


SC-323:30 ORANGETEAM~NOTPRIMARYSURVEYROUTEINSTRUCTIONS Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
SC-323:30 ORANGE TEAM~NOT PRIMARY SURVEY ROUTE INSTRUCTIONS Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.TraveleastonLakeRoadtoFisherRoad(2.7miles).2~GosouthonFisherRoadtoShepherdRoad(0.7miles).Takeanairsampleneartheintersection ofFisherRoadandShepherdRoad(519)asperinstructions inAppendixII.3.PlaceaTLDneartheintersection ofFisherRoadandShepherdRoad(519).4.ContinuesouthonFisherRoadtoTrimbleRoad(1.1miles).PlaceaTLDneartheintersection ofFisherRoadandTrimbleRoad(420).5.ContinuesouthonFisherRoadtoKenyonRoad(0.7miles).GowestonKenyonRoadtoFurnaceRoad(1.1miles).PlaceaTLDneartheintersection ofKenyonRoadandFurnaceRoad($49).6.GonorthonFurnaceRoadtoLakeRoad(2.7miles).7.,ReporttoRadioOperatorforfurtherinstructions.  
1.Travel east on Lake Road to Fisher Road (2.7 miles).2~Go south on Fisher Road to Shepherd Road (0.7 miles).Take an air sample near the intersection of Fisher Road and Shepherd Road (519)as per instructions in Appendix II.3.Place a TLD near the intersection of Fisher Road and Shepherd Road (519).4.Continue south on Fisher Road to Trimble Road (1.1 miles).Place a TLD near the intersection of Fisher Road and Trimble Road (420).5.Continue south on Fisher Road to Kenyon Road (0.7 miles).Go west on Kenyon Road to Furnace Road (1.1 miles).Place a TLD near the intersection of Kenyon Road and Furnace Road ($49).6.Go north on Furnace Road to Lake Road (2.7 miles).7., Report to Radio Operator for further instructions.  


SC-32331ORANGETEAMSECONDARY SURVEYROUTE(WESTORNORTHWEST WINDS)INSTRUCTIONS Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
SC-323 31 ORANGE TEAM SECONDARY SURVEY ROUTE (WEST OR NORTHWEST WINDS)INSTRUCTIONS Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
1.FromLakeRoadandFurnaceRoad,gosouthtoRidgeRoad(4.2miles).2.GosouthonWalworth-Ontario RoadtoTrummonds Road(2~3miles).3~Go'eastonTrummonds RoadtoArborRoad(1~1miles)~PlaceaTLDneartheintersection ofTrummonds RoadandArborRoad(022).4.GonorthonArborRoadtoRidgeRoad(2.3miles).5.GoeastonRidgeRoadtoEddyRidgeRoad(2.2miles).PlaceaTLDneartheintersection ofRidgeRoadandEddyRidgeRoad.6.ContinueeastonRidgeRoadtoTuckahoeRoad(0.3miles).7.GonorthonTuckahoeRoadtoSalmonCreekRoad(2.5miles).PlaceaTLDnear.theintersection ofTuckahoeRoadandSalmonCreekRoad.8.ContinuenorthonSalmonCreekRoadtoLakeRoadandreporttoRadioOperatorforfurtherinstructions.  
1.From Lake Road and Furnace Road, go south to Ridge Road (4.2 miles).2.Go south on Walworth-Ontario Road to Trummonds Road (2~3 miles).3~Go'east on Trummonds Road to Arbor Road (1~1 miles)~Place a TLD near the intersection of Trummonds Road and Arbor Road (022).4.Go north on Arbor Road to Ridge Road (2.3 miles).5.Go east on Ridge Road to Eddy Ridge Road (2.2 miles).Place a TLD near the intersection of Ridge Road and Eddy Ridge Road.6.Continue east on Ridge Road to Tuckahoe Road (0.3 miles).7.Go north on Tuckahoe Road to Salmon Creek Road (2.5 miles).Place a TLD near.the intersection of Tuckahoe Road and Salmon Creek Road.8.Continue north on Salmon Creek Road to Lake Road and report to Radio Operator for further instructions.  


SC-323:32 ORANGETEAMSECONDARY SURVEYROUTE(EASTORNORTHEAST WINDS)INSTRUCTIONS
SC-323:32 ORANGE TEAM SECONDARY SURVEY ROUTE (EAST OR NORTHEAST WINDS)INSTRUCTIONS
~OE:Numbersgiveninparentheses arepredesignated surveypoints.Mileagesgivenareapproximate.
~O E: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.
FromLakeRoadandFurnaceRoad,gowestonLakeRoadtoRoderParkway(accessroadtoOntarioontheLake)(5.1miles).GonorthonRoderParkwaytointersection withOntarioDriveandplaceaTLDnearintersection (418)(0.5miles).2.ReturntoLakeRoad,continuewesttoCountyLineRoad(2.4miles).3.GosouthonCountyLineRoadtoBerg/Schlegel Road(2.0miles).PlaceaTLDneartheintersection ofCountyLineRoadandBerg/Schlegel Road(536).4.ContinuesouthonCountyLineRoadtoStateRoute104(1.2miles).TurnrightontoStateRoute104andgotoSaltRoad(1.2miles).TurnleftontoSaltRoadtoPlankRoad(2.1miles).5.GowestonPlankRoadtoStateRoute250(2.8miles).6.ContinuewestonPlankRoadtoRG&EEasternMonroeServiceCenter,1270PlankRoad.ReportresultsofsurveystoRadioOperator.
From Lake Road and Furnace Road, go west on Lake Road to Roder Parkway (access road to Ontario on the Lake)(5.1 miles).Go north on Roder Parkway to intersection with Ontario Drive and place a TLD near intersection (418)(0.5 miles).2.Return to Lake Road, continue west to County Line Road (2.4 miles).3.Go south on County Line Road to Berg/Schlegel Road (2.0 miles).Place a TLD near the intersection of County Line Road and Berg/Schlegel Road (536).4.Continue south on County Line Road to State Route 104 (1.2 miles).Turn right onto State Route 104 and go to Salt Road (1.2 miles).Turn left onto Salt Road to Plank Road (2.1 miles).5.Go west on Plank Road to State Route 250 (2.8 miles).6.Continue west on Plank Road to RG&E Eastern Monroe Service Center, 1270 Plank Road.Report results of surveys to Radio Operator.7.Return to Route 250 and go north on Route 250 to State Road (1.2 miles).Place a TLD at the intersection of State Road and Route 250 (538).8.Continue north on Route 250 to Main Street in the Village of Webster (2.3 miles).9.Go east on Main Street to Phillips Road (0.6 miles).10.Go north on Phillips Road to substation 574 driveway which is 20'orth of access road to State Route 104.ll.Report to Radio Operator for further instructions.
7.ReturntoRoute250andgonorthonRoute250toStateRoad(1.2miles).PlaceaTLDattheintersection ofStateRoadandRoute250(538).8.ContinuenorthonRoute250toMainStreetintheVillageofWebster(2.3miles).9.GoeastonMainStreettoPhillipsRoad(0.6miles).10.GonorthonPhillipsRoadtosubstation 574drivewaywhichis20'orthofaccessroadtoStateRoute104.ll.ReporttoRadioOperatorforfurtherinstructions.
Cl 0 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER GlNNA STATlog UN'Te<COMPLETED DATE: TlME:-PROCEDURE NO.SC-324 REV.NO.7 EMERGENCY ON-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTEND NT EFFECTIVE DATE QA~NON-QA CATEGORY 1.0 REVIEWED BY'HIS PROCEDURE CONTAINS 24 PAGES P)
Cl0 ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERGlNNASTATlogUN'Te<COMPLETED DATE:TlME:-PROCEDURE NO.SC-324REV.NO.7EMERGENCY ON-SITERADIATION SURVEYTEAMSTECHNICAL REVIEWPORCREVIEWDATEPLANTSUPERINTEND NTEFFECTIVE DATEQA~NON-QACATEGORY1.0REVIEWEDBY'HISPROCEDURE CONTAINS24PAGES P)
SC-324:1 SC-324 EMERGENCY ON-SITE RADIATION SURVEY TEAMS 1~0 PURPOSE: The prime objective of the Emergency On-Site Radiation Survey Teams is to rapidly survey areas immediately surrounding the restricted area in order to determine the extent and magnitude of any uncontrolled release of radioactive materials following an incident.It should be stressed that the initial on-site survey is of great importance.
SC-324:1SC-324EMERGENCY ON-SITERADIATION SURVEYTEAMS1~0PURPOSE:Theprimeobjective oftheEmergency On-SiteRadiation SurveyTeamsistorapidlysurveyareasimmediately surrounding therestricted areainordertodetermine theextentandmagnitude ofanyuncontrolled releaseofradioactive materials following anincident.
Decisions regarding the extent and types of protective actions required will be based upon data reported by the survey teams.
Itshouldbestressedthattheinitialon-sitesurveyisofgreatimportance.
Decisions regarding theextentandtypesofprotective actionsrequiredwillbebasedupondatareportedbythesurveyteams.


==2.0REFERENCES==
==2.0 REFERENCES==
:
:
2.2SC-421,Determination ofIodineorParticulate SC-232Voluntary Acceptance ofEmergency Exposure3.0INSTRUCTIONS F1Obtainappropriate On-SiteSurveyTeamfootlocker asdirectedbyTagBoardAssignment.
2.2 SC-421, Determination of Iodine or Particulate SC-232 Voluntary Acceptance of Emergency Exposure 3.0 INSTRUCTIONS F 1 Obtain appropriate On-Site Survey Team footlocker as directed by Tag Board Assignment.
Ifsealisbroken,useequipment listinsidefootlocker toinventory equipment.
If seal is broken, use equipment list inside footlocker to inventory equipment.
Requesttheassistance oftheSurveyCenterManagerinobtaining replacement equipment ifnecessary.
Request the assistance of the Survey Center Manager in obtaining replacement equipment if necessary.
3.2Obtainfollowing equipment whichisnotstoredinfootlocker.
3.2 Obtain following equipment which is not stored in footlocker.
3.2.1Personalthermalluminecent dosimeter (TLD)foreachteammember.3.2.2One0-5Rdosimeter foreachteammember,Sign-inondosimeter logsheet.3.2.3Onefull-face maskwithiodinefilterandvoiceemitterforeachTeammember.3.2.43.2.53.2.6Handi-Talkie radio.LowVolumeAirSamplerwithfilterholder.RM-14Radiation MonitorwithHP-190Probe.
3.2.1 Personal thermal luminecent dosimeter (TLD)for each team member.3.2.2 One 0-5R dosimeter for each team member, Sign-in on dosimeter log sheet.3.2.3 One full-face mask with iodine filter and voice emitter for each Team member.3.2.4 3.2.5 3.2.6 Handi-Talkie radio.Low Volume Air Sampler with filter holder.RM-14 Radiation Monitor with HP-190 Probe.
r SC-324:23''AutoDigi-master orRO-2doseratemeter.3.3Completethefollowing itemspriortodeparting ontheassignedsurveyroute.3.3.1Checkoperation ofradiosystem,portableairsampler,radiation countratemonitor,anddoseratemeterusingequipment check-out procedures inAppendixI.3'.23'.33.3.4Loadsurveyequipment ontoequipment beltsandbackpacks,fill'inSurveyTeamStatusBoard,andinformSurvey.CenterManageryouarereadyfordeparture..
r SC-324:2 3''Auto Digi-master or RO-2 dose rate meter.3.3 Complete the following items prior to departing on the assigned survey route.3.3.1 Check operation of radio system, portable air sampler, radiation count rate monitor, and dose rate meter using equipment check-out procedures in Appendix I.3'.2 3'.3 3.3.4 Load survey equipment onto equipment belts and back packs, fill'in Survey Team Status Board, and inform Survey.Center Manager you are ready for departure..
Logtime,date,andsurveyteammembersonsurveymap.Establish radiocommunication withTechnical SupportCenterRadioOperatorandadviseofteamsdeparture.
Log time, date, and survey team members on survey map.Establish radio communication with Technical Support Center Radio Operator and advise of teams departure.
3.3.5Logtime,date,flowrateandstarttimeoflowvolumeairsampleronreverseofsurveymap.3.4Protective clothingandfullfacemaskswithcharcoalfilterswillbewornasdirectedbytheDoseAssessment Manager.Internalcontamination willbedetermined byaWholeBodyCountafterthesurvey.3.5Performradiation surveysusingtheappropriate instructions ofAppendixIIwhilefollowing theSurveyRouteinstructions contained inAppendixIII.3.5.13.5.2Donotenterareaswhereradiation levelsaregreaterthan2R/hrunlessdirectedbyaHealthPhysicist.
3.3.5 Log time, date, flow rate and start time of low volume air sampler on reverse of survey map.3.4 Protective clothing and full face masks with charcoal filters will be worn as directed by the Dose Assessment Manager.Internal contamination will be determined by a Whole Body Count after the survey.3.5 Perform radiation surveys using the appropriate instructions of Appendix II while following the Survey Route instructions contained in Appendix III.3.5.1 3.5.2 Do not enter areas where radiation levels are greater than 2 R/hr unless directed by a Health Physicist.
Thedoselimitation ofthesurveyteamislimitedto1REMunlesstheHealthPhysicist, orEmergency Coordinator authorizes ahigherlimit.3.5.3AONETIMEdoselimitof75REMmaybeusedtosavethelifeofanindividual onavoluntary basis.(SC-232)3.5.4AONETIMEdoselimitof25REMmaybeusedtoinsureequipment isoperational orsecuredinordertopreventagreaterpossiblehazardtothegeneralpublic.  
The dose limitation of the survey team is limited to 1 REM unless the Health Physicist, or Emergency Coordinator authorizes a higher limit.3.5.3 A ONETIME dose limit of 75 REM may be used to save the life of an individual on a voluntary basis.(SC-232)3.5.4 A ONETIME dose limit of 25 REM may be used to insure equipment is operational or secured in order to prevent a greater possible hazard to the general public.  


SC-324:33.5.5Ateachassignedsurveypointtheteamshouldreportthefollowing information totheRadioOperator:
SC-324:3 3.5.5 At each assigned survey point the team should report the following information to the Radio Operator:-Location-Completed Actions-Results of Surveys-Departure for next Survey Point 3'.6 Upon completion of Survey Route inform radio operator at Technical Support Center.The Dose Assessment Manager will assign an additional Survey Route or direct you to return to the Survey Center.3.6 3.6.1 3.6.2 Upon returning to the Survey Center perform a contam-ination survey of team personnel for contamination.
-Location
If any contamination greater than 100 CPM above background is found, contact the Survey Center Manager for decontamination instructions.
-Completed Actions-ResultsofSurveys-Departure fornextSurveyPoint3'.6Uponcompletion ofSurveyRouteinformradiooperatoratTechnical SupportCenter.TheDoseAssessment Managerwillassignanadditional SurveyRouteordirectyoutoreturntotheSurveyCenter.3.63.6.13.6.2Uponreturning totheSurveyCenterperformacontam-inationsurveyofteampersonnel forcontamination.
Give all iodine filters, particulate filters, survey maps, and data records to Survey Center Manager.Dispose of contaminated and potentially contaminated waste in an approved manner.3'.3 3.6.4 3.6.5 Re-stock, inventory, and seal Survey Team Equipment, Footlocker, stow in Survey Team Room.Return radio system, portable air sampler, radiation count rate meter, and dose rate meter to the Survey Team Room and place on charge as appropriate.
Ifanycontamination greaterthan100CPMabovebackground isfound,contacttheSurveyCenterManagerfordecontamination instructions.
Return 0-5R dosimeters and sign-out on dosimeter log sheet.3.6.6 Fill out Survey Team Status Board and inform Survey Center Manager of team return.  
Givealliodinefilters,particulate filters,surveymaps,anddatarecordstoSurveyCenterManager.Disposeofcontaminated andpotentially contaminated wasteinanapprovedmanner.3'.33.6.43.6.5Re-stock, inventory, andsealSurveyTeamEquipment, Footlocker, stowinSurveyTeamRoom.Returnradiosystem,portableairsampler,radiation countratemeter,anddoseratemetertotheSurveyTeamRoomandplaceonchargeasappropriate.
Return0-5Rdosimeters andsign-outondosimeter logsheet.3.6.6FilloutSurveyTeamStatusBoardandinformSurveyCenterManagerofteamreturn.  


SC-324:4APPENDIXIEMERGENCY ON-SITERADIATION SURVEYTEAMEQUIPMENT CHECKOUTANDOPERATION
SC-324:4 APPENDIX I EMERGENCY ON-SITE RADIATION SURVEY TEAM EQUIPMENT CHECKOUT AND OPERATION
'I SC-324:5RADIOSYSTEMTheradiosystemconsistsofahand-held radioandattachedantenna.Tocheckoutandoperatethesystem,completethefollowing steps.1~Ensuretheantennaissecurelyscrewedintotheconnection ontopoftheradio.Ifatelescoping antennaisinstalled ensureitisextendedtoitsfulllengthwhenoperating theradio.3~TurnthechannelselectorswitchtoChannel2.TurnthesquelchknobfullCCW.4~TurnthevolumeknobCWtoturntheradioonandadjustthevolumelevel.Arushingsoundshouldbeheard.NOTE:Ifnosoundisheard,unitisinoperable.
'I SC-324:5 RADIO SYSTEM The radio system consists of a hand-held radio and attached antenna.To checkout and operate the system, complete the following steps.1~Ensure the antenna is securely screwed into the connection on top of the radio.If a telescoping antenna is installed ensure it is extended to its full length when operating the radio.3~Turn the channel selector switch to Channel 2.Turn the squelch knob full CCW.4~Turn the volume knob CW to turn the radio on and adjust the volume level.A rushing sound should be heard.NOTE: If no sound is heard, unit is inoperable.
ObtainnewunitandinformSurveyCenterManager.5.AdjustsquelchknobCWjustenoughtoquiettheradio.IfsquelchknobisturnedtoofarCWweaksignalswillnotbeheard.6.Thegeneralprocedure forcommunicating ontheradioshouldbeasfollows:a)StationCalledb)Blue/Yellow Teamc)Messaged)"Over"Duringadrillorexerciseallfictitious datawillbeprecededwiththewords"Thisisadrill....."
Obtain new unit and inform Survey Center Manager.5.Adjust squelch knob CW just enough to quiet the radio.If squelch knob is turned too far CW weak signals will not be heard.6.The general procedure for communicating on the radio should be as follows: a)Station Called b)Blue/Yellow Team c)Message d)"Over" During a drill or exercise all fictitious data will be preceded with the words"This is a drill....." Examples: "Technical Support Center, This is the Blue Team, At location number 1, Over" , 8."Technical Support Center, This is the Yellow Team, This is a drill, Results of the general area survey at location 6 are 6,500 Counts Per Minute above background, Over" To transmit depress the push-to-talk switch on the side of the radio.Speak in a normal voice into the speaker/mike.
Examples:
To receive, release the push-to-talk switch.  
"Technical SupportCenter,ThisistheBlueTeam,Atlocationnumber1,Over",8."Technical SupportCenter,ThisistheYellowTeam,Thisisadrill,Resultsofthegeneralareasurveyatlocation6are6,500CountsPerMinuteabovebackground, Over"Totransmitdepressthepush-to-talk switchonthesideoftheradio.Speakinanormalvoiceintothespeaker/mike.
Toreceive,releasethepush-to-talk switch.  


SC-324:6RADIOSYSTEM(CONT)TheremaybetimesthatTSCorEOFwillbereceiving communications fromateamthatyoucannothear.IfthishappenstheRadioOperatorwilltellyoutowaitorstandby.Afterhehascompleted histraffichewillaskyoutotransmityourinformation.
SC-324:6 RADIO SYSTEM (CONT)There may be times that TSC or EOF will be receiving communications from a team that you cannot hear.If this happens the Radio Operator will tell you to wait or standby.After he has completed his traffic he will ask you to transmit your information.
Rememberthisisonebigpartyline;everyonecan'ttalkatonce.WhenyouhavebeendirectedtosecureyourSurveyTeam,turntheradiooffandplaceitinthechargerlocatedintheSurveyTeamRoomattheSurveyCenter.  
Remember this is one big party line;everyone can't talk at once.When you have been directed to secure your Survey Team, turn the radio off and place it in the charger located in the Survey Team Room at the Survey Center.  


SC-324'MODELVAS-2EARMARK'<LOUDMOUTHnVOICEAMPLIFICATION SYSTEMThe"LoudMouth"Systemisdesignedtoprovidevoiceamplification forindividuals wearingrespiratory protection devices.Equipment Check:A.EarmarkThroatMicrophone ModelTM-1Figure1(attached) showstheproper"atrest"positionforthemicrophone.
SC-324'MODEL VAS-2 EARMARK'<LOUD MOUTHn VOICE AMPLIFICATION SYSTEM The"Loud Mouth" System is designed to provide voice amplification for individuals wearing respiratory protection devices.Equipment Check: A.Earmark Throat Microphone Model TM-1 Figure 1 (attached) shows the proper"at rest" position for the microphone.
Ifitisnecessary toreformthespringtension,holdthemicrophone, startingtwoinchesbehindthemicrophone head,betweenthethumbandforefinger andbendthecablesmallamountswhileprogressing downthecableuntiltheendofthespringisfelt.Checkthediameterofthecoilandrepeatifnecessary.
If it is necessary to reform the spring tension, hold the microphone, starting two inches behind the microphone head, between the thumb and forefinger and bend the cable small amounts while progressing down the cable until the end of the spring is felt.Check the diameter of the coil and repeat if necessary.
Notethatthemicrophone headshouldtiltupfromaflatsurfaceabout1/4inch.Ifnecessary, formthespringtogivethisdimension.
Note that the microphone head should tilt up from a flat surface about 1/4 inch.If necessary, form the spring to give this dimension.
Equipment Operation:
Equipment Operation:
A.,C.Ensuremicrophone cableissecurelyconnected tojackonvoiceamplifier.
A., C.Ensure microphone cable is securely connected to jack on voice amplifier.
Themicrophone isdesignedtobelocatedontherightsideofthethroat(seefigure2).Themicrophone mustlayflatontheneckandpressfirmlyintothethroat.Securelyfastenamplifier unittobelt.D.Tooperateunit,turnvolumecontrolclockwise.
The microphone is designed to be located on the right side of the throat (see figure 2).The microphone must lay flat on the neck and press firmly into the throat.Securely fasten amplifier unit to belt.D.To operate unit, turn volume control clockwise.
Talkswitchinuppositionisinstandbymode.Slideswitchtodownpositiontotalk.Adjustvolumetodesiredlevelwithvolumecontrol.,
Talk switch in up position is in standby mode.Slide switch to down position to talk.Adjust volume to desired level with volume control., ,NOTE: When communicating through radio, telephone, etc., speak precisely.
,NOTE:Whencommunicating throughradio,telephone, etc.,speakprecisely.
Keep speaker at least 12" from the throat mic.Keep the means of communication 12" from the throat mic.Hold the means of communication off to the side of the speaker.If any feedback is apparent, lower volume.E~F.Turn unit off by turning volume control counter clockwise as far as it will turn.Leave talk switch in the standby position.Batteries:
Keepspeakeratleast12"fromthethroatmic.Keepthemeansofcommunication 12"fromthethroatmic.Holdthemeansofcommunication offtothesideofthespeaker.Ifanyfeedbackisapparent, lowervolume.E~F.Turnunitoffbyturningvolumecontrolcounterclockwise asfarasitwillturn.Leavetalkswitchinthestandbyposition.
A 9-volt Alkaline Battery is the required power source.The battery is located in the amplifier unit.To replace battery, remove cover plate to battery compartment.
Batteries:
Pull plastic tab, remove and replace battery.Note: Small terminal (+)in first.  
A9-voltAlkalineBatteryistherequiredpowersource.Thebatteryislocatedintheamplifier unit.Toreplacebattery,removecoverplatetobatterycompartment.
Pullplastictab,removeandreplacebattery.Note:Smallterminal(+)infirst.  


SC-324:8SlightbendhereOnaflatsurfacethemicshouldrestabout1/4"abovesaidsurfaceWhenmicislaidonaflatsurfaceitshouldformacircle2to21/2"india.depending onusersize.Efithasbeenstretched toformalargercircletheinbuiltspringwireshouldbereformedtoproducethediameters indicated.
SC-324:8 Slight bend here On a flat surface the mic should rest about 1/4" above said surface When mic is laid on a flat surface it should form a circle 2 to 2 1/2" in dia.depending on user size.Ef it has been stretched to form a larger circle the inbuilt spring wire should be reformed to produce the diameters indicated.
Thisinsuresproperthroatpress-ureforoptimumsoundquality.Fig.1MictopressonrightsideofwearersvoiceboxFig.2  
This insures proper throat press-ure for optimum sound quality.Fig.1 Mic to press on right side of wearers voice box Fig.2  


SC-324'9RM-14RADIATION SURVEYMETEREQUIPMENT CHECKDisconnect powercordfrombackofmetertakingcarenottoturntestswitchon.2.3.EnsurethatanHP-190probeisconnected tothedetectorjack.Turnrangeswitchtobattery.Metershouldreadinthe"BATT-OK" area.4~5.Performinstrument sourcecheck.Obtain'sourcefromsafeandverifymeterreadingcorresponds toattachedcardthenlogmeterreadingontosourcechecklog.Turnrangeswitchtooff.EQUIPMENT OPERATIONS 2.3~TurnrangeswitchtoXI.Placeresponseswitchinthe"SLOW"position.
SC-324'9 RM-14 RADIATION SURVEY METER EQUIPMENT CHECK Disconnect power cord from back of meter taking care not to turn test switch on.2.3.Ensure that an HP-190 probe is connected to the detector jack.Turn range switch to battery.Meter should read in the"BATT-OK" area.4~5.Perform instrument source check.Obtain'source from safe and verify meter reading corresponds to attached card then log meter reading onto source check log.Turn range switch to off.EQUIPMENT OPERATIONS 2.3~Turn range switch to XI.Place response switch in the"SLOW" position.Adjust the volume control so that the audio indication (a click)'can be heard.4~The range switch should be adjusted such that the highest.reading gives a mid-scale deflection.
Adjustthevolumecontrolsothattheaudioindication (aclick)'canbeheard.4~Therangeswitchshouldbeadjustedsuchthatthehighest.readinggivesamid-scale deflection.
5.All readings must be multiplied by the range switch setting (X1, X10, X100).6.2,200 CPM is approximately 1 mrem/hour.
5.Allreadingsmustbemultiplied bytherangeswitchsetting(X1,X10,X100).6.2,200CPMisapproximately 1mrem/hour.
Maximum scale is 50,000 CPM or 23 mR/hr.7 0 Upon completion of the survey turn the unit off and return it to the Survey Team Room.Unit should be recharged before the next, use.  
Maximumscaleis50,000CPMor23mR/hr.70Uponcompletion ofthesurveyturntheunitoffandreturnittotheSurveyTeamRoom.Unitshouldberecharged beforethenext,use.  


SC-324:10 AUTODIGI-MASTER DOSERATEMETEREQUIPMENT CHECK1~2.Turnunitontobesurethatthedigitaldisplaylights.IIPerforminstrument sourcecheck.Obtainsourcefrom'safeandverifythatmeterreadingcorresponds toattached, cardthenlogmeterreadingintosourcechecklog.EQUIPMENT OPERATIONS 1~Allowunittocompleteonecycle(displaywillblink)beforereadingwhenturningunitonorwhenradiation levelchangessignificantly.
SC-324:10 AUTO DIGI-MASTER DOSE RATE METER EQUIPMENT CHECK 1~2.Turn unit on to be sure that the digital display lights.I I Perform instrument source check.Obtain source from'safe and verify that meter reading corresponds to attached, card then log meter reading into source check log.EQUIPMENT OPERATIONS 1~Allow unit to complete one cycle (display will blink)before reading when turning unit on or when radiation level changes significantly.
2~Unitwillautomatically changefromonerangetothenext.Thereadingisalwaysdirect.TheDigi-Master maybeusedtodetectthepresenceofBetabutcannotbeusedfordosemeasurement ofBeta.Also,Betadetection isonlyeffective whentheunitisoperating inthemrem/hour range.a.TakeareadingwiththeBetawindowclosedandrecord.b.TakeareadingwiththeBetawindowopenedandrecord.c.IfthereadingwiththeBetawindowopenisgreaterthanthereadingwiththeBetawindowclosedthereisBetaradiation present.d.IfaBetadoserateisneededasurveywithanRO-2orequivalent instrument must.bemade.4~Uponcompletion ofthesurvey,turnunitoffandreturnittotheSurveyTeamRoom.Unitshouldberecharged beforethenextuse.  
2~Unit will automatically change from one range to the next.The reading is always direct.The Digi-Master may be used to detect the presence of Beta but cannot be used for dose measurement of Beta.Also, Beta detection is only effective when the unit is operating in the mrem/hour range.a.Take a reading with the Beta window closed and record.b.Take a reading with the Beta window opened and record.c.If the reading with the Beta window open is greater than the reading with the Beta window closed there is Beta radiation present.d.If a Beta dose rate is needed a survey with an RO-2 or equivalent instrument must.be made.4~Upon completion of the survey, turn unit off and return it to the Survey Team Room.Unit should be recharged before the next use.  


SC-324:11 RO-2DOSERATEMETEREQUIPMENT CHECKTurnthefunctionselectorswitchtothe"BATT1"and"BATT2"positions.
SC-324:11 RO-2 DOSE RATE METER EQUIPMENT CHECK Turn the function selector switch to the"BATT 1" and"BATT 2" positions.
Metershouldindicateabovethebatterycut-offline.2~Performinstrument sourcecheck.Obtainsourcefromsafeandverifythatmeterreadingcorresponds toattachedcardthenlogmeterreadingontosourcechecklog.EQUIPMENT OPERATION 1~0'erothemeterbyturningthefunctionselectorswitchto"ZERO"andturningthe"ZEROADZ"knobasnecessary.
Meter should indicate above the battery cut-off line.2~Perform instrument source check.Obtain source from safe and verify that meter reading corresponds to attached card then log meter reading onto source check log.EQUIPMENT OPERATION 1~0'ero the meter by turning the function selector switch to"ZERO" and turning the"ZERO ADZ" knob as necessary.
Thezeroadjustmaybemadeinaradiation fieldbyplacingthefunctionselectorswitchat"ZEROADJ".Tomeasuretheradiation field,positionthefunctionselectorswitchtothelowestrangewhichprovidesamid-scale deflection ofthemeter.3~WiththeBetashieldclosedthemeterwillreadthewholebodyGammadoserate.4~ToobtainaBetadoseratemeasurement performthefollow-ing:CAUTION:Thefaceofthebetawindowisverythin.WhenevertheBetashieldisopen,guardtheshieldagainstdamagebypunctureorcontamination bydustordirt.a.Takeanareameasurement withtheBetashieldclosed.b.OpentheslidingBetashieldonthebottomofthecaseandtakeanareameasurement.
The zero adjust may be made in a radiation field by placing the function selector switch at"ZERO ADJ".To measure the radiation field, position the function selector switch to the lowest range which provides a mid-scale deflection of the meter.3~With the Beta shield closed the meter will read the whole body Gamma dose rate.4~To obtain a Beta dose rate measurement perform the follow-ing: CAUTION: The f ace o f the beta window is very thin.Whenever the Beta shield is open, guard the shield against damage by puncture or contamination by dust or dirt.a.Take an area measurement with the Beta shield closed.b.Open the sliding Beta shield on the bottom of the case and take an area measurement.
c.SubtracttheclosedshieldreadingfromtheopenshieldreadingandmultiplybytheBetacorrection factormarkedontheinstrument.
c.Subtract the closed shield reading from the open shield reading and multiply by the Beta correction factor marked on the instrument.
d.ThisnumberistheBetadoserateforthatarea.5.Whenthesurveyiscompleted turnthefunctionselectorswitchtoOFF.  
d.This number is the Beta dose rate for that area.5.When the survey is completed turn the function selector switch to OFF.  


SC-324:12 BATTERYPOWEREDLOWVOLUMEAIRSAMPLEREQUIPMENT CHECK1~2~Disconnect fromBatteryCharger.Attachsamplingheadandfiltermediumtofilterhousinginlet.3~4~Removeanti-tamper coverplateandplacemasterON/OFFswitchinONposition.
SC-324:12 BATTERY POWERED LOW VOLUME AIR SAMPLER EQUIPMENT CHECK 1~2~Disconnect from Battery Charger.Attach sampling head and filter medium to filter housing inlet.3~4~Remove anti-tamper cover plate and place master ON/OFF switch in ON position.This switch also resets the time.The switch is located in the lower left hand corner.Turn unit on using ON/OFF switch located to the right of the digital display.NOTE: Master ON/OFF switch must be on for unit to operate.Master ON/OFF switch also resets time display.6.7~If charge status of unit is known, temporarily start unit and press the test button."BATT." LED should light indicating a charge of 954 or greater.If LED does not light, recharge unit before use.Turn unit off.Replace anti-tamper cover.EQUIPMENT OPERATION 1~2~Ensure filter cartridge contains a GY-130 Silver Zeolite cartridge and a particulate filter.Connect filter cartridge to sampler.At start of sampling period record start time, press test, record time in digital display and a flow of 4.0 LPM on sample envelopes and reverse of MPP.Turn unit on using ON/OFF switch located to the right of the digital display.NOTE: Master ON/OFF switch must be on for unit to operate.Master ON/OFF switch also resets time display.  
Thisswitchalsoresetsthetime.Theswitchislocatedinthelowerlefthandcorner.TurnunitonusingON/OFFswitchlocatedtotherightofthedigitaldisplay.NOTE:MasterON/OFFswitchmustbeonforunittooperate.MasterON/OFFswitchalsoresetstimedisplay.6.7~Ifchargestatusofunitisknown,temporarily startunitandpressthetestbutton."BATT."LEDshouldlightindicating achargeof954orgreater.IfLEDdoesnotlight,rechargeunitbeforeuse.Turnunitoff.Replaceanti-tamper cover.EQUIPMENT OPERATION 1~2~Ensurefiltercartridge containsaGY-130SilverZeolitecartridge andaparticulate filter.Connectfiltercartridge tosampler.Atstartofsamplingperiodrecordstarttime,presstest,recordtimeindigitaldisplayandaflowof4.0LPMonsampleenvelopes andreverseofMPP.TurnunitonusingON/OFFswitchlocatedtotherightofthedigitaldisplay.NOTE:MasterON/OFFswitchmustbeonforunittooperate.MasterON/OFFswitchalsoresetstimedisplay.  


SC-324:13BATTERYPOWEREDLOWVOLUMEAIRSAMPLER(CONT)Ifthe"FAULT"LEDislit.Thiswasactivated byeitheranundervoltage, overcurrent, oroverpressure (restri.'cted flor)beyondtheunitscapability.
SC-324: 13 BATTERY POWERED LOW VOLUME AIR SAMPLER (CONT)If the"FAULT" LED is lit.This was activated by either an undervoltage, overcurrent, or overpressure (restri.'cted flor)beyond the units capability.
Themotorisstoppedandthetimeislatched.Bypressingthe"TEST"button,thetime(inminutes)intosamplingatwhichthefaultoccurredwillbedisplayed indicating avalidsampleperiod.NOTE:Thetimerstopsafter15-30secondsintoafaultcondition topreventunnecesary shutdown.
The motor is stopped and the time is latched.By pressing the"TEST" button, the time (in minutes)into sampling at which the fault occurred will be displayed indicating a valid sample period.NOTE: The timer stops after 15-30 seconds into a fault condition to prevent unnecesary shutdown.At end of sampling period turn pump off using ON/OFF switch located to right of digital display.Press TEST button, record time in digital display, stop time and all other pertinent information on may and envelopes.
AtendofsamplingperiodturnpumpoffusingON/OFFswitchlocatedtorightofdigitaldisplay.PressTESTbutton,recordtimeindigitaldisplay,stoptimeandallotherpertinent information onmayandenvelopes.
Sample volume in liters equals the flow rate in liters per minute multiplied by minutes the sampler operated.The sampler has a fixed flow rate of 4 liters per minute.If the unit was operated for thirty minutes, the ample volume would equal 120 liters (4 x 30=120).  
Samplevolumeinlitersequalstheflowrateinlitersperminutemultiplied byminutesthesampleroperated.
Thesamplerhasafixedflowrateof4litersperminute.Iftheunitwasoperatedforthirtyminutes,theamplevolumewouldequal120liters(4x30=120).  


SC-324:14APPENDIXIIIRRADIATION SURVEYINSTRUCTIONS
SC-324: 14 APPENDIX II IRRADIATION SURVEY INSTRUCTIONS


SC-324:15 GENERALAREARADIATION SURVEY2~Ageneralradiation areasurveyshouldbeconducted whilemovingbetweendefinedsurveypoints,andatthespecificsurveypoints.Thesurveyshouldbeconducted usinganRM-14Radiation MonitorwithanHP-190probe.3.Whenconducting amovingsurvey,theHP-190probeshouldbeheldinahorizontal positionandprotected fromtheelementsandwind.4~IftheRM-14readingchangesmorethan1,000CPMstopandconductasurveyforBetausingtheAutoDigi-Master orRO-2.5.ReporttheresultsofthesurveytotheRadioOperatoratthenextsurveypoint,oraftercompletion oftheBetasurvey.  
SC-324:15 GENERAL AREA RADIATION SURVEY 2~A general radiation area survey should be conducted while moving between defined survey points, and at the specific survey points.The survey should be conducted using an RM-14 Radiation Monitor with an HP-190 probe.3.When conducting a moving survey, the HP-190 probe should be held in a horizontal position and protected from the elements and wind.4~If the RM-14 reading changes more than 1,000 CPM stop and conduct a survey for Beta using the Auto Digi-Master or RO-2.5.Report the results of the survey to the Radio Operator at the next survey point, or after completion of the Beta survey.  


SC-324:16 SURVEYTODETERMINE PRESENCEOFBETARADIATION IftheGeneralAreaRadiation Surveyshowsachangeof1000CPMontheRM-14,orifthe"plume"issuspected tobeinyourarea,asurveytodetectthepresenceofBetaradiation shouldbeconducted.
SC-324:16 SURVEY TO DETERMINE PRESENCE OF BETA RADIATION If the General Area Radiation Survey shows a change of 1000 CPM on the RM-14, or if the"plume" is suspected to be in your area, a survey to detect the presence of Beta radiation should be conducted.
2~UsinganAutoDigi-Master, orRO-2doseratemeterconductthefollowing surveys.a.Withthedetectorwindowaimedup:BetashieldopenBetashieldclosedDifference gl=(openreading-closedreading)b.Withthedetectorwindowaimeddown:3~BetashieldopenBetashieldclosedDifference g2=(openreading-closedreading)I1feitherdifference glordifference g2fromStep2ispositivethisisanindication thatBetaradiation ispresent.a.Ifbothdifference g1and42arepositive, thisisanindication thatyouareintheplume.b.Ifonlydifference glispositive, thisisanindica-tionthattheplumeisoverhead.
2~Using an Auto Digi-Master, or RO-2 dose rate meter conduct the following surveys.a.With the detector window aimed up: Beta shield open Beta shield closed Difference gl=(open reading-closed reading)b.With the detector window aimed down: 3~Beta shield open Beta shield closed Difference g2=(open reading-closed reading)I 1f either difference gl or difference g2 from Step 2 is positive this is an indication that Beta radiation is present.a.If both difference g1 and 42 are positive, this is an indication that you are in the plume.b.If only difference gl is positive, this is an indica-tion that the plume is overhead.Report the results of the survey to the Radio Operator and await further instructions from the Dose Assessment Manager.  
ReporttheresultsofthesurveytotheRadioOperatorandawaitfurtherinstructions fromtheDoseAssessment Manager.  


SC-324:17 LOWVOLUMEAIRSAMPLE1~2~DrawairthroughaGY-130silverzeolitecartridge andparticula'te filterusingalowvolumeairsamplerforapproximately 30minutes.IRecordthy.sampledate,time,andlocationontwosampleenvelopes andonthebackofthesurveymap.3~4~Determine thebackground radiation levelusingtheRM-14Radiation MonitorandHP-190probe.Recordthereadingoneachenvelope, andonthesurveymap.UsingonionskinglovesremovetheGY-130silverzeolitecartridge fromthesampleholderandreadtheactivitylevelwiththeRM-14Radiation MonitorandHP-190probe,byholdingtheprobewindowontheinletsideofthesilverzeolitecartridge.
SC-324:17 LOW VOLUME AIR SAMPLE 1~2~Draw air through a GY-130 silver zeolite cartridge and particula'te filter using a low volume air sampler for approximately 30 minutes.I Record thy.sample date, time, and location on two sample envelopes and on the back of the survey map.3~4~Determine the background radiation level using the RM-14 Radiation Monitor and HP-190 probe.Record the reading on each envelope, and on the survey map.Using onion skin gloves remove the GY-130 silver zeolite cartridge from the sample holder and read the activity level with the RM-14 Radiation Monitor and HP-190 probe, by holding the probe window on the inlet side of the silver zeolite cartridge.
DONOTTOUCHTHEPROBEWINDOWWITHTHECARTRIDGE.
DO NOT TOUCH THE PROBE WINDOW WITH THE CARTRIDGE.
Recordthereadingononeenvelopeandplacethecartridge inthatenvelope.
Record the reading on one envelope and place the cartridge in that envelope.Record the reading on the back of the survey map.5.Read the activity level of the particulate filter using the RM-14 Radiation Monitor and HP-190 probe.DO NOT TOUCH THE PROBE WINDOW WITH THE PARTICULATE FILTER~Record the reading on the other envelope and place the particulate filter in the envelope.Record the reading on the back of the survey map.6.Remove the onion skins and discard in a plastic bag.Treat as contaminated material.7~Report the following information to the Radio Operator: a~b.c~d.e.f.Sample location Date and Time sample was taken Volume of air sample in liters (See page 13 for calculations)
Recordthereadingonthebackofthesurveymap.5.Readtheactivityleveloftheparticulate filterusingtheRM-14Radiation MonitorandHP-190probe.DONOTTOUCHTHEPROBEWINDOWWITHTHEPARTICULATE FILTER~Recordthereadingontheotherenvelopeandplacetheparticulate filterintheenvelope.
Recordthereadingonthebackofthesurveymap.6.Removetheonionskinsanddiscardinaplasticbag.Treatascontaminated material.
7~Reportthefollowing information totheRadioOperator:
a~b.c~d.e.f.SamplelocationDateandTimesamplewastakenVolumeofairsampleinliters(Seepage13forcalculations)


===Background===
===Background===
countrateincpmGY-130silverzeolitecartridge countrateincpmParticulate filtercountrateincpmNOTE:Fieldcalculations oftheairborneactivitylevelmaybeperformed asfollows:(SC-421)Samplevolumeinlitersequalstheflowrate(4LPM)timesminutesthesampleroperated.  
count rate in cpm GY-130 silver zeolite cartridge count rate in cpm Particulate filter count rate in cpm NOTE: Field calculations of the airborne activity level may be performed as follows: (SC-421)Sample volume in liters equals the flow rate (4 LPM)times minutes the sampler operated.  


SC-324:18 LOWVOLUMEAIRSAMPLE(CONT)Iodine-131 (GY-130cartridge)
SC-324:18 LOW VOLUME AIR SAMPLE (CONT)Iodine-131 (GY-130 cartridge)
CPMSamle-CPMBackround8.3x10-8(VolumeofSampleinLiters)Particulate CPMSamle.-CPMBackround2.4x10-8(VolumeofSampleinLiters)uci/ccIodine-131 uci/ccParticulate
CPM Sam le-CPM Back round 8.3 x 10-8 (Volume of Sample in Liters)Particulate CPM Sam le.-CPM Back round 2.4 x 10-8 (Volume of Sample in Liters)uci/cc Iodine-131 uci/cc Particulate


SC-324:19CHANGINGFILTERSATFIXEDENVIRONMENTAL STATIONSRecordthefollowing information onthesampleenvelopeleftfromthepreviousfilterchange:a~b.cd.e.DateTimeSystemVacuum(inches)Gasmeterreading(cubicfeet)Totalhourmeter(recordincolumnmarked"OFF")TurnpumpoffUsingonionskinglovesremovethefilterholderatthequickdisconnect joint.Unscrewtheoutsideretaining ringandremovetheparticu-latefilterfromtheholderandplaceinthesampleenvelope.
SC-324: 19 CHANGING FILTERS AT FIXED ENVIRONMENTAL STATIONS Record the following information on the sample envelope left from the previous filter change: a~b.c d.e.Date Time System Vacuum (inches)Gasmeter reading (cubic feet)Total hour meter (record in column marked"OFF")Turn pump off Using onion skin gloves remove the filter holder at the quick disconnect joint.Unscrew the outside retaining ring and remove the particu-late filter from the holder and place in the sample envelope.If a charcoal or zeolite cartridge was in use transfer the information on the particulate filter envelope to a new envelope and place the cartridge in the envelope.Place a new GY-130 silver zeolite cartridge in the sample head.Place a new particulate filter in the holder, replace the retaining ring and reconnect holder to the pump at the quick disconnect joint.Remove onion skins and place in a plastic bag.Treat's contaminated.
Ifacharcoalorzeolitecartridge wasinusetransfertheinformation ontheparticulate filterenvelopetoanewenvelopeandplacethecartridge intheenvelope.
Turn the pump on.Record the following information to two new envelopes.
PlaceanewGY-130silverzeolitecartridge inthesamplehead.Placeanewparticulate filterintheholder,replacetheretaining ringandreconnect holdertothepumpatthequickdisconnect joint.Removeonionskinsandplaceinaplasticbag.Treat'scontaminated.
Mark one envelope"GY-130 silver zeolite".a~b.c~d.e.f.Station number Date Time System vacuum (inches)Gasmeter reading (cubic feet)Total hour meter (record in the"ON" column)Place the new envelopes inside the monitor cabinet.  
Turnthepumpon.Recordthefollowing information totwonewenvelopes.
Markoneenvelope"GY-130silverzeolite".
a~b.c~d.e.f.StationnumberDateTimeSystemvacuum(inches)Gasmeterreading(cubicfeet)Totalhourmeter(recordinthe"ON"column)Placethenewenvelopes insidethemonitorcabinet.  


SC-324:20 CHANGINGFILTERSATFIXEDENVIRONMENTAL STATIONS(CONT)Bringtheenvelopes containing thecartridge/filter removedtotheSurveyCenteratthecompletion ofyourassignedrouteorwhendirectedbytheDoseAssessment Manager.  
SC-324:20 CHANGING FILTERS AT FIXED ENVIRONMENTAL STATIONS (CONT)Bring the envelopes containing the cartridge/filter removed to the Survey Center at the completion of your assigned route or when directed by the Dose Assessment Manager.  


SC-324:21APPENDIXIIIONSITERADIATION SURVEYTEAMINSTRUCTIONS
SC-324: 21 APPENDIX III ON SITE RADIATION SURVEY TEAM INSTRUCTIONS


SC-324:22 BLUETEAMSURVEYROUTEINSTRUCTIONS 2.3.FromtheSurveyCenterproceednortheast totheedgeofthegrass.PTurnsouthacrossthelawnandproceedtoenvironmental stationg4andchangethefilterandcartridge perinstru-ctionsinAppendixII.Proceedsoutheast toManorHousedriveway, followdrivewaytowhereitturnsnorth,proceedeastoutofthetreesintoorchard.4~Gothroughorchard,thenturnnorthandproceedtoenviro-nmentalstation53andchangethefilterandcartridge.
SC-324:22 BLUE TEAM SURVEY ROUTE INSTRUCTIONS 2.3.From the Survey Center proceed northeast to the edge of the grass.P Turn south across the lawn and proceed to environmental station g4 and change the filter and cartridge per instru-ctions in Appendix II.Proceed southeast to Manor House driveway, follow driveway to where it turns north, proceed east out of the trees into orchard.4~Go through orchard, then turn north and proceed to enviro-nmental station 53 and change the filter and cartridge.
5.6.7.ProceedwestacrossfieldandthroughwoodstoManorHousedriveway.
5.6.7.Proceed west across field and through woods to Manor House driveway.Go north on Manor House driveway to the lake shore.Proceed east to environmental station g2 and change the filter and cartridge.
GonorthonManorHousedrivewaytothelakeshore.Proceedeasttoenvironmental stationg2andchangethefilterandcartridge.
8.9.Proceed west, along the lake shore to the plant fence.Proceed along the plant fence to the Guard House.10.If the Central Alarm Station (CAS)and Secondary Alarm Station (SAS)are manned contact CAS on the radio for access to the site.Otherwise obtain a"hard key" to gain access to the site from the Survey Manager.12.Proceed east from the Guard House along access road and across south side of plant building.Circle across grass towards Upper-Radwaste Storage Area, continuing to plant fence.13'ontinue west along plant fence to the Screenhouse.
8.9.Proceedwest,alongthelakeshoretotheplantfence.ProceedalongtheplantfencetotheGuardHouse.10.IftheCentralAlarmStation(CAS)andSecondary AlarmStation(SAS)aremannedcontactCASontheradioforaccesstothesite.Otherwise obtaina"hardkey"togainaccesstothesitefromtheSurveyManager.12.ProceedeastfromtheGuardHousealongaccessroadandacrosssouthsideofplantbuilding.
Proceed south along side of plant building and return to Guard House.15.Report to Radio Operator for instructions.  
CircleacrossgrasstowardsUpper-Radwaste StorageArea,continuing toplantfence.13'ontinuewestalongplantfencetotheScreenhouse.
ProceedsouthalongsideofplantbuildingandreturntoGuardHouse.15.ReporttoRadioOperatorforinstructions.  


SC-324:23 YELLOWTEAMSURVEYROUTEINSTRUCTIONS ProceedwestfromtheSurveyCentertotheplantsiteroad.Continuenorthacrossthebridgetoenvironmental stationg5andchangethefilterandcartridge.
SC-324:23 YELLOW TEAM SURVEY ROUTE INSTRUCTIONS Proceed west from the Survey Center to the plant site road.Continue north across the bridge to environmental station g5 and change the filter and cartridge.
ProceedwestalongDeerCreekandtheparkinglottoenvironmental stationg6andchangethefilterandcartridge perinstructions inAppendixII.Proceedwestthroughtheappleorchardapproximately 100yards.Turnnorththroughtheappleorchard,towardsthehill,tothenorthwest corneroftheplantfence.Proceedsouthalongtheplantfencetoenvironmental stationg7andchangethefilterandcartridge.
Proceed west along Deer Creek and the parking lot to environmental station g6 and change the filter and cartridge per instructions in Appendix II.Proceed west through the apple orchard approximately 100 yards.Turn north through the apple orchard, towards the hill, to the northwest corner of the plant fence.Proceed south along the plant fence to environmental station g7 and change the filter and cartridge.
ContinuealongtheplantfencetotheGuardHouse.IftheCentralAlarmStation(CAS)andSecondary AlarmStation(SAS)aremannedcontactCASontheradioforaccesstothesite.Otherwise obtaina"hardkey"togainaccesstothesitefromtheSurveyManager.ProceedwestfromGuardHousetotheaccessroad.~Continuenorthontheaccessroadandacrossthegrasstotheplantfence.Proceedeastalongtheplantfencetothedischarge canal.ProceedsouthalongthewestsideoftheplantbuildingandreturntotheGuardHouse.ReporttoRadioOperatorforinstructions.  
Continue along the plant fence to the Guard House.I f the Central Alarm Station (CAS)and Secondary Alarm Station (SAS)are manned contact CAS on the radio for access to the site.Otherwise obtain a"hard key" to gain access to the site from the Survey Manager.Proceed west from Guard House to the access road.~Continue north on the access road and across the grass to the plant fence.Proceed east along the plant fence to the discharge canal.Proceed south along the west side of the plant building and return to the Guard House.Report to Radio Operator for instructions.  
~gi LAKEONTARIOIIIIIIIIIIIII1IIIOKCX0K0IIIIL04IIIIIIIIIII)<<-x-I"IIIIXIIIISoIII0PARKINGLOTrkIIT0rrIIIIIISfIIL0IIlIIIrr/////4ONSITESURVEYMAPNOSCALEPATE:TEAMMEMBERSGLUEI2TIME:YELLOWl2SUGGESTED ROUTE  
~gi LAKE ONTARIO I I I I I I I I I I I I I 1 I I I O K C X 0 K 0 III IL 0 4 I I I I I I I I I I I)<<-x-I" I I I IX I I I IS o III 0 PARKING LOT r k I I T 0 r r I I I I I IS f I I L 0 I I l I I I r r/////4 ONSITE SURVEY MAP NO SCALE PATE: TEAM MEMBERS GLUE I 2 TIME: YELLOW l 2 SUGGESTED ROUTE  
'
'
ROCHESTER GASANDELECTRICCORPORATIO GXNNASTATIONCONTROLLED COPYNUMBERPROCEDURE NQ.SC-420REV.NO.15ESTIMATING OFF-SITEDOSESPORCREVIEWDATEPLANTSUPERXNNTEFFECTXVE DATEQANON-QACATEGORY1.0REVIEWEDBY'MXSPROCEDURE CONTAXNS33PAGES I6 SC-420-1SC-420ESTIMATING OFF-SITEDOSES1~0HJRPOSE:Thepurposeofthisprocedure istoprovideestimates byaHealthPhysicist ofthepostaccidentdoseintheareasaroundtheplantandguidancefortheselection ofsamplinglocations.
ROCHESTER GAS AND ELECTRIC CORPORATIO GXNNA STATION CONTROLLED COPY NUMBER PROCEDURE NQ.SC-420 REV.NO.15 ESTIMATING OFF-SITE DOSES PORC REVIEW DATE PLANT SUPERXN NT EFFECTXVE DATE QA NON-QA CATEGORY 1.0 REVIEWED BY'MXS PROCEDURE CONTAXNS 33 PAGES I 6 SC-420-1 SC-420 ESTIMATING OFF-SITE DOSES 1~0 HJRPOSE: The purpose of this procedure is to provide estimates by a Health Physicist of the post accident dose in the areas around the plant and guidance for the selection of sampling locations.
Information isneededearlytodecidewhatactionbetakentolimittheexposureofthegeneralpublic.Stepsmustbetakentodefinetheaffectedareas,assesstheextentandsignificance ofthereleaseandprovidedataonwhichappropriate protective actionscanbebased.2'2.12.22'
Information is needed early to decide what action be taken to limit the exposure of the general public.Steps must be taken to define the affected areas, assess the extent and significance of the release and provide data on which appropriate protective actions can be based.2'2.1 2.2 2'


==REFERENCES:==
==REFERENCES:==


NuclearEmergency ResponsePlanN.Y.S.Radiological Emergency Preparedness PlanSC-100,SC-442,SC-450S-14'2~52'EPA-520,ManualoProtective AetioGuidesandPotec-tiveActionsforNuclearIncidents (Feb.1980).Regulatory Guide1.1093'INSTRUCTIONS:
Nuclear Emergency Response Plan N.Y.S.Radiological Emergency Preparedness Plan SC-100, SC-442, SC-450 S-14'2~5 2'EPA-520, Manual o Protective Aetio Guides and P otec-tive Actions for Nuclear Incidents (Feb.1980).Regulatory Guide 1.109 3'INSTRUCTIONS:
3'3'.13~1.23.1.33.1.4Thefollowing equipment isavailable for.useinestima-tingdoses.Xu/QIsopleths, andXu/Qtabulated values(Table1).Mapofsurrounding area,U.S.Geological Survey(1inch:24000inchscale).ControlRoomwindandtemperature indicators.
3'3'.1 3~1.2 3.1.3 3.1.4 The following equipment is available for.use in estima-ting doses.Xu/Q Isopleths, and Xu/Q tabulated values (Table 1).Map of surrounding area, U.S.Geological Survey (1 inch: 24000 inch scale).Control Room wind and temperature indicators.
ControlRoomRadiation MonitorSystem.
Control Room Radiation Monitor System.
F8lg1I1 SC-420.:2 3.1.5Back-upwindspeedanddirection indicators atStation204*,andNationalWeatherService.Supple-mentalwindspeedindicators atStation230**.*Locatedonthe.southsideofRoute104betweenSlocumandLakesideRoadsinOntario.**Located at1102AtlanticAvenuebetweenLincolnRoadandRoute350inWalworth.
F 8 lg1I 1 SC-420.:2 3.1.5 Back-up wind speed and direction indicators at Station 204*, and National Weather Service.Supple-mental wind speed indicators at Station 230**.*Located on the.south side of Route 104 between Slocum and Lakeside Roads in Ontario.**Located at 1102 Atlantic Avenue between Lincoln Road and Route 350 in Walworth.3'.6 3'3~2~1 3''Alternatively the procedure can be accomplished using the IBM PC EOF5MODA procedure.
3'.63'3~2~13''Alternatively theprocedure canbeaccomplished usingtheIBMPCEOF5MODAprocedure.
Prelimina Radiolo ical Estimates and Event Classif-~icat la For initial notification purposes, a first-cut estimate of potential offsite doses and releases may be obtained by the Control Room using SC-240, Attachment I.Levels are provided for various accidents evaluated in the Ginna FSAR and in previous AEC Safety Evaluations for Ginna plant siting and design.It is preferable to base offsite estimates'pon measured release values.Vent activity concentrations and release rates can be determined from monitor calibration factors provided in Attachment VII, and from Procedure PC-23.5.3''An estimate of the 2 hr site boundary whole body dose from plant vent noble gas concentration, obtained from S-14.2 (low range monitor)or PC-23.5 (hi range monitor)may be obtained using the following equation: Plant vant (uCi/cc)x 18~a 2 hr whola body uCi/cc dose REM at site boundary~NO The following assumptions were made for these calculations:
Prelimina RadioloicalEstimates andEventClassif-~icatlaForinitialnotification
X/Q 4.8 x 10 4 sec/m (default value in lieu of actual meteorology data<assuming downwind mixing conditions 100 times more conservative than annual average conditions.
: purposes, afirst-cut estimateofpotential offsitedosesandreleasesmaybeobtainedbytheControlRoomusingSC-240,Attachment I.Levelsareprovidedforvariousaccidents evaluated intheGinnaFSARandinpreviousAECSafetyEvaluations forGinnaplantsitinganddesign.Itispreferable tobaseoffsiteestimates'pon measuredreleasevalues.Ventactivityconcentrations andreleaseratescanbedetermined frommonitorcalibration factorsprovidedinAttachment VII,andfromProcedure PC-23.5.3''Anestimateofthe2hrsiteboundarywholebodydosefromplantventnoblegasconcentration, obtainedfromS-14.2(lowrangemonitor)orPC-23.5(hirangemonitor)maybeobtainedusingthefollowing equation:
)Plant vent flow 77,000 cfm (3.63 x 107 cc/sec)EPA-520 whole body dose curve (t Ohr)  
Plantvant(uCi/cc)x18~a2hrwholabodyuCi/ccdoseREMatsiteboundary~NOThefollowing assumptions weremadeforthesecalculations:
'41 SC-420:3 3''Iodine effluent monitor or isotopic data are unavailable, a default valve of 1.0E-4 should be used to reflect the estimated release concentration ratio of gross iodine to noble gas.Note: When data is available calculate an Iodine to noble gas ratio that reflects present conditions.
X/Q4.8x104sec/m(defaultvalueinlieuofactualmeteorology data<assumingdownwindmixingconditions 100timesmoreconservative thanannualaverageconditions.
3.2'3.2.6 Determine the classification of the emergency with respect to plant releases and site boundary doses from the criteria provided in SC-100.Any preliminary dose estimates used as a basis for emergency classification or protective action recomm-endations should be refined as follows using release measurements and actual meteorological and field sampling data as they become available.
)Plantventflow77,000cfm(3.63x107cc/sec)EPA-520wholebodydosecurve(tOhr)  
3'Use of the EO TSC ZBM-PC Assessme t Com uter Pro ram 3~3~1 3'Refer to Attachment ZV"ZBM-PC Assessment Computer Program" for specific instructions to use the program.Use of Meteo olo ca a e e se D t w th EPA Dose F ctors Manual Met o 3.4.1 Obtain the temperature at 33'nd 250'rom the"Status Report Form", Control Room, TSC or Computer Terminal.From the 250'emperature subtract the 33'emperatu-re.Zf readings from the main weather tower are unavailable, proceed to step 3.4.2.1.T250'T33'elta T 3.4.1.1 Meteorological Data can be obtained by phone from the MIDAS storage computer in the Meteorological Tower Trailer by using the TI-Silent 700 Terminal.See Attachment ZZ for instructions.
'41 SC-420:33''Iodineeffluentmonitororisotopicdataareunavailable, adefaultvalveof1.0E-4shouldbeusedtoreflecttheestimated releaseconcentration ratioofgrossiodinetonoblegas.Note:Whendataisavailable calculate anIodinetonoblegasratiothatreflectspresentconditions.
3''Zf Delta T is<-1.9, the condition is unstable (Pascgxill Category B)'.Zf Delta T is>-1.9 and<-0.5, the condition is neutral (Pascpxill Category D).  
3.2'3.2.6Determine theclassification oftheemergency withrespecttoplantreleasesandsiteboundarydosesfromthecriteriaprovidedinSC-100.Anypreliminary doseestimates usedasabasisforemergency classification orprotective actionrecomm-endations shouldberefinedasfollowsusingreleasemeasurements andactualmeteorological andfieldsamplingdataastheybecomeavailable.
3'UseoftheEOTSCZBM-PCAssessmetComuterProram3~3~13'RefertoAttachment ZV"ZBM-PCAssessment ComputerProgram"forspecificinstructions tousetheprogram.UseofMeteoolocaaeeseDtwthEPADoseFctorsManualMeto3.4.1Obtainthetemperature at33'nd250'romthe"StatusReportForm",ControlRoom,TSCorComputerTerminal.
Fromthe250'emperature subtractthe33'emperatu-re.Zfreadingsfromthemainweathertowerareunavailable, proceedtostep3.4.2.1.T250'T33'elta T3.4.1.1Meteorological DatacanbeobtainedbyphonefromtheMIDASstoragecomputerintheMeteorological TowerTrailerbyusingtheTI-Silent 700Terminal.
SeeAttachment ZZforinstructions.
3''ZfDeltaTis<-1.9,thecondition isunstable(Pascgxill CategoryB)'.ZfDeltaTis>-1.9and<-0.5,thecondition isneutral(Pascpxill CategoryD).  
't'S)t~
't'S)t~
IfDeltaTis>-0.5,thecondition isstable(Pasquill CategoryF).NOTE:Condition isTodetermine thePasquillstability classA-G,seeAttachment VI.Intheeventthatmeteorological dataareunavailable fromthemainweathertower,datacanbeobtainedfromtheback-uptowerusingAttachment III.Ifdatacannotbeobtainedbyphone,theEmergency Coordinator shoulddirectanindividual toproceedtotheback-upweatherinstrument recorderatthetower.Iftheprimarytowertemperature sensorsarenotavailable todetermine stability, theindividual takingthereadingsshouldnotewindspeed(mph)winddirection (degrees) andapproximate fluctuation inwinddirection (degrees) averagedoverthelasthour.Thewinddirection fluctuation isdetermined byeyeballing orbydrawing2averagelinesthroughthelasthour'swinddirection
If Delta T is>-0.5, the condition is stable (Pasquill Category F).NOTE: Condition is To determine the Pasquill stability class A-G, see Attachment VI.In the event that meteorological data are unavailable from the main weather tower, data can be obtained from the back-up tower using Attachment III.If data cannot be obtained by phone, the Emergency Coordinator should direct an individual to proceed to the back-up weather instrument recorder at the tower.If the primary tower temperature sensors are not available to determine stability, the individual taking the readings should note wind speed (mph)wind direction (degrees)and approximate fluctuation in wind direction (degrees)averaged over the last hour.The wind direction fluctuation is determined by eyeballing or by drawing 2 average lines through the last hour's wind direction extremes, and subtracting the difference.
: extremes, andsubtracting thedifference.
Station 204 wind speed, wind direction and wind direction fluctuation readings are reported to the Technical Support Center by phone (ext.500 through 507)or by the plant P.A.The individual at Station 204 should request for further instructions from the Emergency Coordinator.
Station204windspeed,winddirection andwinddirection fluctuation readingsarereportedtotheTechnical SupportCenterbyphone(ext.500through507)orbytheplantP.A.Theindividual atStation204shouldrequestforfurtherinstructions fromtheEmergency Coordinator.
-To determine atmospheric stability from wind fluctua-tion, use the following table: W d luctuat o<45 degrees anytime)45 degrees night time stable (inversion) neutral 45 degrees-75 degrees daytime neutral>75 degrees daytime unstable (lapse)Select the Xu/Q plastic overlay matching the condition determined in 3.4.2 and attach to the area map.(Also tabulated Xu/Q values are given in the attached Table 1).~
-Todetermine atmospheric stability fromwindfluctua-tion,usethefollowing table:Wdluctuato<45degreesanytime)45degreesnighttimestable(inversion) neutral45degrees-75degreesdaytimeneutral>75degreesdaytimeunstable(lapse)SelecttheXu/Qplasticoverlaymatchingthecondition determined in3.4.2andattachtotheareamap.(Alsotabulated Xu/QvaluesaregivenintheattachedTable1).~
e~4i t' SC-420:5 Obtain wind speed and direction data from the"Status Report Form", the Control Room, TSC, Computer Terminal or alternatively from Station 204.The direction given will be that.from which the wind is blowin Wind Speed Wind Direction (mph)(degrees)NOTE: Supplemental weather information is also available from the National Weather Service Offices in Rochester (716-328-7633) or Buffalo (716-632-2223), if necessary, and at Station 230.Instructions for obtaining Nation Weather Service information is found in Attachment IV.Align the centerline of the overlay in the downwind direction.
e~4it' SC-420:5Obtainwindspeedanddirection datafromthe"StatusReportForm",theControlRoom,TSC,ComputerTerminaloralternatively fromStation204.Thedirection givenwillbethat.fromwhichthewindisblowinWindSpeedWindDirection (mph)(degrees)
The mark on the centerline at the bottom of the overlay should be aligned on a compass point on the map 180 degrees from the degrees given in 3.3.4.To determine this point, do one of the following:
NOTE:Supplemental weatherinformation isalsoavailable fromtheNationalWeatherServiceOfficesinRochester (716-328-7633) orBuffalo(716-632-2223),
If the degrees given in step 3.3.4 is between 180 and 360, subtract 180.Zf the degrees given in step 3.3.4 is between 0 and 180, add 180.Degrees wind is blowing from Degrees II Align mark on centerline of overlay (at bottom)at Degrees The Xu/Q plastic overlays and Table 1 values have, for convenience been calculated based upon a wind speed of 1 mph.Thus,-in order to determine X/Q sec/m3, is necessary to divide the isopleth value by the actual wind speed, in mph.Obtain concentration of particulate, noble gas and iodines and vent flow to determine release rate.See Attachment Z.To calculate the downwind concentration of noble gas, particulates or radioiodine, multiply the release rate of radioactivity (Ci/sec)from the plant times the X/Q (sec/m)dispersion coefficient determined in  
ifnecessary, andatStation230.Instructions forobtaining NationWeatherServiceinformation isfoundinAttachment IV.Alignthecenterline oftheoverlayinthedownwinddirection.
~1'P\I 4.o4 SC-420:6 step 3.3.6.The resultant concentration will be in Ci/m or uCi/cc.Perform these calculations on Attachment 1 3.4.9 3.4'0 3.4.11 3''2 3.4.13 3'Obtain an initial estimate of release duration from the Emergency Coordinator or Recovery Manager.If this estimate is unavailable, use an initial release duration estimate of 2 hours for dose projection purposes.Whole body gamma dose rate due to noble gas isotopes is estimated using Table III and using the listed factor corresponding to the approximate time after shutdown.Multiply this factor times the concent-ration calculated in Step 3.4.7 to get Rem/hour.Whole body gamma~dos is obtained by multiplying the dose rate calculated in Step 3.4.9 times the exposure time determined in Step 3.4.8.The result is Rem.Thyroid dose rate to the child is estimated using Table IV and using the listed factor corresponding to the time after shutdown.Multiply this factor times the concentration calculated in Step 3.4.7 to get rem/hour.Projected dose rates are always determined for the child thyroid as they are the most sensitive people.To determine the dose or dose rate for adults (which would only be necessary for emergency workers)divide the dose or dose rate for the child by 2.Thyroid~ose is found by multiplying the dose rate calculated in Step 3.4.11 times the exposure time determined in Step 3.4.8.Surve Tea Dat 3.5.1 3.5'Note the sample locations on the map that are covered by the Xu/Q overlay.The initial sample taken should be in a high concentration area and on a first stage survey route.Using the attached list of sample locations and teams, notify proper teams where to take samples.When results are received, mark results on appropriate map and status board.When the initial field sampling results are received, assign a Xu/Q value to the sample results using the Xu/g value for the line closest to the sample locati-on.For the plastic overlays, all points along a given line are assumed to have the same concentration as the initial sample.The concentration at any l>7.IE'14 SC-420:7 SOLUTION: other point of interest can be estimated by multiplying the sample concentration by the ratio of the respective Xu/Q values.EXAMPLE: A sample taken on a Xu/Q line of 5 x 10 E-6 indicated an iodine concentration of 5 x 10 E-7 uCi/cc and dose rate of 100 mrem/hr.Determine the concentration and dose rate expected at a Xu/Q value of 2 X 10 E-7?Iodine at 2 X 10 E 7~2 x 10 E 7 x 5 x 10 E 7 uCi=2 x 10 E 8 uCi 5 x 10 E-6 CC CC Dose Rate at 2 x 10 E-7 x 100 (mrem/hr)~4(mrem/hr) 5 x 10 E-6 3''3.5.4 3'.5~~3~5.6 3.5'Compare measured dose rates and air concentrations to predicted values, and adjust dose pro)ections accord-ingly.Notify the survey team to continue surveying the affected area looking for high concentration areas and hot spots.If the wind direction changes, realign overlay using 3.4.5.Sample new locations indicated by the overlay.If the wind speed changes, recalibrate the overlay by dividing the original speed by the new wind speed and multiply by the concentration or dose.Resample to check new overlay calibration.
Themarkonthecenterline atthebottomoftheoverlayshouldbealignedonacompasspointonthemap180degreesfromthedegreesgivenin3.3.4.Todetermine thispoint,dooneofthefollowing:
For puff type, releases multiply wind speed by elapsed time to find distance radioactive cloud has traveled.3'.8 Environmental TLD's, (SC-442)and Post Accident Environmental Samples, (SC-450)may be used to give values for off-site doses.3'tect v Action Guides 0 3'.1 3.6.2 Recommend the appropriate measures to be followed with respect to the general public.Table II give the pro)ected whole body and thyroid dose levels which warrant, given protective actions (e.g.sheltering,'vacuation) indicated.
Ifthedegreesgiveninstep3.3.4isbetween180and360,subtract180.Zfthedegreesgiveninstep3.3.4isbetween0and180,add180.DegreeswindisblowingfromDegreesIIAlignmarkoncenterline ofoverlay(atbottom)atDegreesTheXu/QplasticoverlaysandTable1valueshave,forconvenience beencalculated baseduponawindspeedof1mph.Thus,-inordertodetermine X/Qsec/m3,isnecessary todividetheisoplethvaluebytheactualwindspeed,inmph.Obtainconcentration ofparticulate, noblegasandiodinesandventflowtodetermine releaserate.SeeAttachment Z.Tocalculate thedownwindconcentration ofnoblegas,particulates orradioiodine, multiplythereleaserateofradioactivity (Ci/sec)fromtheplanttimestheX/Q(sec/m)dispersion coefficient determined in  
Weather forecast information should be considered when planning protective actions.
~1'P\I4.o4 SC-420:6step3.3.6.Theresultant concentration willbeinCi/moruCi/cc.Performthesecalculations onAttachment 13.4.93.4'03.4.113''23.4.133'ObtainaninitialestimateofreleasedurationfromtheEmergency Coordinator orRecoveryManager.Ifthisestimateisunavailable, useaninitialreleasedurationestimateof2hoursfordoseprojection purposes.
4 1 4 f V SC-420:8 TABI F.Xu GINNA SITE VALUES OF Q AS A FUNCTION OF STABILITY AND DISTANCE DOWNWIND DISTANCE FEET UNSTABLE STABLE 200 400 500 600 800 1,000 1,200 1,400 1,600 l(800 2(000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 9,500 10,000 11,000 12(000 13,000 14,000 15,000 16,000 660 1,310 1,640 1,970 2,620 3,280 3,940 4,590 5,250 5,910 6,560 8(200 9(840 11,500 13(100 14,800 16,400 18,000 19,700 21,300 23,000 24,600 26(200 27,900 29,500 31,200 32,800 36,100 39(400 42,700'45,900 49(200 52,500 0.1 0'0'0.4 0'0'0'0.9 1.0 1.1 1.2 1~6 1.9 2~2 2'2'3'3'3'4'4'4'5'5.3 5'5'6'6'7.5 F 1 8'9.3 10'2.22E-04 8'6E-05 4.20E-05 4.71E-05 2.91E-05 1.83E-05 1.24E-05 8.98E-06 6'1E-06 5.35E-06 3'3E-06 2'9E-06 1.42E-06 1.20E-06 1.04E-06 9.03E-07 7.96E-07 7.07E-07 6.41E-07 6'1E-07 5.65E-07 5.33E-07 5.05E-07 4.79E-07 4.56E-07 4.35E-07 4.17E-07 3.88E-07 3.63E-07 3.41E-07 3.22E-07 3.04E-07 2.89E-07 5.01E-04 3.02E-04 2.36E-04 2.02E-04 1.49E-04 1.16E-04 9.27E-05 7'8E-05 6'2E-05 5.44E-05 4.76E-05 3.53E-05 2.77E-05 2 24E-05 1.86E-05 1.56E-05 1.33E-05 1.15E-05 1.02E-05 9.25E-06 8'0E-06 7.66E-06 7.02E-06 6'5E-06 5'5E-06 5.51E-06 5'7E-06 4.62E-06 4.16E-06 3'6E-06 3'2E-06 3.12E-06 2.86E-06 6.00E-04 4,73E-04 4'6E-04 3.82E-04 3.16E-04 2.65E-04 2.29E-04 2.01E-04 1.79E-04 1.60E-04 1.44E-04 1'7E-04 9.80E-05 8.34E-05 7.19E-05 6.27E-05 5.51E-05 4'6E-05 4.50E-05 4.11E-05 3.76E-05 3.46E-05 3'9E-05 2.96E-05 2.75E-05 2.61E-05 2'9E-05 2.28E-05 2.10E-05 1.94E-05 1.80E-05 1.67E-05 1.56E-05 NOTE VALUES ARE BASED ON 1 MPH WINDS Offsite doses are calculated at 500 meters (0.3 miles), the minimum distance to the exclusion area boundary
Wholebodygammadoserateduetonoblegasisotopesisestimated usingTableIIIandusingthelistedfactorcorresponding totheapproximate timeaftershutdown.
/~f l r'  
Multiplythisfactortimestheconcent-rationcalculated inStep3.4.7togetRem/hour.
)PHOIECZED DOSE (HEH)K)I'IRE XOH3IATION)Whole Body<l I)Thymid<5 I)Whole Body l to<5 I (&Mid 5 to<25 I I)Whole body 5 and abave I)'Ihymid 25 and abave I I)Pm)ected Dose (Rem)to I Baergency Team Wad~.)No planned protective actions)State may issue an advisory to seek shelter and await furt2mr instructions.
Wholebodygamma~dosisobtainedbymultiplying thedoseratecalculated inStep3.4.9timestheexposuretimedetermined inStep3.4.8.TheresultisRem.Thyroiddoseratetothechildisestimated usingTableIVandusingthelistedfactorcorresponding tothetimeaftershutdown.
tor ernrimnmental radiatian levels.)Seek shelter as a minimum.(Cansider evacuation.
Multiplythisfactortimestheconcentration calculated inStep3.4.7togetrem/hour.
Evacuate unless con-straints make it impractical.
Projected doseratesarealwaysdetermined forthechildthyroidastheyarethemostsensitive people.Todetermine thedoseordoserateforadults(whichwouldonlybenecessary foremergency workers)dividethedoseordoserateforthechildby2.Thyroid~oseisfoundbymultiplying thedoseratecalculated inStep3.4.11timestheexposuretimedetermined inStep3.4.8.SurveTeaDat3.5.13.5'Notethesamplelocations onthemapthatarecoveredbytheXu/Qoverlay.Theinitialsampletakenshouldbeinahighconcentration areaandonafirststagesurveyroute.Usingtheattachedlistofsamplelocations andteams,notifyproperteamswheretotakesamples.Whenresultsarereceived, markresultsonappropriate mapandstatusboard.Whentheinitialfieldsamplingresultsarereceived, assignaXu/QvaluetothesampleresultsusingtheXu/gvalueforthelineclosesttothesamplelocati-on.Fortheplasticoverlays, allpointsalongagivenlineareassumedtohavethesameconcentration astheinitialsample.Theconcentration atany l>7.IE'14 SC-420:7SOLUTION:
)Monitor environmental radiatian levels.l access.(Conduct mandatory evacuatian.
otherpointofinterestcanbeestimated bymultiplying thesampleconcentration bytheratiooftherespective Xu/Qvalues.EXAMPLE:AsampletakenonaXu/Qlineof5x10E-6indicated aniodineconcentration of5x10E-7uCi/ccanddoserateof100mrem/hr.Determine theconcentration anddoserateexpectedataXu/Qvalueof2X10E-7?Iodineat2X10E7~2x10E7x5x10E7uCi=2x10E8uCi5x10E-6CCCCDoseRateat2x10E-7x100(mrem/hr)
)%sitar ernrinxmental radiatian levels and and~ust area for mandatory evacuation based on these levels.l access.I I (Previously reccolmended (protective actions may]be reconsidered or terminated.(If canstraints exist, (special consideratian
~4(mrem/hr) 5x10E-63''3.5.43'.5~~3~5.63.5'Comparemeasureddoseratesandairconcentrations topredicted values,andadjustdosepro)ections accord-ingly.Notifythesurveyteamtocontinuesurveying theaffectedarealookingforhighconcentration areasandhotspots.Ifthewinddirection changes,realignoverlayusing3.4.5.Samplenewlocations indicated bytheoverlay.Ifthewindspeedchanges,recalibrate theoverlaybydividingtheoriginalspeedbythenewwindspeedandmultiplybytheconcentration ordose.Resampletochecknewoverlaycalibration.
)should be given for)evacuation of children)and t women.I)Seeking shelter would)be an alternative if)evacuation were not (inaaaiiately possible.(Whole Body I)amid I I IWh le~I I I 25 75)Cantxol exposure of etergency team meakmm to these levels mxegt far lifesaving missians.(Appvapriate contxols far~gency wad~, include time limitatians, irators and stable iodine.(Cantxol exposure of emergency team members performing lifesaving missians to this level.(Cantrol of time of eagxaure will be effective.(AlthoL~respirators (and stable iodine)should be used whme (effective to control (dose to emergency team)l~c~.thy idd I (may nat be a limiting)factor for lifesaving missions.I t1 Rd f Pl IW W.a hl tl 1 the incident must take existing~tians into ccesideration.(b)At the time of the.incident, officials may impl~lm-impact protective actions in keeping q y~~  
Forpufftype,releasesmultiplywindspeedbyelapsedtimetofinddistanceradioactive cloudhastraveled.
3'.8Environmental TLD's,(SC-442)andPostAccidentEnvironmental Samples,(SC-450)maybeusedtogivevaluesforoff-sitedoses.3'tectvActionGuides03'.13.6.2Recommend theappropriate measurestobefollowedwithrespecttothegeneralpublic.TableIIgivethepro)ected wholebodyandthyroiddoselevelswhichwarrant,givenprotective actions(e.g.sheltering,'vacuation) indicated.
Weatherforecastinformation shouldbeconsidered whenplanningprotective actions.
414fV SC-420:8TABIF.XuGINNASITEVALUESOFQASAFUNCTIONOFSTABILITY ANDDISTANCEDOWNWINDDISTANCEFEETUNSTABLESTABLE2004005006008001,0001,2001,4001,600l(8002(0002,5003,0003,5004,0004,5005,0005,5006,0006,5007,0007,5008,0008,5009,0009,50010,00011,00012(00013,00014,00015,00016,0006601,3101,6401,9702,6203,2803,9404,5905,2505,9106,5608(2009(84011,50013(10014,80016,40018,00019,70021,30023,00024,60026(20027,90029,50031,20032,80036,10039(40042,700'45,90049(20052,5000.10'0'0.40'0'0'0.91.01.11.21~61.92~22'2'3'3'3'4'4'4'5'5.35'5'6'6'7.5F18'9.310'2.22E-048'6E-054.20E-054.71E-052.91E-051.83E-051.24E-058.98E-066'1E-065.35E-063'3E-062'9E-061.42E-061.20E-061.04E-069.03E-077.96E-077.07E-076.41E-076'1E-075.65E-075.33E-075.05E-074.79E-074.56E-074.35E-074.17E-073.88E-073.63E-073.41E-073.22E-073.04E-072.89E-075.01E-043.02E-042.36E-042.02E-041.49E-041.16E-049.27E-057'8E-056'2E-055.44E-054.76E-053.53E-052.77E-05224E-051.86E-051.56E-051.33E-051.15E-051.02E-059.25E-068'0E-067.66E-067.02E-066'5E-065'5E-065.51E-065'7E-064.62E-064.16E-063'6E-063'2E-063.12E-062.86E-066.00E-044,73E-044'6E-043.82E-043.16E-042.65E-042.29E-042.01E-041.79E-041.60E-041.44E-041'7E-049.80E-058.34E-057.19E-056.27E-055.51E-054'6E-054.50E-054.11E-053.76E-053.46E-053'9E-052.96E-052.75E-052.61E-052'9E-052.28E-052.10E-051.94E-051.80E-051.67E-051.56E-05NOTEVALUESAREBASEDON1MPHWINDSOffsitedosesarecalculated at500meters(0.3miles),theminimumdistancetotheexclusion areaboundary
/~flr'  
)PHOIECZED DOSE(HEH)K)I'IREXOH3IATION
)WholeBody<lI)Thymid<5I)WholeBodylto<5I(&Mid5to<25II)Wholebody5andabaveI)'Ihymid25andabaveII)Pm)ected Dose(Rem)toIBaergency TeamWad~.)Noplannedprotective actions)Statemayissueanadvisorytoseekshelterandawaitfurt2mrinstructions.
torernrimnmental radiatian levels.)Seekshelterasaminimum.(Cansider evacuation.
Evacuateunlesscon-straintsmakeitimpractical.
)Monitorenvironmental radiatian levels.laccess.(Conductmandatory evacuatian.
)%sitarernrinxmental radiatian levelsandand~ustareaformandatory evacuation basedontheselevels.laccess.II(Previously reccolmended (protective actionsmay]bereconsidered orterminated.
(Ifcanstraints exist,(specialconsideratian
)shouldbegivenfor)evacuation ofchildren)andtwomen.I)Seekingshelterwould)beanalternative if)evacuation werenot(inaaaiiately possible.
(WholeBodyI)amidIIIWhle~III2575)Cantxolexposureofetergency teammeakmmtotheselevelsmxegtfarlifesaving missians.
(Appvapriate contxolsfar~gencywad~,includetimelimitatians, iratorsandstableiodine.(Cantxolexposureofemergency teammembersperforming lifesaving missianstothislevel.(Cantroloftimeofeagxaurewillbeeffective.
(AlthoL~respirators (andstableiodine)shouldbeusedwhme(effective tocontrol(dosetoemergency team)l~c~.thyiddI(maynatbealimiting)factorforlifesaving missions.
It1RdfPlIWW.ahltl1theincidentmusttakeexisting~tiansintoccesideration.
(b)Atthetimeofthe.incident, officials mayimpl~lm-impact protective actionsinkeepingqy~~  


SC-420:10 TASu.XX1NobleGasDoseConversion FactorsTimeAfterShutdownhoursRemhoureruCicc*01~52.53'4.56'12'5'E+025'E+024'E+023'E+023~1E+022'E+021.2E+02*Multiply uCi/ccbythelistedfactortoobtainRem/hour.
SC-420:10 TASu.XX1 Noble Gas Dose Conversion Factors Time After Shutdown hours Rem hour er uCi cc*0 1~5 2.5 3'4.5 6'12'5'E+02 5'E+02 4'E+02 3'E+02 3~1E+02 2'E+02 1.2 E+02*Multiply uCi/cc by the listed factor to obtain Rem/hour.
Qf' SC-420:11 Radioiodine DoseConversion FactorsTimeAfterShutdownhours1'3456789101112Rem/hourChildThyroideruCicc*F1E+055'E+056'E+056'E+056'E+057'E+057'E+057'E+057'E+058'E+058'E+058'E+05*Multiply uCi/ccbythelistedfactortoobtainRem/hourchildthyroid
Qf' SC-420:11 Radioiodine Dose Conversion Factors Time After Shutdown hours 1'3 4 5 6 7 8 9 10 11 12 Rem/hour Child Thyroid er uCi cc*F 1 E+05 5'E+05 6'E+05 6'E+05 6'E+05 7'E+05 7'E+05 7'E+05 7'E+05 8'E+05 8'E+05 8'E+05*Multiply uCi/cc by the listed factor to obtain Rem/hour child thyroid


SC-420:12GENERALINFORMATION:
SC-420: 12 GENERAL INFORMATION:
QuaintTimeShutdawnTime:ReleaseStartTime:ReleaseVent:Stability Class:VentFlmr(CEM):VERI'ONCEPIHATIO&#xc3; FRCNKPEIlJEPP HONI'IORREADING:NobleGas(MonitorNo.cgnX~uCicg(cxxntrate)(calib.factor)cpnRadioiodine (MonitorNo.):uCi/cc*(vpITtocanoe)/m/hours(lateraxuztrate)(initialcountrate)/(timebetweencpnreadings)
Quaint Time Shutdawn Time: Release Start Time: Release Vent: Stability Class: Vent Flmr (CEM): VERI'ONCEPIHATIO&#xc3; FRCN KPEIlJEPP HONI'IOR READING: Noble Gas (Monitor No.cgn X~uCi cg (cxxnt rate)(calib.factor)cpn Radioiodine (Monitor No.): uCi/cc*(vpITto canoe)/m/hours (later axuzt rate)(initial count rate)/(time between cpn readings)X&mV'hr=uci/cc*(calib.factor)(vent canc.)Particulate (Manitor No.): (cnxnt rate)cgn X~uCi cc (calib.factor)cgn uCi/cc*(vents caner)To ca+vert CPM to cc/sec'FH x 2.8E4 cc/CF x 1 miq/60 sec NOHXZ GAS: To calculate release RATE in Ci/sec fran monitors: uCi/cc x cc/sec x E-6 Cguci Ci/sec*NOZE: Verrt canmntratian can be input dimply fran SPXNG monitors, if available.  
X&mV'hr=uci/cc*(calib.factor)(ventcanc.)Particulate (ManitorNo.):(cnxntrate)cgnX~uCicc(calib.factor)cgnuCi/cc*(ventscaner)Toca+vertCPMtocc/sec'FH x2.8E4cc/CFx1miq/60secNOHXZGAS:Tocalculate releaseRATEinCi/secfranmonitors:
uCi/ccxcc/secxE-6CguciCi/sec*NOZE:Verrtcanmntratian canbeinputdimplyfranSPXNGmonitors, ifavailable.  


SC-420:13Topredictdownwindconcentration:
SC-420: 13 To predict downwind concentration:
~mmexCi/secx1/()mph=(~Q)m(windspeed)
~mme x Ci/sec x 1/()mph=(~Q)m (windspeed)
~sec-xCi/secx1/()mph(}{0/Q)m(windspeed)~sec-xCi/secx1/()mph=(&#xc3;g/Q)m(windspeed) uCi/ccatS.B.500metersuCi/ccat2milesuCi/ccat5miles(}{0/Q)mxCi/secx1/()noh(win{:Ispeed) uCi/ccat10milessec-xCi/secx1/()ephuCi/ccat(}a}/Q)(windspcad)(distance)
~sec-x Ci/sec x 1/()mph (}{0/Q)m (wind speed)~sec-x Ci/sec x 1/()mph=(&#xc3;g/Q)m (windspeed) uCi/cc at S.B.500 meters uCi/cc at 2 miles uCi/cc at 5 miles (}{0/Q)m x Ci/sec x 1/()noh (win{:Ispeed) uCi/cc at 10 miles sec-x Ci/sec x 1/()eph uCi/cc at (}a}/Q)(windsp cad)(distance)
DistanceHoursafterShutdownRe+hourperuCi/cc(TableZIZ):HholeBodyDoseRateQRe@h~our 5B~miles5ad)es10mi)es~ectedexposureduration(Raus):Prcr}ected wholeBodyDose(rem)Tocalculate releaseRATEinCi/secfranmonitors:
Distance Hours after Shutdown R e+hour per uCi/cc (Table ZIZ): Hhole Body Dose Rate QRe@h~our 5 B~miles 5 ad)es 10 mi)es~ected exposure duration (Raus): Prcr}ected whole Body Dose (rem)To calculate release RATE in Ci/sec fran monitors: cc/sec x E-6 Ci/uCi To p{redict dcwnsrJLnd ocexentraticn x Cl/sec x 1/()mph (}{0/Q)(wind speed)x C)/sec x 1/()mph (}0}/Q)(wind speed)x Ci/sec x 1/()mph{}{q/{})(winispmxl) x Ci/sec x 1/()each{}{0/Q)(wind speed)uci/cc at S.B.500 metsLm uci/cc at g miles uCi/cc at~les uci/cc at~omilas C!'
cc/secxE-6Ci/uCiTop{redictdcwnsrJLnd ocexentraticn xCl/secx1/()mph(}{0/Q)(windspeed)xC)/secx1/()mph(}0}/Q)(windspeed)xCi/secx1/()mph{}{q/{})(winispmxl) xCi/secx1/()each{}{0/Q)(windspeed)uci/ccatS.B.500metsLmuci/ccatgmilesuCi/ccat~lesuci/ccat~omilas C!'
SC-420: 14~sec-x Ci/sec x l/()mph uci/cc at (Xc/Q)m (wizilsgeax))(distance)
SC-420:14~sec-xCi/secxl/()mphuci/ccat(Xc/Q)m(wizilsgeax))
Distance Ho(,~after Shutdown rem/hour per uCi/cc (Table IV): Maid Dose Rate, Child~h~our S.B 2 miles 5 miles 10 miles Pro)ected exposure duration (Hours)'ro)ected'Ihyroid Dose, Child (rem)PARPIQKATE:
(distance)
To calculate release RATE in Ci/sec fran mcnitors: cc/sec x E-6 Ci/uCi To~ct dawnwind cc(ncentration sec-x Ci/sec x 1/()~(zty'Q)(wind speed)uCi/cc at S.B.500 meters uCi/cc at 2 miles sec-x Ci/sec x 1/()mph (MQ)(wind speed)sec-x Ci/sec x 3/()smh uCi/cc at 5 miles (XU/Q)(wtmdsgeed) x Ci/sec x Q()mph (MQ)(wind speed)uCi/cc at~Omiles x Ci/sec x+()~(MQ)(wind sg)eed)uCi/cc at-(distance)
DistanceHo(,~afterShutdownrem/hourperuCi/cc(TableIV):MaidDoseRate,Child~h~ourS.B2miles5miles10milesPro)ected exposureduration(Hours)'ro)ected
Distance Hours after Shutdctwn**Reap/haur per uCi/cc:~S~mg es~5~em g(~~em  
'IhyroidDose,Child(rem)PARPIQKATE:
Tocalculate releaseRATEinCi/secfranmcnitors:
cc/secxE-6Ci/uCiTo~ctdawnwindcc(ncentration sec-xCi/secx1/()~(zty'Q)(windspeed)uCi/ccatS.B.500metersuCi/ccat2milessec-xCi/secx1/()mph(MQ)(windspeed)sec-xCi/secx3/()smhuCi/ccat5miles(XU/Q)(wtmdsgeed) xCi/secxQ()mph(MQ)(windspeed)uCi/ccat~OmilesxCi/secx+()~(MQ)(windsg)eed)uCi/ccat-(distance)
DistanceHoursafterShutdctwn
**Reap/haur peruCi/cc:~S~mges~5~emg(~~em  


SC-420:35%holeBodyorturgDoseRate~rem~m~rProjected exposureduration(Hours):Proj~RholeBodyorZungDose(rem)*MZE:Shea~rogriate dosecanversian factorforpmMculates wouldbebasedupontheresultsofanisatcpicanalysisofthemRcture,arxlreferenc~
SC-420: 35%hole Body or turg Dose Rate~rem~m~r Projected exposure duration (Hours): Proj~Rhole Body or Zung Dose (rem)*MZE: She a~rogriate dose canversian factor for pmMculates would be based upon the results of an isatcpic analysis of the mRcture, arxl referenc~Reg.Guide 1.109.
Reg.Guide1.109.
r'I'I C 22+I 4!'III SC-420:16 l&EMMT GFIMIT1 SANPIZ MI&#xc3;IS 0 I G R I R A RiEjN E]E J G D)N)E I 01 I G R I R A RI E IN E/E/G DINIEL G R R A R E I N E I E I G D I N I E I IAKE&KNICK1M30CKER I BRICK CSURCH&KNIC5KRK3CK1&
r'I'IC22+I4!'III SC-420:16 l&EMMTGFIMIT1SANPIZMI&#xc3;IS0IGRIRARiEjNE]EJGD)N)EI01IGRIRARIEINE/E/GDINIELGRRAREINEIEIGDINIEIIAKE&KNICK1M30CKER IBRICKCSURCH&KNIC5KRK3CK1&
X X X X X X X X X I BRICK CHURCH&GN'IPQUO CEPXKR I BRICK CHURQi&SIQCXJM IAKE&SIDQ3M 6 BEAR CREEK HARKR I 7 PUSAN&I 8 T1GMBIZ&FURNACE I I 0 I ll SIDCX3M&KENYON X X X X X X X X X 12 13 14 I RP-104&I RT-104&KNI I&0 X X X X I 16 I 7 X X Ql I E 71 SC-420: 17 XNEMlMY OFF-SITE SQ6?XZ XOZPIS 0 (G R R A R EiN E I E I G D/N/E/0 GIR R I A R E(N E]E)G D I N I E t I I o (GER I R I A R)E)N E I E I G D I N I E I 20 GRlPKIZ&FISHER I 21 RP-104&FISHER I 22 TRUMMONDS&X SECOND STAGE X I X)'X/24 I TRUMMONDS&NAINGRIH I 350&PADVl IANE I 25 RP-350&286 I I I 6 I 27 SIUHY IQNESGME&IAKE I I 29&I 30 KENT C5KEK&I 31.21&RP-I 32 CN X X X X 33 34 X X 35 36 37 38 I ZZNE&RP-0 I 250&SZATE X Vl p II kg,~i a'.v>>~et SC-420:18 DKBGBKF OFF~SAMPIZ POEPXS I o I o)0)G R I R A RI E IN EiEiG D(N/E G R R A R E N E)EiG D I N I E I G R R A R E(N E I E I G D/N/E 39 40 41 42 45 46 47 48 49)FMX52K N26GE SERVICE CEPZl&PZA%(MAD I PEW FGKD I SAIJP&SCSIZGEL I SAIIP&SOOINARD I&KiITING I IAEE MAD&EKUZE 250 I QX3PPE ICE&I RT-21&HQKSNC6GH I RP-21&I FURNACE&EENYCN X X X X X X X I I X I l X SBXND SZAQE X I X X X X 50 51 I RV-350&I PVNV&X I I X X
XXXXXXXXXIBRICKCHURCH&GN'IPQUOCEPXKRIBRICKCHURQi&SIQCXJMIAKE&SIDQ3M6BEARCREEKHARKRI7PUSAN&I8T1GMBIZ&FURNACEII0IllSIDCX3M&KENYONXXXXXXXXX121314IRP-104&IRT-104&KNII&0XXXXI16I7XX QlIE71 SC-420:17XNEMlMYOFF-SITESQ6?XZXOZPIS0(GRRAREiNEIEIGD/N/E/0GIRRIARE(NE]E)GDINIEtIIo(GERIRIAR)E)NEIEIGDINIEI20GRlPKIZ&FISHERI21RP-104&FISHERI22TRUMMONDS
&XSECONDSTAGEXIX)'X/24ITRUMMONDS
&NAINGRIHI350&PADVlIANEI25RP-350&286III6I27SIUHYIQNESGME&IAKEII29&I30KENTC5KEK&I31.21&RP-I32CNXXXX3334XX35363738IZZNE&RP-0I250&SZATEX VlpIIkg,~ia'.v>>~et SC-420:18 DKBGBKFOFF~SAMPIZPOEPXSIoIo)0)GRIRARIEINEiEiGD(N/EGRRARENE)EiGDINIEIGRRARE(NEIEIGD/N/E394041424546474849)FMX52KN26GESERVICECEPZl&PZA%(MADIPEWFGKDISAIJP&SCSIZGELISAIIP&SOOINARDI&KiITINGIIAEEMAD&EKUZE250IQX3PPEICE&IRT-21&HQKSNC6GH IRP-21&IFURNACE&EENYCNXXXXXXXIIXIlXSBXNDSZAQEXIXXXX5051IRV-350&IPVNV&XIIXX


SC-420:19KEYFACILITIES LOCATEDABOUTGINNASITEComanandProductDistancefromSiteDirection fromSiteDuffy-Mott Co.,Inc.Williamson BabyFoodsTheWatermanFoodProductsCo.FoodProcessing OntarioKrautCorp.7RailroadAve.FoodProcessing VictorPreserving Co.FoodProcessing OntarioColdStorageFoodProcessing WatermanFruitProductsCo.FoodProcessing OntarioFoodProductsFoodProcessing LyndanProductsCo.FoodProcessing 8-1/2miles3-4miles3-4miles3-4miles3>>4miles3-4miles3-4miles3-4milesSoutheast SouthSouthSWSouthSouthSWSouthSWSouthSWSouthSWOntarioWaterDistrictWilliamson WaterDistrict1.1miles5-1/4milesOntarioFireDepartment 4milesEast.EastSoutheast OntarioCenterFireDepartment UnionHillFireDepartment OntarioTownHall3.5milesI5miles4milesSouthSouthwest South  
SC-420: 19 KEY FACILITIES LOCATED ABOUT GINNA SITE Com an and Product Distance from Site Direction from Site Duffy-Mott Co., Inc.Williamson Baby Foods The Waterman Food Products Co.Food Processing Ontario Kraut Corp.7 Railroad Ave.Food Processing Victor Preserving Co.Food Processing Ontario Cold Storage Food Processing Waterman Fruit Products Co.Food Processing Ontario Food Products Food Processing Lyndan Products Co.Food Processing 8-1/2 miles 3-4 miles 3-4 miles 3-4 miles 3>>4 miles 3-4 miles 3-4 miles 3-4 miles Southeast South South SW South South SW South SW South SW South SW Ontario Water District Williamson Water District 1.1 miles 5-1/4 miles Ontario Fire Department 4 miles East.East Southeast Ontario Center Fire Department Union Hill Fire Department Ontario Town Hall 3.5 miles I 5 miles 4 miles South Southwest South  


SC-420:20 HOSESINANDABOGTGINNASITEHouseLocatioHouseonLakeRoaddirectlysouthofplantDistanceOwner'sfromSite.Beebee1,500ft.Direction fromSiteSouthHouseonS.W.,corner ofLakeRoadandOntarioCtr.Rd.HouseonNorthsideofLakeRd.S.E.ofTrainingCenteraccessRoadHouseonprivateroadnorthofabovehouseLoomis2,000ft.Taillee2,500ft.2I000SouthSESoutheast Southwest  
SC-420:20 HOSES IN AND ABOGT GINNA SITE House Locatio House on Lake Road directly south of plant Distance Owner's from Site.Beebee 1,500 ft.Direction from Site South House on S.W.,corner of Lake Road and Ontario Ctr.Rd.House on North side of Lake Rd.S.E.of Training Center access Road House on private road north of above house Loomis 2,000 ft.Taillee 2,500 ft.2I 000 South SE Southeast Southwest  


SC-420:21 Instructions forinterpreting andaccessing DataintheMIDASstoragecomputerintheMeterological TowerTrailer.SetupforTI-Silent 700inTSCNUM-depressswitchrightLOWSPEED-depressswitchrightHALFDEPLEX-depressswitchleftONLINE-depressswitchleftON/OFF-pushswitchtoforwardpositionThecomputercanbequizzedbyphoneusingthefollowing numbers:300BAUDTERMINAL-phone5524-5711(TISilent700)1200BAUDTERMINAL-phon'eg524-5761Thereareshorttimeperiodswhenthephoneconnections aredisabledwhileinternalcalculations aretakingplace.Wheneverthe1200BAUDlineisinuse,the300BAUDlineisdisabled.
SC-420:21 Instructions for interpreting and accessing Data in the MIDAS storage computer in the Meterological Tower Trailer.Set up for TI-Silent 700 in TSC NUM-depress switch right LOW SPEED-depress switch right HALF DEPLEX-depress switch left ON LINE-depress switch left ON/OFF-push switch to forward position The computer can be quizzed by phone using the following numbers: 300 BAUD TERMINAL-phone 5 524-5711 (TI Silent 700)1200 BAUD TERMINAL-phon'e g 524-5761 There are short time periods when the phone connections are disabled while internal calculations are taking place.Whenever the 1200 BAUD line is in use, the 300 BAUD line is disabled.Normal communication times from the master MIDAS computer is a 30 minute period centered around 3:30, 7:30, and 11:30 EST.To obtain: Last 15 minute average-Type AVXX[RETURN]Last collected value-Type PPXX (RETURN]If ILLEGAL REQUEST appears, retype the command again.Illegal request is returned if the command was typed wrong of a spurious charater was included, i.e.-line feed.For AVXX prinout: XX~, 01 02 04~10-20~40-77 Prints Prints Prints Prints Prints Prints Prints all speed averages all direction averages all temperature averages all delta temperature averages miscellaneous averages rain averages all averages For PPXX printout:~Can~e pum~e 01 02 03 04 05~Na e WS 33A WS 33B WS 150A WS 150B WS 250
Normalcommunication timesfromthemasterMIDAScomputerisa30minuteperiodcenteredaround3:30,7:30,and11:30EST.Toobtain:Last15minuteaverage-TypeAVXX[RETURN]Lastcollected value-TypePPXX(RETURN]IfILLEGALREQUESTappears,retypethecommandagain.Illegalrequestisreturnedifthecommandwastypedwrongofaspuriouscharaterwasincluded, i.e.-linefeed.ForAVXXprinout:XX~,010204~10-20~40-77PrintsPrintsPrintsPrintsPrintsPrintsPrintsallspeedaveragesalldirection averagesalltemperature averagesalldeltatemperature averagesmiscellaneous averagesrainaveragesallaveragesForPPXXprintout:
-Y C SC-420'22 ATTAmmZNT II CONT Channel XX Number 08 09 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 32 Name WD 33A WD 33B WD 150A WD 150B WD 250 TER 33A TER 33B TE 150A TE 150B TE 250A TE 250B DT 150A DT 150B DT 250A DT 250B DEW 33 TEG 33 RAIN'NTERPRETATION OF DATA 15 min.averages for 01-15 min;16>>30 ming 31-45 min;46-60 min WS-Wind Speed-Average divided by 10 measured value WD-Wind Direction-Average is read directly TE-Temperature
~Can~epum~e0102030405~NaeWS33AWS33BWS150AWS150BWS250
-Average divided by 10 measured value DT-Delta Temperature
-YC SC-420'22 ATTAmmZNT IICONTChannelXXNumber080910111214151617181920212223242532NameWD33AWD33BWD150AWD150BWD250TER33ATER33BTE150ATE150BTE250ATE250BDT150ADT150BDT250ADT250BDEW33TEG33RAIN'NTERPRETATION OFDATA15min.averagesfor01-15min;16>>30ming31-45min;46-60minWS-WindSpeed-Averagedividedby10measuredvalueWD-WindDirection
-Average divided by 10 calculated value DEW-Dewpoint Temperature
-AverageisreaddirectlyTE-Temperature
-Average divided by 10 measured value TEG-Ambient Temperature
-Averagedividedby10measuredvalueDT-DeltaTemperature
'at Dewpoint Monitor-Average divided by 10 measured value RAIN-Rainfall-'verage divided by 100 accumulated inches of rain NAME-Parameter and height in meters on tower AVGE-Average of values collected in last 15 minutes average ST.DEV-Standard deviation of average data MIN.-Minimum value for last 15 minute average MAX.-Maximum value for last 15 minute average I-Index code: 0 Good;1 Questionableg 2 Bad;3 Unsteady wind data'Calm Wi.ndg 5 Flat direction MNDR-Meander range for wind direction AVRN-Average of meander range CNT-No longer used for data 4 gl,&#xc3;1 SC-420:23 hiTACrBKNT III Instructions for accessing data at the Substation 204 meteorolog-ical tower on Route 104 between Slocum and Lakeside Roads.The equipment consists of a 33 foot tower with wind speed and direction indicators, a strip chart recorder, and an Odessa Data Logger.The data logger can be quizzed by phone using'the following specifications:
-Averagedividedby10calculated valueDEW-DewpointTemperature
Speed Parity Duplex Data bits Stop bits Phone&#xb9;-1200 band-Odd-Full 7 1 524-2067 In.case of a modem problem, call Galson Technical Services, Lee Davis, (315)428-6612.Odess Commands H-Output a summary of hourly averages collected from midnight until last hour.Data will include wind direction, wind speed, and sigma theta (SD1).G-Output 5 minute values for present hour L-Ouput a listing of the operating configuration P-Output 5 minute values T-Time Control CD to exit 1 P SC-420:24 ATTACt&KNT IV RECOMMENDED PROCEDURE FOR RE UESTING METEOROLOGICAL SUPPORT FROM THE NATIONAL WEATHER SERVICE-ROCHESTER (a)(b)Contact the National Weather Service at (716)328-7633 (unlisted) 263-6808 (unlisted) 328-7391 (listed 8 a.m.to 4 p.m.)Provide to the Nation Weathex Service Your name You are calling from Rochester Gas&Electric Ginna Nucleax Power Plant A phone number you can be contacted A brief explanation of the nature of the release and curx'ent wind conditions at the plant (c)Request information based on below 1.An emergency on-going or immediately imminent release: Ask for the current surface wind-conditions and the forecast for the next three (3)to six (6)hours.The foxecaster on duty should be able to provide the information within a few minutes.This should help with evacuation decisions in the immediate vicinity of.the release.2.A potential or imminent explosion-type of release which would drive solid radioactive debris far up into the atmosphere:
-Averagedividedby10measuredvalueTEG-AmbientTemperature
This is the type of situation where fall-out plots may be helpful.Unfortunately fall-out plots take time to prepare so that in an on-going or immediately imminent situation,'they are not very useful.In such a short-fused situation a rough estimate from the surface and upper air winds could be more readily provided by+e forecaster on duty.3~A potential, but not immediate release:
'atDewpointMonitor-Averagedividedby10measuredvalueRAIN-Rainfall-'veragedividedby100accumulated inchesofrainNAME-Parameter andheightinmetersontowerAVGE-Averageofvaluescollected inlast15minutesaverageST.DEV-Standarddeviation ofaveragedataMIN.-Minimumvalueforlast15minuteaverageMAX.-Maximumvalueforlast15minuteaverageI-Indexcode:0Good;1Questionableg 2Bad;3Unsteadywinddata'CalmWi.ndg5Flatdirection MNDR-Meanderrangeforwinddirection AVRN-AverageofmeanderrangeCNT-Nolongerusedfordata 4gl,&#xc3;1 SC-420:23 hiTACrBKNT IIIInstructions foraccessing dataattheSubstation 204meteorolog-icaltoweronRoute104betweenSlocumandLakesideRoads.Theequipment consistsofa33foottowerwithwindspeedanddirection indicators, astripchartrecorder, andanOdessaDataLogger.Thedataloggercanbequizzedbyphoneusing'the following specifications:
V A r~~I' SC-420:25 gTTACHtCENT 1V~CONT'D In this case there may be time to plan evacuations in advance.Don', however, expect an immediate, detailed surface and upper air 24-hour wind forecast.Make the call requesting the data and give the forecaster on duty 15 minutes to 1/2 hour to prepare the information and return your call.The most significant information to a low-level release would be the surface wind direction and speed,.The surface wind is most important in the immediate vicinity of the release, that is, roughly 100 to 500 yards down-wind depending on the strength of the release, the speed of the wind and the stability of the atmosphere.
SpeedParityDuplexDatabitsStopbitsPhone&#xb9;-1200band-Odd-Full71524-2067In.caseofamodemproblem,callGalsonTechnical
Beyond that distance the plume spreads so that the boundary layer winds (average from the surface to approximately 2,000 feet)become more important.
: Services, LeeDavis,(315)428-6612.
Twenty four hour (24 hr.)forecasts of both the surface wind and the boundary layer wind can be made although local effects such as the land-lake breeze make such forecasts difficult in Western New York.When incidents on the scale of the Three Mile Island situation occur, the National Weather Service will take special action in terms of meteorological support.This can include special observations and ,,forecast information.
OdessCommandsH-Outputasummaryofhourlyaveragescollected frommidnightuntillasthour.Datawillincludewinddirection, windspeed,andsigmatheta(SD1).G-Output5minutevaluesforpresenthourL-Ouputalistingoftheoperating configuration P-Output5minutevaluesT-TimeControlCDtoexit 1P SC-420:24 ATTACt&KNT IVRECOMMENDED PROCEDURE FORREUESTINGMETEOROLOGICAL SUPPORTFROMTHENATIONALWEATHERSERVICE-ROCHESTER (a)(b)ContacttheNationalWeatherServiceat(716)328-7633(unlisted) 263-6808(unlisted) 328-7391(listed8a.m.to4p.m.)ProvidetotheNationWeathexServiceYournameYouarecallingfromRochester Gas&ElectricGinnaNucleaxPowerPlantAphonenumberyoucanbecontacted Abriefexplanation ofthenatureofthereleaseandcurx'entwindconditions attheplant(c)Requestinformation basedonbelow1.Anemergency on-goingorimmediately imminentrelease:Askforthecurrentsurfacewind-conditions andtheforecastforthenextthree(3)tosix(6)hours.Thefoxecaster ondutyshouldbeabletoprovidetheinformation withinafewminutes.Thisshouldhelpwithevacuation decisions intheimmediate vicinityof.therelease.2.Apotential orimminentexplosion-type ofreleasewhichwoulddrivesolidradioactive debrisfarupintotheatmosphere:
Under these circumstances, the National Weather Service should be informed as soon as possible so that arrangements (personnel, equip-ment, etc.)can be made to provide additional support.  
Thisisthetypeofsituation wherefall-outplotsmaybehelpful.Unfortunately fall-outplotstaketimetopreparesothatinanon-goingorimmediately imminentsituation,
~I SC-420:26 ATTACHMENT V IBM-PC ASSESSMENT COMPUTER PROGRAM 1.0 RUNNING THE PROGRAM Starting setup of the computer System Unit.....OFF Color Display....ON Printer.......ON 1.2 1.3 1.4 1.5 1.6 1'1~8 1.9 1.10 Place DOS 3.1 disc into A-drive (left side)with label.side up Turn system unit to...ON (wait approximately 45 seconds)When prompted enter new date in the form MM-DD-YYi then press<~(return)When prompted enter new time in the form HH:MMg then press (return)(note: hours should be entered in 24 hour format i.e.01:00 for 1 a.m.and 13:00 for 1 p.m.)The A)prompt will now be seen on the screen.Remove the DOS 3.1 disc and place the symphony 1.1 disc in the A drive.Type immediately after A)ACCESS and press<~(return).Select"SYMPHONY" from the menu and press<~(return).Wait approximately 2 minutes for the"SYMPHONY" serial number to appear then press<~(return).Place the EOF5MOD disc in drive B (right side).Press the[F9]button then type FR;press<~(return)and wait approximately 150 seconds for the EOF5MOD file to load.Once the EOF5MOD file is loaded follow the program instruc-tion on screen.1.11 Use the[PRINT SCREEN]key to print the DATA ENTRY FORM.1.12 Use the[ALT][S]keys to print the NYS Part II form.1.13 2.0 Use the[ALT][W]keys to print the DOSE PROJECTIONS/SURVEY DATE FORM.ENTERING EOF5MOD PAEVQfETERS
'theyarenotveryuseful.Insuchashort-fused situation aroughestimatefromthesurfaceandupperairwindscouldbemorereadilyprovidedby+eforecaster onduty.3~Apotential, butnotimmediate release:
*t 1~
VAr~~I' SC-420:25 gTTACHtCENT 1V~CONT'DInthiscasetheremaybetimetoplanevacuations inadvance.Don',however,expectanimmediate, detailedsurfaceandupperair24-hourwindforecast.
SC-420'27 ATTACHMENT V CONT~D 2~1 2.2 2'2'2'2'2'2'2.9 2'0 2'l When the EOF5MOD code is loaded as described above, the cursor should be on"CALC TIME".Type in the"CALC TIME" in 24 hours notation, press<~(return).The cursor should no be on"T250".Type in the 250 foot met tower temperature reading in degrees farenheit, press (return).The cursor should now be on"T33".Type in the 33 foot met tower temperature reading in degrees farenheit, press (return).The cursor should no be on"WINDSPD".
Makethecallrequesting thedataandgivetheforecaster onduty15minutesto1/2hourtopreparetheinformation andreturnyourcall.Themostsignificant information toalow-level releasewouldbethesurfacewinddirection andspeed,.Thesurfacewindismostimportant intheimmediate vicinityoftherelease,thatis,roughly100to500yardsdown-wind depending onthestrengthoftherelease,thespeedofthewindandthestability oftheatmosphere.
Type in the wind-speed, in MPH, from the met tower 33 foot.reading, press (return).The cursor should now be.on R-10a.Type in the R-10A reading (in units of UCi/cc)using data from the SPZNG MONITOR UNIT 1 CHANNEL 3 (the sping units need to be corrected form UCi to UCi/cc.This can be done via the sping unit),"interpret mode"g press<~(return).The cursor should now be on R-10B.Type in the R-10b reading (in units of UCi/cc)using data from the SPING MONITOR UNIT 2 CHANNEL 3 (The sping units need to be corrected from UCi to UCi/cc.This can be done via the sping unit),~'interpret mode";press<~(return).The cursor should now be on R-12.Type in the R-12 reading (in units of UCi/cc)using data from the SPING MONITOR UNIT I CHANNELS 5, 7, or ((depending on the amount of the release), press<~(return).The cursor should now be on R-14.Type in the R-14 reading (in units of UCi/cc)using data from the SPZNG MONITOR UNIT 2 CHANNEL 5, 7 or 9 (depending on the amount of the release), press<~(return).The cursor should now be, on R-15.Type in the R-15 reading (in units of UCi/cc)using data from the SPING MONITOR UNIT 3 CHANNEL 5, 7, or 9 (depending on the amount of the release), press<~(return).The cursor should now be on"SHUTDOWN DATE".Enter the date the plant shut down.Press<~(return).The cursor should not be on"SHTDWN TIME".Enter the time that the plant shut down (in 24 hour format).Press<~(return).
Beyondthatdistancetheplumespreadssothattheboundarylayerwinds(averagefromthesurfacetoapproximately 2,000feet)becomemoreimportant.
t, SC-420:28 ATTACHMENT V CONTEND The cursor should not be on"DATA DATE".Enter the date that the data was taken.Press<~(return).The cursor should now be on"DATA TIME".Enter the time that the data was taken (in 24 hour format).Press<~(return).The cursor should now be on"EXPOSURE".
Twentyfourhour(24hr.)forecasts ofboththesurfacewindandtheboundarylayerwindcanbemadealthoughlocaleffectssuchastheland-lake breezemakesuchforecasts difficult inWesternNewYork.Whenincidents onthescaleoftheThreeMileIslandsituation occur,theNationalWeatherServicewilltakespecialactionintermsofmeteorological support.Thiscanincludespecialobservations and,,forecast information.
Enter the length of time that the population has been or will be exposed since the start of the release (time is to be entered, in HH:MM format).If a time of 1 hour is entered results will indicate dose rate (i.e.R/hr).Press<~(return).The cursor should be on"'X'ILES".
Underthesecircumstances, theNationalWeatherServiceshouldbeinformedassoonaspossiblesothatarrangements (personnel, equip-ment,etc.)canbemadetoprovideadditional support.  
If you wish to calculate dose pro)ections at, some other distance besides ten miles input the distance.The whole body doses in Rem should now be displayed at the bottom of the spreadsheet along with protective action recommendations.
~I SC-420:26 ATTACHMENT VIBM-PCASSESSMENT COMPUTERPROGRAM1.0RUNNINGTHEPROGRAMStartingsetupofthecomputerSystemUnit.....OFFColorDisplay....ONPrinter.......ON1.21.31.41.51.61'1~81.91.10PlaceDOS3.1discintoA-drive(leftside)withlabel.sideupTurnsystemunitto...ON(waitapproximately 45seconds)WhenpromptedenternewdateintheformMM-DD-YYi thenpress<~(return)WhenpromptedenternewtimeintheformHH:MMgthenpress(return)(note:hoursshouldbeenteredin24hourformati.e.01:00for1a.m.and13:00for1p.m.)TheA)promptwillnowbeseenonthescreen.RemovetheDOS3.1discandplacethesymphony1.1discintheAdrive.Typeimmediately afterA)ACCESSandpress<~(return).
h SC-420:29 PAS UILL STABILITY CLASS AND Xu VALUES AS A FUNCTION OR STABILITY AND DISTANCE.Determining the Pasquill stability class Obtain the temperature at 33'nd 250'nd determine the delta T as in step 3.4.1 of SC-420.If the 250'emperature is unavailable, the 150'emperature may be used.Select the right hand columns in Table A giving the range of delta T for the 250 ft.>>33 ft.delta T (DEG.F/217 ft).Determine in which range the measured delta T falls and select the corresponding Pasquill stability class listed in the left hand column of Table A.Using Table B, determine the Xu/Q value for the stability class determined in step 1.03 above and the distance desired.The Xu/{}values can be used in Attachment I to SC-420 for dose assessment calculations.  
Select"SYMPHONY" fromthemenuandpress<~(return).
Waitapproximately 2minutesforthe"SYMPHONY" serialnumbertoappearthenpress<~(return).
PlacetheEOF5MODdiscindriveB(rightside).Pressthe[F9]buttonthentypeFR;press<~(return)andwaitapproximately 150secondsfortheEOF5MODfiletoload.OncetheEOF5MODfileisloadedfollowtheprograminstruc-tiononscreen.1.11Usethe[PRINTSCREEN]keytoprinttheDATAENTRYFORM.1.12Usethe[ALT][S]keystoprinttheNYSPartIIform.1.132.0Usethe[ALT][W]keystoprinttheDOSEPROJECTIONS/SURVEY DATEFORM.ENTERINGEOF5MODPAEVQfETERS
*t1~
SC-420'27 ATTACHMENT VCONT~D2~12.22'2'2'2'2'2'2.92'02'lWhentheEOF5MODcodeisloadedasdescribed above,thecursorshouldbeon"CALCTIME".Typeinthe"CALCTIME"in24hoursnotation, press<~(return).
Thecursorshouldnobeon"T250".Typeinthe250footmettowertemperature readingindegreesfarenheit, press(return).Thecursorshouldnowbeon"T33".Typeinthe33footmettowertemperature readingindegreesfarenheit, press(return).
Thecursorshouldnobeon"WINDSPD".
Typeinthewind-speed,inMPH,fromthemettower33foot.reading,press(return).Thecursorshouldnowbe.onR-10a.TypeintheR-10Areading(inunitsofUCi/cc)usingdatafromtheSPZNGMONITORUNIT1CHANNEL3(thespingunitsneedtobecorrected formUCitoUCi/cc.Thiscanbedoneviathespingunit),"interpret mode"gpress<~(return).
ThecursorshouldnowbeonR-10B.TypeintheR-10breading(inunitsofUCi/cc)usingdatafromtheSPINGMONITORUNIT2CHANNEL3(Thespingunitsneedtobecorrected fromUCitoUCi/cc.Thiscanbedoneviathespingunit),~'interpret mode";press<~(return).
ThecursorshouldnowbeonR-12.TypeintheR-12reading(inunitsofUCi/cc)usingdatafromtheSPINGMONITORUNITICHANNELS5,7,or((depending ontheamountoftherelease),
press<~(return).
ThecursorshouldnowbeonR-14.TypeintheR-14reading(inunitsofUCi/cc)usingdatafromtheSPZNGMONITORUNIT2CHANNEL5,7or9(depending ontheamountoftherelease),
press<~(return).Thecursorshouldnowbe,onR-15.TypeintheR-15reading(inunitsofUCi/cc)usingdatafromtheSPINGMONITORUNIT3CHANNEL5,7,or9(depending ontheamountoftherelease),
press<~(return).
Thecursorshouldnowbeon"SHUTDOWN DATE".Enterthedatetheplantshutdown.Press<~(return).
Thecursorshouldnotbeon"SHTDWNTIME".Enterthetimethattheplantshutdown(in24hourformat).Press<~(return).
t, SC-420:28 ATTACHMENT VCONTENDThecursorshouldnotbeon"DATADATE".Enterthedatethatthedatawastaken.Press<~(return).
Thecursorshouldnowbeon"DATATIME".Enterthetimethatthedatawastaken(in24hourformat).Press<~(return).Thecursorshouldnowbeon"EXPOSURE".
Enterthelengthoftimethatthepopulation hasbeenorwillbeexposedsincethestartoftherelease(timeistobeentered,inHH:MMformat).Ifatimeof1hourisenteredresultswillindicatedoserate(i.e.R/hr).Press<~(return).
Thecursorshouldbeon"'X'ILES".
Ifyouwishtocalculate dosepro)ections at,someotherdistancebesidestenmilesinputthedistance.
ThewholebodydosesinRemshouldnowbedisplayed atthebottomofthespreadsheet alongwithprotective actionrecommendations.
h SC-420:29 PASUILLSTABILITY CLASSANDXuVALUESASAFUNCTIONORSTABILITY ANDDISTANCE.Determining thePasquillstability classObtainthetemperature at33'nd250'nddetermine thedeltaTasinstep3.4.1ofSC-420.Ifthe250'emperature isunavailable, the150'emperature maybeused.SelecttherighthandcolumnsinTableAgivingtherangeofdeltaTforthe250ft.>>33ft.deltaT(DEG.F/217ft).Determine inwhichrangethemeasureddeltaTfallsandselectthecorresponding Pasquillstability classlistedinthelefthandcolumnofTableA.UsingTableB,determine theXu/Qvalueforthestability classdetermined instep1.03aboveandthedistancedesired.TheXu/{}valuescanbeusedinAttachment ItoSC-420fordoseassessment calculations.  


~TABLEsouBlLlCl.ASSCRRlABASEDONDELTATENPERATURE
~TABLE sou BlLl Cl.ASS CR RlA BASED ON DELTA TENPERATURE
~auTA150FT.-33FT.250FT.-33FT.DELTAT(OEG.F/100FT.)DELTAT(DEG.F/117FT.)DELTAT(OEG.F/217FT.)BBBLBB-1.0.1.17-2.17.1.0.0.9-1;17.1.05.2.17-1~95C-0.9-0.8.1.05.0.94-1.95-1.74.0.8-0.3-0.94~0.35~1.74.-0.65.0.30.8-0.350.94.0.651.740.82.20.942.571.744.772.22.574.77 I
~au TA 150 FT.-33 FT.250 FT.-33 FT.DELTA T (OEG.F/100 FT.)DELTA T (DEG.F/117 FT.)DELTA T (OEG.F/217 FT.)BBBLBB-1.0.1.17-2.17.1.0.0.9-1;17.1.05.2.17-1~95 C-0.9-0.8.1.05.0.94-1.95-1.74.0.8-0.3-0.94~0.35~1.74.-0.65.0.3 0.8-0.35 0.94.0.65 1.74 0.8 2.2 0.94 2.57 1.74 4.77 2.2 2.57 4.77 I
GINNA,SITEVAIIJESOF{}ASAHlNCZXCNOFSZhBIZZTY ANDDLc)IQQKE G200400500600800100012001400160018002000250030003500400045005000550060006500700075008000850090009500100001100012000130001400015000160000.10.20.30.40.5.0.60.70.91.01.11.21.61.92.22.52.83.13.43.74.04.34.75.05.3'.65.96.26.87.58.18.79.310.0NE:1.15E~3.48E&51.16E&51.14E&55.80E&63.79E&62.81E~2.16E~1.71E~1.39E&61.22E&61.02E&68.79E&77.76E&76.95EW76.29EW75.75E&75.29E&74.90E&74.59E&7.4.32EW74.08E&73.86E&73.66E&73.49E&73.33EW73.19EW72.97E&72.79EW72.62E&72.47EW72.34E&72i23E&72.22E~8.96E-054.20E&54.71E&52o9lEW51.83E&51.24E&58+98E~6.8IE&65.35E~3.93~62.09E&61.42E&61.20E&61.04E&69.03EW77.96E&77.07EW76.41E&76.01EW75.65EW75.33E&75.05EW74.79EW74.56EW74.35EW74.17E&73.88E&73.63E&73.41EW73.22EW73.04E&72.89EW73.67E~1.78E~1.25E~1.06E~7.02E&55.09EW53.86E&53o03E&52.44E&52.OIE&51.70E&5l.18E&58.76EW66.9IE&65.59E&64.61E&63.87E&63.30E&62.86E&62.53E&62.25EW62.02E&61.82E&61.65EW61.50EW61.37E&61.26E&61.11E&6.9.76E&78.67E&77.76E&76.98EW76.32EW75.01E~3.02E~2.36E~2.02E~1.49E~1.16E~9.27EW57.58EW56.32E&55.44E&54.76E&53.53E&52.77EW52.24E&5l.86EW51.56EW51.33E&51.15E&51.02EW59.25E&68.40E&67.66E&67.02E~6.45E&65.95E&65.51E~5.17E~4.62E&64.16E&63.76E&63.42E~3.12E&62.86E&65.03E~3.37E~2.80E-042.50EW41.94EW41.55E~1.27E~l.06E&49.14E-057.99EW57.05E&55.33EW54.24E&53.46E&52.87EW52.42E&52.07E-051.80EW51.65E&51.52E&51.41E&51.30E&51.2IZ&51.13E&5l.06E&59.94E&69.47E&68.61EW67.88E&67.24EW66.68EW63.18E&65.74EW66.00EW44.73E&44.36EW43.82EW43.16E~2.65E~2.29E~2.01E~1.79E~l.60EW4E1.44E~l.17E&49.80EW58.43EW57.19EW56.27E&55.51K&54.96EW54.50E&54.11E&53.76E&53.46E&53.19E&52.96EW52.75EW52.6IEW52.49EW52.28EW52.10EW51.94EW51.80E&5l.67EW5l.56EW56.45EW45.36E-045.46EW44.70E&44.22E&43.81E-043.46EW43.16EW42.88E-042.64E~2.43E-042.00E-041.67E-041.43E-041.23E-04l.08EW49.99E-059.30E-058.68E-058.12E-057.61EW57.15EW56.74E-056.36EW56.07EW55.80EW55.55EW55.10EW54.71EW54.37EW54.06EW53.79E-053.54E-05Offmitedosesarecalculated at500meters(0.3miles),themimihnzndietarue.tn
GINNA, SITE VAIIJES OF{}AS A HlNCZXCN OF SZhBIZZTY AND DLc)IQQKE G 200 400 500 600 800 1000 1200 1400 1600 1800 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 10000 11000 12000 13000 14000 15000 16000 0.1 0.2 0.3 0.4 0.5.0.6 0.7 0.9 1.0 1.1 1.2 1.6 1.9 2.2 2.5 2.8 3.1 3.4 3.7 4.0 4.3 4.7 5.0 5.3'.6 5.9 6.2 6.8 7.5 8.1 8.7 9.3 10.0 NE: 1.15E~3.48E&5 1.16E&5 1.14E&5 5.80E&6 3.79E&6 2.81E~2.16E~1.71E~1.39E&6 1.22E&6 1.02E&6 8.79E&7 7.76E&7 6.95EW7 6.29EW7 5.75E&7 5.29E&7 4.90E&7 4.59E&7.4.32EW7 4.08E&7 3.86E&7 3.66E&7 3.49E&7 3.33EW7 3.19EW7 2.97E&7 2.79EW7 2.62E&7 2.47EW7 2.34E&7 2i23E&7 2.22E~8.96E-05 4.20E&5 4.71E&5 2o9lEW5 1.83E&5 1.24E&5 8+98E~6.8IE&6 5.35E~3.93~6 2.09E&6 1.42E&6 1.20E&6 1.04E&6 9.03EW7 7.96E&7 7.07EW7 6.41E&7 6.01EW7 5.65EW7 5.33E&7 5.05EW7 4.79EW7 4.56EW7 4.35EW7 4.17E&7 3.88E&7 3.63E&7 3.41EW7 3.22EW7 3.04E&7 2.89EW7 3.67E~1.78E~1.25E~1.06E~7.02E&5 5.09EW5 3.86E&5 3o03E&5 2.44E&5 2.OIE&5 1.70E&5 l.18E&5 8.76EW6 6.9IE&6 5.59E&6 4.61E&6 3.87E&6 3.30E&6 2.86E&6 2.53E&6 2.25EW6 2.02E&6 1.82E&6 1.65EW6 1.50EW6 1.37E&6 1.26E&6 1.11E&6.9.76E&7 8.67E&7 7.76E&7 6.98EW7 6.32EW7 5.01E~3.02E~2.36E~2.02E~1.49E~1.16E~9.27EW5 7.58EW5 6.32E&5 5.44E&5 4.76E&5 3.53E&5 2.77EW5 2.24E&5 l.86EW5 1.56EW5 1.33E&5 1.15E&5 1.02EW5 9.25E&6 8.40E&6 7.66E&6 7.02E~6.45E&6 5.95E&6 5.51E~5.17E~4.62E&6 4.16E&6 3.76E&6 3.42E~3.12E&6 2.86E&6 5.03E~3.37E~2.80E-04 2.50EW4 1.94EW4 1.55E~1.27E~l.06E&4 9.14E-05 7.99EW5 7.05E&5 5.33EW5 4.24E&5 3.46E&5 2.87EW5 2.42E&5 2.07E-05 1.80EW5 1.65E&5 1.52E&5 1.41E&5 1.30E&5 1.2IZ&5 1.13E&5 l.06E&5 9.94E&6 9.47E&6 8.61EW6 7.88E&6 7.24EW6 6.68EW6 3.18E&6 5.74EW6 6.00EW4 4.73E&4 4.36EW4 3.82EW4 3.16E~2.65E~2.29E~2.01E~1.79E~l.60EW4E 1.44E~l.17E&4 9.80EW5 8.43EW5 7.19EW5 6.27E&5 5.51K&5 4.96EW5 4.50E&5 4.11E&5 3.76E&5 3.46E&5 3.19E&5 2.96EW5 2.75EW5 2.6IEW5 2.49EW5 2.28EW5 2.10EW5 1.94EW5 1.80E&5 l.67EW5 l.56EW5 6.45EW4 5.36E-04 5.46EW4 4.70E&4 4.22E&4 3.81E-04 3.46EW4 3.16EW4 2.88E-04 2.64E~2.43E-04 2.00E-04 1.67E-04 1.43E-04 1.23E-04 l.08EW4 9.99E-05 9.30E-05 8.68E-05 8.12E-05 7.61EW5 7.15EW5 6.74E-05 6.36EW5 6.07EW5 5.80EW5 5.55EW5 5.10EW5 4.71EW5 4.37EW5 4.06EW5 3.79E-05 3.54E-05 Offmite doses are calculated at 500 meters (0.3 miles), the mimihnzn dietarue.tn
'theexe3umonnxea-boundary  
'the exe3umon nxea-boundary  


SC-420:32.ATTACHMENT VIIRMSPROCESSMONITORCALIBRATION FACTORSASOF87~R-10CONTAINMENT XODXNE:uCi/ccIodine-131
SC-420: 32.ATTACHMENT VII RMS PROCESS MONITOR CALIBRATION FACTORS AS OF 87~R-10 CONTAINMENT XODXNE: uCi/cc Iodine-131
=(~cpm/hour)
=(~cpm/hour)(5.05 E-12)R-10B PIANT VENT IODINE: R-'11 uCi/cc Iodine-131
(5.05E-12)R-10BPIANTVENTIODINE:R-'11uCi/ccIodine-131
(~cpm/hour}(4.74 E-12)CONTAINMENT PARTICULATE:
(~cpm/hour}
uCi/cc as Cs>>137~(~l CONTAINMENT GAS: cpm)(2.54 E-12)R-1 uCi/cc as Xe-133 (PLANT VENT PARTICULATE:
(4.74E-12)CONTAINMENT PARTICULATE:
uCi/cc as Cs-137 (PLANT VENT GAS: cpm)(5.6 E-8)cpm)(2.55 E-12)Calibration factors calculated based on Kr-85 and Xe-133 calibration factors.uCi/cc as Xe-133~(cpm)(3.3 E-8)AIR EJECTOR AND GLAN STEAM EXHAUST GAS: uCi/cc as Xe-133~(cpm)(1.36 E-6)uci/cc's normal gas mixture*(cpm)(5.0 E-8)R-6*Based on the mixture of noble gas present in the reactor coolant during the 01/25/82 tube rupture which is represent-ative of normal operations.
uCi/ccasCs>>137~(~lCONTAINMENT GAS:cpm)(2.54E-12)R-1uCi/ccasXe-133(PLANTVENTPARTICULATE:
CONTAINMENT FAN COOLER SERVICE WATER uCi/cc as Cs-137~(cpm)(1.3 E-7)COMPONENT COOLING: uCi/cc as Cs-137 (cpm)(1.3 E-7)
uCi/ccasCs-137(PLANTVENTGAS:cpm)(5.6E-8)cpm)(2.55E-12)Calibration factorscalculated basedonKr-85andXe-133calibration factors.uCi/ccasXe-133~(cpm)(3.3E-8)AIREJECTORANDGLANSTEAMEXHAUSTGAS:uCi/ccasXe-133~(cpm)(1.36E-6)uci/cc'snormalgasmixture*(cpm)(5.0E-8)R-6*Basedonthemixtureofnoblegaspresentinthereactorcoolantduringthe01/25/82tuberupturewhichisrepresent-ativeofnormaloperations.
I i 4 SC-420'33 RNS PROC'.SS MONITOR CALIBRATION FACTORS AS OF R-18 RADWASTE SYSTEM DISCHARGE:
CONTAINMENT FANCOOLERSERVICEWATERuCi/ccasCs-137~(cpm)(1.3E-7)COMPONENT COOLING:uCi/ccasCs-137(cpm)(1.3E-7)
uCi/cc as Cs-137 (cpm)(1.18 E-8)R-19 STEAM GENERATOR BLOWDOWN'Ci/cc as Cs-137 (cpm)(2.9 E-8)R-20 SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER: uCi/cc as Cs-137 (cpm)(2.9 E-8)R-21 RETENTION TANK: uCi/cc as Cs-137 (cpm)(1.01 E-8)~R-2 HIGH CONDUCTIVITY WASTE TANK: uCi/cc as Cs-137 (cpm)(8.84 E-9)R-31 STEAM LXNE RADIATION MONITOR: mr/hr (cpm)(2.03 E-2)STEAM LINE RADZAXTON MONITOR: mr/hr (cpm)(1.83 E-2)-36 CONTROL ROOM NOBLE GAS MONITOR: uCi/cc as Kr-85 (uCi/cc as Xe-133 (cpm)(2.16 E-8)cpm)(1.31 E-7)3-37.CONTROL ROOM PARTICULATE MONITOR: uCi/cc as Cs-137 (cpm)(2.63 E-13)P-38 CONTROL ROOM IODINE MONXTOR: uCi/cc as I-131~(cpm)(2.99 E-12)  
Ii4 SC-420'33 RNSPROC'.SSMONITORCALIBRATION FACTORSASOFR-18RADWASTESYSTEMDISCHARGE:
uCi/ccasCs-137(cpm)(1.18E-8)R-19STEAMGENERATOR BLOWDOWN'Ci/cc asCs-137(cpm)(2.9E-8)R-20SPENTFUELPOOLHEATEXCHANGER SERVICEWATER:uCi/ccasCs-137(cpm)(2.9E-8)R-21RETENTION TANK:uCi/ccasCs-137(cpm)(1.01E-8)~R-2HIGHCONDUCTIVITY WASTETANK:uCi/ccasCs-137(cpm)(8.84E-9)R-31STEAMLXNERADIATION MONITOR:mr/hr(cpm)(2.03E-2)STEAMLINERADZAXTON MONITOR:mr/hr(cpm)(1.83E-2)-36CONTROLROOMNOBLEGASMONITOR:uCi/ccasKr-85(uCi/ccasXe-133(cpm)(2.16E-8)cpm)(1.31E-7)3-37.CONTROLROOMPARTICULATE MONITOR:uCi/ccasCs-137(cpm)(2.63E-13)P-38CONTROLROOMIODINEMONXTOR:uCi/ccasI-131~(cpm)(2.99E-12)  


ROCHESTER GASANDELECTRICCORPORATIONS GINNASTATIONCONTROLLED COPYNUHBERPROCEDURE NO.SC-421REV.NO;6DETERMINATION OFIODINEORPARTICULATE ACTIVITYTECHNICAL REVIEWPORCREVIEWDATEPLANTSURINTENDENT EFFECTIVE DATEQAXNON-QACATEGORYl.OREVIEWEDBY:TRISPROCEDURE CONTAINS6PAGES Is~*l*f\kllIj~~~lacb,I SC-421:1SC-421DETERMINATION OFIODINEORPARTICUIATE ACTIVITY1.0PIJIU?OSE:
ROCHESTER GAS AND ELECTRIC CORPORATIONS GINNA STATION CONTROLLED COPY NUHBER PROCEDURE NO.SC-421 REV.NO;6 DETERMINATION OF IODINE OR PARTICULATE ACTIVITY TECHNICAL REVIEW PORC REVIEW DATE PLANT SU RINTENDENT EFFECTIVE DATE QA X NON-QA CATEGORY l.O REVIEWED BY: TRIS PROCEDURE CONTAINS 6 PAGES I s~*l*f\k ll I j~~~lac b, I SC-421:1 SC-421 DETERMINATION OF IODINE OR PARTICUIATE ACTIVITY 1.0 PIJIU?OSE:
Thedetermination oftheairborneiodineconcentration soastodetermine resultant thyroiddoseisextremely important duringthefirst2hoursafterarelease.Therefore, theprocedure consistsofrapidsamplecollection andpreliminary analysisoftheparticulate filtersandiodinecartridges inthefield.2'F12'
The determination of the airborne iodine concentration so as to determine resultant thyroid dose is extremely important during the first 2 hours after a release.Therefore, the procedure consists of rapid sample collection and preliminary analysis of the particulate filters and iodine cartridges in the field.2'F 1 2'


==REFERENCES:==
==REFERENCES:==


NuclearEmergency ResponsePlanSC-323,Emergency Off-SiteRadiation SurveyTeamsSC-324,Emergency On-SiteRadiation SurveyTeams3.0INSTRUCTIONS:
Nuclear Emergency Response Plan SC-323, Emergency Off-Site Radiation Survey Teams SC-324, Emergency On-Site Radiation Survey Teams 3.0 INSTRUCTIONS:
3.13~1.13~1~23~1.33,.1.43~1.53.1.63~1.7Thefollowing equipment willbeavailable.
3.1 3~1.1 3~1~2 3~1.3 3,.1.4 3~1.5 3.1.6 3~1.7 The following equipment will be available.
Combination particulate filterandcartridge holders.Glassfiberfilters,50mm,GelmariTypeA/Eorequivalent.
Combination particulate filter and cartridge holders.Glass fiber filters, 50 mm, Gelmari Type A/E or equivalent.
Silverzeolitecartridge foriodinecollection, ScienceApplications, Inc.TypeGY-130orequivalent.
Silver zeolite cartridge for iodine collection, Science Applications, Inc.Type GY-130 or equivalent.
Batteryoperatedcountratemeter,0-50,000cpm,audiblealarm,rechargeable, EberlinemodelRM-14orequivalent.
Battery operated count rate meter, 0-50, 000 cpm, audible alarm, rechargeable, Eberline model RM-14 or equivalent.
EndwindowGMprobe,alphabeta,gammasensitive, EberlinemodelHP-190orequivalent.
End window GM probe, alpha beta, gamma sensitive, Eberline model HP-190 or equivalent.
Off-siteteamairsampler,approximately 30lpmflowrateusingaglassfiberandsilverzeolitecartridge, batteryoperated12volt,RADECOmodelH-809Corequivalent.
Off-site team air sampler, approximately 30 lpm flow rate using a glass fiber and silver zeolite cartridge, battery operated 12 volt, RADECO model H-809C or equivalent.
'n-siteteamlowvolumeairsampler,batteryoperated, rechargeable, 4lpmflowrate,GilianmodelHFS-113Torequivalent,.
'n-site team low volume air sampler, battery operated, rechargeable, 4 lpm flow rate, Gilian model HFS-113T or equivalent,.
IP4k+~
IP 4k+~
SC-421:23.1~83'Emergency SurveyCentersamplers,
SC-421:2 3.1~8 3'Emergency Survey Center samplers,'attery operated, rechargeable, time, approximately 30 lpm using a glass fiber filter and silver zeolite cartridge, RADECO model H-809 B2 or equivalent.
'atteryoperated, rechargeable, time,approximately 30lpmusingaglassfiberfilterandsilverzeolitecartridge, RADECOmodelH-809B2orequivalent.
'ff-Site Team Sam lin 3.2.1 3.2'3.2'3.2'3''3''Install glass fiber filter and silver zeolite cartridge in the filter holder for the H-809C sampler.Screw filter holder into H-809C sampler.C Put on/off switch into"off" position.Connect power cables to 12 volt battery, red clamp to positive terminal and black clamp to ground.Turn on sampler and record start time and flow rate in lpm (in the field record book of survey sheet).Allow sampler to run for approximately ten minutes, shut off sampler and record stop time.Determine the liters of air sampled as follows: lpm x minutes sampled=liters 3'.8 3.2.9 3.2.10 Determine the background reading in cpm using the RM-14 and HP-190 probe and record the reading.If background in the area is>200 cpm, move to an area where the background is<200 cpm.If background
'ff-SiteTeamSamlin3.2.13.2'3.2'3.2'3''3''Installglassfiberfilterandsilverzeolitecartridge inthefilterholderfortheH-809Csampler.ScrewfilterholderintoH-809Csampler.CPuton/offswitchinto"off"position.
<200 cpm is difficult to locate, the Dose Assessment Manager can provide additional instructions.
Connectpowercablesto12voltbattery,redclamptopositiveterminalandblackclamptoground.Turnonsamplerandrecordstarttimeandflowrateinlpm(inthefieldrecordbookofsurveysheet).Allowsamplertorunforapproximately tenminutes,shutoffsamplerandrecordstoptime.Determine thelitersofairsampledasfollows:lpmxminutessampled=liters3'.83.2.93.2.10Determine thebackground readingincpmusingtheRM-14andHP-190probeandrecordthereading.Ifbackground intheareais>200cpm,movetoanareawherethebackground is<200cpm.Ifbackground
Remove the particulate filter from the holder, place the HP-190 probe close to but not touching the filter, and record the reading.Determine the particulate activity as follows: filter-c m back round x 2.37 x 10=uCi/cc)liters NOTE: Minimum sensitivity for a 10 minute sample at 30 lpm, a 100 cpm net reading~and a probe efficiency of 1.94 is 7.9 x 10" uCi/cc.Remove the silver zeolite cartridge from the.holder, place the HP-190 probe against the inlet side of the cartridge and record the cpm,reading.
<200cpmisdifficult tolocate,theDoseAssessment Managercanprovideadditional instructions.
If the reading is off scale, determine the iodine activity per Step 3.2.13 instead of Step 3.2.12.
Removetheparticulate filterfromtheholder,placetheHP-190probeclosetobutnottouchingthefilter,andrecordthereading.Determine theparticulate activityasfollows:filter-cmbackroundx2.37x10=uCi/cc)litersNOTE:Minimumsensitivity fora10minutesampleat30lpm,a100cpmnetreading~andaprobeefficiency of1.94is7.9x10"uCi/cc.Removethesilverzeolitecartridge fromthe.holder,placetheHP-190probeagainsttheinletsideofthecartridge andrecordthecpm,reading.
1~ty~4 l 4 y k X I'g J.>4I' SC-421:3 3.2.12 Determine the iodine activity as follows for probe against the inlet side of cartridge:.
Ifthereadingisoffscale,determine theiodineactivityperStep3.2.13insteadofStep3.2.12.
c m cartrid e>>c m back round x 8.34 x 10"'uCi/cc ()liters NOTE'OTE: Minimum sensitivity for,a 10 minute sample at 30 lpm, a 100 cpm net reading and a probe efficiency of 0.54%is 2.8 x 10 uCi/cc.This is equivalent to 0.08 Rem Thyroid (0-2 hour)and 0.8 Rem Thyroid (1 day).The possibility exists that the background may be too high to determine a reading from the cartridge.
1~ty~4l4ykXI'gJ.>4I' SC-421:33.2.12Determine theiodineactivityasfollowsforprobeagainsttheinletsideofcartridge:.
If this condition exists, move to a lower background area and re-survey the cartridge.
cmcartride>>cmbackroundx8.34x10"'uCi/cc()litersNOTE'OTE:
3.2.13 3.2.14 3.2'5 3~3 Determine the iodine activity as follows for the HP-190 probe one inch (one cartridge thickness) away from the inlet side of the cartridge.
Minimumsensitivity for,a10minutesampleat30lpm,a100cpmnetreadingandaprobeefficiency of0.54%is2.8x10uCi/cc.Thisisequivalent to0.08RemThyroid(0-2hour)and0.8RemThyroid(1day).Thepossibility existsthatthebackground maybetoohightodetermine areadingfromthecartridge.
c m cartrid e-c m back round x 2.37 x 10 7~uCi/cc ()liters Convert Iodine 131 Concentration to thyroid dose by the following formulas and mark on map.(uCi/cc Iodine)(3 x 10~)=Rem thyroid (0-2 hour)(uCi/cc Iodine)(3 x 10~)=Rem thyroid (1 day)Place filter and cartridge in the envelope, record the required information on the envelope and save for lab analysis.On>>Site team sam lin 3.3.1 3''Install glass fiber filter and silver zeolite cartridge in the filter holder attached to the low volume sampler.Remove anti-tamper cover plate and place master ON/OFF switch in ON position.Th js switch also resets the time.The switch is located in the lower left hand corner.hh F 1'3 a 3%4 f P4~A''I I l'i''1  
Ifthiscondition exists,movetoalowerbackground areaandre-survey thecartridge.
'3.3.3 3''3.3.5 SC-421'4 If charge status of unit is unknown, temporarily start unit and press the test button.<<BAT.<<LED should light indicating a charge of 954 or greater.If LED does not light, recharge unit before use.Replace anti-tamper cover.Unit is now ready for use.At start of sampling period record start time, Press test, record time in digital display and a flow of 4.0 LPM (unless unit has been reset at another flow rate).Turn unit on using ON/OFF'witch located to the right of the digital display.NOTE Master ON/OFF switch must be on for unit to operate.Master ON/OFF switch also resets time display.3.3.6 If the"FAULT" LED is lit.This was activated by either an undervoltage; overcurrent, or overpressure (restricted flow)beyond the units capability.
3.2.133.2.143.2'53~3Determine theiodineactivityasfollowsfortheHP-190probeoneinch(onecartridge thickness) awayfromtheinletsideofthecartridge.
The motor is stopped and the time is latched.By pressing the"TEST" button, the time (in minutes)into sampling at which the fault occurred will be'displayed indica-ting a valid sample period.NOTE: The timer stops after 15-20 seconds into a fault condition to prevent unnecessary shutdown.3''3.3.8 3.3.9 At end of sampling period turn pump off using ON/OFF switch located to right of digital display.Press"TEST" button, record time in digital display, stop time and all other pertinent information on data sheet.Determine the background reading.in cpm using the RM-14 and HP-190 probe and record the reading.If the background in the area is>200 cpm, move to an area where the background is<200 cpm.If background
cmcartride-cmbackroundx2.37x107~uCi/cc()litersConvertIodine131Concentration tothyroiddosebythefollowing formulasandmarkonmap.(uCi/ccIodine)(3x10~)=Remthyroid(0-2hour)(uCi/ccIodine)(3 x10~)=Remthyroid(1day)Placefilterandcartridge intheenvelope, recordtherequiredinformation ontheenvelopeandsaveforlabanalysis.
<200 cpm is difficult to locate, the Dose Assessment Manager can provide additional instructions.
On>>Siteteamsamlin3.3.13''Installglassfiberfilterandsilverzeolitecartridge inthefilterholderattachedtothelowvolumesampler.Removeanti-tamper coverplateandplacemasterON/OFFswitchinONposition.
Remove the particulate-filter from the holder, place the HP-190 probe close but not touching the filter and record the cpm reading.3.3.10 Determine the particulate activity as follows:.~~c m filter-c m bac roun x 2.37 x 10 8~uCi/cd.: ()volume in liters c, il 1'I NOTE: SC-421: 5 Minimum sensitivity for a 30 minute sample at 4 lpm, a 50 cpm net reading, a probe efficiency of 1.94 is 6 x 10"9 uCi/cc.3.3.11 3.3.12 Remove the silver zeolite cartridge from the holder, place the HP-190 probe against the inlet side of the cartridge and record the cpm reading.Determine the iodine activity as follows: c m cartrid e-c m back round x 8.34 x 10"=uCi/cc (")volume in liters NOTE: NOTE: Minimum sensitivity for a 30 minute sample at 4 lpm, a 50 cpm net readinc[and a probe efficiency of 0.544 is 2 x 10" uCi/cc.The possibility exists that the background may be too high to determine a reading from the cartridge.
Thjsswitchalsoresetsthetime.Theswitchislocatedinthelowerlefthandcorner.hh F1'3a3%4fP4~A''IIl'i''1  
If this condition exists, move to a lower background area and re-survey the cartridge.
'3.3.33''3.3.5SC-421'4Ifchargestatusofunitisunknown,temporarily startunitandpressthetestbutton.<<BAT.<<LEDshouldlightindicating achargeof954orgreater.IfLEDdoesnotlight,rechargeunitbeforeuse.Replaceanti-tamper cover.Unitisnowreadyforuse.Atstartofsamplingperiodrecordstarttime,Presstest,recordtimeindigitaldisplayandaflowof4.0LPM(unlessunithasbeenresetatanotherflowrate).TurnunitonusingON/OFF'witch locatedtotherightofthedigitaldisplay.NOTEMasterON/OFFswitchmustbeonforunittooperate.MasterON/OFFswitchalsoresetstimedisplay.3.3.6Ifthe"FAULT"LEDislit.Thiswasactivated byeitheranundervoltage; overcurrent, oroverpressure (restricted flow)beyondtheunitscapability.
3.3'3 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3'.5 3.4'3'a7~~Place the filter and cartridge on the envelope, record the required information on the envelope and save for lab analysis.Emer enc Surve Center and Technical Su ort Center~sam lln Install glass fiber filter and silver zeolite cartridge in the filter holder for the H-809 B2 sampler.Screw filter holder into H-809 B2 sampler.Move sampler to desired location.Set timer to 10 minutes.Start sampler and record time and flow rate in lpm.The sampler will automatically shut off in 10 minutes.Determine the liters of air sampled as follows: lpm x 10 minutes sampled=liters Determine the background reading in cpm using the RM-14 and HP-190 probe and record the reading.If the background in the area is>200 cpm, move to an area where the background is<200 cpm.If background
Themotorisstoppedandthetimeislatched.Bypressingthe"TEST"button,thetime(inminutes)intosamplingatwhichthefaultoccurredwillbe'displayed indica-tingavalidsampleperiod.NOTE:Thetimerstopsafter15-20secondsintoafaultcondition topreventunnecessary shutdown.
<200 cpm is difficult to locate, the Dose Assessment Manager can provide additional instructions.
3''3.3.83.3.9AtendofsamplingperiodturnpumpoffusingON/OFFswitchlocatedtorightofdigitaldisplay.Press"TEST"button,recordtimeindigitaldisplay,stoptimeandallotherpertinent information ondatasheet.Determine thebackground reading.in cpmusingtheRM-14andHP-190probeandrecordthereading.Ifthebackground intheareais>200cpm,movetoanareawherethebackground is<200cpm.Ifbackground
V lg SC-421:6 3.4.8 3''Remove the particulate filter from the holder, place the HP-190 probe close to but not touching the filter and record the cpm reading.Determine the particulate activity as follows: c m filter-NOTE: c m back round x 2.37 x 10"=uCi/cc)liters Minimum sensitivity for a 10 minute sample at 30 lpm a 100 cpm net reading, and a probe efficiency of 1.94 is 7.9 x 10"9 uCi/cc.3'.10 3'.11 Remove the silver zeolite cartridge from the holder, place the HP-190 probe against the inlet side if the cartridge and record the cpm reading.If the reading is off-scale, determine'the iodine activity per 3.4.12 instead of Step 3.4.11.Determine the iodine-activity as follows for probe against the cartridge:
<200cpmisdifficult tolocate,theDoseAssessment Managercanprovideadditional instructions.
c m cartrid e-c m back round x 8.34 x 10=uCi/cc ()liters NOTE: NOTE: Minimum sensitivity for a 10 minute sample at 30 lpm a 100 cpm net reading and a probe efficiency of 0.544 is 2.8 x 10 9 uCi/cc.This is equivalent to 0.08 Rem thyroid (0-2 hour)and 0.8 Rem Thyroid (1'day).The possibility exists that the background may be too high to determine a reading from the caxtridge.
Removetheparticulate-filterfromtheholder,placetheHP-190probeclosebutnottouchingthefilterandrecordthecpmreading.3.3.10Determine theparticulate activityasfollows:.~~cmfilter-cmbacrounx2.37x108~uCi/cd.:()volumeinlitersc,il 1'I NOTE:SC-421:5Minimumsensitivity fora30minutesampleat4lpm,a50cpmnetreading,aprobeefficiency of1.94is6x10"9uCi/cc.3.3.113.3.12Removethesilverzeolitecartridge fromtheholder,placetheHP-190probeagainsttheinletsideofthecartridge andrecordthecpmreading.Determine theiodineactivityasfollows:cmcartride-cmbackroundx8.34x10"=uCi/cc(")volumeinlitersNOTE:NOTE:Minimumsensitivity fora30minutesampleat4lpm,a50cpmnetreadinc[andaprobeefficiency of0.544is2x10"uCi/cc.Thepossibility existsthatthebackground maybetoohightodetermine areadingfromthecartridge.
If this condition exists, move to a lower background area and re-survey the cartridge.
Ifthiscondition exists,movetoalowerbackground areaandre-survey thecartridge.
3''2 3.4.13 3.5 Determine the iodine activity as follows for the HP-190 probe one inch (one cartridge thickness) away from the inlet side of the cartridge.
3.3'33.43.4.13.4.23.4.33.4.43'.53.4'3'a7~~Placethefilterandcartridge ontheenvelope, recordtherequiredinformation ontheenvelopeandsaveforlabanalysis.
c m cartrid e-c m back round x 2.37 x 10 7=uCi/cc ()liters Place the filter and cartridge in an envelope marked with the time of sample, liters sampled, and location and save for lab analysis.For more accurate results, analysis may be performed'n the plant environmental lab with the GeLi and multichannel analyzer per PC-1.4.  
EmerencSurveCenterandTechnical SuortCenter~samllnInstallglassfiberfilterandsilverzeolitecartridge inthefilterholderfortheH-809B2sampler.ScrewfilterholderintoH-809B2sampler.Movesamplertodesiredlocation.
Settimerto10minutes.Startsamplerandrecordtimeandflowrateinlpm.Thesamplerwillautomatically shutoffin10minutes.Determine thelitersofairsampledasfollows:lpmx10minutessampled=litersDetermine thebackground readingincpmusingtheRM-14andHP-190probeandrecordthereading.Ifthebackground intheareais>200cpm,movetoanareawherethebackground is<200cpm.Ifbackground
<200cpmisdifficult tolocate,theDoseAssessment Managercanprovideadditional instructions.
Vlg SC-421:63.4.83''Removetheparticulate filterfromtheholder,placetheHP-190probeclosetobutnottouchingthefilterandrecordthecpmreading.Determine theparticulate activityasfollows:cmfilter-NOTE:cmbackroundx2.37x10"=uCi/cc)litersMinimumsensitivity fora10minutesampleat30lpma100cpmnetreading,andaprobeefficiency of1.94is7.9x10"9uCi/cc.3'.103'.11Removethesilverzeolitecartridge fromtheholder,placetheHP-190probeagainsttheinletsideifthecartridge andrecordthecpmreading.Ifthereadingisoff-scale, determine
'theiodineactivityper3.4.12insteadofStep3.4.11.Determine theiodine-activity asfollowsforprobeagainstthecartridge:
cmcartride-cmbackroundx8.34x10=uCi/cc()litersNOTE:NOTE:Minimumsensitivity fora10minutesampleat30lpma100cpmnetreadingandaprobeefficiency of0.544is2.8x109uCi/cc.Thisisequivalent to0.08Remthyroid(0-2hour)and0.8RemThyroid(1'day).Thepossibility existsthatthebackground maybetoohightodetermine areadingfromthecaxtridge.
Ifthiscondition exists,movetoalowerbackground areaandre-survey thecartridge.
3''23.4.133.5Determine theiodineactivityasfollowsfortheHP-190probeoneinch(onecartridge thickness) awayfromtheinletsideofthecartridge.
cmcartride-cmbackroundx2.37x107=uCi/cc()litersPlacethefilterandcartridge inanenvelopemarkedwiththetimeofsample,literssampled,andlocationandsaveforlabanalysis.
Formoreaccurateresults,analysismaybeperformed
'ntheplantenvironmental labwiththeGeLiandmultichannel analyzerperPC-1.4.  


Rochester GasandElectricCorporation Inter-Office Correspondence July18,1986SUSyZCT:Revisions totheElectric6SteamProduction NuclearEIIergency OffsiteResponseProcedures TO:HoldersoftheElectric&SteamProduction NuclearEmergency OffsiteResponseProcedures ManualEnclosedisarevisedprocedure fortheElectricaSteamProduction NuclearEIIergency OffsiteResponseProcedures Manual.Manualholdersshouldreadtheattachedmaterialandmakethechangeslistedbelow.Superseded anddeletedprocedures shouldbedestroyed andtheattachedacknowledgement formcompleted whenthesechangeshavebeenentered.Instructions formakinchanesRemovethefollawinIndexpagesi,iiESP2/6,2/7ESP3/1ESP4/3ESP5/1through5/C-3ESP8/1ESP10/4ESP16/4I16/5ESP17/2ESP19/1,19/2,19/3ESP20/1Through20/lles:InsertthefoU.awing es:Indexpagesi,iiESP2/6;2/7ESP3/1'ESP4/3ESP5/1through5/C-3ESP8/1ESP10/4ESP16/4,16/5ESP17/2ESP19/1g19/2I19/3ESP19/4ESP20through20/2andAttachment 1ESP22/1Jenn3.fer McAr11xeQcincDocumntOstrol
Rochester Gas and Electric Corporation Inter-Office Correspondence July 18, 1986 SUSyZCT: Revisions to the Electric 6 Steam Production Nuclear EIIergency Offsite Response Procedures TO: Holders of the Electric&Steam Production Nuclear Emergency Offsite Response Procedures Manual Enclosed is a revised procedure for the Electric a Steam Production Nuclear EIIergency Offsite Response Procedures Manual.Manual holders should read the attached material and make the changes listed below.Superseded and deleted procedures should be destroyed and the attached acknowledgement form completed when these changes have been entered.Instructions for makin chan es Remove the follawin Index pages i, ii ESP 2/6, 2/7 ESP 3/1 ESP 4/3 ESP 5/1 through 5/C-3 ESP 8/1 ESP 10/4 ESP 16/4 I 16/5 ESP 17/2 ESP 19/1, 19/2, 19/3 ESP 20/1 Through 20/ll es: Insert the foU.awing es: Index pages i, ii ESP 2/6;2/7 ESP 3/1'ESP 4/3 ESP 5/1 through 5/C-3 ESP 8/1 ESP 10/4 ESP 16/4, 16/5 ESP 17/2 ESP 19/1 g 19/2 I 19/3 ESP 19/4 ESP 20 through 20/2 and Attachment 1 ESP 22/1 Jenn3.fer McAr11xe Qc inc Docum nt Os trol


ROCHESTER GASANDELECTRICCORPORATION InterOfficeCorrespondence July17,1986
ROCHESTER GAS AND ELECTRIC CORPORATION Inter Office Correspondence July 17, 1986  


==SUBJECT:==
==SUBJECT:==
Revisions toElectricandSteamProduction NuclearEmergency OffsiteResponseProcedures TO:DocumentControlReplacePageReplacePagesReplacePageReplacePageReplacePagesReplacePageReplacePagePleasedistribute theattachedchangesaslistedbelow:~~-i-IndexI2/6,2/73/14/35/1through5/C-38/110/4ReplacePages16/4,16/5ReplacePageReplacePages17/219/1,19/2,19/3InsertRemoveInsert.InsertPagePagesPagesPage19/420/1through20/llJ20through20/2andAttachment 122/1Attachments DavidW.BurkeCorporate Emergency Planner 1WII ELECTRICANDSTEAMPRODUCTION DEPARTMENT NUCLEAREMERGENCY OFFSITERESPONSEPROCEDURES Note:INDEXRevisionofspecificareasoneachpageisindicated byverticallinesintherighthandcolumn.VicePresident, ElectricandSteamProduction ReportstoNRCRev.3-Sept.19852~3~4~5.6.7~Corporate EOF/Recovery ManagerChecklist Corporate RecoveryManagerCallListNuclearOperations ManagerChecklist EOF-DoseAssessment Checklist StatusSheetProcedure EOFCommunication andSupportPersonnel Instructions Rev.13-June1986Rev.6-June1986Rev.10-June1986Rev.8-June1986Rev.7-June1984Rev.3-July19848.9~10.12.13.14.15.16.EOF/Recovery CenterSetupChecklist DELETEDMonthlyInspection ofEquipment Checklist MonthlyCommunications Equipment Check.RadioOperation Procedure NewYorkState"Hotline" (RECS)Operation andTestProcedure EOFLogsEmergency Operations FacilityTrainingProgramEOF/Recovery CenterContinuous ManningRev.5-June1986JULY1984Rev.4-June1986Rev.3-June1984Rev.3-Aug.1984Rev.2-July1984Rev.1-Aug.1984Rev.1-July1984Rev.6-June1986Revision3June1986 iNfI NUCLEAREMERGENCY OFFSITERESPONSEPROCEDURES INDEX(Continued) 17.Emergency Operations FacilityQuarterly Telephone NumberCheck18.DELETED19.EOFTelecopier Use20.Monitoring GinnaParameters 21.Corporate Spokesperson's Call-List.
Revisions to Electric and Steam Production Nuclear Emergency Offsite Response Procedures TO: Document Control Replace Page Replace Pages Replace Page Replace Page Replace Pages Replace Page Replace Page Please distribute the attached changes as listed below:~~-i-Index I 2/6, 2/7 3/1 4/3 5/1 through 5/C-3 8/1 10/4 Replace Pages 16/4, 16/5 Replace Page Replace Pages 17/2 19/1, 19/2, 19/3 Insert Remove Insert.Insert Page Pages Pages Page 19/4 20/1 through 20/ll J 20 through 20/2 and Attachment 1 22/1 Attachments David W.Burke Corporate Emergency Planner 1 WII ELECTRIC AND STEAM PRODUCTION DEPARTMENT NUCLEAR EMERGENCY OFFSITE RESPONSE PROCEDURES Note: INDEX Revision of specific areas on each page is indicated by vertical lines in the right hand column.Vice President, Electric and Steam Production Reports to NRC Rev.3-Sept.1985 2~3~4~5.6.7~Corporate EOF/Recovery Manager Checklist Corporate Recovery Manager Call List Nuclear Operations Manager Checklist EOF-Dose Assessment Checklist Status Sheet Procedure EOF Communication and Support Personnel Instructions Rev.13-June 1986 Rev.6-June 1986 Rev.10-June 1986 Rev.8-June 1986 Rev.7-June 1984 Rev.3-July 1984 8.9~10.12.13.14.15.16.EOF/Recovery Center Setup Checklist DELETED Monthly Inspection of Equipment Checklist Monthly Communications Equipment Check.Radio Operation Procedure New York State"Hotline" (RECS)Operation and Test Procedure EOF Logs Emergency Operations Facility Training Program EOF/Recovery Center Continuous Manning Rev.5-June 1986 JULY 1984 Rev.4-June 1986 Rev.3-June 1984 Rev.3-Aug.1984 Rev.2-July 1984 Rev.1-Aug.1984 Rev.1-July 1984 Rev.6-June 1986 Revision 3 June 1986 i N f I NUCLEAR EMERGENCY OFFSITE RESPONSE PROCEDURES INDEX (Continued) 17.Emergency Operations Facility Quarterly Telephone Number Check 18.DELETED 19.EOF Telecopier Use 20.Monitoring Ginna Parameters 21.Corporate Spokesperson's Call-List.
22.OffsiteAgencyLiaisonCallListRev.2-June1986JULY1984Rev.3-June1986Rev.3-June1986Rev.2-Sept.1985Rev.0-June1986Revision3June1986 1-AI,1IE ESP2/6ATTACHMENT 2E.O.F.KEYPERSONNEL CALLLIST1)DavidK.Laniak(Advisory Group)2)BruceA.Snow(NuclearOperations) 3)RobertE.Smith(Engineering) 4)JohnH.Oberlies(Corporate Spokesperson)
22.Offsite Agency Liaison Call List Rev.2-June 1986 JULY 1984 Rev.3-June 1986 Rev.3-June 1986 Rev.2-Sept.1985 Rev.0-June 1986 Revision 3 June 1986 1-A I ,1 I E ESP 2/6 ATTACHMENT 2 E.O.F.KEY PERSONNEL CALL LIST 1)David K.Laniak (Advisory Group)2)Bruce A.Snow (Nuclear Operations) 3)Robert E.Smith (Engineering) 4)John H.Oberlies (Corporate Spokesperson)
JohnC.Noon(Corporate Spokesperson) 5)WilfredJ.Schrouder, Jr.(Facilities andPersonnel) 6)RichardA.Sullivan(PublicRelations) 7)BernardR.Quinn(OffsiteHealthPhysicist) 8)HowardE.Rowley(OffsiteAgencyLiaison)9)DavidN.Burke(Corporate Emergency Planner)VOffice:Home:Office:Home:Office:Home:Office:Home:Office:Home:Office:Home:Office:Home:Beeper:Office:Home:Office:Home:Beeper:Office:Home:4t=","x.'880'I77-3>8')>>~
John C.Noon (Corporate Spokesperson) 5)Wilfred J.Schrouder, Jr.(Facilities and Personnel) 6)Richard A.Sullivan (Public Relations) 7)Bernard R.Quinn (Offsite Health Physicist) 8)Howard E.Rowley (Offsite Agency Liaison)9)David N.Burke (Corporate Emergency Planner)V Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Beeper: Office: Home: Office: Home: Beeper: Office: Home: 4t=","x.'880'I 77-3>8')>>~
xP~',7"Oi'f-0>8Revision13June1986 II'rrtII~I~OIb~<~>&~PP)R'$~Q
x P~', 7"Oi'f-0>8 Revision 13 June 1986 II'r r t II~I~O I b~<~>&~PP)R'$~Q
@m+gpggQ~A'~425>"-~~K t'~ylIQt~~..i~gtI~$A'k ATTACHMENT 2E.O.F.KEYPERSONALCALLLISTALTERNATES ESP2/7BruceA.Snow(Recovery Manager)1)RichardE.Phillips(Advisory Group)2)WesleyH.Backus(NuclearOperations) 3)RobertC.Mecredy(Engineering) 4)a.JohnE.Arthur(Engineering) b.John.C.Noon(Corporate Spokesperson)
@m+gp ggQ~A'~425>"-~~K t'~yl I Qt~~..i~g tI~$A'k ATTACHMENT 2 E.O.F.KEY PERSONAL CALL LIST ALTERNATES ESP 2/7 Bruce A.Snow (Recovery Manager)1)Richard E.Phillips (Advisory Group)2)Wesley H.Backus (Nuclear Operations) 3)Robert C.Mecredy (Engineering) 4)a.John E.Arthur (Engineering) b.John.C.Noon (Corporate Spokesperson)
Office:Home:Office:Home:Office:Home:Office:Home:Office:Home:Office:Home:II885)JeffreyW.Peters(Facilities andPersonnel) 6)JackJennejahn (PublicRelations) 7)NelsonA.Kiedrowski (OffsiteHealthPhysicist) 8)BethKing(OffsiteAgencyLiaison)Office:Home:Office:Home:Office:Home:Office:Home:$8.8Ex.8''w~.6915-52>=8Revision13June1986 1LIc;JIIl' ESP3/1NUCLEAREMERGENCY OFFSITERESPONSECORPORATE RECOVERYMANAGERCALLLIST1~0PURPOSE:1.1ToprovidetheVicePresident ofElectricandSteamProduction andSuperintendent ofNuclearProduction areadilyavailable listingofphonenumberstobeusedduringanuclearemergency.
Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: I I 8 8 5)Jeffrey W.Peters (Facilities and Personnel) 6)Jack Jennejahn(Public Relations) 7)Nelson A.Kiedrowski (Offsite Health Physicist) 8)Beth King (Offsite Agency Liaison)Office: Home: Office: Home: Office: Home: Office: Home:$8.8 Ex.8''w~.69 15-52>=8 Revision 13 June 1986 1 L I c;JI I l' ESP 3/1 NUCLEAR EMERGENCY OFFSITE RESPONSE CORPORATE RECOVERY MANAGER CALL LIST 1~0 PURPOSE: 1.1 To provide the Vice President of Electric and Steam Production and Superintendent of Nuclear Production a readily available listing of phone numbers to be used during a nuclear emergency.
 
2.0 REFERENCE 2.1 Nuclear Emergency Response Plan 3.0 INSTRUCTIONS 3.1 Call sequence and phone numbers: Extension Residence 3.1.1 Chairman of the Board 3.1.2 President 3.1.3 Executive Vice President 3.1.4 Manager of Public Relations 8 89'80, 8 72---"."-4 67'-558 377-38.,-'.1.5 Plant Protection Department-Kodak Park-'2'"t 3.1.6 3.2 Institute of Nuclear Power Operations (INPO)Emergency Call Number for"Alert and Above" action levels 0~;9$'3"-..09gO~
==2.0 REFERENCE==
The Ginna Plant Nuclear Safety Audit and Review Board shall be called into session as a result of the emergency.
2.1NuclearEmergency ResponsePlan3.0INSTRUCTIONS 3.1Callsequenceandphonenumbers:Extension Residence 3.1.1ChairmanoftheBoard3.1.2President 3.1.3Executive VicePresident 3.1.4ManagerofPublicRelations 889'80,872---"."-
Revision 6 June 1986 I'I I'<'eb C'I ESP 4/3 NUCLEAR OPERATIONS CALL'LIST NAME HOME PHONE BUSINESS PHONE Wesley Backus Jack Paris Frank Aman Bertha Gohl Y Michelle Fideor 6-3'8'--'1$.gl)%..4M&.'.~~.Don Wilbert 5''"'AIR'$Greg Joss Melvin Sexton"'"""""'"~''
467'-558377-38.,-'.1.5PlantProtection Department-KodakPark-'2'"t3.1.63.2Institute ofNuclearPowerOperations (INPO)Emergency CallNumberfor"AlertandAbove"actionlevels0~;9$'3"-..09gO~
"9+'~'G~nna'x~7 z na<Charlotte Buckman'Ex't.''0 ALTERNATES Don Travis Andy MacNamara Amy Jo Spurles Dewey Horning Charlie Anderson 82-3835..'a 6-392-.2665;,--54'6-Ext.3'15 524 7148 71 30.2 098 2700.x.19 1'6-"3-'59-1499-'
TheGinnaPlantNuclearSafetyAuditandReviewBoardshallbecalledintosessionasaresultoftheemergency.
""':~2~0'6%'.;-: z~nn;'F T.**Ginna numbers may be dialed direct from the main o f f ice or by dialing 9-524-4446 and giving the operator the extension.
Revision6June1986 I'II'<'ebC'I ESP4/3NUCLEAROPERATIONS CALL'LIST NAMEHOMEPHONEBUSINESSPHONEWesleyBackusJackParisFrankAmanBerthaGohlYMichelleFideor6-3'8'--'1$
Revision 10 June 1986 t/, ee.aeemw'1't~+~~~I~%44QR~~~~~'P+P.'g 4PSMQR~~Jgpegl+A4DW 448 pj4t~~%4PVC 440llt~~.WIROPf J.~gWQiia@5kg{j~<~e%iH)r.~5~
.gl)%..4M&.'.~~.DonWilbert5''"'AIR'$GregJossMelvinSexton"'"""""'"~''
gp~~g g~dhj~3@fi&#xb9;~~)eVi4i~r
"9+'~'G~nna'x~7zna<Charlotte Buckman'Ex't.''0 ALTERNATES DonTravisAndyMacNamara AmyJoSpurlesDeweyHorningCharlieAnderson82-3835..'a6-392-.2665;,
~gtg@g g~~~"'~~)~~~yv,,+
--54'6-Ext.3'1552471487130.20982700.x.191'6-"3-'59-1499-'
""':~2~0'6%'.;-:z~nn;'FT.**Ginnanumbersmaybedialeddirectfromthemainofficeorbydialing9-524-4446 andgivingtheoperatortheextension.
Revision10June1986 t/,ee.aeemw'1't~+~~~I~%44QR~~~~~'P+P.'g 4PSMQR~~Jgpegl+A4DW 448pj4t~~%4PVC 440llt~~.WIROPfJ.~gWQiia@5kg{j~<~e%iH)r.~5~
gp~~gg~dhj~3@fi&#xb9;~~)eVi4i~r
~gtg@gg~~~"'~~)~~~yv,,+
~~~~~sh~;~
~~~~~sh~;~
~mi2~m~'Wsa;~w~4~
~mi2~m~'Wsa;~w~4~
r' ESP5/1NUCLEAREMERGENCY OFFSITERESPONSEEOFDOSEASSESSMENTS CHECKLIST 1.0PURPOSE:1.1Toprovideamethodforestimating post-accident radiation dosestothepublicbaseduponthemeterological andradio-logicalinformation collected atandinthevicinityofGinnaStation.1.2TheEOFDoseAssessment teamshouldinitially serviceasasupportgrouptotheGinnaTSCduringtheearlypostaccident phase;assisting inaparalledefforttoascertain out-ofplantradiological conditions.
r' ESP 5/1 NUCLEAR EMERGENCY OFFSITE RESPONSE EOF DOSE ASSESSMENTS CHECKLIST 1.0 PURPOSE: 1.1 To provide a method for estimating post-accident radiation doses to the public based upon the meterological and radio-logical information collected at and in the vicinity of Ginna Station.1.2 The EOF Dose Assessment team should initially service as a support group to the Ginna TSC during the early postaccident phase;assisting in a paralled effort to ascertain out-of plant radiological conditions.
Initially, theTSCmaintains leadresponsibility forproviding recommendations totheEmergency Coordinator, NuclearOperations ManagerandCorporate RecoveryManagerconcerning protective actionstobetaken.EOFDoseAssessment assumesleadresponsibility onlywhenconditions inStep3.7aremet.
Initially, the TSC maintains lead responsibility for providing recommendations to the Emergency Coordinator, Nuclear Operations Managerand Corporate Recovery Manager concerning protective actions to be taken.EOF Dose Assessment assumes lead responsibility only when conditions in Step 3.7 are met.


==2.0REFERENCES==
==2.0 REFERENCES==
:
:
2.1NuclearEmergency ResponsePlan.2~2SC420I"Tab1esofProtective ActionGuides"andfiguresshowingprojected exposure.
2.1 Nuclear Emergency Response Plan.2~2 SC 4 2 0 I"Tab 1 es of Protective Action Guides" and f igures showing projected exposure.3.0 INSTRUCTIONS:
 
3.1 Upon notification by EOF/Recovery Manager of an emergency at Ginna Station, the Dose Assessment Manager shall notify following personnel to institute the Appendix B call list: Robert Burton Dudley Schuyler Wendel Knoll&E'--86-1824":, RG&E-24Q-'2224,,-,--RG'Ext:..--:8: 9 Ext.4042 813:~3.2 Assure that communications equipment is operable, preferably by a communications aide;this includes: (a)Dose Assessment Direct Phone to TSC Dose Assessment (yellow phone-center desk)(b)Two Centrex telephones.
==3.0 INSTRUCTIONS==
Revision 8 June 1986
3.1Uponnotification byEOF/Recovery Managerofanemergency atGinnaStation,theDoseAssessment Managershallnotifyfollowing personnel toinstitute theAppendixBcalllist:RobertBurtonDudleySchuylerWendelKnoll&E'--86-1824":,RG&E-24Q-'2224,,
''I pl."A iC p w (c)Health Physics Network (HPN)Telephone (center desk).(d)Dose Assessment VHF Radio (communications desk).(e)RG&E telephone extension,,(8097 side desk).(f)Bearcat Scanner (communications desk).3'.1 3''(g)NYS Hotline (red phone-center desk).(h)Ginna Ext.598 (side desk)Contact TSC Dose Assessment Area and notify Health Physicist that.the EOF Dose Assessment Staff is available to begin assisting in offsite evaluation efforts.Obtain meteorological and radiological data available from TSC and/or from the MV-8000 computer link (including wind speed, direction and atmospheric stability inform-ation, effluent and area monitor readings and any available field measurements).
-,--RG'Ext:..--:8:9Ext.4042813:~3.2Assurethatcommunications equipment isoperable, preferably byacommunications aide;thisincludes:
3.4 Initiate plotting of data on appropriate status boards and maps located in the EOF Dose Assessment Area.k 3.5 Commence dose projection efforts as specified in Ginna Station procedure SC-420"Supplementary Dose Calcula-tions" may also be performed using alternate techniques.
(a)DoseAssessment DirectPhonetoTSCDoseAssessment (yellowphone-centerdesk)(b)TwoCentrextelephones.
3~6 Based upon plant status, pro j ected or actual o f f site radiological 1evals and pro j ected exposure times, determine the appropriate protective actions (e.g.she-ltering, evacuation to be recommended to the Corporate Recovery Manager).Confirm with the TSC Dose Assessment group.(Refer to Protective Action Guides in Table IV SC-420).4 Rev.8 June 1986 k@1$1f'I 14 I II k 3'The EOF Dose Assessment Group is to assume primary responsibility dose projections, coordinating offsite surveys and protective action recommendations from the TSC only if the following conditions are met: (a)Minimum EOF Dose Assessment manpower is attained:*lead dose assessment individual
Revision8June1986
*assistant dose assessment individual
''Ipl."AiCpw (c)HealthPhysicsNetwork(HPN)Telephone (centerdesk).(d)DoseAssessment VHFRadio(communications desk).(e)RG&Etelephone extension,,(8097 sidedesk).(f)BearcatScanner(communications desk).3'.13''(g)NYSHotline(redphone-center desk).(h)GinnaExt.598(sidedesk)ContactTSCDoseAssessment AreaandnotifyHealthPhysicist that.theEOFDoseAssessment Staffisavailable tobeginassisting inoffsiteevaluation efforts.Obtainmeteorological andradiological dataavailable fromTSCand/orfromtheMV-8000computerlink(including windspeed,direction andatmospheric stability inform-ation,effluentandareamonitorreadingsandanyavailable fieldmeasurements).
*communications aide*courier*plotter (b)Establishment of satisfactory flow of current information regarding plant status, plant effluent and area monitors, meteorological conditions, and survey team data.(c)Communications established with survey teams, preferably direct radio contact, or indirect via relay from TSC.(d)Verification that the Corporate Recovery Manager and the TSC Dose Assessment Group are cognizant of shift in dose assessment responsibility to the EOF.(e)Verif ication that minimal backup support can be maintained at Ginna TSC to assist in dose assessment effort should flow of information to EOF be disrupted.
3.4Initiateplottingofdataonappropriate statusboardsandmapslocatedintheEOFDoseAssessment Area.k3.5Commencedoseprojection effortsasspecified inGinnaStationprocedure SC-420"Supplementary DoseCalcula-tions"mayalsobeperformed usingalternate techniques.
3.8 Two additional field monitoring teams may be dispatched from the EOF to supplement offsite survey efforts.The methodology and predesignated survey routes are included in Appendices A through C attached.Specific survey routes will be confirmed prior to team departure from EOF.3.9 EOF survey teams shall be advised by the lead dose assessment individual of survey routes, checkpoints, communications, and protective equipment to be used in the field, prior to leaving the EOF.All survey teams shall sign out on survey team status board.
3~6Baseduponplantstatus,projectedoractualoffsiteradiological 1evalsandprojectedexposuretimes,determine theappropriate protective actions(e.g.she-ltering,evacuation toberecommended totheCorporate RecoveryManager).
wl ESP 5/A-1 APPENDIX A SUPPLEMENTAL OFFS1TE SURVEY ROUTES 1.0 EOF Surve Team-1 Lon-ran e Route EOF-1 1.1.1 Take 490 East to 590 North.(If rush hour, alternate route can be Culver to Atlantic Avenue.)1~1.2 1.1.3 1.1.4 Take Browncroft Blvd.exit, head east to Creek Street.Head north on Creek Street, continue to intersection of Creek and Empire Boulevard.(Eastway Plaza).Cross intersection and proceed to Sibley's Eastway.Set up air sampler and commence operation (note start time and initial totalizer reading).Continue on Bay Road heading.north.1.1.5 1.1.6 l.1.7 1.1.8 Follow Bay Road North to Lake Road and turn west.Continue west on Lake Road proceeding onto Seabreeze expressway (Route 590 S)heading south.Take Route 404 Webster exit (East), and head east on Empire Boulevard.
ConfirmwiththeTSCDoseAssessment group.(RefertoProtective ActionGuidesinTableIVSC-420).4Rev.8June1986 k@1$1f'I14IIIk 3'TheEOFDoseAssessment Groupistoassumeprimaryresponsibility doseprojections, coordinating offsitesurveysandprotective actionrecommendations fromtheTSConlyifthefollowing conditions aremet:(a)MinimumEOFDoseAssessment manpowerisattained:
Retrieve air sampler at Sibley's Eastway.Report air sample data and request further instructions.
*leaddoseassessment individual
1.2 Short-ran e Route EOF-1 1.2~1 1~2.2 Take East Avenue to Culver Road, turn north on Culver.Proceed on Culver to Empire Boulevard.
*assistant doseassessment individual
Start air sample (note start time and initial totalizer reading).Let sampler run for approximately 30 minutes.Report results to Dose Assessment.
*communications aide*courier*plotter(b)Establishment ofsatisfactory flowofcurrentinformation regarding plantstatus,planteffluentandareamonitors, meteorological conditions, andsurveyteamdata.(c)Communications established withsurveyteams,preferably directradiocontact,orindirectviarelayfromTSC.(d)Verification thattheCorporate RecoveryManagerandtheTSCDoseAssessment Grouparecognizant ofshiftindoseassessment responsibility totheEOF.(e)Verificationthatminimalbackupsupportcanbemaintained atGinnaTSCtoassistindoseassessment effortshouldflowofinformation toEOFbedisrupted.
1.2.3 Proceed northwest on Waring Road to Norton Street.Turn west on Norton.1~2.4 Continue to Portland Avenue, turn left.1.2.5 Head south on Portland to North Street Rev.8 June 1986 L v!ll 4)'
3.8Twoadditional fieldmonitoring teamsmaybedispatched fromtheEOFtosupplement offsitesurveyefforts.Themethodology andpredesignated surveyroutesareincludedinAppendices AthroughCattached.
ESP 5/A-2 1.2.6 Follow North Street to East Avenue 1.2.7.Request further instructions.
Specificsurveyrouteswillbeconfirmed priortoteamdeparture fromEOF.3.9EOFsurveyteamsshallbeadvisedbytheleaddoseassessment individual ofsurveyroutes,checkpoints, communications, andprotective equipment tobeusedinthefield,priortoleavingtheEOF.Allsurveyteamsshallsignoutonsurveyteamstatusboard.
2'EOF Surve Team-2 2.1 Lon-ran e Route EOF-2 2~1~1 Take 490 East, continue through"can of worms" to Route 441 (Linden Avenue)exit.(If rush hour, alternate route can be East Avenue to Linden).2.1.2 2.1.3 2'.4 Follow 441 through Penfield village, to Route 250 intersection.(Penfair Plaza).Set up air sampler at Penfair Plaza and commence operation (note start time and initial totalizer reading).Continue east on Route 441 to Harris Road.Turn north on Harris Road, and proceed to Atlantic Avenue.2.1.5 2.1~6 2.1.7 Turn west on Atlantic, and continue to Route 250 intersection (Webster-Fairport Road).Turn left.Return to Penfair Plaza on Route 250, retrieve air sampler and report readings to Dose Assessment.
wl ESP5/A-1APPENDIXASUPPLEMENTAL OFFS1TESURVEYROUTES1.0EOFSurveTeam-1Lon-raneRouteEOF-11.1.1Take490Eastto590North.(Ifrushhour,alternate routecanbeCulvertoAtlanticAvenue.)1~1.21.1.31.1.4TakeBrowncroft Blvd.exit,headeasttoCreekStreet.HeadnorthonCreekStreet,continuetointersection ofCreekandEmpireBoulevard.
Request further instructions.
(EastwayPlaza).Crossintersection andproceedtoSibley'sEastway.Setupairsamplerandcommenceoperation (notestarttimeandinitialtotalizer reading).
2.2 Short-ran e Route EOF-2 2'.1 2.2'Take Monroe Avenue, hea'ding southeast to the 12 Corners.Commence air sample at 12 Corners (note start time and initial totalizer reading).Let sampler run for approximately 30 minutes.Report results to Dose Assessment.
ContinueonBayRoadheading.north.1.1.51.1.6l.1.71.1.8FollowBayRoadNorthtoLakeRoadandturnwest.ContinuewestonLakeRoadproceeding ontoSeabreeze expressway (Route590S)headingsouth.TakeRoute404Websterexit(East),andheadeastonEmpireBoulevard.
2'.3 2''2''2'.6 Turn north on Winton Road, proceed to Main Street.Turn west on Main Street, follow Main to Culver Road.Turn south on Culver, and proceed to East Avenue.Request further instructions.
RetrieveairsampleratSibley'sEastway.Reportairsampledataandrequestfurtherinstructions.
Rev.8 June 1986 V l~
1.2Short-ran eRouteEOF-11.2~11~2.2TakeEastAvenuetoCulverRoad,turnnorthonCulver.ProceedonCulvertoEmpireBoulevard.
APPENDIX B ESP 5B/1*MESSAGE*Is this the residence?
Startairsample(notestarttimeandinitialtotalizer reading).
May I speak to (called individual)"There is a SITE EMERGENCY AT GINNA STATION.Report to the EOF Dose Assessment Area immediately.
Letsamplerrunforapproximately 30minutes.ReportresultstoDoseAssessment.
I repeat, report to the EOF Dose Assess-ment Area immediately.
1.2.3Proceednorthwest onWaringRoadtoNortonStreet.TurnwestonNorton.1~2.4ContinuetoPortlandAvenue,turnleft.1.2.5HeadsouthonPortlandtoNorthStreetRev.8June1986 Lv!ll4)'
Do you understand'P~~
ESP5/A-21.2.6FollowNorthStreettoEastAvenue1.2.7.Requestfurtherinstructions.
If individual does not answer the telephone, ask for him/her.proper entry on tally sheet.TALLY SHEET Make NAME TELEPHONE WORK HOME TIME INDIVIDUAL AT HOME YES-NO NO ANS.M.V.BURGESS R.M.BURTON D.D.DAKIN~~C.H.FINK N.A.KIEDROWSKI
2'EOFSurveTeam-22.1Lon-raneRouteEOF-22~1~1Take490East,continuethrough"canofworms"toRoute441(LindenAvenue)exit.(Ifrushhour,alternate routecanbeEastAvenuetoLinden).2.1.22.1.32'.4Follow441throughPenfieldvillage,toRoute250intersection.
<<3~1~5=%4:2.8-4 W.L.KNOLL S.T.MAC INTYRE i2>D.J.MONEY J.F.PAS UINI i 7'"-=~~,-l9-'-'-2 87'>>8~9"'5=7-"6,3 J.J.PRILL E.W.PRYTHERCH B.R.UINN 89'2'46-'-XL5'- 20 K.M.SAHLER D.N.SCHUYLER 86--8 G.A.THORNE J.L.WILLIAMS 2-~4 TELEPRO Revision 8 June 1986 A,~I l I'\W ESP 5/C-1 APPENDIX C FIELD CALCULATIONS FOR LOW VOLUME AIR SAMPLES USING RM-14 1)Particulate
(PenfairPlaza).SetupairsampleratPenfairPlazaandcommenceoperation (notestarttimeandinitialtotalizer reading).
-Filter Removed from Holder: CPM Sam le-CPM BKG 2.4 X 10=~=(Volume of Sample in~CC uCi/cc Particulate 2)Iodine-Cartridge Inlet Face to Probe-End Cap Removed: 'PM Sam le-CPM BKG 8.34X10-g (Volume of Sample in CC)uCi/cc Iodine TAKING LOW VOLUME SAMPLE: LOW VOLUME AIR SAMPLER CHECK: 1.RECORD: Date, Time, Location, and Totalizer Reading (A).2.Turn Unit, ON and sample for approximately 30 minutes.3.Turn Unit OFF-RECORD: Date, Time, Location&Totalizer Reading (B).~~4.Sample Volume=(B-A)(Calibra-tion factor)=cc.NOTE: Calibration Factor is noted on side of sampler.5.Read filters with RM-14 and save in marked envelopes.
ContinueeastonRoute441toHarrisRoad.TurnnorthonHarrisRoad,andproceedtoAtlanticAvenue.2.1.52.1~62.1.7TurnwestonAtlantic, andcontinuetoRoute250intersection (Webster-Fairport Road).Turnleft.ReturntoPenfairPlazaonRoute250,retrieveairsamplerandreportreadingstoDoseAssessment.
1.Connect Battery Pack to Pump Unit.2.Turn switch ON-Check flow meter for movement.3.Turn Unit OFF.4.INSURE Filter Assembly contains a GY-130 cart-ridge and a particulate filter before taking sample.RADECO H 809C HIGH VOLUME AIR SAMPLER CHECK'.Connect cables to power source, Red clip to positive and Black clip to negative.2.Turn on switch and check flow meter, flov meter vill be off scale high with no filters in place.3.Turn unit off.4.Insure filter assembly contains a GY-130 cartridge and a partic-ulate filter.Rev.8 June 1986
Requestfurtherinstructions.
'I g J APPENDIX C CONT'D ESP 5/C-2 TAKING RADECO HIGH VOLUME AIR SAMPLE'.Record: Date, Time and Location 2.Turn unit on and sample for 10 minutes.3.Record the flow rate in cfm.(Normal is 1.5 cfm).4.Sample volume=flow rate in cfm Z minutes sampled.5.Read filters with RM-14 and save in marked envelopes.
2.2Short-ran eRouteEOF-22'.12.2'TakeMonroeAvenue,hea'dingsoutheast tothe12Corners.Commenceairsampleat12Corners(notestarttimeandinitialtotalizer reading).
FIELD CALCULATIONS FOR HIGH VOLUME AIR SAMPLES USING RM-14: 1.Particulate
Letsamplerrunforapproximately 30minutes.ReportresultstoDoseAssessment.
-Filter removed from holder: CPM Sam le-CPM BKG 8.38 X 10 uCi/cc Particulate 2.Iodine-Cartridge Inlet Face to Probe: CPM Sam le-CPM BKG 3.0 X 10:g w uCi/cc Iodine-131 Rev.8 June 1986
2'.32''2''2'.6TurnnorthonWintonRoad,proceedtoMainStreet.TurnwestonMainStreet,followMaintoCulverRoad.TurnsouthonCulver,andproceedtoEastAvenue.Requestfurtherinstructions.
Rev.8June1986 Vl~
APPENDIXBESP5B/1*MESSAGE*
Isthistheresidence?
MayIspeakto(calledindividual)
"ThereisaSITEEMERGENCY ATGINNASTATION.ReporttotheEOFDoseAssessment Areaimmediately.
Irepeat,reporttotheEOFDoseAssess-mentAreaimmediately.
Doyouunderstand'P~~
Ifindividual doesnotanswerthetelephone, askforhim/her.properentryontallysheet.TALLYSHEETMakeNAMETELEPHONE WORKHOMETIMEINDIVIDUAL ATHOMEYES-NONOANS.M.V.BURGESSR.M.BURTOND.D.DAKIN~~C.H.FINKN.A.KIEDROWSKI
<<3~1~5=%4:2.8-4W.L.KNOLLS.T.MACINTYREi2>D.J.MONEYJ.F.PASUINIi7'"-=~~,-l9-'-'-287'>>8~9"'5=7-"6,3J.J.PRILLE.W.PRYTHERCH B.R.UINN89'2'46-'-XL5'- 20K.M.SAHLERD.N.SCHUYLER86--8G.A.THORNEJ.L.WILLIAMS2-~4TELEPRORevision8June1986 A,~IlI'\W ESP5/C-1APPENDIXCFIELDCALCULATIONS FORLOWVOLUMEAIRSAMPLESUSINGRM-141)Particulate
-FilterRemovedfromHolder:CPMSamle-CPMBKG2.4X10=~=(VolumeofSamplein~CCuCi/ccParticulate 2)Iodine-Cartridge InletFacetoProbe-EndCapRemoved:'PMSamle-CPMBKG8.34X10-g(VolumeofSampleinCC)uCi/ccIodineTAKINGLOWVOLUMESAMPLE:LOWVOLUMEAIRSAMPLERCHECK:1.RECORD:Date,Time,Location, andTotalizer Reading(A).2.TurnUnit,ONandsampleforapproximately 30minutes.3.TurnUnitOFF-RECORD:Date,Time,Location&Totalizer Reading(B).~~4.SampleVolume=(B-A)(Calibra-tionfactor)=cc.NOTE:Calibration Factorisnotedonsideofsampler.5.ReadfilterswithRM-14andsaveinmarkedenvelopes.
1.ConnectBatteryPacktoPumpUnit.2.TurnswitchON-Checkflowmeterformovement.
3.TurnUnitOFF.4.INSUREFilterAssemblycontainsaGY-130cart-ridgeandaparticulate filterbeforetakingsample.RADECOH809CHIGHVOLUMEAIRSAMPLERCHECK'.Connectcablestopowersource,RedcliptopositiveandBlackcliptonegative.
2.Turnonswitchandcheckflowmeter,flovmetervillbeoffscalehighwithnofiltersinplace.3.Turnunitoff.4.InsurefilterassemblycontainsaGY-130cartridge andapartic-ulatefilter.Rev.8June1986
'IgJ APPENDIXCCONT'DESP5/C-2TAKINGRADECOHIGHVOLUMEAIRSAMPLE'.Record:Date,TimeandLocation2.Turnunitonandsamplefor10minutes.3.Recordtheflowrateincfm.(Normalis1.5cfm).4.Samplevolume=flowrateincfmZminutessampled.5.ReadfilterswithRM-14andsaveinmarkedenvelopes.
FIELDCALCULATIONS FORHIGHVOLUMEAIRSAMPLESUSINGRM-14:1.Particulate
-Filterremovedfromholder:CPMSamle-CPMBKG8.38X10uCi/ccParticulate 2.Iodine-Cartridge InletFacetoProbe:CPMSamle-CPMBKG3.0X10:gwuCi/ccIodine-131Rev.8June1986


ESP5/C-3APPENDIXCCONT'DRADIOUSEPROCEDURE 2~3~4~5~6.7~8.9~Extendantennafull(ifnecessary).
ESP 5/C-3 APPENDIX C CONT'D RADIO USE PROCEDURE 2~3~4~5~6.7~8.9~Extend antenna full (if necessary).
ChannelselectoronChannel3.TurnunitON.Adjustsquelch.Depressswitchtotransmit, call"Technical SupportCenter"or"EOF/RecoveryCenter".Speakinnormalvoice,slowlyanddistinctly, intospeaker/mike.
Channel selector on Channel 3.Turn unit ON.Adjust squelch.Depress switch to transmit, call"Technical Support Center" or"EOF/Recovery Center".Speak in normal voice, slowly and distinctly, into speaker/mike.
Releaseswitchtoreceive.Basestationwillterminate withitscallsign.Ifduringadrill-precedeallcallswith,"ThisisaDrill".AUTODIGI-MASTER DOSERATEMETER1.TurnunitON.2.TakereadingsnotingiftheyareMR/HRorR/HR.NOTE'NITREADSOUTEVERY2SECONDS.Rev.8Zune1986 itElk'h(rg\
Release switch to receive.Base station will terminate with its call sign.If during a drill-precede all calls with,"This is a Drill".AUTO DIGI-MASTER DOSE RATE METER 1.Turn unit ON.2.Take readings noting if they are MR/HR or R/HR.NOTE'NIT READS OUT EVERY 2 SECONDS.Rev.8 Zune 1986 it Elk'h (rg\
ESP16/4ATTACHMENT IIEOF/RECOVERY CENTERPOSITIONQUALIFICATION LIST'a)(b)(c)(d)(e)RecoverManaer:(1)RogerW.'ober(2)BruceA.SnowAdvisoSuortManaer:(1)DaveLaniak(2)RichardPhillipsNuclear0erationsManaer:(1)BruceA.Snow(2)WesleyH.BackusEnineerinSuortManaer:(1)RobertSmith(2)RobertC.MecredyFacilities andPersonnel Manaer:(1)WilfredJ.Schrouder, Jr.(2)JefferyW.Peters(f)PublicRelations Manaer:(1)RichardSullivan(2)JackJennejahn (g)CororateSokeserson:(1)JohnOberlies(2)JohnE.Arthur(3)JohnC.Noon(h)OffsiteDoseAssessment Manaer(1)BernardQuinn(2)NelsonA.Kiedrowski OffsiteAencLiaison(1)HowardE.Rowley(2)BethS.KingCororateEmerencPlanner(1)DavidW.BurkeRevision6June1986
ESP 16/4 ATTACHMENT II EOF/RECOVERY CENTER POSITION QUALIFICATION LIST'a)(b)(c)(d)(e)Recover Mana er: (1)Roger W.'ober (2)Bruce A.Snow Adviso Su ort Mana er: (1)Dave Laniak (2)Richard Phillips Nuclear 0 erations Mana er: (1)Bruce A.Snow (2)Wesley H.Backus En ineerin Su ort Mana er: (1)Robert Smith (2)Robert C.Mecredy Facilities and Personnel Mana er: (1)Wilfred J.Schrouder, Jr.(2)Jeffery W.Peters (f)Public Relations Mana er: (1)Richard Sullivan (2)Jack Jennejahn (g)Cor orate S okes erson: (1)John Oberlies (2)John E.Arthur (3)John C.Noon (h)Offsite Dose Assessment Mana er (1)Bernard Quinn (2)Nelson A.Kiedrowski Offsite A enc Liaison (1)Howard E.Rowley (2)Beth S.King Cor orate Emer enc Planner (1)David W.Burke Revision 6 June 1986
-144'st'PI,4'~l ESP16/5EOF/RECOVERY CENTERPOSITIONQUALIFICATION LIST(cont.)(k)EOFRecoverCenterBettyGohlMichelleFideorAmyJoSpurlesMichelleFideorCharlotte BuckmanJackParisDonaldBuehlmanDonWilbertAndrewMcNamaraDonaldTravisFrankAmanMailRoomMailRoomMailRoomGregJossDeweyHorningDonaldTravisCharlieAndersonAndrewMcNamaraMelvinSextonSuortPersonnel:
-14 4's t'P I, 4'~l ESP 16/5 EOF/RECOVERY CENTER POSITION QUALIFICATION LIST (cont.)(k)EOF Recover Center Betty Gohl Michelle Fideor Amy Jo Spurles Michelle Fideor Charlotte Buckman Jack Paris Donald Buehlman Don Wilbert Andrew McNamara Donald Travis Frank Aman Mail Room Mail Room Mail Room Greg Joss Dewey Horning Donald Travis Charlie Anderson Andrew McNamara Melvin Sexton Su ort Personnel: (Secretary, Recovery Manager)(Receptionist, Check-In)(Receptionist
(Secretary, RecoveryManager)(Receptionist, Check-In)
-Alternate)(Telecopier
(Receptionist
-Outgoing Only)(Telecopier
-Alternate)
-Incoming Only)(Communications)(Communications)(Communications)(Communications (Communications)(Communications)(Courier)(Courier)(Courier)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper).(Plant Computer Operator)(Plant Comput: er Operator)Offsite Dose Assessment Personnel:
(Telecopier
M.V.D.D.S.T.D.J.J.F.J.J.C.H.W.L.E.W.P.K.K.M.D.N.J.L.Burgess Dakin MacIntyre Money Pascpxini Prill Fink Knoll Prytherch Humphrey Sahler Schuyler Williams Survey Team Survey Team Survey Team Survey Team Survey Team Survey Team Midas Operator Data Poster Radioman Communications Communications Weatherman Calculator Revision 6 June 1986
-OutgoingOnly)(Telecopier
$1 ESP 17/2 ATTACHMENT I UARTERLY TELEPHONE NUMBER CHECK 1.Section (Check One)Recovery Manager Engineering Support Manager Public Relations Manager Ginna Station SC-600 to SC-606 Inclusive Nuclear Operations Manger Security Manager Facilities and Personnel Manager Advisory Support Manager Offsite Agency Liaison 2~Our phone number list was checked on (date)No changes are required Attached or is a revised copy of the phone list.(initial)(initial)3.Forward completed form to Corporate Emergency Planner.Revision 2 June 1986 ca rill'1 I'lX'P , 4 NUCLEAR EMERGENCY OFFSITE RESPONSE PROCEDURES ACCESS TO GINNA WEATHER TOWER ESP 20/1 1.0 PURPOSE: This procedure provides instructions for interpreting and accessing data in the MIDAS storage computer in the Meteorlogical Tower Trailer.2.0 2.1 2~1.1 2''2.1.3 INSTRUCTIONS:
-IncomingOnly)(Communications)
Set up for TI-Silent 700 in the EOF, 49 East Avenue.On/Off-push switch to forward position (located top right corner)On Line-depressed to right Dial-9-524-5711.
(Communications)
When computer tone is heard, insert phone in acoustic coupler with mouthpiece to the left.Wait for the word"connected" to be printed.Enter command AV77[return]to print all last 15 minute averages.To sign off, hang up phone and the word"disconnected" will be printed.There are short time periods when the phone connections are disabled while internal calculations are taking place.Whenever the 1200 BAUD line is in use, the 300 BAUD line is disabled.Normal communication times from the master MIDAS computer is a 30 minute period centered around 3: 30, 7: 30 and 11: 30 EST.2'~4 To obtain: Last 15 minute average-Type AVXX[RETURN]Last collected value-Type PPXX[RETURN]NOTE: If ILLEGAL REQUEST appears, retype the command again.Illegal request is returned if the command was typed wrong or a spurious character was included, i.e.-line feed.For AVXX printout: XX 01 02 04 10 20 40 77 Prints Prints Prints Prints Prints Prints Prints all speed averages all direction averages all temperature averages all delta temperature averages miscellaneous averages rain averages all averages Revision 3 June 1986
(Communications)
~~141 For PPXX printout: ESP 20/2 Channel XX Number 01 02 03 04 05 08 09 10 ll 12 14 15 16 17'8 19 20 21 22 23 24 25 32 Name WS 33A WS 33B WS 150A WS 150B WS 250 WD 33A WD 33B WD 150A WD 150B WD 250 TER 33A TER 33B TE 150A TE 150B, TE 250A TE 250B DT 150A DT 150B DT 250A DT 250B DEW 33 TEG 33 RAIN INTERPRETATION OF DATA 15 min.averages for'01-15 min;16-30 min;31-45 min;46-60 min.WS WD TE DT DEW TEG RAIN NAME AVGE ST.DEV MIN.MAX.I MNDR AVRN CNT Wind Speed-Average divided by 10=measured value Wind Direction-Average is read directly Temperature
(Communications (Communications)
-Average divided by 10='measured value Delta Temperature
(Communications)
-Average divided by 10=calculated value Dewpoint Temperature
(Courier)
-Average divided by 10 measured value Ambient Temperature at Dewpoint Monitor-Average divided by 10=measured value Rainfall-Average divided by 100=accumulated inches of rain Parameter and height in meters on tower Average of values collected in last 15 minutes average Standard deviation of average'data Minimum value for last 15 minute average Maximum value for last 15 minute average Index code: 0=Good;1=Questionable; 2=Bad;3=Unsteady wing data;4=Calm Wind;5=Flat direction Meander range for wind direction Average of meander range No longer used for data Revision 3 June 1986
(Courier)
<cA Il I't, I I 4 r ATTACHMENT I P']7ff R P~IA'I i so y'f sf~~~(OIL'I'CITE ROCHESTER GAS AND ELECTRIC CORPORATION
(Courier)
~89 EAST AVENUE, ROCHESTER, N.Y.14649-0001
(StatusBoardKeeper)(StatusBoardKeeper)(StatusBoardKeeper)(StatusBoardKeeper)(StatusBoardKeeper)(StatusBoardKeeper).(PlantComputerOperator)
<f LC>w04f i~fa cooa fib 546-2700 May 20, 1986 Mr.James Papile Radiological Emergency Preparedness Group Empire State Plaza 22nd Floor, Corning Tower II Albany, NY 12237~l Dear This letter is to inform you that the"Ginna Access" system for monitoring plant conditions is not available while the new Plant Parameter Computer System (PPCS)and Safety Assessment System (SAS)is being installed.
(PlantComput:erOperator)
According to our computer people some form of"Ginna Access" will again be available, later in the year.In the interim you have been supplied with appropriate phone numbers.If you have any questions on this letter do not hesitate to call me on (716)724-8022.Sincerely,/David W.Burke Corporate Emergency Planner Copies: Mr.B.A.Snow Mr.D.L.Piede l~
OffsiteDoseAssessment Personnel:
OFFSITE AGENCY LIAISON CALL LIST ESP 22/1 1.0 PURPOSE: To=provide the Offsite Agency Liaison with phone numbers to alert RG&E advisors to the New York State, Monroe and Wayne County Emergency Operations Centers.2.0 INSTRUCTIONS:
M.V.D.D.S.T.D.J.J.F.J.J.C.H.W.L.E.W.P.K.K.M.D.N.J.L.BurgessDakinMacIntyre MoneyPascpxini PrillFinkKnollPrytherch HumphreySahlerSchuylerWilliamsSurveyTeamSurveyTeamSurveyTeamSurveyTeamSurveyTeamSurveyTeamMidasOperatorDataPosterRadiomanCommunications Communications Weatherman Calculator Revision6June1986
4 2.1 Upon notification by the EOF/Recovery Manager of an emergency at Ginna Station, notify the following personnel to standby or report to their respective EOC post,.2.1.1 J.Robert Brown (N.Y.S.)Office: Home: 7'2 4 6 82-8=: unuse, 2~1.2 2~1.3 James F.Sweet (Wayne)Raymond B.Junot (Monroe)Office: Home: Office: Home: 5 6-2700 ex.71-283 815 483-6 334-2690 Revision 0 June 1986
$1 ESP17/2ATTACHMENT IUARTERLYTELEPHONE NUMBERCHECK1.Section(CheckOne)RecoveryManagerEngineering SupportManagerPublicRelations ManagerGinnaStationSC-600toSC-606Inclusive NuclearOperations MangerSecurityManagerFacilities andPersonnel ManagerAdvisorySupportManagerOffsiteAgencyLiaison2~Ourphonenumberlistwascheckedon(date)NochangesarerequiredAttachedorisarevisedcopyofthephonelist.(initial)
~\w 1 fJ}}
(initial) 3.Forwardcompleted formtoCorporate Emergency Planner.Revision2June1986 carill'1I'lX'P,4 NUCLEAREMERGENCY OFFSITERESPONSEPROCEDURES ACCESSTOGINNAWEATHERTOWERESP20/11.0PURPOSE:Thisprocedure providesinstructions forinterpreting andaccessing dataintheMIDASstoragecomputerintheMeteorlogical TowerTrailer.2.02.12~1.12''2.1.3INSTRUCTIONS:
SetupforTI-Silent 700intheEOF,49EastAvenue.On/Off-pushswitchtoforwardposition(locatedtoprightcorner)OnLine-depressed torightDial-9-524-5711.
Whencomputertoneisheard,insertphoneinacousticcouplerwithmouthpiece totheleft.Waitfortheword"connected" tobeprinted.EntercommandAV77[return]toprintalllast15minuteaverages.
Tosignoff,hangupphoneandtheword"disconnected" willbeprinted.Thereareshorttimeperiodswhenthephoneconnections aredisabledwhileinternalcalculations aretakingplace.Wheneverthe1200BAUDlineisinuse,the300BAUDlineisdisabled.
Normalcommunication timesfromthemasterMIDAScomputerisa30minuteperiodcenteredaround3:30,7:30and11:30EST.2'~4Toobtain:Last15minuteaverage-TypeAVXX[RETURN]Lastcollected value-TypePPXX[RETURN]NOTE:IfILLEGALREQUESTappears,retypethecommandagain.Illegalrequestisreturnedifthecommandwastypedwrongoraspuriouscharacter wasincluded, i.e.-linefeed.ForAVXXprintout:
XX01020410204077PrintsPrintsPrintsPrintsPrintsPrintsPrintsallspeedaveragesalldirection averagesalltemperature averagesalldeltatemperature averagesmiscellaneous averagesrainaveragesallaveragesRevision3June1986
~~141 ForPPXXprintout:
ESP20/2ChannelXXNumber0102030405080910ll1214151617'81920212223242532NameWS33AWS33BWS150AWS150BWS250WD33AWD33BWD150AWD150BWD250TER33ATER33BTE150ATE150B,TE250ATE250BDT150ADT150BDT250ADT250BDEW33TEG33RAININTERPRETATION OFDATA15min.averagesfor'01-15 min;16-30min;31-45min;46-60min.WSWDTEDTDEWTEGRAINNAMEAVGEST.DEVMIN.MAX.IMNDRAVRNCNTWindSpeed-Averagedividedby10=measuredvalueWindDirection
-AverageisreaddirectlyTemperature
-Averagedividedby10='measured valueDeltaTemperature
-Averagedividedby10=calculated valueDewpointTemperature
-Averagedividedby10measuredvalueAmbientTemperature atDewpointMonitor-Averagedividedby10=measuredvalueRainfall-Averagedividedby100=accumulated inchesofrainParameter andheightinmetersontowerAverageofvaluescollected inlast15minutesaverageStandarddeviation ofaverage'dataMinimumvalueforlast15minuteaverageMaximumvalueforlast15minuteaverageIndexcode:0=Good;1=Questionable; 2=Bad;3=Unsteadywingdata;4=CalmWind;5=Flatdirection Meanderrangeforwinddirection AverageofmeanderrangeNolongerusedfordataRevision3June1986
<cAIlI't,II4r ATTACHMENT IP']7ffRP~IA'Iisoy'fsf~~~(OIL'I'CITEROCHESTER GASANDELECTRICCORPORATION
~89EASTAVENUE,ROCHESTER, N.Y.14649-0001
<fLC>w04fi~facooafib546-2700May20,1986Mr.JamesPapileRadiological Emergency Preparedness GroupEmpireStatePlaza22ndFloor,CorningTowerIIAlbany,NY12237~lDearThisletteristoinformyouthatthe"GinnaAccess"systemformonitoring plantconditions isnotavailable whilethenewPlantParameter ComputerSystem(PPCS)andSafetyAssessment System(SAS)isbeinginstalled.
According toourcomputerpeoplesomeformof"GinnaAccess"willagainbeavailable, laterintheyear.Intheinterimyouhavebeensuppliedwithappropriate phonenumbers.Ifyouhaveanyquestions onthisletterdonothesitatetocallmeon(716)724-8022.
Sincerely,
/DavidW.BurkeCorporate Emergency PlannerCopies:Mr.B.A.SnowMr.D.L.Piede l~
OFFSITEAGENCYLIAISONCALLLISTESP22/11.0PURPOSE:To=providetheOffsiteAgencyLiaisonwithphonenumberstoalertRG&EadvisorstotheNewYorkState,MonroeandWayneCountyEmergency Operations Centers.2.0INSTRUCTIONS:
42.1Uponnotification bytheEOF/Recovery Managerofanemergency atGinnaStation,notifythefollowing personnel tostandbyorreporttotheirrespective EOCpost,.2.1.1J.RobertBrown(N.Y.S.)Office:Home:7'24682-8=:unuse,2~1.22~1.3JamesF.Sweet(Wayne)RaymondB.Junot(Monroe)Office:Home:Office:Home:56-2700ex.71-283815483-6334-2690Revision0June1986
~\w1fJ}}

Revision as of 10:22, 6 July 2018

Forwards Revised Epips,Nuclear Emergency Response Offsite Procedures & Revised Nuclear Emergency Info Plan.
ML17308A109
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/18/1989
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17250A895 List:
References
NUDOCS 8907310144
Download: ML17308A109 (250)


Text

AC CE1ZRATED D1STKBUTION DEMONS XTION SYSTEM REGULA10l INFORMATION DISTRIBUTIO YSTEM (RIDE)ACCESSION NBR:.8907310144 DOC.DATE: 89/07/18 NOTARIZED:

NO DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised EPIPs,nuclear emergency response offsite procedures 6 revised"Nuclear Emergency Info Plan." DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR (ENCL/SIZE:/+'Og TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, C NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSONFA BEP EPB 10 REG FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D'R gOZE IO ALL i RIDSII RECIPIENIS PIEASE HELP US'IO RIXXJCE HASTE!CGMI'ACI'IHE DOCXMKI'ONTROL DESK, RXN Pl-37 (EXT.20079)I ELZK2VZE RKR MMB HKH DISTRIBUTION LISTS KlR DOCXIMEHZS YOU DCRPT NEZDf D D, TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 sszsrsuz zsmizz R hrD IIIII II eZIm S 101K I STASS I rz(rrrII inrush ZK ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649.0001 QCS.CPHONE ARCA COOK 7SSS 546-2700 July 18, 1989 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Allen Johnson PWR Project Directorate No.1 Washington, D.C.20555

Subject:

Revisions to Emergency Plan Implementing Procedures, Nuclear Emergency Response Offsite Procedures and Nuclear Emergency Information Plan R.E.Ginna Nuclear Power Plant Docket No.50-244 Gentlemen:

In accordance with 10 CFR 50.54, enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures, Nuclear Emergency Response Offsite Procedures and Nuclear Emergency Information Plan.Very truly yours, Enclosures Robert C.Mecred General Manager Nuclear Production zc: USNRC, Region I (2 copies)Resident Inspector, Ginna Station 8qP7+$0i44 8950<<02 I PDR ADOCK 0 PNU F ROCHESTER GAS AND ELECTRIC CORPORATION Inter Office Correspondence June 9, 1989

SUBJECT:

Nuclear Emergency Response Offsite Procedures (NEORP)Revision 20 TO: Holders of Controlled Copies Please update your manual as follows: REMOVE Title Page/ESP 2/4 2/6,7,8~)~

4/3,4 Section 5 6/1,~2 7/4 ll/1)2)3 15/1,2,5,6 1 6/2 I 3 I 4 I 5 I 6 I 7 2 0 I 2 0/1 I 2 I Att I 2 1/1 22/1 24/1, 2, 3 25/3,4 26/3 i 4/5 INSERT Title Page ESP 2/4 2/6,7,8, 9 3/1 4/3,4 Section 5 6/1, 2 7/4 ll/l)2)3 15/1)2)5)6 16/2)3)4)5)6)7 17/2 20/1, 2 2 1/1 22/1 24/1,2,3 25/3,4 26/3,4,5\David W.Burke Corporate Nuclear Emergency Planner as/dwb neorp C4 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER GINNA STATIC UNIT 01 COMPLET OATE:-TIME:-PROCEDURE NO.SC-323 REV.NO.1 MERGENCY OFF-SITE DXATXON S VEY TEAMS PORC REVIEW DATE TECHNICAL REVIEW-8)PLANT SUPERIN E NT 9-to-F1 EFFECTIVE DATE QA A NON-QA CA EGORY 1.0 REVIEWED BY: THIS PROCEDURE CONTAINS 32 PAGES

C-323 EMERGENCY OFF-SI RADIATION SURVEY TEAMS 1~0 PURPOSE: The prime objective of the Emergency.Off-Site Radiation Survey Teams is to rapidly survey areas downwind of the plant'site in order to determine the extent and magnitude of any uncontrolled release of radioactive materials following an incident.It should be stressed that the initial off-site survey is of great importance.

Decisions regarding the extent and types of protective actions required will be based upon data reported by the survey teams.2'

REFERENCES:

2~1 2.2 SC-421, Determination of Iodine or Particulate SC-232 Voluntary Acceptance of Emergency Exposure 3.0 INSTRUCTIONS:

3'3'Obtain appropriate Off-Site Survey Team footlocker as directed by Tag Board assignment.

If seal is broken, use equipment list inside footlocker to inventory equipment.

Request the assistance of the Survey Center Manager in obtaining replacement equipment if necessary.

Obtain the following equipment which is not stored in footlocker.

3~2~1 Personal thermal.luminescent dosimeter-(TLD)for each team member.333'.4 One full-face mask with voice emitter and iodine filter for each team member.One 0-500 mR dosimeter and one 0-5 R dosimeter for each team member.Sign-in on dosimeter log sheet.Pack o f 6 environmental TLD'f rom lead storage container.

3.2'Porta-Mobil II radio and magnetic mount car antenna.

SC-323:2 3.2.6 RADECO H-809C Portable High Volume Air Sampler with filter holder.33'.8 33'3~3~1 3~3~2 RM-14 Radiation Monitor with HP-190 Probe.Auto-Digimaster or RO-2 dose rate meter.Low Volume Air Sampler with filter holder.Complete the following items prior to departing on the assigned survey route.Check operation of radio system, portable air sampler, radiation count rate monitor, and dose rate meter using equipment check-out procedures in Appendix Z.Obtain transportation and check vehicle for contamin-ation by taking swipe survey or end window survey on the horizontal surfaces with an HP-190 probe and count rate meter.If survey indicates surface contamination of more than 250 CPM above background contact the Survey Center Manager for decontamination instructions.

3~3~3 333~4 3~4~1 Load survey equipment into vehicle, fill in Survey Team Status Board, and inform Survey Center Manager you are ready for departure.

Obtain wind.direction and speed data.Log time, date, and survey team members on survey map.Establish radio communications with Technical Support Center Radio Operator and advise of teams departure.

Per f orm radiation surveys using the appropriate instructions of Appendix ZZ while following the Primary Survey Route instructions contained in Appendix III.Do not enter areas where radiation levels are greater than 2 R per hour unless directed by a Health Physi-cist.33.4.3 3The dose limitation of the survey team is limited to 1 REM unless the Health Physicist or Emergency Coordin-ator authorizes a higher limit.A one time dose limit of 75 REM may be used to save the life of an individual-on a voluntary basis (SC-232).A one time dose limit of 25 REM may be used to insure

SC-323:3~3.4'3.4.6 equipment is operational or secured in order to prevent a greater possible hazard to the general public.At each assigned, survey point the team should report the following information to the Radio Operator:>>Location-Completed Actions-Results of Surveys-Departure for next Survey Point If radio contact cannot be made, report.using a telephone.

Call collect on one of these numbers.GINNA 315-524-4446 315-524-4984 315-524-4973 716-546-7845 716-546-4015 E.O.F.716-262-5798 716-262-5799 3.4'3'3'.Upon completion of Primary Survey Route inform radio operator at the Tech Support Center.The Dose Assessment Manager will assign an Alternate Survey Route or direct you to return to the Survey Center.Full face masks with charcoal filters will be worn as directed by the Dose Assessment Manager.Potential internal contamination will be determined by a Whole Body Count after the'survey.Upon returning to the Survey Center perform a survey of team personnel for contamination.

If any contamin-ation greater than 100 CPM above background is found, contact the Survey Center Manager for decontamination instructions.

3~6~1 Conduct a survey o f the vehicle for contamination.-

If any contamination greater than 250 CPM above background is found contact the Survey Center Manager for decontamination instructions.

33'.3 3Give all iodine filters, particulate filters, survey maps, and data records to Survey Center Manager.Dispose of contaminated and potentially contaminated waste in an approved manner.Restock,.inventory, and seal Survey Team Equipment Footlocker, stow in an approved manner.

0 SC-323:4 Return radio system, portable air sampler, radiation count rate meter, and dose rate meter to the Survey Team Room and place on charge as appropriate.

Return 0-500 mr and 0-5 R dosimeters and sign-out on dosimeter log sheet.Fill out Survey Team Status Board and inform Survey Center Manager of teams return.

SC-323:5 APPENDIX I EMERGENCY OFF-SITE RADIATION SURVEY TEAM EQUIPMENT CHECKOUT AND OPERATION

SC-323:6 RADIO SYSTEM The radio system consists of a hand-held radio and magnetic mount car antenna.To checkout and operate the system, complete the following steps.Turn ON Radio.1.Remove charger)ack from lower side'of the radio.2.Turn the OFF-VOLUME control about half way to the right.3.Turn the SQUELCH (SQ)control to the right as far as possible.A hissing sound will be heard from the speaker.4.Adjust the VOLUME.control until the hissing sound is easily heard but not annoyingly loud.5.Turn the SQUELCH control slowly to the left until the hissing noise gust fades out.This ad)ustment is very important, as it eliminates annoying noise when no one is calling you.Zt also determined how sensitive your radio will be to incoming calls.6.Zn multi-frequency units, select the proper frequency.

You are now ready to receive messages from other radios in your system.7.If radio is to be used with car antenna see mounting instruc-tions.Mount Antenna on Car l.Ensure the vehicles metal roof is free of ice and snow.2.Hold the magnetic mount antenna in the palm'of your hand with the antenna wire pointed towards the rear or the vehicle and the base of the mount at an angle of about 45 degrees to the vehicle roof.3.Position the front edge of the mount in the approximate center of vehicle roof.4.Lower the mount onto the vehicle roof.It will be held in place by the magnetic force.***************CAUTION**************DO NOT ATTEMPT TO MOVE THE ANTENNA BY SLIDING IT.YOU WILL SCRATCH THE SURFACE OF THE VEHICLE.ALWAYS REMOVE THE MOUNT BY LIFTING FROM THE REARl**************.*CAUTION**************

SC-323:7 5~6.Route the antenna lead wire into the vehicle between the door gamb.With any amount of weather stripPing the lead should not be damaged.Affix the lead wire near the head liner with a piece of tape.Insert the antenna connection plug into the side of the radio and tighten the locking screw in place.Do not remove the short antenna.PROCEDURE 1~The general procedure for communicating on the radio should be as follows: a)Station called b)Red/Green/Orange Team c)Message d)"Over" During a drill or exercise all fictitious data will be preceded with the words"This is a drill...." 2~3~5.6~Examples: "Tech Support Center, This is the Red team, at location number 1, Over""Tech Support Center, This is the Green team, t is is d i g-Results of the general area survey at location 36 are 6,500 counts per minute above background, Over" To transmit, depress the push-to-talk switch on the micro-phone.Speak in a normal voice across the microphone.

To receive, release the push-to-talk switch.There may be time that the TSC or EOF will be receiving communications from a team that you cannot hear.Zf this happens the Radio Operator will tell you to wait or standby.After he has completed his traffic he will ask you to transmit your information.

Remember this is one big party line;everyone can't talk at.once.When you have been directed to secure your Survey Team, turn the radio off, disconnect the antenna plug from the radio and remove the magnetic mount antenna from the vehicle by lifting up at the rear of the mount.Connect the, radio to the charger located in the Survey Team Room at the Survey Center, and place the magnetic mount antenna on the bench.

SC-323:8 RADECO H 809C HIGH VOLUME AIR SAMPLER EQUIPMENT CHECK l.Ensure power switch on air sampler is off.2.Ensure battery charger is not plugged in and on the 12 volt position.Black and red clips of battery charger are not touching.3.Connect air sampler power cables to the battery charger, RED clip to positive and BLACK clip to negative.4.Plug in battery charger.5.Turn power switch on air sampler on.6.Check flow meter on air sampler.Flow meter should be off scale high with no filters in place.7.Turn power switch on air sampler off.8.Unplug battery charger and disconnect air sampler power cables.9.Separate clips of battery charger and clamp onto cabinet.EQUIPMENT OPERATION FROM VEHICLE 1.Ensure power switch on air sampler is off.2.Connect BLACK power clip to vehicle ground (engine block, chassis, etc.)and RED power clip to positive post of vehicle battery.3.Ensure the filter assembly contains a GY-130 silverzeolite cartridge and a particulate filter.4.Turn air sampler on and record the sample date, time, location, and air flow rate (normal is 30 lpm)on a sample envelope.5.Run sampler for approximately 10 minutes.6.Record air flow rate of air sampler in lpm and time sampler turned off.7.Turn air sampler off.

SC-323:9 RM-14 RADIATION SURVEY METER EQUIPMENT CHECK: Disconnect power cord from back of meter taking care not to turn test switch on.2.Ensure that an HP-190 probe is connected to the detector)ack.3~Turn range switch to battery.Meter should read in the<<BATT-OK" area.4.Perform instrument source check.Obtain source from safe and verify meter reading corresponds to attached card then log meter reading onto source check log.5.Turn range switch off.EQUIPMENT OPERATION:

1.Turn range switch to Xl.2~Place response switch in the"SLOW" position.3.Adjust the volume control so that the audio indication (a click)can be heard.4.The range switch should be ad)usted such that the highest reading gives a mid-scale deflection.

5.All readings must be multiplied by the range switch setting (Xl)X10~X100)'.2, 200 CPM is approximately 1 mrem/hour.

Maximum scale is 50,000 cpm or 23 mr per hour.7.Upon completion of the survey turn the unit off and return to the Survey Team Room.Unit should be recharged before the next use.

SC-323:10 AUTO DIGI-,MASTER DOSE METER EQUIPMENT CHECK: Turn unit on to be sure that the digital display lights.2.Perform instrument source check.Obtain source from safe and verify that meter reading corresponds to attached card then log meter reading into source check log.EQUIPMENT OPERATION:

l.Allow unit to complete one cycle (display will blink)before reading when turning unit on or when radiation level changes significantly.

2.Unit will automatically change from one range to the next.The reading is always direct.3.The Digi-Master may be used to detect the presence of Beta but cannot be used for dose measurement of Beta.Also, Beta detection is only effective when the unit is operating in the mrem/hour range.a.Take a reading with the Beta window closed and record.b.Take a reading with the Beta window opened and record.c.If the reading with the Beta window open is greater than the reading with the Beta window closed there is Beta~radiation present.d.If a Beta dose rate is needed a survey with an RO-2 or equivalent instrument must be made.4.Upon completion of the survey, turn off and return to the Survey Team Room.Unit should be recharged before the next use~

SC-323:11 RO-2 DOSE RATE METER EQUIPMENT CHECK Turn the function selector switch to the"BATT 1" and"BATT 2'~positions.

Meter should indicate above the battery cut-off line.2.Perform instrument source check.Obtain source from safe and verify that meter reading corresponds to attached card then log meter reading onto source'check log.EQUIPMENT OPERATION l.Zero the meter by turning the function selector switch to"ZERO" and turning the"ZERO ADJ" knob as necessary.

The zero adjust may be made in a radiation field by placing the function selector switch at"ZERO ADJ".2.To measure the radiation field position the function selector switch to the lowest range which provides a mid-scale deflec-tion of the meter.3~With the Beta shield closed the meter will read the whole body Gamma dose rate..4.To obtain a Beta dose rate measurement perform the following:

CAUTION: The f ace o f the beta window is very thin.Whenever the Beta shield is open, guard the shield against damage by puncture or contamination by dust or dirt.Take an area measurement with the Beta shield closed.b.Open the sliding Beta shield on the bottom of the case and take an area measurement.

c.Subtract the closed shield reading from the open shield reading and multiply by the Beta correction factor marked on the instrument.

d.This number is the Beta dose rate for that area.5.When the survey is completed turn the function selector switch to OFF.

SC-323:12 MODEL VAS-2 1UQIMARK+LOUD MOUTH>>VOXCE AMPLXFXCATXON SYSTEM The>>Loud Mouth" System is designed to provide voice amplification for individuals wearing respiratory protection devices.Equipment Check: A.Earmark Throat Microphone Model TM-1 Figure 1 (attached) shows the proper>>at rest" position for the microphone.

If it is necessary to.reform the spring tension, hold the microphone, starting two inches behind the microphone head, between-the thumb and forefinger and bend the cable small amounts while progressing down the cable until'he end of the spring is felt.Check the diameter of the coil and repeat if necessary.

Note that the microphone head should tilt up from a flat surface about 1/4 inch.If necessary, form the spring to give this dimension.

Equipment Operation:

A.'.C.D.Ensure microphone cable is securely connected to jack on voice amplifier.

The microphone is designed to be located on the right side of the throat (see figure 2).The microphone must lay flat on the neck and press firmly into the throat.Securely fasten amplifier unit to belt.To operate unit, turn volume control'lockwise.

Talk switch in up position is in standby mode.Slide switch to down position'to talk.Adjust volume to desired level with volume control.NOTE: When communicating through radio, telephone, etc., speak precisely.

Keep speaker at least 12>>from the throat mic.Keep the means of communication 12>>from the throat mic.Hold the means of communication off to the side of the speaker.If any feedback is apparent, lower volume.~ED F.Turn unit off by turning volume control counter clockwise as far as it will turn.Leave'talk switch in-the standby position.Batteries:

A 9-volt Alkaline Battery is the required power source.The battery is located in the amplifier unit.To replace battery, remove cover plate to battery compartment.

Pull plastic tab, remove and replace battery.Note: Small terminal (+)in first.

SC-323:13 Slight bend here On a flat surface the mic should rest about 1/4" above said surface~2-'2 1'/2" When mic is laid on a flat surface it should form a circle 2 to 2 1/2" in dia.depending on user size.If it has been stretched to form a larger circle the inbuilt spring wire should.be reformed to produce the diameters indicated.

This insures proper throat press-.ur'e for optimum sound quality.Fig.1 Mic to press on right side of wearers voice box Fig.2

SC-323:14 APPENDIX II RADIATION SURVEY INSTRUCTIONS

I GENERAL AREA RADIATION SURVEY SC-323:15 1.A general radiation area survey should be conducted while moving between defined survey points, and at the specific survey points.2.The survey.should be conducted using an RM-14 Radiation Monitor with an HP-190 probe.3.When conducting a moving survey, the HP-190 probe should be installed in the mounting bracket and positioned outside a vehicle window.The detection window of the HP-190 probe should be horizontal position and pointed to the rear of the vehicle to protected the detector from the elements and wind.4.Vehicle speed should not exceed 15 mph during a mobile survey.5.If the RM-14 reading changes more than 1,000 CPM stop and conduct a survey for Beta using the Auto Digi-Master or R0-2.6.Report the results of the mobile survey to the Radio Operator at the next survey point, or after completion of the Beta survey.'

SC-323:16 SURVEY TO DETERMINE.PRESENCE OF BETA RADIATION 1.If the General Area Radiation Survey shows a change of 1000 CPM on the RM-14, or if the"plume" is suspected to be in your area, a survey to detect the presence of Beta radiation should be conducted.

2.Using an Auto Digi-Master, or RO-2 dose rate meter conduct the following surveys.a.With the detector window aimed up: Beta shield open Beta shield closed Difference gl=(open reading-closed reading)b.With the detector window aimed down: Beta shield open Beta shield closed Difference g2 (open reading-closed reading)3.If either difference gl or difference 42 from Step 2 is positive this is an indication that Beta radiation is present.a.If both difference gl and 52 are positive, this is an indication that you are in the plume.b.If only difference 41 is positive, this is an indication that the plume is overhead.4.Repeat the results of the survey to the Radio Operator and await further instructions from the Dose Assessment Manager.

SC-323: 17 INSTALLATION OF TLD 1.Specific locations for TLD's will be listed on the survey route instructions or will be given by the Dose Assessment Manager.2.Hammer a nail into a utility pole at the specified location.The nail, should be positioned on the pole.at head height and on the side closest to the site.3.Affix a TLD to the nail using tape.Ensure the TLD window is oriented towards the site.4.Record the location (either survey point number or road intersections)', utility pole number, date time, and TLD number on the back of the survey map.

SC-323:18 HIGH VOLUME AIR SAMPLE Draw approximately 300 liters of air through a GY-130 silver zeolite cartridge and particulate filter using a RADECO H 809C High volume air sampler.This will take approximately 10 minutes.2.Record the sample date, time, and location (either survey point number or road intersections) on two sample envelopes and on the back of the survey map.3.Determine the background radiation level using the RM-14 Radiation Monitor and HP-190 probe.Record the reading on each envelope, and on the survey map.If background reading is greater than 200 CPM move to lower background prior to taking readings.If background of 200 cpm cannot be located contact Dose Assessment fo'r further instructions.

4.Using onion skins remove the GY-130 silver zeolite cartridge from the sample holder and read the activity level with the RM-14 Radiation Monitor and HP-190 probe by holding the probe window on the inlet side of the cartridge filter.DO NOT TOUCH THE PROBE WINDOW WITH THE CARTRIDGE.

Record the reading on one envelope and place the cartridge.

in the envelope.Record the reading on the back of the survey map.NOTE: If cartridge is reading off scale move probe approxi-mately 1" from cartridge.

Report and log data as being taken at 1".5.Read the activity level of the particulate filter using the RM-14 Radiation Monitor and HP-190 probe.DO NOT TOUCH THE PROBE WINDOW WITH THE PARTICULATE FILTER.Record the reading on the other envelope and place the particulate filter in the envelope.Record the reading on the back of the survey map..6.Remove the onion skins and discard in a plastic bag.Treat as contaminated material.7.Report the following information to the Radio Operator: a.Sample location b.Date and time sample was taken c.Volume of air sample in liters (See page 16 for calcula-tions)d.Background count rate in cpm e.GY-130 silver zeolite cartridge count rate in cpm f.Particulate filter count rate in cpm

SC-323: 19 NOTE: I~Field calculations of the airborne activity level may be performed as follows (SC-421): Sampler=volume in liters equals the flow rate of the sampler in lpm times minutes the sampler operated.Iodine-131 (GY-130 cartridge)

CPM Sam le-CPM Back round 8.34 x lO=J (Volume of Sample in Liters)Particulate uCi/cc Iodine-131 CPM Sam le-CPM Back round 2.37 x 10=/(Volume of Sample in Liters)uci/cc Particulate

SC-323:20 LOW VOLUME AIR SAMPLE 1.Draw air through a GY-130 silver zeolite cartridge and particulat'e filter using a low volume air sampler for approx-imately 30 minutes.2.Record the sample date, time, and location on two sample envelopes and on the back of the survey map.3~Determine the background radiation level using the RM-14 Radiation Monitor and HP-190 probe.Record the reading on each envelope, and on the survey map.4.Using onion skin gloves remove the GY-130 silver zeolite cartridge from the sample holder and read the activity level with the RM-14 Radiation Monitor and HP-190 probe, by holding the probe window on the inlet side of the silver zeolite cartridge.

DO NOT TOUCH THE PROBE WINDOW WITH THE CARTRIDGE.

Record the reading on one envelope and place the cartridge in that envelope.Record the reading on the back of the survey map.5.Read the activity level of the particulate filter using the RM-14 Radiation Monitor and HP-190 probe.DO NOT TOUCH THE PROBE WINDOW WITH THE PARTICULATE FILTER.Record the reading on the other envelope and place the particulate

.filter in the envelope.Record the reading on the back of the survey map.6.Remove the onion skins and discard in a plastic bag.Treat as contaminated material.7.Report the following information to the Radio Operator: a.Sample location b.Date and Time sample was taken c.Volume of air sample in liters (See page,13 for calcula-tions)d.Background count rate in cpm e.GY-130 silver zeolite cartridge count rate in cpm f.Particulate filter count rate in cpm NOTE: Field calculations of the airborne activity level may be performed as follows: (SC-421)Sample volume in liters equals the flow rate (4 LPM)times minutes the sampler operated.

SC-323:21 LON VOLUME.AIR SAMPLE (CONT)Iodine-131 (GY-130 cartridge)

CPM Sam le-CPM Back round 8.3 x 10-8 (Volume of Sample in Liters)Particulate CPM Sam le-CPM Back round 2.4 x 10-8 (Volume of Sample in Liters)uCi/cc Iodine-131 uci/cc Particulate

SC-323:22 CHANGING FILTERS AT FIXED ENVIRONMENTAL STATIONS 1.Record the following information on the sample envelope left from the previous filter change: a.Date b.Time c.System Vacuum (inches)d.Gasmeter reading (cubic feet)e.Total hour meter (record in column marked"OFF")2.Turn pump,off 3~Using onion skins remove the filter holder at the quick disconnect joint.4.Unscrew the outside retaining ring and remove the particulate filter from the holder and place in the sample envelope.5.If a charcoal cartridge was in use transfer the information on the particulate filter envelope to a new envelope and place the charcoal cartridge in the envelope.6.Place a new GY-130 silver zeolite cartridge in the sample head.7.Place a new particulate filter in the holder, replace the~retaining ring and reconnect holder to the pump at the quick disconnect joint.8.Remove onion skins and place in a plastic bag.Treat as contaminated.

9.Turn the pump on.10.Record the following information to two new envelopes.

Mark one envelope"GY-130 silver zeolite".a.Station number b.Date c.Time d.System vacuum (inches)e.Gasmeter reading (cubic feet)f.Total hour meter (record in the"ON" column)ll.Place the new envelopes inside the monitor cabinet.12.Bring the envelopes containing the cartridge/filter removed to the Survey Center at the completion of your assigned route or.when directed by the Dose Assessment Manager.

SC-323:23 APPENDIX III OFF SITE RADIATION SURVEY TEAM INSTRUCTION

SC-323:24 RED-TEAM PRIMARY SURVEY ROUTE INSTRUCTIONS

~OT: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.From the Training Center driveway travel east on Lake Road to Knickerbocker Road (1.1 miles).Place a TLD near the inter-section of Lake Road and Knickerbocker Road (gl).2.Go south on Knickerbocker Road..to Brick Church Road (1.0 miles).Place a TLD near the intersection of Knickerbocker Road and Brick Church Road (52).3.Continue south on'nickerbocker Road to Kenyon Road (1.3 miles).Place a TLD near the intersection of Knickerbocker Road and Kenyon Road (49).Take a high volume air sample at this intersection (49)as per instructions in Appendix II.4.Go west on Kenyon Road to Slocum Road (1.9 miles).5.Go north on Slocum Road to Brick Church Road (1.3 miles).Place a TLD near the intersection of Slocum Road and Brick Church Road (44).6.Continue north on Slocum Road to Lake Road (1.0 miles).7.Report to Radio Operator for further instructions.

SC-323:25 RED TEAM SECONDARY SURVEY ROUTE (WEST OR NORTHWEST WINDS)INSTRUCTIONS

~OT e Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.From the intersection of Lake and Slocum Road.2.Go east on Lake Road to Ontario Center Road (1.0 mile)a.So south on Ontario Center Road to Ridge Road/Ontario Center (3.1 miles)4.Continue south on Ontario Center Road/Route 350 to Route 441/Walworth Road (6.3 miles).5.Go east on Route 441/Walworth Road to main intersection in Village of Walworth (Walworth-Ontario Road, 1.0 miles).Place a TLD near the intersection (f26).6.Report to the Radio Operator for further instructions.

SC-323:26 RED TEAM SECONDARY SURVEY ROUTE (EAST OR NORTHEAST WINDS)INSTRUCTIONS NOTE: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.From the intersection of Lake and Slocum Road.2.Go south on Slocum Road to Ridge Road (3.1 miles).3.Go east on Ridge Road to State Route 350/Ontario Center Road (1.0 miles).4.Go south on State.Route 350 to Plank Road (3.2 miles).5.Go west on Plank Road to County Line Road (4.1 miles).Place a TLD near the intersection of Plank Road and County Line Road (046)~6.Continue west on Plank Road to Salt Road (1.5 miles).Place a TLD near the intersections of Plank Road and Salt Road (f39).7.Go north on Salt Road to Schlegel Road (4.1 miles).Place a.TLD near the intersection of Salt Road and Schlegel Road (542).8.Continue north on Salt Road to Lake Road and report to Radio Operator for further instructions.

SC-323'27 GIVEN TEAM PRIMARY SURVEY ROUTE INSTRUCTIONS

~NO: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.Travel west on Lake Road to Lakeside Road (1.7 miles).Place a TLD near the intersection of Lake Road and Lakeside Road (gl7)~2.Go south on Lakeside Road to Boston Road (1.0 miles).Take a high volume air sample near the intersection of Lakeside Road and Boston Road (516)as per instructions in Appendix II.Place a TLD near the intersection of Lakeside and Boston Road i (f16).3.Continue south on Lakeside Road to Ridge Road (2.0 miles).4.Go east on Ridge Road to Ontario Center Road (1.6 miles).5.Go north on Ontario Center Road to Brick Church Road (2.1 miles).Place a TLD near the, intersection of Ontario Center Road and Brick Church Road (g3).6.Continue north to Lake Road.7.Report to Radio Operator for further instructions.

0 SC-323:28 GREEN TEAM SECONDARY SURVEY ROUTE (WEST OR NORTHWEST WINDS)INSTRUCTIONS Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.From Lake Road and Ontario Center Road, go east to Pultneyville (7..0 miles).Place a TLD in the Pultneyville area (428)near white settler monument at the Lake.2.Go south from Pultneyville on State Route 21 to Pound Road (3.4 miles).Place a TLD along State Route 21 south of Pound Road (548).3~Continue south on State Route 21 to Farnsworth Road (4.6 miles).Place a TLD near the intersection of State Route 21 and Farnsworth Road (447).4.Continue south on State Route 21 and into the Village of Marion (3.0 miles).5.Return to Main Street in the Village of Williamson on State Route 21 (5.3 miles).6.Report to Radio Operator for further instructions.

I 1 1 1~~l 5

SC-323'29 G~EN TEAM SECONDARY SURVEY ROUTE (EAST OR NORTHEAST HINDS)INSTRUCTIONS

~T Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.From Lake Road and Ontario Center Road, go west to State Route 250.Place a TLD near intersection of Lake Road and State Route 250 (445)(6.0 miles).2.Continue west on Lake Road to Whiting Road (1.8 miles).3.Go south on Whiting Road to Klem Road (1.8 miles).4.Go west on Klem Road to Five Mile Line Road (0.4 miles).5.Go south on Five Mile Line Road to Plank Road (3.4 miles).Place a TLD near the intersection of Five Mile Line Road and Plank Road (551).6.Continue south on Five Mile Line Road to Penfield Four Corners (intersection with Penfield Road, State Route 441)(3.6 miles).Place a TLD near back of Baptist Church parking lot, 500~east of intersection on north side of Penfield Road ($41).7.Report to Radio Operator for further instructions.

SC-323:30 ORANGE TEAM~NOT PRIMARY SURVEY ROUTE INSTRUCTIONS Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.Travel east on Lake Road to Fisher Road (2.7 miles).2~Go south on Fisher Road to Shepherd Road (0.7 miles).Take an air sample near the intersection of Fisher Road and Shepherd Road (519)as per instructions in Appendix II.3.Place a TLD near the intersection of Fisher Road and Shepherd Road (519).4.Continue south on Fisher Road to Trimble Road (1.1 miles).Place a TLD near the intersection of Fisher Road and Trimble Road (420).5.Continue south on Fisher Road to Kenyon Road (0.7 miles).Go west on Kenyon Road to Furnace Road (1.1 miles).Place a TLD near the intersection of Kenyon Road and Furnace Road ($49).6.Go north on Furnace Road to Lake Road (2.7 miles).7., Report to Radio Operator for further instructions.

SC-323 31 ORANGE TEAM SECONDARY SURVEY ROUTE (WEST OR NORTHWEST WINDS)INSTRUCTIONS Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

1.From Lake Road and Furnace Road, go south to Ridge Road (4.2 miles).2.Go south on Walworth-Ontario Road to Trummonds Road (2~3 miles).3~Go'east on Trummonds Road to Arbor Road (1~1 miles)~Place a TLD near the intersection of Trummonds Road and Arbor Road (022).4.Go north on Arbor Road to Ridge Road (2.3 miles).5.Go east on Ridge Road to Eddy Ridge Road (2.2 miles).Place a TLD near the intersection of Ridge Road and Eddy Ridge Road.6.Continue east on Ridge Road to Tuckahoe Road (0.3 miles).7.Go north on Tuckahoe Road to Salmon Creek Road (2.5 miles).Place a TLD near.the intersection of Tuckahoe Road and Salmon Creek Road.8.Continue north on Salmon Creek Road to Lake Road and report to Radio Operator for further instructions.

SC-323:32 ORANGE TEAM SECONDARY SURVEY ROUTE (EAST OR NORTHEAST WINDS)INSTRUCTIONS

~O E: Numbers given in parentheses are predesignated survey points.Mileages given are approximate.

From Lake Road and Furnace Road, go west on Lake Road to Roder Parkway (access road to Ontario on the Lake)(5.1 miles).Go north on Roder Parkway to intersection with Ontario Drive and place a TLD near intersection (418)(0.5 miles).2.Return to Lake Road, continue west to County Line Road (2.4 miles).3.Go south on County Line Road to Berg/Schlegel Road (2.0 miles).Place a TLD near the intersection of County Line Road and Berg/Schlegel Road (536).4.Continue south on County Line Road to State Route 104 (1.2 miles).Turn right onto State Route 104 and go to Salt Road (1.2 miles).Turn left onto Salt Road to Plank Road (2.1 miles).5.Go west on Plank Road to State Route 250 (2.8 miles).6.Continue west on Plank Road to RG&E Eastern Monroe Service Center, 1270 Plank Road.Report results of surveys to Radio Operator.7.Return to Route 250 and go north on Route 250 to State Road (1.2 miles).Place a TLD at the intersection of State Road and Route 250 (538).8.Continue north on Route 250 to Main Street in the Village of Webster (2.3 miles).9.Go east on Main Street to Phillips Road (0.6 miles).10.Go north on Phillips Road to substation 574 driveway which is 20'orth of access road to State Route 104.ll.Report to Radio Operator for further instructions.

Cl 0 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER GlNNA STATlog UN'Te<COMPLETED DATE: TlME:-PROCEDURE NO.SC-324 REV.NO.7 EMERGENCY ON-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW PORC REVIEW DATE PLANT SUPERINTEND NT EFFECTIVE DATE QA~NON-QA CATEGORY 1.0 REVIEWED BY'HIS PROCEDURE CONTAINS 24 PAGES P)

SC-324:1 SC-324 EMERGENCY ON-SITE RADIATION SURVEY TEAMS 1~0 PURPOSE: The prime objective of the Emergency On-Site Radiation Survey Teams is to rapidly survey areas immediately surrounding the restricted area in order to determine the extent and magnitude of any uncontrolled release of radioactive materials following an incident.It should be stressed that the initial on-site survey is of great importance.

Decisions regarding the extent and types of protective actions required will be based upon data reported by the survey teams.

2.0 REFERENCES

2.2 SC-421, Determination of Iodine or Particulate SC-232 Voluntary Acceptance of Emergency Exposure 3.0 INSTRUCTIONS F 1 Obtain appropriate On-Site Survey Team footlocker as directed by Tag Board Assignment.

If seal is broken, use equipment list inside footlocker to inventory equipment.

Request the assistance of the Survey Center Manager in obtaining replacement equipment if necessary.

3.2 Obtain following equipment which is not stored in footlocker.

3.2.1 Personal thermal luminecent dosimeter (TLD)for each team member.3.2.2 One 0-5R dosimeter for each team member, Sign-in on dosimeter log sheet.3.2.3 One full-face mask with iodine filter and voice emitter for each Team member.3.2.4 3.2.5 3.2.6 Handi-Talkie radio.Low Volume Air Sampler with filter holder.RM-14 Radiation Monitor with HP-190 Probe.

r SC-324:2 3Auto Digi-master or RO-2 dose rate meter.3.3 Complete the following items prior to departing on the assigned survey route.3.3.1 Check operation of radio system, portable air sampler, radiation count rate monitor, and dose rate meter using equipment check-out procedures in Appendix I.3'.2 3'.3 3.3.4 Load survey equipment onto equipment belts and back packs, fill'in Survey Team Status Board, and inform Survey.Center Manager you are ready for departure..

Log time, date, and survey team members on survey map.Establish radio communication with Technical Support Center Radio Operator and advise of teams departure.

3.3.5 Log time, date, flow rate and start time of low volume air sampler on reverse of survey map.3.4 Protective clothing and full face masks with charcoal filters will be worn as directed by the Dose Assessment Manager.Internal contamination will be determined by a Whole Body Count after the survey.3.5 Perform radiation surveys using the appropriate instructions of Appendix II while following the Survey Route instructions contained in Appendix III.3.5.1 3.5.2 Do not enter areas where radiation levels are greater than 2 R/hr unless directed by a Health Physicist.

The dose limitation of the survey team is limited to 1 REM unless the Health Physicist, or Emergency Coordinator authorizes a higher limit.3.5.3 A ONETIME dose limit of 75 REM may be used to save the life of an individual on a voluntary basis.(SC-232)3.5.4 A ONETIME dose limit of 25 REM may be used to insure equipment is operational or secured in order to prevent a greater possible hazard to the general public.

SC-324:3 3.5.5 At each assigned survey point the team should report the following information to the Radio Operator:-Location-Completed Actions-Results of Surveys-Departure for next Survey Point 3'.6 Upon completion of Survey Route inform radio operator at Technical Support Center.The Dose Assessment Manager will assign an additional Survey Route or direct you to return to the Survey Center.3.6 3.6.1 3.6.2 Upon returning to the Survey Center perform a contam-ination survey of team personnel for contamination.

If any contamination greater than 100 CPM above background is found, contact the Survey Center Manager for decontamination instructions.

Give all iodine filters, particulate filters, survey maps, and data records to Survey Center Manager.Dispose of contaminated and potentially contaminated waste in an approved manner.3'.3 3.6.4 3.6.5 Re-stock, inventory, and seal Survey Team Equipment, Footlocker, stow in Survey Team Room.Return radio system, portable air sampler, radiation count rate meter, and dose rate meter to the Survey Team Room and place on charge as appropriate.

Return 0-5R dosimeters and sign-out on dosimeter log sheet.3.6.6 Fill out Survey Team Status Board and inform Survey Center Manager of team return.

SC-324:4 APPENDIX I EMERGENCY ON-SITE RADIATION SURVEY TEAM EQUIPMENT CHECKOUT AND OPERATION

'I SC-324:5 RADIO SYSTEM The radio system consists of a hand-held radio and attached antenna.To checkout and operate the system, complete the following steps.1~Ensure the antenna is securely screwed into the connection on top of the radio.If a telescoping antenna is installed ensure it is extended to its full length when operating the radio.3~Turn the channel selector switch to Channel 2.Turn the squelch knob full CCW.4~Turn the volume knob CW to turn the radio on and adjust the volume level.A rushing sound should be heard.NOTE: If no sound is heard, unit is inoperable.

Obtain new unit and inform Survey Center Manager.5.Adjust squelch knob CW just enough to quiet the radio.If squelch knob is turned too far CW weak signals will not be heard.6.The general procedure for communicating on the radio should be as follows: a)Station Called b)Blue/Yellow Team c)Message d)"Over" During a drill or exercise all fictitious data will be preceded with the words"This is a drill....." Examples: "Technical Support Center, This is the Blue Team, At location number 1, Over" , 8."Technical Support Center, This is the Yellow Team, This is a drill, Results of the general area survey at location 6 are 6,500 Counts Per Minute above background, Over" To transmit depress the push-to-talk switch on the side of the radio.Speak in a normal voice into the speaker/mike.

To receive, release the push-to-talk switch.

SC-324:6 RADIO SYSTEM (CONT)There may be times that TSC or EOF will be receiving communications from a team that you cannot hear.If this happens the Radio Operator will tell you to wait or standby.After he has completed his traffic he will ask you to transmit your information.

Remember this is one big party line;everyone can't talk at once.When you have been directed to secure your Survey Team, turn the radio off and place it in the charger located in the Survey Team Room at the Survey Center.

SC-324'MODEL VAS-2 EARMARK'<LOUD MOUTHn VOICE AMPLIFICATION SYSTEM The"Loud Mouth" System is designed to provide voice amplification for individuals wearing respiratory protection devices.Equipment Check: A.Earmark Throat Microphone Model TM-1 Figure 1 (attached) shows the proper"at rest" position for the microphone.

If it is necessary to reform the spring tension, hold the microphone, starting two inches behind the microphone head, between the thumb and forefinger and bend the cable small amounts while progressing down the cable until the end of the spring is felt.Check the diameter of the coil and repeat if necessary.

Note that the microphone head should tilt up from a flat surface about 1/4 inch.If necessary, form the spring to give this dimension.

Equipment Operation:

A., C.Ensure microphone cable is securely connected to jack on voice amplifier.

The microphone is designed to be located on the right side of the throat (see figure 2).The microphone must lay flat on the neck and press firmly into the throat.Securely fasten amplifier unit to belt.D.To operate unit, turn volume control clockwise.

Talk switch in up position is in standby mode.Slide switch to down position to talk.Adjust volume to desired level with volume control., ,NOTE: When communicating through radio, telephone, etc., speak precisely.

Keep speaker at least 12" from the throat mic.Keep the means of communication 12" from the throat mic.Hold the means of communication off to the side of the speaker.If any feedback is apparent, lower volume.E~F.Turn unit off by turning volume control counter clockwise as far as it will turn.Leave talk switch in the standby position.Batteries:

A 9-volt Alkaline Battery is the required power source.The battery is located in the amplifier unit.To replace battery, remove cover plate to battery compartment.

Pull plastic tab, remove and replace battery.Note: Small terminal (+)in first.

SC-324:8 Slight bend here On a flat surface the mic should rest about 1/4" above said surface When mic is laid on a flat surface it should form a circle 2 to 2 1/2" in dia.depending on user size.Ef it has been stretched to form a larger circle the inbuilt spring wire should be reformed to produce the diameters indicated.

This insures proper throat press-ure for optimum sound quality.Fig.1 Mic to press on right side of wearers voice box Fig.2

SC-324'9 RM-14 RADIATION SURVEY METER EQUIPMENT CHECK Disconnect power cord from back of meter taking care not to turn test switch on.2.3.Ensure that an HP-190 probe is connected to the detector jack.Turn range switch to battery.Meter should read in the"BATT-OK" area.4~5.Perform instrument source check.Obtain'source from safe and verify meter reading corresponds to attached card then log meter reading onto source check log.Turn range switch to off.EQUIPMENT OPERATIONS 2.3~Turn range switch to XI.Place response switch in the"SLOW" position.Adjust the volume control so that the audio indication (a click)'can be heard.4~The range switch should be adjusted such that the highest.reading gives a mid-scale deflection.

5.All readings must be multiplied by the range switch setting (X1, X10, X100).6.2,200 CPM is approximately 1 mrem/hour.

Maximum scale is 50,000 CPM or 23 mR/hr.7 0 Upon completion of the survey turn the unit off and return it to the Survey Team Room.Unit should be recharged before the next, use.

SC-324:10 AUTO DIGI-MASTER DOSE RATE METER EQUIPMENT CHECK 1~2.Turn unit on to be sure that the digital display lights.I I Perform instrument source check.Obtain source from'safe and verify that meter reading corresponds to attached, card then log meter reading into source check log.EQUIPMENT OPERATIONS 1~Allow unit to complete one cycle (display will blink)before reading when turning unit on or when radiation level changes significantly.

2~Unit will automatically change from one range to the next.The reading is always direct.The Digi-Master may be used to detect the presence of Beta but cannot be used for dose measurement of Beta.Also, Beta detection is only effective when the unit is operating in the mrem/hour range.a.Take a reading with the Beta window closed and record.b.Take a reading with the Beta window opened and record.c.If the reading with the Beta window open is greater than the reading with the Beta window closed there is Beta radiation present.d.If a Beta dose rate is needed a survey with an RO-2 or equivalent instrument must.be made.4~Upon completion of the survey, turn unit off and return it to the Survey Team Room.Unit should be recharged before the next use.

SC-324:11 RO-2 DOSE RATE METER EQUIPMENT CHECK Turn the function selector switch to the"BATT 1" and"BATT 2" positions.

Meter should indicate above the battery cut-off line.2~Perform instrument source check.Obtain source from safe and verify that meter reading corresponds to attached card then log meter reading onto source check log.EQUIPMENT OPERATION 1~0'ero the meter by turning the function selector switch to"ZERO" and turning the"ZERO ADZ" knob as necessary.

The zero adjust may be made in a radiation field by placing the function selector switch at"ZERO ADJ".To measure the radiation field, position the function selector switch to the lowest range which provides a mid-scale deflection of the meter.3~With the Beta shield closed the meter will read the whole body Gamma dose rate.4~To obtain a Beta dose rate measurement perform the follow-ing: CAUTION: The f ace o f the beta window is very thin.Whenever the Beta shield is open, guard the shield against damage by puncture or contamination by dust or dirt.a.Take an area measurement with the Beta shield closed.b.Open the sliding Beta shield on the bottom of the case and take an area measurement.

c.Subtract the closed shield reading from the open shield reading and multiply by the Beta correction factor marked on the instrument.

d.This number is the Beta dose rate for that area.5.When the survey is completed turn the function selector switch to OFF.

SC-324:12 BATTERY POWERED LOW VOLUME AIR SAMPLER EQUIPMENT CHECK 1~2~Disconnect from Battery Charger.Attach sampling head and filter medium to filter housing inlet.3~4~Remove anti-tamper cover plate and place master ON/OFF switch in ON position.This switch also resets the time.The switch is located in the lower left hand corner.Turn unit on using ON/OFF switch located to the right of the digital display.NOTE: Master ON/OFF switch must be on for unit to operate.Master ON/OFF switch also resets time display.6.7~If charge status of unit is known, temporarily start unit and press the test button."BATT." LED should light indicating a charge of 954 or greater.If LED does not light, recharge unit before use.Turn unit off.Replace anti-tamper cover.EQUIPMENT OPERATION 1~2~Ensure filter cartridge contains a GY-130 Silver Zeolite cartridge and a particulate filter.Connect filter cartridge to sampler.At start of sampling period record start time, press test, record time in digital display and a flow of 4.0 LPM on sample envelopes and reverse of MPP.Turn unit on using ON/OFF switch located to the right of the digital display.NOTE: Master ON/OFF switch must be on for unit to operate.Master ON/OFF switch also resets time display.

SC-324: 13 BATTERY POWERED LOW VOLUME AIR SAMPLER (CONT)If the"FAULT" LED is lit.This was activated by either an undervoltage, overcurrent, or overpressure (restri.'cted flor)beyond the units capability.

The motor is stopped and the time is latched.By pressing the"TEST" button, the time (in minutes)into sampling at which the fault occurred will be displayed indicating a valid sample period.NOTE: The timer stops after 15-30 seconds into a fault condition to prevent unnecesary shutdown.At end of sampling period turn pump off using ON/OFF switch located to right of digital display.Press TEST button, record time in digital display, stop time and all other pertinent information on may and envelopes.

Sample volume in liters equals the flow rate in liters per minute multiplied by minutes the sampler operated.The sampler has a fixed flow rate of 4 liters per minute.If the unit was operated for thirty minutes, the ample volume would equal 120 liters (4 x 30=120).

SC-324: 14 APPENDIX II IRRADIATION SURVEY INSTRUCTIONS

SC-324:15 GENERAL AREA RADIATION SURVEY 2~A general radiation area survey should be conducted while moving between defined survey points, and at the specific survey points.The survey should be conducted using an RM-14 Radiation Monitor with an HP-190 probe.3.When conducting a moving survey, the HP-190 probe should be held in a horizontal position and protected from the elements and wind.4~If the RM-14 reading changes more than 1,000 CPM stop and conduct a survey for Beta using the Auto Digi-Master or RO-2.5.Report the results of the survey to the Radio Operator at the next survey point, or after completion of the Beta survey.

SC-324:16 SURVEY TO DETERMINE PRESENCE OF BETA RADIATION If the General Area Radiation Survey shows a change of 1000 CPM on the RM-14, or if the"plume" is suspected to be in your area, a survey to detect the presence of Beta radiation should be conducted.

2~Using an Auto Digi-Master, or RO-2 dose rate meter conduct the following surveys.a.With the detector window aimed up: Beta shield open Beta shield closed Difference gl=(open reading-closed reading)b.With the detector window aimed down: 3~Beta shield open Beta shield closed Difference g2=(open reading-closed reading)I 1f either difference gl or difference g2 from Step 2 is positive this is an indication that Beta radiation is present.a.If both difference g1 and 42 are positive, this is an indication that you are in the plume.b.If only difference gl is positive, this is an indica-tion that the plume is overhead.Report the results of the survey to the Radio Operator and await further instructions from the Dose Assessment Manager.

SC-324:17 LOW VOLUME AIR SAMPLE 1~2~Draw air through a GY-130 silver zeolite cartridge and particula'te filter using a low volume air sampler for approximately 30 minutes.I Record thy.sample date, time, and location on two sample envelopes and on the back of the survey map.3~4~Determine the background radiation level using the RM-14 Radiation Monitor and HP-190 probe.Record the reading on each envelope, and on the survey map.Using onion skin gloves remove the GY-130 silver zeolite cartridge from the sample holder and read the activity level with the RM-14 Radiation Monitor and HP-190 probe, by holding the probe window on the inlet side of the silver zeolite cartridge.

DO NOT TOUCH THE PROBE WINDOW WITH THE CARTRIDGE.

Record the reading on one envelope and place the cartridge in that envelope.Record the reading on the back of the survey map.5.Read the activity level of the particulate filter using the RM-14 Radiation Monitor and HP-190 probe.DO NOT TOUCH THE PROBE WINDOW WITH THE PARTICULATE FILTER~Record the reading on the other envelope and place the particulate filter in the envelope.Record the reading on the back of the survey map.6.Remove the onion skins and discard in a plastic bag.Treat as contaminated material.7~Report the following information to the Radio Operator: a~b.c~d.e.f.Sample location Date and Time sample was taken Volume of air sample in liters (See page 13 for calculations)

Background

count rate in cpm GY-130 silver zeolite cartridge count rate in cpm Particulate filter count rate in cpm NOTE: Field calculations of the airborne activity level may be performed as follows: (SC-421)Sample volume in liters equals the flow rate (4 LPM)times minutes the sampler operated.

SC-324:18 LOW VOLUME AIR SAMPLE (CONT)Iodine-131 (GY-130 cartridge)

CPM Sam le-CPM Back round 8.3 x 10-8 (Volume of Sample in Liters)Particulate CPM Sam le.-CPM Back round 2.4 x 10-8 (Volume of Sample in Liters)uci/cc Iodine-131 uci/cc Particulate

SC-324: 19 CHANGING FILTERS AT FIXED ENVIRONMENTAL STATIONS Record the following information on the sample envelope left from the previous filter change: a~b.c d.e.Date Time System Vacuum (inches)Gasmeter reading (cubic feet)Total hour meter (record in column marked"OFF")Turn pump off Using onion skin gloves remove the filter holder at the quick disconnect joint.Unscrew the outside retaining ring and remove the particu-late filter from the holder and place in the sample envelope.If a charcoal or zeolite cartridge was in use transfer the information on the particulate filter envelope to a new envelope and place the cartridge in the envelope.Place a new GY-130 silver zeolite cartridge in the sample head.Place a new particulate filter in the holder, replace the retaining ring and reconnect holder to the pump at the quick disconnect joint.Remove onion skins and place in a plastic bag.Treat's contaminated.

Turn the pump on.Record the following information to two new envelopes.

Mark one envelope"GY-130 silver zeolite".a~b.c~d.e.f.Station number Date Time System vacuum (inches)Gasmeter reading (cubic feet)Total hour meter (record in the"ON" column)Place the new envelopes inside the monitor cabinet.

SC-324:20 CHANGING FILTERS AT FIXED ENVIRONMENTAL STATIONS (CONT)Bring the envelopes containing the cartridge/filter removed to the Survey Center at the completion of your assigned route or when directed by the Dose Assessment Manager.

SC-324: 21 APPENDIX III ON SITE RADIATION SURVEY TEAM INSTRUCTIONS

SC-324:22 BLUE TEAM SURVEY ROUTE INSTRUCTIONS 2.3.From the Survey Center proceed northeast to the edge of the grass.P Turn south across the lawn and proceed to environmental station g4 and change the filter and cartridge per instru-ctions in Appendix II.Proceed southeast to Manor House driveway, follow driveway to where it turns north, proceed east out of the trees into orchard.4~Go through orchard, then turn north and proceed to enviro-nmental station 53 and change the filter and cartridge.

5.6.7.Proceed west across field and through woods to Manor House driveway.Go north on Manor House driveway to the lake shore.Proceed east to environmental station g2 and change the filter and cartridge.

8.9.Proceed west, along the lake shore to the plant fence.Proceed along the plant fence to the Guard House.10.If the Central Alarm Station (CAS)and Secondary Alarm Station (SAS)are manned contact CAS on the radio for access to the site.Otherwise obtain a"hard key" to gain access to the site from the Survey Manager.12.Proceed east from the Guard House along access road and across south side of plant building.Circle across grass towards Upper-Radwaste Storage Area, continuing to plant fence.13'ontinue west along plant fence to the Screenhouse.

Proceed south along side of plant building and return to Guard House.15.Report to Radio Operator for instructions.

SC-324:23 YELLOW TEAM SURVEY ROUTE INSTRUCTIONS Proceed west from the Survey Center to the plant site road.Continue north across the bridge to environmental station g5 and change the filter and cartridge.

Proceed west along Deer Creek and the parking lot to environmental station g6 and change the filter and cartridge per instructions in Appendix II.Proceed west through the apple orchard approximately 100 yards.Turn north through the apple orchard, towards the hill, to the northwest corner of the plant fence.Proceed south along the plant fence to environmental station g7 and change the filter and cartridge.

Continue along the plant fence to the Guard House.I f the Central Alarm Station (CAS)and Secondary Alarm Station (SAS)are manned contact CAS on the radio for access to the site.Otherwise obtain a"hard key" to gain access to the site from the Survey Manager.Proceed west from Guard House to the access road.~Continue north on the access road and across the grass to the plant fence.Proceed east along the plant fence to the discharge canal.Proceed south along the west side of the plant building and return to the Guard House.Report to Radio Operator for instructions.

~gi LAKE ONTARIO I I I I I I I I I I I I I 1 I I I O K C X 0 K 0 III IL 0 4 I I I I I I I I I I I)<<-x-I" I I I IX I I I IS o III 0 PARKING LOT r k I I T 0 r r I I I I I IS f I I L 0 I I l I I I r r/////4 ONSITE SURVEY MAP NO SCALE PATE: TEAM MEMBERS GLUE I 2 TIME: YELLOW l 2 SUGGESTED ROUTE

'

ROCHESTER GAS AND ELECTRIC CORPORATIO GXNNA STATION CONTROLLED COPY NUMBER PROCEDURE NQ.SC-420 REV.NO.15 ESTIMATING OFF-SITE DOSES PORC REVIEW DATE PLANT SUPERXN NT EFFECTXVE DATE QA NON-QA CATEGORY 1.0 REVIEWED BY'MXS PROCEDURE CONTAXNS 33 PAGES I 6 SC-420-1 SC-420 ESTIMATING OFF-SITE DOSES 1~0 HJRPOSE: The purpose of this procedure is to provide estimates by a Health Physicist of the post accident dose in the areas around the plant and guidance for the selection of sampling locations.

Information is needed early to decide what action be taken to limit the exposure of the general public.Steps must be taken to define the affected areas, assess the extent and significance of the release and provide data on which appropriate protective actions can be based.2'2.1 2.2 2'

REFERENCES:

Nuclear Emergency Response Plan N.Y.S.Radiological Emergency Preparedness Plan SC-100, SC-442, SC-450 S-14'2~5 2'EPA-520, Manual o Protective Aetio Guides and P otec-tive Actions for Nuclear Incidents (Feb.1980).Regulatory Guide 1.109 3'INSTRUCTIONS:

3'3'.1 3~1.2 3.1.3 3.1.4 The following equipment is available for.use in estima-ting doses.Xu/Q Isopleths, and Xu/Q tabulated values (Table 1).Map of surrounding area, U.S.Geological Survey (1 inch: 24000 inch scale).Control Room wind and temperature indicators.

Control Room Radiation Monitor System.

F 8 lg1I 1 SC-420.:2 3.1.5 Back-up wind speed and direction indicators at Station 204*, and National Weather Service.Supple-mental wind speed indicators at Station 230**.*Located on the.south side of Route 104 between Slocum and Lakeside Roads in Ontario.**Located at 1102 Atlantic Avenue between Lincoln Road and Route 350 in Walworth.3'.6 3'3~2~1 3Alternatively the procedure can be accomplished using the IBM PC EOF5MODA procedure.

Prelimina Radiolo ical Estimates and Event Classif-~icat la For initial notification purposes, a first-cut estimate of potential offsite doses and releases may be obtained by the Control Room using SC-240, Attachment I.Levels are provided for various accidents evaluated in the Ginna FSAR and in previous AEC Safety Evaluations for Ginna plant siting and design.It is preferable to base offsite estimates'pon measured release values.Vent activity concentrations and release rates can be determined from monitor calibration factors provided in Attachment VII, and from Procedure PC-23.5.3An estimate of the 2 hr site boundary whole body dose from plant vent noble gas concentration, obtained from S-14.2 (low range monitor)or PC-23.5 (hi range monitor)may be obtained using the following equation: Plant vant (uCi/cc)x 18~a 2 hr whola body uCi/cc dose REM at site boundary~NO The following assumptions were made for these calculations:

X/Q 4.8 x 10 4 sec/m (default value in lieu of actual meteorology data<assuming downwind mixing conditions 100 times more conservative than annual average conditions.

)Plant vent flow 77,000 cfm (3.63 x 107 cc/sec)EPA-520 whole body dose curve (t Ohr)

'41 SC-420:3 3Iodine effluent monitor or isotopic data are unavailable, a default valve of 1.0E-4 should be used to reflect the estimated release concentration ratio of gross iodine to noble gas.Note: When data is available calculate an Iodine to noble gas ratio that reflects present conditions.

3.2'3.2.6 Determine the classification of the emergency with respect to plant releases and site boundary doses from the criteria provided in SC-100.Any preliminary dose estimates used as a basis for emergency classification or protective action recomm-endations should be refined as follows using release measurements and actual meteorological and field sampling data as they become available.

3'Use of the EO TSC ZBM-PC Assessme t Com uter Pro ram 3~3~1 3'Refer to Attachment ZV"ZBM-PC Assessment Computer Program" for specific instructions to use the program.Use of Meteo olo ca a e e se D t w th EPA Dose F ctors Manual Met o 3.4.1 Obtain the temperature at 33'nd 250'rom the"Status Report Form", Control Room, TSC or Computer Terminal.From the 250'emperature subtract the 33'emperatu-re.Zf readings from the main weather tower are unavailable, proceed to step 3.4.2.1.T250'T33'elta T 3.4.1.1 Meteorological Data can be obtained by phone from the MIDAS storage computer in the Meteorological Tower Trailer by using the TI-Silent 700 Terminal.See Attachment ZZ for instructions.

3Zf Delta T is<-1.9, the condition is unstable (Pascgxill Category B)'.Zf Delta T is>-1.9 and<-0.5, the condition is neutral (Pascpxill Category D).

't'S)t~

If Delta T is>-0.5, the condition is stable (Pasquill Category F).NOTE: Condition is To determine the Pasquill stability class A-G, see Attachment VI.In the event that meteorological data are unavailable from the main weather tower, data can be obtained from the back-up tower using Attachment III.If data cannot be obtained by phone, the Emergency Coordinator should direct an individual to proceed to the back-up weather instrument recorder at the tower.If the primary tower temperature sensors are not available to determine stability, the individual taking the readings should note wind speed (mph)wind direction (degrees)and approximate fluctuation in wind direction (degrees)averaged over the last hour.The wind direction fluctuation is determined by eyeballing or by drawing 2 average lines through the last hour's wind direction extremes, and subtracting the difference.

Station 204 wind speed, wind direction and wind direction fluctuation readings are reported to the Technical Support Center by phone (ext.500 through 507)or by the plant P.A.The individual at Station 204 should request for further instructions from the Emergency Coordinator.

-To determine atmospheric stability from wind fluctua-tion, use the following table: W d luctuat o<45 degrees anytime)45 degrees night time stable (inversion) neutral 45 degrees-75 degrees daytime neutral>75 degrees daytime unstable (lapse)Select the Xu/Q plastic overlay matching the condition determined in 3.4.2 and attach to the area map.(Also tabulated Xu/Q values are given in the attached Table 1).~

e~4i t' SC-420:5 Obtain wind speed and direction data from the"Status Report Form", the Control Room, TSC, Computer Terminal or alternatively from Station 204.The direction given will be that.from which the wind is blowin Wind Speed Wind Direction (mph)(degrees)NOTE: Supplemental weather information is also available from the National Weather Service Offices in Rochester (716-328-7633) or Buffalo (716-632-2223), if necessary, and at Station 230.Instructions for obtaining Nation Weather Service information is found in Attachment IV.Align the centerline of the overlay in the downwind direction.

The mark on the centerline at the bottom of the overlay should be aligned on a compass point on the map 180 degrees from the degrees given in 3.3.4.To determine this point, do one of the following:

If the degrees given in step 3.3.4 is between 180 and 360, subtract 180.Zf the degrees given in step 3.3.4 is between 0 and 180, add 180.Degrees wind is blowing from Degrees II Align mark on centerline of overlay (at bottom)at Degrees The Xu/Q plastic overlays and Table 1 values have, for convenience been calculated based upon a wind speed of 1 mph.Thus,-in order to determine X/Q sec/m3, is necessary to divide the isopleth value by the actual wind speed, in mph.Obtain concentration of particulate, noble gas and iodines and vent flow to determine release rate.See Attachment Z.To calculate the downwind concentration of noble gas, particulates or radioiodine, multiply the release rate of radioactivity (Ci/sec)from the plant times the X/Q (sec/m)dispersion coefficient determined in

~1'P\I 4.o4 SC-420:6 step 3.3.6.The resultant concentration will be in Ci/m or uCi/cc.Perform these calculations on Attachment 1 3.4.9 3.4'0 3.4.11 32 3.4.13 3'Obtain an initial estimate of release duration from the Emergency Coordinator or Recovery Manager.If this estimate is unavailable, use an initial release duration estimate of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for dose projection purposes.Whole body gamma dose rate due to noble gas isotopes is estimated using Table III and using the listed factor corresponding to the approximate time after shutdown.Multiply this factor times the concent-ration calculated in Step 3.4.7 to get Rem/hour.Whole body gamma~dos is obtained by multiplying the dose rate calculated in Step 3.4.9 times the exposure time determined in Step 3.4.8.The result is Rem.Thyroid dose rate to the child is estimated using Table IV and using the listed factor corresponding to the time after shutdown.Multiply this factor times the concentration calculated in Step 3.4.7 to get rem/hour.Projected dose rates are always determined for the child thyroid as they are the most sensitive people.To determine the dose or dose rate for adults (which would only be necessary for emergency workers)divide the dose or dose rate for the child by 2.Thyroid~ose is found by multiplying the dose rate calculated in Step 3.4.11 times the exposure time determined in Step 3.4.8.Surve Tea Dat 3.5.1 3.5'Note the sample locations on the map that are covered by the Xu/Q overlay.The initial sample taken should be in a high concentration area and on a first stage survey route.Using the attached list of sample locations and teams, notify proper teams where to take samples.When results are received, mark results on appropriate map and status board.When the initial field sampling results are received, assign a Xu/Q value to the sample results using the Xu/g value for the line closest to the sample locati-on.For the plastic overlays, all points along a given line are assumed to have the same concentration as the initial sample.The concentration at any l>7.IE'14 SC-420:7 SOLUTION: other point of interest can be estimated by multiplying the sample concentration by the ratio of the respective Xu/Q values.EXAMPLE: A sample taken on a Xu/Q line of 5 x 10 E-6 indicated an iodine concentration of 5 x 10 E-7 uCi/cc and dose rate of 100 mrem/hr.Determine the concentration and dose rate expected at a Xu/Q value of 2 X 10 E-7?Iodine at 2 X 10 E 7~2 x 10 E 7 x 5 x 10 E 7 uCi=2 x 10 E 8 uCi 5 x 10 E-6 CC CC Dose Rate at 2 x 10 E-7 x 100 (mrem/hr)~4(mrem/hr) 5 x 10 E-6 33.5.4 3'.5~~3~5.6 3.5'Compare measured dose rates and air concentrations to predicted values, and adjust dose pro)ections accord-ingly.Notify the survey team to continue surveying the affected area looking for high concentration areas and hot spots.If the wind direction changes, realign overlay using 3.4.5.Sample new locations indicated by the overlay.If the wind speed changes, recalibrate the overlay by dividing the original speed by the new wind speed and multiply by the concentration or dose.Resample to check new overlay calibration.

For puff type, releases multiply wind speed by elapsed time to find distance radioactive cloud has traveled.3'.8 Environmental TLD's, (SC-442)and Post Accident Environmental Samples, (SC-450)may be used to give values for off-site doses.3'tect v Action Guides 0 3'.1 3.6.2 Recommend the appropriate measures to be followed with respect to the general public.Table II give the pro)ected whole body and thyroid dose levels which warrant, given protective actions (e.g.sheltering,'vacuation) indicated.

Weather forecast information should be considered when planning protective actions.

4 1 4 f V SC-420:8 TABI F.Xu GINNA SITE VALUES OF Q AS A FUNCTION OF STABILITY AND DISTANCE DOWNWIND DISTANCE FEET UNSTABLE STABLE 200 400 500 600 800 1,000 1,200 1,400 1,600 l(800 2(000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 9,500 10,000 11,000 12(000 13,000 14,000 15,000 16,000 660 1,310 1,640 1,970 2,620 3,280 3,940 4,590 5,250 5,910 6,560 8(200 9(840 11,500 13(100 14,800 16,400 18,000 19,700 21,300 23,000 24,600 26(200 27,900 29,500 31,200 32,800 36,100 39(400 42,700'45,900 49(200 52,500 0.1 0'0'0.4 0'0'0'0.9 1.0 1.1 1.2 1~6 1.9 2~2 2'2'3'3'3'4'4'4'5'5.3 5'5'6'6'7.5 F 1 8'9.3 10'2.22E-04 8'6E-05 4.20E-05 4.71E-05 2.91E-05 1.83E-05 1.24E-05 8.98E-06 6'1E-06 5.35E-06 3'3E-06 2'9E-06 1.42E-06 1.20E-06 1.04E-06 9.03E-07 7.96E-07 7.07E-07 6.41E-07 6'1E-07 5.65E-07 5.33E-07 5.05E-07 4.79E-07 4.56E-07 4.35E-07 4.17E-07 3.88E-07 3.63E-07 3.41E-07 3.22E-07 3.04E-07 2.89E-07 5.01E-04 3.02E-04 2.36E-04 2.02E-04 1.49E-04 1.16E-04 9.27E-05 7'8E-05 6'2E-05 5.44E-05 4.76E-05 3.53E-05 2.77E-05 2 24E-05 1.86E-05 1.56E-05 1.33E-05 1.15E-05 1.02E-05 9.25E-06 8'0E-06 7.66E-06 7.02E-06 6'5E-06 5'5E-06 5.51E-06 5'7E-06 4.62E-06 4.16E-06 3'6E-06 3'2E-06 3.12E-06 2.86E-06 6.00E-04 4,73E-04 4'6E-04 3.82E-04 3.16E-04 2.65E-04 2.29E-04 2.01E-04 1.79E-04 1.60E-04 1.44E-04 1'7E-04 9.80E-05 8.34E-05 7.19E-05 6.27E-05 5.51E-05 4'6E-05 4.50E-05 4.11E-05 3.76E-05 3.46E-05 3'9E-05 2.96E-05 2.75E-05 2.61E-05 2'9E-05 2.28E-05 2.10E-05 1.94E-05 1.80E-05 1.67E-05 1.56E-05 NOTE VALUES ARE BASED ON 1 MPH WINDS Offsite doses are calculated at 500 meters (0.3 miles), the minimum distance to the exclusion area boundary

/~f l r'

)PHOIECZED DOSE (HEH)K)I'IRE XOH3IATION)Whole Body<l I)Thymid<5 I)Whole Body l to<5 I (&Mid 5 to<25 I I)Whole body 5 and abave I)'Ihymid 25 and abave I I)Pm)ected Dose (Rem)to I Baergency Team Wad~.)No planned protective actions)State may issue an advisory to seek shelter and await furt2mr instructions.

tor ernrimnmental radiatian levels.)Seek shelter as a minimum.(Cansider evacuation.

Evacuate unless con-straints make it impractical.

)Monitor environmental radiatian levels.l access.(Conduct mandatory evacuatian.

)%sitar ernrinxmental radiatian levels and and~ust area for mandatory evacuation based on these levels.l access.I I (Previously reccolmended (protective actions may]be reconsidered or terminated.(If canstraints exist, (special consideratian

)should be given for)evacuation of children)and t women.I)Seeking shelter would)be an alternative if)evacuation were not (inaaaiiately possible.(Whole Body I)amid I I IWh le~I I I 25 75)Cantxol exposure of etergency team meakmm to these levels mxegt far lifesaving missians.(Appvapriate contxols far~gency wad~, include time limitatians, irators and stable iodine.(Cantxol exposure of emergency team members performing lifesaving missians to this level.(Cantrol of time of eagxaure will be effective.(AlthoL~respirators (and stable iodine)should be used whme (effective to control (dose to emergency team)l~c~.thy idd I (may nat be a limiting)factor for lifesaving missions.I t1 Rd f Pl IW W.a hl tl 1 the incident must take existing~tians into ccesideration.(b)At the time of the.incident, officials may impl~lm-impact protective actions in keeping q y~~

SC-420:10 TASu.XX1 Noble Gas Dose Conversion Factors Time After Shutdown hours Rem hour er uCi cc*0 1~5 2.5 3'4.5 6'12'5'E+02 5'E+02 4'E+02 3'E+02 3~1E+02 2'E+02 1.2 E+02*Multiply uCi/cc by the listed factor to obtain Rem/hour.

Qf' SC-420:11 Radioiodine Dose Conversion Factors Time After Shutdown hours 1'3 4 5 6 7 8 9 10 11 12 Rem/hour Child Thyroid er uCi cc*F 1 E+05 5'E+05 6'E+05 6'E+05 6'E+05 7'E+05 7'E+05 7'E+05 7'E+05 8'E+05 8'E+05 8'E+05*Multiply uCi/cc by the listed factor to obtain Rem/hour child thyroid

SC-420: 12 GENERAL INFORMATION:

Quaint Time Shutdawn Time: Release Start Time: Release Vent: Stability Class: Vent Flmr (CEM): VERI'ONCEPIHATIOÃ FRCN KPEIlJEPP HONI'IOR READING: Noble Gas (Monitor No.cgn X~uCi cg (cxxnt rate)(calib.factor)cpn Radioiodine (Monitor No.): uCi/cc*(vpITto canoe)/m/hours (later axuzt rate)(initial count rate)/(time between cpn readings)X&mV'hr=uci/cc*(calib.factor)(vent canc.)Particulate (Manitor No.): (cnxnt rate)cgn X~uCi cc (calib.factor)cgn uCi/cc*(vents caner)To ca+vert CPM to cc/sec'FH x 2.8E4 cc/CF x 1 miq/60 sec NOHXZ GAS: To calculate release RATE in Ci/sec fran monitors: uCi/cc x cc/sec x E-6 Cguci Ci/sec*NOZE: Verrt canmntratian can be input dimply fran SPXNG monitors, if available.

SC-420: 13 To predict downwind concentration:

~mme x Ci/sec x 1/()mph=(~Q)m (windspeed)

~sec-x Ci/sec x 1/()mph (}{0/Q)m (wind speed)~sec-x Ci/sec x 1/()mph=(Ãg/Q)m (windspeed) uCi/cc at S.B.500 meters uCi/cc at 2 miles uCi/cc at 5 miles (}{0/Q)m x Ci/sec x 1/()noh (win{:Ispeed) uCi/cc at 10 miles sec-x Ci/sec x 1/()eph uCi/cc at (}a}/Q)(windsp cad)(distance)

Distance Hours after Shutdown R e+hour per uCi/cc (Table ZIZ): Hhole Body Dose Rate QRe@h~our 5 B~miles 5 ad)es 10 mi)es~ected exposure duration (Raus): Prcr}ected whole Body Dose (rem)To calculate release RATE in Ci/sec fran monitors: cc/sec x E-6 Ci/uCi To p{redict dcwnsrJLnd ocexentraticn x Cl/sec x 1/()mph (}{0/Q)(wind speed)x C)/sec x 1/()mph (}0}/Q)(wind speed)x Ci/sec x 1/()mph{}{q/{})(winispmxl) x Ci/sec x 1/()each{}{0/Q)(wind speed)uci/cc at S.B.500 metsLm uci/cc at g miles uCi/cc at~les uci/cc at~omilas C!'

SC-420: 14~sec-x Ci/sec x l/()mph uci/cc at (Xc/Q)m (wizilsgeax))(distance)

Distance Ho(,~after Shutdown rem/hour per uCi/cc (Table IV): Maid Dose Rate, Child~h~our S.B 2 miles 5 miles 10 miles Pro)ected exposure duration (Hours)'ro)ected'Ihyroid Dose, Child (rem)PARPIQKATE:

To calculate release RATE in Ci/sec fran mcnitors: cc/sec x E-6 Ci/uCi To~ct dawnwind cc(ncentration sec-x Ci/sec x 1/()~(zty'Q)(wind speed)uCi/cc at S.B.500 meters uCi/cc at 2 miles sec-x Ci/sec x 1/()mph (MQ)(wind speed)sec-x Ci/sec x 3/()smh uCi/cc at 5 miles (XU/Q)(wtmdsgeed) x Ci/sec x Q()mph (MQ)(wind speed)uCi/cc at~Omiles x Ci/sec x+()~(MQ)(wind sg)eed)uCi/cc at-(distance)

Distance Hours after Shutdctwn**Reap/haur per uCi/cc:~S~mg es~5~em g(~~em

SC-420: 35%hole Body or turg Dose Rate~rem~m~r Projected exposure duration (Hours): Proj~Rhole Body or Zung Dose (rem)*MZE: She a~rogriate dose canversian factor for pmMculates would be based upon the results of an isatcpic analysis of the mRcture, arxl referenc~Reg.Guide 1.109.

r'I'I C 22+I 4!'III SC-420:16 l&EMMT GFIMIT1 SANPIZ MIÃIS 0 I G R I R A RiEjN E]E J G D)N)E I 01 I G R I R A RI E IN E/E/G DINIEL G R R A R E I N E I E I G D I N I E I IAKE&KNICK1M30CKER I BRICK CSURCH&KNIC5KRK3CK1&

X X X X X X X X X I BRICK CHURCH&GN'IPQUO CEPXKR I BRICK CHURQi&SIQCXJM IAKE&SIDQ3M 6 BEAR CREEK HARKR I 7 PUSAN&I 8 T1GMBIZ&FURNACE I I 0 I ll SIDCX3M&KENYON X X X X X X X X X 12 13 14 I RP-104&I RT-104&KNI I&0 X X X X I 16 I 7 X X Ql I E 71 SC-420: 17 XNEMlMY OFF-SITE SQ6?XZ XOZPIS 0 (G R R A R EiN E I E I G D/N/E/0 GIR R I A R E(N E]E)G D I N I E t I I o (GER I R I A R)E)N E I E I G D I N I E I 20 GRlPKIZ&FISHER I 21 RP-104&FISHER I 22 TRUMMONDS&X SECOND STAGE X I X)'X/24 I TRUMMONDS&NAINGRIH I 350&PADVl IANE I 25 RP-350&286 I I I 6 I 27 SIUHY IQNESGME&IAKE I I 29&I 30 KENT C5KEK&I 31.21&RP-I 32 CN X X X X 33 34 X X 35 36 37 38 I ZZNE&RP-0 I 250&SZATE X Vl p II kg,~i a'.v>>~et SC-420:18 DKBGBKF OFF~SAMPIZ POEPXS I o I o)0)G R I R A RI E IN EiEiG D(N/E G R R A R E N E)EiG D I N I E I G R R A R E(N E I E I G D/N/E 39 40 41 42 45 46 47 48 49)FMX52K N26GE SERVICE CEPZl&PZA%(MAD I PEW FGKD I SAIJP&SCSIZGEL I SAIIP&SOOINARD I&KiITING I IAEE MAD&EKUZE 250 I QX3PPE ICE&I RT-21&HQKSNC6GH I RP-21&I FURNACE&EENYCN X X X X X X X I I X I l X SBXND SZAQE X I X X X X 50 51 I RV-350&I PVNV&X I I X X

SC-420: 19 KEY FACILITIES LOCATED ABOUT GINNA SITE Com an and Product Distance from Site Direction from Site Duffy-Mott Co., Inc.Williamson Baby Foods The Waterman Food Products Co.Food Processing Ontario Kraut Corp.7 Railroad Ave.Food Processing Victor Preserving Co.Food Processing Ontario Cold Storage Food Processing Waterman Fruit Products Co.Food Processing Ontario Food Products Food Processing Lyndan Products Co.Food Processing 8-1/2 miles 3-4 miles 3-4 miles 3-4 miles 3>>4 miles 3-4 miles 3-4 miles 3-4 miles Southeast South South SW South South SW South SW South SW South SW Ontario Water District Williamson Water District 1.1 miles 5-1/4 miles Ontario Fire Department 4 miles East.East Southeast Ontario Center Fire Department Union Hill Fire Department Ontario Town Hall 3.5 miles I 5 miles 4 miles South Southwest South

SC-420:20 HOSES IN AND ABOGT GINNA SITE House Locatio House on Lake Road directly south of plant Distance Owner's from Site.Beebee 1,500 ft.Direction from Site South House on S.W.,corner of Lake Road and Ontario Ctr.Rd.House on North side of Lake Rd.S.E.of Training Center access Road House on private road north of above house Loomis 2,000 ft.Taillee 2,500 ft.2I 000 South SE Southeast Southwest

SC-420:21 Instructions for interpreting and accessing Data in the MIDAS storage computer in the Meterological Tower Trailer.Set up for TI-Silent 700 in TSC NUM-depress switch right LOW SPEED-depress switch right HALF DEPLEX-depress switch left ON LINE-depress switch left ON/OFF-push switch to forward position The computer can be quizzed by phone using the following numbers: 300 BAUD TERMINAL-phone 5 524-5711 (TI Silent 700)1200 BAUD TERMINAL-phon'e g 524-5761 There are short time periods when the phone connections are disabled while internal calculations are taking place.Whenever the 1200 BAUD line is in use, the 300 BAUD line is disabled.Normal communication times from the master MIDAS computer is a 30 minute period centered around 3:30, 7:30, and 11:30 EST.To obtain: Last 15 minute average-Type AVXX[RETURN]Last collected value-Type PPXX (RETURN]If ILLEGAL REQUEST appears, retype the command again.Illegal request is returned if the command was typed wrong of a spurious charater was included, i.e.-line feed.For AVXX prinout: XX~, 01 02 04~10-20~40-77 Prints Prints Prints Prints Prints Prints Prints all speed averages all direction averages all temperature averages all delta temperature averages miscellaneous averages rain averages all averages For PPXX printout:~Can~e pum~e 01 02 03 04 05~Na e WS 33A WS 33B WS 150A WS 150B WS 250

-Y C SC-420'22 ATTAmmZNT II CONT Channel XX Number 08 09 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 32 Name WD 33A WD 33B WD 150A WD 150B WD 250 TER 33A TER 33B TE 150A TE 150B TE 250A TE 250B DT 150A DT 150B DT 250A DT 250B DEW 33 TEG 33 RAIN'NTERPRETATION OF DATA 15 min.averages for 01-15 min;16>>30 ming 31-45 min;46-60 min WS-Wind Speed-Average divided by 10 measured value WD-Wind Direction-Average is read directly TE-Temperature

-Average divided by 10 measured value DT-Delta Temperature

-Average divided by 10 calculated value DEW-Dewpoint Temperature

-Average divided by 10 measured value TEG-Ambient Temperature

'at Dewpoint Monitor-Average divided by 10 measured value RAIN-Rainfall-'verage divided by 100 accumulated inches of rain NAME-Parameter and height in meters on tower AVGE-Average of values collected in last 15 minutes average ST.DEV-Standard deviation of average data MIN.-Minimum value for last 15 minute average MAX.-Maximum value for last 15 minute average I-Index code: 0 Good;1 Questionableg 2 Bad;3 Unsteady wind data'Calm Wi.ndg 5 Flat direction MNDR-Meander range for wind direction AVRN-Average of meander range CNT-No longer used for data 4 gl,Ã1 SC-420:23 hiTACrBKNT III Instructions for accessing data at the Substation 204 meteorolog-ical tower on Route 104 between Slocum and Lakeside Roads.The equipment consists of a 33 foot tower with wind speed and direction indicators, a strip chart recorder, and an Odessa Data Logger.The data logger can be quizzed by phone using'the following specifications:

Speed Parity Duplex Data bits Stop bits Phone¹-1200 band-Odd-Full 7 1 524-2067 In.case of a modem problem, call Galson Technical Services, Lee Davis, (315)428-6612.Odess Commands H-Output a summary of hourly averages collected from midnight until last hour.Data will include wind direction, wind speed, and sigma theta (SD1).G-Output 5 minute values for present hour L-Ouput a listing of the operating configuration P-Output 5 minute values T-Time Control CD to exit 1 P SC-420:24 ATTACt&KNT IV RECOMMENDED PROCEDURE FOR RE UESTING METEOROLOGICAL SUPPORT FROM THE NATIONAL WEATHER SERVICE-ROCHESTER (a)(b)Contact the National Weather Service at (716)328-7633 (unlisted) 263-6808 (unlisted) 328-7391 (listed 8 a.m.to 4 p.m.)Provide to the Nation Weathex Service Your name You are calling from Rochester Gas&Electric Ginna Nucleax Power Plant A phone number you can be contacted A brief explanation of the nature of the release and curx'ent wind conditions at the plant (c)Request information based on below 1.An emergency on-going or immediately imminent release: Ask for the current surface wind-conditions and the forecast for the next three (3)to six (6)hours.The foxecaster on duty should be able to provide the information within a few minutes.This should help with evacuation decisions in the immediate vicinity of.the release.2.A potential or imminent explosion-type of release which would drive solid radioactive debris far up into the atmosphere:

This is the type of situation where fall-out plots may be helpful.Unfortunately fall-out plots take time to prepare so that in an on-going or immediately imminent situation,'they are not very useful.In such a short-fused situation a rough estimate from the surface and upper air winds could be more readily provided by+e forecaster on duty.3~A potential, but not immediate release:

V A r~~I' SC-420:25 gTTACHtCENT 1V~CONT'D In this case there may be time to plan evacuations in advance.Don', however, expect an immediate, detailed surface and upper air 24-hour wind forecast.Make the call requesting the data and give the forecaster on duty 15 minutes to 1/2 hour to prepare the information and return your call.The most significant information to a low-level release would be the surface wind direction and speed,.The surface wind is most important in the immediate vicinity of the release, that is, roughly 100 to 500 yards down-wind depending on the strength of the release, the speed of the wind and the stability of the atmosphere.

Beyond that distance the plume spreads so that the boundary layer winds (average from the surface to approximately 2,000 feet)become more important.

Twenty four hour (24 hr.)forecasts of both the surface wind and the boundary layer wind can be made although local effects such as the land-lake breeze make such forecasts difficult in Western New York.When incidents on the scale of the Three Mile Island situation occur, the National Weather Service will take special action in terms of meteorological support.This can include special observations and ,,forecast information.

Under these circumstances, the National Weather Service should be informed as soon as possible so that arrangements (personnel, equip-ment, etc.)can be made to provide additional support.

~I SC-420:26 ATTACHMENT V IBM-PC ASSESSMENT COMPUTER PROGRAM 1.0 RUNNING THE PROGRAM Starting setup of the computer System Unit.....OFF Color Display....ON Printer.......ON 1.2 1.3 1.4 1.5 1.6 1'1~8 1.9 1.10 Place DOS 3.1 disc into A-drive (left side)with label.side up Turn system unit to...ON (wait approximately 45 seconds)When prompted enter new date in the form MM-DD-YYi then press<~(return)When prompted enter new time in the form HH:MMg then press (return)(note: hours should be entered in 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> format i.e.01:00 for 1 a.m.and 13:00 for 1 p.m.)The A)prompt will now be seen on the screen.Remove the DOS 3.1 disc and place the symphony 1.1 disc in the A drive.Type immediately after A)ACCESS and press<~(return).Select"SYMPHONY" from the menu and press<~(return).Wait approximately 2 minutes for the"SYMPHONY" serial number to appear then press<~(return).Place the EOF5MOD disc in drive B (right side).Press the[F9]button then type FR;press<~(return)and wait approximately 150 seconds for the EOF5MOD file to load.Once the EOF5MOD file is loaded follow the program instruc-tion on screen.1.11 Use the[PRINT SCREEN]key to print the DATA ENTRY FORM.1.12 Use the[ALT][S]keys to print the NYS Part II form.1.13 2.0 Use the[ALT][W]keys to print the DOSE PROJECTIONS/SURVEY DATE FORM.ENTERING EOF5MOD PAEVQfETERS

  • t 1~

SC-420'27 ATTACHMENT V CONT~D 2~1 2.2 2'2'2'2'2'2'2.9 2'0 2'l When the EOF5MOD code is loaded as described above, the cursor should be on"CALC TIME".Type in the"CALC TIME" in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notation, press<~(return).The cursor should no be on"T250".Type in the 250 foot met tower temperature reading in degrees farenheit, press (return).The cursor should now be on"T33".Type in the 33 foot met tower temperature reading in degrees farenheit, press (return).The cursor should no be on"WINDSPD".

Type in the wind-speed, in MPH, from the met tower 33 foot.reading, press (return).The cursor should now be.on R-10a.Type in the R-10A reading (in units of UCi/cc)using data from the SPZNG MONITOR UNIT 1 CHANNEL 3 (the sping units need to be corrected form UCi to UCi/cc.This can be done via the sping unit),"interpret mode"g press<~(return).The cursor should now be on R-10B.Type in the R-10b reading (in units of UCi/cc)using data from the SPING MONITOR UNIT 2 CHANNEL 3 (The sping units need to be corrected from UCi to UCi/cc.This can be done via the sping unit),~'interpret mode";press<~(return).The cursor should now be on R-12.Type in the R-12 reading (in units of UCi/cc)using data from the SPING MONITOR UNIT I CHANNELS 5, 7, or ((depending on the amount of the release), press<~(return).The cursor should now be on R-14.Type in the R-14 reading (in units of UCi/cc)using data from the SPZNG MONITOR UNIT 2 CHANNEL 5, 7 or 9 (depending on the amount of the release), press<~(return).The cursor should now be, on R-15.Type in the R-15 reading (in units of UCi/cc)using data from the SPING MONITOR UNIT 3 CHANNEL 5, 7, or 9 (depending on the amount of the release), press<~(return).The cursor should now be on"SHUTDOWN DATE".Enter the date the plant shut down.Press<~(return).The cursor should not be on"SHTDWN TIME".Enter the time that the plant shut down (in 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> format).Press<~(return).

t, SC-420:28 ATTACHMENT V CONTEND The cursor should not be on"DATA DATE".Enter the date that the data was taken.Press<~(return).The cursor should now be on"DATA TIME".Enter the time that the data was taken (in 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> format).Press<~(return).The cursor should now be on"EXPOSURE".

Enter the length of time that the population has been or will be exposed since the start of the release (time is to be entered, in HH:MM format).If a time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is entered results will indicate dose rate (i.e.R/hr).Press<~(return).The cursor should be on"'X'ILES".

If you wish to calculate dose pro)ections at, some other distance besides ten miles input the distance.The whole body doses in Rem should now be displayed at the bottom of the spreadsheet along with protective action recommendations.

h SC-420:29 PAS UILL STABILITY CLASS AND Xu VALUES AS A FUNCTION OR STABILITY AND DISTANCE.Determining the Pasquill stability class Obtain the temperature at 33'nd 250'nd determine the delta T as in step 3.4.1 of SC-420.If the 250'emperature is unavailable, the 150'emperature may be used.Select the right hand columns in Table A giving the range of delta T for the 250 ft.>>33 ft.delta T (DEG.F/217 ft).Determine in which range the measured delta T falls and select the corresponding Pasquill stability class listed in the left hand column of Table A.Using Table B, determine the Xu/Q value for the stability class determined in step 1.03 above and the distance desired.The Xu/{}values can be used in Attachment I to SC-420 for dose assessment calculations.

~TABLE sou BlLl Cl.ASS CR RlA BASED ON DELTA TENPERATURE

~au TA 150 FT.-33 FT.250 FT.-33 FT.DELTA T (OEG.F/100 FT.)DELTA T (DEG.F/117 FT.)DELTA T (OEG.F/217 FT.)BBBLBB-1.0.1.17-2.17.1.0.0.9-1;17.1.05.2.17-1~95 C-0.9-0.8.1.05.0.94-1.95-1.74.0.8-0.3-0.94~0.35~1.74.-0.65.0.3 0.8-0.35 0.94.0.65 1.74 0.8 2.2 0.94 2.57 1.74 4.77 2.2 2.57 4.77 I

GINNA, SITE VAIIJES OF{}AS A HlNCZXCN OF SZhBIZZTY AND DLc)IQQKE G 200 400 500 600 800 1000 1200 1400 1600 1800 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 10000 11000 12000 13000 14000 15000 16000 0.1 0.2 0.3 0.4 0.5.0.6 0.7 0.9 1.0 1.1 1.2 1.6 1.9 2.2 2.5 2.8 3.1 3.4 3.7 4.0 4.3 4.7 5.0 5.3'.6 5.9 6.2 6.8 7.5 8.1 8.7 9.3 10.0 NE: 1.15E~3.48E&5 1.16E&5 1.14E&5 5.80E&6 3.79E&6 2.81E~2.16E~1.71E~1.39E&6 1.22E&6 1.02E&6 8.79E&7 7.76E&7 6.95EW7 6.29EW7 5.75E&7 5.29E&7 4.90E&7 4.59E&7.4.32EW7 4.08E&7 3.86E&7 3.66E&7 3.49E&7 3.33EW7 3.19EW7 2.97E&7 2.79EW7 2.62E&7 2.47EW7 2.34E&7 2i23E&7 2.22E~8.96E-05 4.20E&5 4.71E&5 2o9lEW5 1.83E&5 1.24E&5 8+98E~6.8IE&6 5.35E~3.93~6 2.09E&6 1.42E&6 1.20E&6 1.04E&6 9.03EW7 7.96E&7 7.07EW7 6.41E&7 6.01EW7 5.65EW7 5.33E&7 5.05EW7 4.79EW7 4.56EW7 4.35EW7 4.17E&7 3.88E&7 3.63E&7 3.41EW7 3.22EW7 3.04E&7 2.89EW7 3.67E~1.78E~1.25E~1.06E~7.02E&5 5.09EW5 3.86E&5 3o03E&5 2.44E&5 2.OIE&5 1.70E&5 l.18E&5 8.76EW6 6.9IE&6 5.59E&6 4.61E&6 3.87E&6 3.30E&6 2.86E&6 2.53E&6 2.25EW6 2.02E&6 1.82E&6 1.65EW6 1.50EW6 1.37E&6 1.26E&6 1.11E&6.9.76E&7 8.67E&7 7.76E&7 6.98EW7 6.32EW7 5.01E~3.02E~2.36E~2.02E~1.49E~1.16E~9.27EW5 7.58EW5 6.32E&5 5.44E&5 4.76E&5 3.53E&5 2.77EW5 2.24E&5 l.86EW5 1.56EW5 1.33E&5 1.15E&5 1.02EW5 9.25E&6 8.40E&6 7.66E&6 7.02E~6.45E&6 5.95E&6 5.51E~5.17E~4.62E&6 4.16E&6 3.76E&6 3.42E~3.12E&6 2.86E&6 5.03E~3.37E~2.80E-04 2.50EW4 1.94EW4 1.55E~1.27E~l.06E&4 9.14E-05 7.99EW5 7.05E&5 5.33EW5 4.24E&5 3.46E&5 2.87EW5 2.42E&5 2.07E-05 1.80EW5 1.65E&5 1.52E&5 1.41E&5 1.30E&5 1.2IZ&5 1.13E&5 l.06E&5 9.94E&6 9.47E&6 8.61EW6 7.88E&6 7.24EW6 6.68EW6 3.18E&6 5.74EW6 6.00EW4 4.73E&4 4.36EW4 3.82EW4 3.16E~2.65E~2.29E~2.01E~1.79E~l.60EW4E 1.44E~l.17E&4 9.80EW5 8.43EW5 7.19EW5 6.27E&5 5.51K&5 4.96EW5 4.50E&5 4.11E&5 3.76E&5 3.46E&5 3.19E&5 2.96EW5 2.75EW5 2.6IEW5 2.49EW5 2.28EW5 2.10EW5 1.94EW5 1.80E&5 l.67EW5 l.56EW5 6.45EW4 5.36E-04 5.46EW4 4.70E&4 4.22E&4 3.81E-04 3.46EW4 3.16EW4 2.88E-04 2.64E~2.43E-04 2.00E-04 1.67E-04 1.43E-04 1.23E-04 l.08EW4 9.99E-05 9.30E-05 8.68E-05 8.12E-05 7.61EW5 7.15EW5 6.74E-05 6.36EW5 6.07EW5 5.80EW5 5.55EW5 5.10EW5 4.71EW5 4.37EW5 4.06EW5 3.79E-05 3.54E-05 Offmite doses are calculated at 500 meters (0.3 miles), the mimihnzn dietarue.tn

'the exe3umon nxea-boundary

SC-420: 32.ATTACHMENT VII RMS PROCESS MONITOR CALIBRATION FACTORS AS OF 87~R-10 CONTAINMENT XODXNE: uCi/cc Iodine-131

=(~cpm/hour)(5.05 E-12)R-10B PIANT VENT IODINE: R-'11 uCi/cc Iodine-131

(~cpm/hour}(4.74 E-12)CONTAINMENT PARTICULATE:

uCi/cc as Cs>>137~(~l CONTAINMENT GAS: cpm)(2.54 E-12)R-1 uCi/cc as Xe-133 (PLANT VENT PARTICULATE:

uCi/cc as Cs-137 (PLANT VENT GAS: cpm)(5.6 E-8)cpm)(2.55 E-12)Calibration factors calculated based on Kr-85 and Xe-133 calibration factors.uCi/cc as Xe-133~(cpm)(3.3 E-8)AIR EJECTOR AND GLAN STEAM EXHAUST GAS: uCi/cc as Xe-133~(cpm)(1.36 E-6)uci/cc's normal gas mixture*(cpm)(5.0 E-8)R-6*Based on the mixture of noble gas present in the reactor coolant during the 01/25/82 tube rupture which is represent-ative of normal operations.

CONTAINMENT FAN COOLER SERVICE WATER uCi/cc as Cs-137~(cpm)(1.3 E-7)COMPONENT COOLING: uCi/cc as Cs-137 (cpm)(1.3 E-7)

I i 4 SC-420'33 RNS PROC'.SS MONITOR CALIBRATION FACTORS AS OF R-18 RADWASTE SYSTEM DISCHARGE:

uCi/cc as Cs-137 (cpm)(1.18 E-8)R-19 STEAM GENERATOR BLOWDOWN'Ci/cc as Cs-137 (cpm)(2.9 E-8)R-20 SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER: uCi/cc as Cs-137 (cpm)(2.9 E-8)R-21 RETENTION TANK: uCi/cc as Cs-137 (cpm)(1.01 E-8)~R-2 HIGH CONDUCTIVITY WASTE TANK: uCi/cc as Cs-137 (cpm)(8.84 E-9)R-31 STEAM LXNE RADIATION MONITOR: mr/hr (cpm)(2.03 E-2)STEAM LINE RADZAXTON MONITOR: mr/hr (cpm)(1.83 E-2)-36 CONTROL ROOM NOBLE GAS MONITOR: uCi/cc as Kr-85 (uCi/cc as Xe-133 (cpm)(2.16 E-8)cpm)(1.31 E-7)3-37.CONTROL ROOM PARTICULATE MONITOR: uCi/cc as Cs-137 (cpm)(2.63 E-13)P-38 CONTROL ROOM IODINE MONXTOR: uCi/cc as I-131~(cpm)(2.99 E-12)

ROCHESTER GAS AND ELECTRIC CORPORATIONS GINNA STATION CONTROLLED COPY NUHBER PROCEDURE NO.SC-421 REV.NO;6 DETERMINATION OF IODINE OR PARTICULATE ACTIVITY TECHNICAL REVIEW PORC REVIEW DATE PLANT SU RINTENDENT EFFECTIVE DATE QA X NON-QA CATEGORY l.O REVIEWED BY: TRIS PROCEDURE CONTAINS 6 PAGES I s~*l*f\k ll I j~~~lac b, I SC-421:1 SC-421 DETERMINATION OF IODINE OR PARTICUIATE ACTIVITY 1.0 PIJIU?OSE:

The determination of the airborne iodine concentration so as to determine resultant thyroid dose is extremely important during the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after a release.Therefore, the procedure consists of rapid sample collection and preliminary analysis of the particulate filters and iodine cartridges in the field.2'F 1 2'

REFERENCES:

Nuclear Emergency Response Plan SC-323, Emergency Off-Site Radiation Survey Teams SC-324, Emergency On-Site Radiation Survey Teams 3.0 INSTRUCTIONS:

3.1 3~1.1 3~1~2 3~1.3 3,.1.4 3~1.5 3.1.6 3~1.7 The following equipment will be available.

Combination particulate filter and cartridge holders.Glass fiber filters, 50 mm, Gelmari Type A/E or equivalent.

Silver zeolite cartridge for iodine collection, Science Applications, Inc.Type GY-130 or equivalent.

Battery operated count rate meter, 0-50, 000 cpm, audible alarm, rechargeable, Eberline model RM-14 or equivalent.

End window GM probe, alpha beta, gamma sensitive, Eberline model HP-190 or equivalent.

Off-site team air sampler, approximately 30 lpm flow rate using a glass fiber and silver zeolite cartridge, battery operated 12 volt, RADECO model H-809C or equivalent.

'n-site team low volume air sampler, battery operated, rechargeable, 4 lpm flow rate, Gilian model HFS-113T or equivalent,.

IP 4k+~

SC-421:2 3.1~8 3'Emergency Survey Center samplers,'attery operated, rechargeable, time, approximately 30 lpm using a glass fiber filter and silver zeolite cartridge, RADECO model H-809 B2 or equivalent.

'ff-Site Team Sam lin 3.2.1 3.2'3.2'3.2'33Install glass fiber filter and silver zeolite cartridge in the filter holder for the H-809C sampler.Screw filter holder into H-809C sampler.C Put on/off switch into"off" position.Connect power cables to 12 volt battery, red clamp to positive terminal and black clamp to ground.Turn on sampler and record start time and flow rate in lpm (in the field record book of survey sheet).Allow sampler to run for approximately ten minutes, shut off sampler and record stop time.Determine the liters of air sampled as follows: lpm x minutes sampled=liters 3'.8 3.2.9 3.2.10 Determine the background reading in cpm using the RM-14 and HP-190 probe and record the reading.If background in the area is>200 cpm, move to an area where the background is<200 cpm.If background

<200 cpm is difficult to locate, the Dose Assessment Manager can provide additional instructions.

Remove the particulate filter from the holder, place the HP-190 probe close to but not touching the filter, and record the reading.Determine the particulate activity as follows: filter-c m back round x 2.37 x 10=uCi/cc)liters NOTE: Minimum sensitivity for a 10 minute sample at 30 lpm, a 100 cpm net reading~and a probe efficiency of 1.94 is 7.9 x 10" uCi/cc.Remove the silver zeolite cartridge from the.holder, place the HP-190 probe against the inlet side of the cartridge and record the cpm,reading.

If the reading is off scale, determine the iodine activity per Step 3.2.13 instead of Step 3.2.12.

1~ty~4 l 4 y k X I'g J.>4I' SC-421:3 3.2.12 Determine the iodine activity as follows for probe against the inlet side of cartridge:.

c m cartrid e>>c m back round x 8.34 x 10"'uCi/cc ()liters NOTE'OTE: Minimum sensitivity for,a 10 minute sample at 30 lpm, a 100 cpm net reading and a probe efficiency of 0.54%is 2.8 x 10 uCi/cc.This is equivalent to 0.08 Rem Thyroid (0-2 hour)and 0.8 Rem Thyroid (1 day).The possibility exists that the background may be too high to determine a reading from the cartridge.

If this condition exists, move to a lower background area and re-survey the cartridge.

3.2.13 3.2.14 3.2'5 3~3 Determine the iodine activity as follows for the HP-190 probe one inch (one cartridge thickness) away from the inlet side of the cartridge.

c m cartrid e-c m back round x 2.37 x 10 7~uCi/cc ()liters Convert Iodine 131 Concentration to thyroid dose by the following formulas and mark on map.(uCi/cc Iodine)(3 x 10~)=Rem thyroid (0-2 hour)(uCi/cc Iodine)(3 x 10~)=Rem thyroid (1 day)Place filter and cartridge in the envelope, record the required information on the envelope and save for lab analysis.On>>Site team sam lin 3.3.1 3Install glass fiber filter and silver zeolite cartridge in the filter holder attached to the low volume sampler.Remove anti-tamper cover plate and place master ON/OFF switch in ON position.Th js switch also resets the time.The switch is located in the lower left hand corner.hh F 1'3 a 3%4 f P4~AI I l'i1

'3.3.3 33.3.5 SC-421'4 If charge status of unit is unknown, temporarily start unit and press the test button.<<BAT.<<LED should light indicating a charge of 954 or greater.If LED does not light, recharge unit before use.Replace anti-tamper cover.Unit is now ready for use.At start of sampling period record start time, Press test, record time in digital display and a flow of 4.0 LPM (unless unit has been reset at another flow rate).Turn unit on using ON/OFF'witch located to the right of the digital display.NOTE Master ON/OFF switch must be on for unit to operate.Master ON/OFF switch also resets time display.3.3.6 If the"FAULT" LED is lit.This was activated by either an undervoltage; overcurrent, or overpressure (restricted flow)beyond the units capability.

The motor is stopped and the time is latched.By pressing the"TEST" button, the time (in minutes)into sampling at which the fault occurred will be'displayed indica-ting a valid sample period.NOTE: The timer stops after 15-20 seconds into a fault condition to prevent unnecessary shutdown.33.3.8 3.3.9 At end of sampling period turn pump off using ON/OFF switch located to right of digital display.Press"TEST" button, record time in digital display, stop time and all other pertinent information on data sheet.Determine the background reading.in cpm using the RM-14 and HP-190 probe and record the reading.If the background in the area is>200 cpm, move to an area where the background is<200 cpm.If background

<200 cpm is difficult to locate, the Dose Assessment Manager can provide additional instructions.

Remove the particulate-filter from the holder, place the HP-190 probe close but not touching the filter and record the cpm reading.3.3.10 Determine the particulate activity as follows:.~~c m filter-c m bac roun x 2.37 x 10 8~uCi/cd.: ()volume in liters c, il 1'I NOTE: SC-421: 5 Minimum sensitivity for a 30 minute sample at 4 lpm, a 50 cpm net reading, a probe efficiency of 1.94 is 6 x 10"9 uCi/cc.3.3.11 3.3.12 Remove the silver zeolite cartridge from the holder, place the HP-190 probe against the inlet side of the cartridge and record the cpm reading.Determine the iodine activity as follows: c m cartrid e-c m back round x 8.34 x 10"=uCi/cc (")volume in liters NOTE: NOTE: Minimum sensitivity for a 30 minute sample at 4 lpm, a 50 cpm net readinc[and a probe efficiency of 0.544 is 2 x 10" uCi/cc.The possibility exists that the background may be too high to determine a reading from the cartridge.

If this condition exists, move to a lower background area and re-survey the cartridge.

3.3'3 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3'.5 3.4'3'a7~~Place the filter and cartridge on the envelope, record the required information on the envelope and save for lab analysis.Emer enc Surve Center and Technical Su ort Center~sam lln Install glass fiber filter and silver zeolite cartridge in the filter holder for the H-809 B2 sampler.Screw filter holder into H-809 B2 sampler.Move sampler to desired location.Set timer to 10 minutes.Start sampler and record time and flow rate in lpm.The sampler will automatically shut off in 10 minutes.Determine the liters of air sampled as follows: lpm x 10 minutes sampled=liters Determine the background reading in cpm using the RM-14 and HP-190 probe and record the reading.If the background in the area is>200 cpm, move to an area where the background is<200 cpm.If background

<200 cpm is difficult to locate, the Dose Assessment Manager can provide additional instructions.

V lg SC-421:6 3.4.8 3Remove the particulate filter from the holder, place the HP-190 probe close to but not touching the filter and record the cpm reading.Determine the particulate activity as follows: c m filter-NOTE: c m back round x 2.37 x 10"=uCi/cc)liters Minimum sensitivity for a 10 minute sample at 30 lpm a 100 cpm net reading, and a probe efficiency of 1.94 is 7.9 x 10"9 uCi/cc.3'.10 3'.11 Remove the silver zeolite cartridge from the holder, place the HP-190 probe against the inlet side if the cartridge and record the cpm reading.If the reading is off-scale, determine'the iodine activity per 3.4.12 instead of Step 3.4.11.Determine the iodine-activity as follows for probe against the cartridge:

c m cartrid e-c m back round x 8.34 x 10=uCi/cc ()liters NOTE: NOTE: Minimum sensitivity for a 10 minute sample at 30 lpm a 100 cpm net reading and a probe efficiency of 0.544 is 2.8 x 10 9 uCi/cc.This is equivalent to 0.08 Rem thyroid (0-2 hour)and 0.8 Rem Thyroid (1'day).The possibility exists that the background may be too high to determine a reading from the caxtridge.

If this condition exists, move to a lower background area and re-survey the cartridge.

32 3.4.13 3.5 Determine the iodine activity as follows for the HP-190 probe one inch (one cartridge thickness) away from the inlet side of the cartridge.

c m cartrid e-c m back round x 2.37 x 10 7=uCi/cc ()liters Place the filter and cartridge in an envelope marked with the time of sample, liters sampled, and location and save for lab analysis.For more accurate results, analysis may be performed'n the plant environmental lab with the GeLi and multichannel analyzer per PC-1.4.

Rochester Gas and Electric Corporation Inter-Office Correspondence July 18, 1986 SUSyZCT: Revisions to the Electric 6 Steam Production Nuclear EIIergency Offsite Response Procedures TO: Holders of the Electric&Steam Production Nuclear Emergency Offsite Response Procedures Manual Enclosed is a revised procedure for the Electric a Steam Production Nuclear EIIergency Offsite Response Procedures Manual.Manual holders should read the attached material and make the changes listed below.Superseded and deleted procedures should be destroyed and the attached acknowledgement form completed when these changes have been entered.Instructions for makin chan es Remove the follawin Index pages i, ii ESP 2/6, 2/7 ESP 3/1 ESP 4/3 ESP 5/1 through 5/C-3 ESP 8/1 ESP 10/4 ESP 16/4 I 16/5 ESP 17/2 ESP 19/1, 19/2, 19/3 ESP 20/1 Through 20/ll es: Insert the foU.awing es: Index pages i, ii ESP 2/6;2/7 ESP 3/1'ESP 4/3 ESP 5/1 through 5/C-3 ESP 8/1 ESP 10/4 ESP 16/4, 16/5 ESP 17/2 ESP 19/1 g 19/2 I 19/3 ESP 19/4 ESP 20 through 20/2 and Attachment 1 ESP 22/1 Jenn3.fer McAr11xe Qc inc Docum nt Os trol

ROCHESTER GAS AND ELECTRIC CORPORATION Inter Office Correspondence July 17, 1986

SUBJECT:

Revisions to Electric and Steam Production Nuclear Emergency Offsite Response Procedures TO: Document Control Replace Page Replace Pages Replace Page Replace Page Replace Pages Replace Page Replace Page Please distribute the attached changes as listed below:~~-i-Index I 2/6, 2/7 3/1 4/3 5/1 through 5/C-3 8/1 10/4 Replace Pages 16/4, 16/5 Replace Page Replace Pages 17/2 19/1, 19/2, 19/3 Insert Remove Insert.Insert Page Pages Pages Page 19/4 20/1 through 20/ll J 20 through 20/2 and Attachment 1 22/1 Attachments David W.Burke Corporate Emergency Planner 1 WII ELECTRIC AND STEAM PRODUCTION DEPARTMENT NUCLEAR EMERGENCY OFFSITE RESPONSE PROCEDURES Note: INDEX Revision of specific areas on each page is indicated by vertical lines in the right hand column.Vice President, Electric and Steam Production Reports to NRC Rev.3-Sept.1985 2~3~4~5.6.7~Corporate EOF/Recovery Manager Checklist Corporate Recovery Manager Call List Nuclear Operations Manager Checklist EOF-Dose Assessment Checklist Status Sheet Procedure EOF Communication and Support Personnel Instructions Rev.13-June 1986 Rev.6-June 1986 Rev.10-June 1986 Rev.8-June 1986 Rev.7-June 1984 Rev.3-July 1984 8.9~10.12.13.14.15.16.EOF/Recovery Center Setup Checklist DELETED Monthly Inspection of Equipment Checklist Monthly Communications Equipment Check.Radio Operation Procedure New York State"Hotline" (RECS)Operation and Test Procedure EOF Logs Emergency Operations Facility Training Program EOF/Recovery Center Continuous Manning Rev.5-June 1986 JULY 1984 Rev.4-June 1986 Rev.3-June 1984 Rev.3-Aug.1984 Rev.2-July 1984 Rev.1-Aug.1984 Rev.1-July 1984 Rev.6-June 1986 Revision 3 June 1986 i N f I NUCLEAR EMERGENCY OFFSITE RESPONSE PROCEDURES INDEX (Continued) 17.Emergency Operations Facility Quarterly Telephone Number Check 18.DELETED 19.EOF Telecopier Use 20.Monitoring Ginna Parameters 21.Corporate Spokesperson's Call-List.

22.Offsite Agency Liaison Call List Rev.2-June 1986 JULY 1984 Rev.3-June 1986 Rev.3-June 1986 Rev.2-Sept.1985 Rev.0-June 1986 Revision 3 June 1986 1-A I ,1 I E ESP 2/6 ATTACHMENT 2 E.O.F.KEY PERSONNEL CALL LIST 1)David K.Laniak (Advisory Group)2)Bruce A.Snow (Nuclear Operations) 3)Robert E.Smith (Engineering) 4)John H.Oberlies (Corporate Spokesperson)

John C.Noon (Corporate Spokesperson) 5)Wilfred J.Schrouder, Jr.(Facilities and Personnel) 6)Richard A.Sullivan (Public Relations) 7)Bernard R.Quinn (Offsite Health Physicist) 8)Howard E.Rowley (Offsite Agency Liaison)9)David N.Burke (Corporate Emergency Planner)V Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Beeper: Office: Home: Office: Home: Beeper: Office: Home: 4t=","x.'880'I 77-3>8')>>~

x P~', 7"Oi'f-0>8 Revision 13 June 1986 II'r r t II~I~O I b~<~>&~PP)R'$~Q

@m+gp ggQ~A'~425>"-~~K t'~yl I Qt~~..i~g tI~$A'k ATTACHMENT 2 E.O.F.KEY PERSONAL CALL LIST ALTERNATES ESP 2/7 Bruce A.Snow (Recovery Manager)1)Richard E.Phillips (Advisory Group)2)Wesley H.Backus (Nuclear Operations) 3)Robert C.Mecredy (Engineering) 4)a.John E.Arthur (Engineering) b.John.C.Noon (Corporate Spokesperson)

Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: Office: Home: I I 8 8 5)Jeffrey W.Peters (Facilities and Personnel) 6)Jack Jennejahn(Public Relations) 7)Nelson A.Kiedrowski (Offsite Health Physicist) 8)Beth King (Offsite Agency Liaison)Office: Home: Office: Home: Office: Home: Office: Home:$8.8 Ex.8w~.69 15-52>=8 Revision 13 June 1986 1 L I c;JI I l' ESP 3/1 NUCLEAR EMERGENCY OFFSITE RESPONSE CORPORATE RECOVERY MANAGER CALL LIST 1~0 PURPOSE: 1.1 To provide the Vice President of Electric and Steam Production and Superintendent of Nuclear Production a readily available listing of phone numbers to be used during a nuclear emergency.

2.0 REFERENCE 2.1 Nuclear Emergency Response Plan 3.0 INSTRUCTIONS 3.1 Call sequence and phone numbers: Extension Residence 3.1.1 Chairman of the Board 3.1.2 President 3.1.3 Executive Vice President 3.1.4 Manager of Public Relations 8 89'80, 8 72---"."-4 67'-558 377-38.,-'.1.5 Plant Protection Department-Kodak Park-'2'"t 3.1.6 3.2 Institute of Nuclear Power Operations (INPO)Emergency Call Number for"Alert and Above" action levels 0~;9$'3"-..09gO~

The Ginna Plant Nuclear Safety Audit and Review Board shall be called into session as a result of the emergency.

Revision 6 June 1986 I'I I'<'eb C'I ESP 4/3 NUCLEAR OPERATIONS CALL'LIST NAME HOME PHONE BUSINESS PHONE Wesley Backus Jack Paris Frank Aman Bertha Gohl Y Michelle Fideor 6-3'8'--'1$.gl)%..4M&.'.~~.Don Wilbert 5"'AIR'$Greg Joss Melvin Sexton"'"""""'"~

"9+'~'G~nna'x~7 z na<Charlotte Buckman'Ex't.0 ALTERNATES Don Travis Andy MacNamara Amy Jo Spurles Dewey Horning Charlie Anderson 82-3835..'a 6-392-.2665;,--54'6-Ext.3'15 524 7148 71 30.2 098 2700.x.19 1'6-"3-'59-1499-'

""':~2~0'6%'.;-: z~nn;'F T.**Ginna numbers may be dialed direct from the main o f f ice or by dialing 9-524-4446 and giving the operator the extension.

Revision 10 June 1986 t/, ee.aeemw'1't~+~~~I~%44QR~~~~~'P+P.'g 4PSMQR~~Jgpegl+A4DW 448 pj4t~~%4PVC 440llt~~.WIROPf J.~gWQiia@5kg{j~<~e%iH)r.~5~

gp~~g g~dhj~3@fi¹~~)eVi4i~r

~gtg@g g~~~"'~~)~~~yv,,+

~~~~~sh~;~

~mi2~m~'Wsa;~w~4~

r' ESP 5/1 NUCLEAR EMERGENCY OFFSITE RESPONSE EOF DOSE ASSESSMENTS CHECKLIST 1.0 PURPOSE: 1.1 To provide a method for estimating post-accident radiation doses to the public based upon the meterological and radio-logical information collected at and in the vicinity of Ginna Station.1.2 The EOF Dose Assessment team should initially service as a support group to the Ginna TSC during the early postaccident phase;assisting in a paralled effort to ascertain out-of plant radiological conditions.

Initially, the TSC maintains lead responsibility for providing recommendations to the Emergency Coordinator, Nuclear Operations Managerand Corporate Recovery Manager concerning protective actions to be taken.EOF Dose Assessment assumes lead responsibility only when conditions in Step 3.7 are met.

2.0 REFERENCES

2.1 Nuclear Emergency Response Plan.2~2 SC 4 2 0 I"Tab 1 es of Protective Action Guides" and f igures showing projected exposure.3.0 INSTRUCTIONS:

3.1 Upon notification by EOF/Recovery Manager of an emergency at Ginna Station, the Dose Assessment Manager shall notify following personnel to institute the Appendix B call list: Robert Burton Dudley Schuyler Wendel Knoll&E'--86-1824":, RG&E-24Q-'2224,,-,--RG'Ext:..--:8: 9 Ext.4042 813:~3.2 Assure that communications equipment is operable, preferably by a communications aide;this includes: (a)Dose Assessment Direct Phone to TSC Dose Assessment (yellow phone-center desk)(b)Two Centrex telephones.

Revision 8 June 1986

I pl."A iC p w (c)Health Physics Network (HPN)Telephone (center desk).(d)Dose Assessment VHF Radio (communications desk).(e)RG&E telephone extension,,(8097 side desk).(f)Bearcat Scanner (communications desk).3'.1 3(g)NYS Hotline (red phone-center desk).(h)Ginna Ext.598 (side desk)Contact TSC Dose Assessment Area and notify Health Physicist that.the EOF Dose Assessment Staff is available to begin assisting in offsite evaluation efforts.Obtain meteorological and radiological data available from TSC and/or from the MV-8000 computer link (including wind speed, direction and atmospheric stability inform-ation, effluent and area monitor readings and any available field measurements).

3.4 Initiate plotting of data on appropriate status boards and maps located in the EOF Dose Assessment Area.k 3.5 Commence dose projection efforts as specified in Ginna Station procedure SC-420"Supplementary Dose Calcula-tions" may also be performed using alternate techniques.

3~6 Based upon plant status, pro j ected or actual o f f site radiological 1evals and pro j ected exposure times, determine the appropriate protective actions (e.g.she-ltering, evacuation to be recommended to the Corporate Recovery Manager).Confirm with the TSC Dose Assessment group.(Refer to Protective Action Guides in Table IV SC-420).4 Rev.8 June 1986 k@1$1f'I 14 I II k 3'The EOF Dose Assessment Group is to assume primary responsibility dose projections, coordinating offsite surveys and protective action recommendations from the TSC only if the following conditions are met: (a)Minimum EOF Dose Assessment manpower is attained:*lead dose assessment individual

  • assistant dose assessment individual
  • communications aide*courier*plotter (b)Establishment of satisfactory flow of current information regarding plant status, plant effluent and area monitors, meteorological conditions, and survey team data.(c)Communications established with survey teams, preferably direct radio contact, or indirect via relay from TSC.(d)Verification that the Corporate Recovery Manager and the TSC Dose Assessment Group are cognizant of shift in dose assessment responsibility to the EOF.(e)Verif ication that minimal backup support can be maintained at Ginna TSC to assist in dose assessment effort should flow of information to EOF be disrupted.

3.8 Two additional field monitoring teams may be dispatched from the EOF to supplement offsite survey efforts.The methodology and predesignated survey routes are included in Appendices A through C attached.Specific survey routes will be confirmed prior to team departure from EOF.3.9 EOF survey teams shall be advised by the lead dose assessment individual of survey routes, checkpoints, communications, and protective equipment to be used in the field, prior to leaving the EOF.All survey teams shall sign out on survey team status board.

wl ESP 5/A-1 APPENDIX A SUPPLEMENTAL OFFS1TE SURVEY ROUTES 1.0 EOF Surve Team-1 Lon-ran e Route EOF-1 1.1.1 Take 490 East to 590 North.(If rush hour, alternate route can be Culver to Atlantic Avenue.)1~1.2 1.1.3 1.1.4 Take Browncroft Blvd.exit, head east to Creek Street.Head north on Creek Street, continue to intersection of Creek and Empire Boulevard.(Eastway Plaza).Cross intersection and proceed to Sibley's Eastway.Set up air sampler and commence operation (note start time and initial totalizer reading).Continue on Bay Road heading.north.1.1.5 1.1.6 l.1.7 1.1.8 Follow Bay Road North to Lake Road and turn west.Continue west on Lake Road proceeding onto Seabreeze expressway (Route 590 S)heading south.Take Route 404 Webster exit (East), and head east on Empire Boulevard.

Retrieve air sampler at Sibley's Eastway.Report air sample data and request further instructions.

1.2 Short-ran e Route EOF-1 1.2~1 1~2.2 Take East Avenue to Culver Road, turn north on Culver.Proceed on Culver to Empire Boulevard.

Start air sample (note start time and initial totalizer reading).Let sampler run for approximately 30 minutes.Report results to Dose Assessment.

1.2.3 Proceed northwest on Waring Road to Norton Street.Turn west on Norton.1~2.4 Continue to Portland Avenue, turn left.1.2.5 Head south on Portland to North Street Rev.8 June 1986 L v!ll 4)'

ESP 5/A-2 1.2.6 Follow North Street to East Avenue 1.2.7.Request further instructions.

2'EOF Surve Team-2 2.1 Lon-ran e Route EOF-2 2~1~1 Take 490 East, continue through"can of worms" to Route 441 (Linden Avenue)exit.(If rush hour, alternate route can be East Avenue to Linden).2.1.2 2.1.3 2'.4 Follow 441 through Penfield village, to Route 250 intersection.(Penfair Plaza).Set up air sampler at Penfair Plaza and commence operation (note start time and initial totalizer reading).Continue east on Route 441 to Harris Road.Turn north on Harris Road, and proceed to Atlantic Avenue.2.1.5 2.1~6 2.1.7 Turn west on Atlantic, and continue to Route 250 intersection (Webster-Fairport Road).Turn left.Return to Penfair Plaza on Route 250, retrieve air sampler and report readings to Dose Assessment.

Request further instructions.

2.2 Short-ran e Route EOF-2 2'.1 2.2'Take Monroe Avenue, hea'ding southeast to the 12 Corners.Commence air sample at 12 Corners (note start time and initial totalizer reading).Let sampler run for approximately 30 minutes.Report results to Dose Assessment.

2'.3 222'.6 Turn north on Winton Road, proceed to Main Street.Turn west on Main Street, follow Main to Culver Road.Turn south on Culver, and proceed to East Avenue.Request further instructions.

Rev.8 June 1986 V l~

APPENDIX B ESP 5B/1*MESSAGE*Is this the residence?

May I speak to (called individual)"There is a SITE EMERGENCY AT GINNA STATION.Report to the EOF Dose Assessment Area immediately.

I repeat, report to the EOF Dose Assess-ment Area immediately.

Do you understand'P~~

If individual does not answer the telephone, ask for him/her.proper entry on tally sheet.TALLY SHEET Make NAME TELEPHONE WORK HOME TIME INDIVIDUAL AT HOME YES-NO NO ANS.M.V.BURGESS R.M.BURTON D.D.DAKIN~~C.H.FINK N.A.KIEDROWSKI

<<3~1~5=%4:2.8-4 W.L.KNOLL S.T.MAC INTYRE i2>D.J.MONEY J.F.PAS UINI i 7'"-=~~,-l9-'-'-2 87'>>8~9"'5=7-"6,3 J.J.PRILL E.W.PRYTHERCH B.R.UINN 89'2'46-'-XL5'- 20 K.M.SAHLER D.N.SCHUYLER 86--8 G.A.THORNE J.L.WILLIAMS 2-~4 TELEPRO Revision 8 June 1986 A,~I l I'\W ESP 5/C-1 APPENDIX C FIELD CALCULATIONS FOR LOW VOLUME AIR SAMPLES USING RM-14 1)Particulate

-Filter Removed from Holder: CPM Sam le-CPM BKG 2.4 X 10=~=(Volume of Sample in~CC uCi/cc Particulate 2)Iodine-Cartridge Inlet Face to Probe-End Cap Removed: 'PM Sam le-CPM BKG 8.34X10-g (Volume of Sample in CC)uCi/cc Iodine TAKING LOW VOLUME SAMPLE: LOW VOLUME AIR SAMPLER CHECK: 1.RECORD: Date, Time, Location, and Totalizer Reading (A).2.Turn Unit, ON and sample for approximately 30 minutes.3.Turn Unit OFF-RECORD: Date, Time, Location&Totalizer Reading (B).~~4.Sample Volume=(B-A)(Calibra-tion factor)=cc.NOTE: Calibration Factor is noted on side of sampler.5.Read filters with RM-14 and save in marked envelopes.

1.Connect Battery Pack to Pump Unit.2.Turn switch ON-Check flow meter for movement.3.Turn Unit OFF.4.INSURE Filter Assembly contains a GY-130 cart-ridge and a particulate filter before taking sample.RADECO H 809C HIGH VOLUME AIR SAMPLER CHECK'.Connect cables to power source, Red clip to positive and Black clip to negative.2.Turn on switch and check flow meter, flov meter vill be off scale high with no filters in place.3.Turn unit off.4.Insure filter assembly contains a GY-130 cartridge and a partic-ulate filter.Rev.8 June 1986

'I g J APPENDIX C CONT'D ESP 5/C-2 TAKING RADECO HIGH VOLUME AIR SAMPLE'.Record: Date, Time and Location 2.Turn unit on and sample for 10 minutes.3.Record the flow rate in cfm.(Normal is 1.5 cfm).4.Sample volume=flow rate in cfm Z minutes sampled.5.Read filters with RM-14 and save in marked envelopes.

FIELD CALCULATIONS FOR HIGH VOLUME AIR SAMPLES USING RM-14: 1.Particulate

-Filter removed from holder: CPM Sam le-CPM BKG 8.38 X 10 uCi/cc Particulate 2.Iodine-Cartridge Inlet Face to Probe: CPM Sam le-CPM BKG 3.0 X 10:g w uCi/cc Iodine-131 Rev.8 June 1986

ESP 5/C-3 APPENDIX C CONT'D RADIO USE PROCEDURE 2~3~4~5~6.7~8.9~Extend antenna full (if necessary).

Channel selector on Channel 3.Turn unit ON.Adjust squelch.Depress switch to transmit, call"Technical Support Center" or"EOF/Recovery Center".Speak in normal voice, slowly and distinctly, into speaker/mike.

Release switch to receive.Base station will terminate with its call sign.If during a drill-precede all calls with,"This is a Drill".AUTO DIGI-MASTER DOSE RATE METER 1.Turn unit ON.2.Take readings noting if they are MR/HR or R/HR.NOTE'NIT READS OUT EVERY 2 SECONDS.Rev.8 Zune 1986 it Elk'h (rg\

ESP 16/4 ATTACHMENT II EOF/RECOVERY CENTER POSITION QUALIFICATION LIST'a)(b)(c)(d)(e)Recover Mana er: (1)Roger W.'ober (2)Bruce A.Snow Adviso Su ort Mana er: (1)Dave Laniak (2)Richard Phillips Nuclear 0 erations Mana er: (1)Bruce A.Snow (2)Wesley H.Backus En ineerin Su ort Mana er: (1)Robert Smith (2)Robert C.Mecredy Facilities and Personnel Mana er: (1)Wilfred J.Schrouder, Jr.(2)Jeffery W.Peters (f)Public Relations Mana er: (1)Richard Sullivan (2)Jack Jennejahn (g)Cor orate S okes erson: (1)John Oberlies (2)John E.Arthur (3)John C.Noon (h)Offsite Dose Assessment Mana er (1)Bernard Quinn (2)Nelson A.Kiedrowski Offsite A enc Liaison (1)Howard E.Rowley (2)Beth S.King Cor orate Emer enc Planner (1)David W.Burke Revision 6 June 1986

-14 4's t'P I, 4'~l ESP 16/5 EOF/RECOVERY CENTER POSITION QUALIFICATION LIST (cont.)(k)EOF Recover Center Betty Gohl Michelle Fideor Amy Jo Spurles Michelle Fideor Charlotte Buckman Jack Paris Donald Buehlman Don Wilbert Andrew McNamara Donald Travis Frank Aman Mail Room Mail Room Mail Room Greg Joss Dewey Horning Donald Travis Charlie Anderson Andrew McNamara Melvin Sexton Su ort Personnel: (Secretary, Recovery Manager)(Receptionist, Check-In)(Receptionist

-Alternate)(Telecopier

-Outgoing Only)(Telecopier

-Incoming Only)(Communications)(Communications)(Communications)(Communications (Communications)(Communications)(Courier)(Courier)(Courier)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper)(Status Board Keeper).(Plant Computer Operator)(Plant Comput: er Operator)Offsite Dose Assessment Personnel:

M.V.D.D.S.T.D.J.J.F.J.J.C.H.W.L.E.W.P.K.K.M.D.N.J.L.Burgess Dakin MacIntyre Money Pascpxini Prill Fink Knoll Prytherch Humphrey Sahler Schuyler Williams Survey Team Survey Team Survey Team Survey Team Survey Team Survey Team Midas Operator Data Poster Radioman Communications Communications Weatherman Calculator Revision 6 June 1986

$1 ESP 17/2 ATTACHMENT I UARTERLY TELEPHONE NUMBER CHECK 1.Section (Check One)Recovery Manager Engineering Support Manager Public Relations Manager Ginna Station SC-600 to SC-606 Inclusive Nuclear Operations Manger Security Manager Facilities and Personnel Manager Advisory Support Manager Offsite Agency Liaison 2~Our phone number list was checked on (date)No changes are required Attached or is a revised copy of the phone list.(initial)(initial)3.Forward completed form to Corporate Emergency Planner.Revision 2 June 1986 ca rill'1 I'lX'P , 4 NUCLEAR EMERGENCY OFFSITE RESPONSE PROCEDURES ACCESS TO GINNA WEATHER TOWER ESP 20/1 1.0 PURPOSE: This procedure provides instructions for interpreting and accessing data in the MIDAS storage computer in the Meteorlogical Tower Trailer.2.0 2.1 2~1.1 22.1.3 INSTRUCTIONS:

Set up for TI-Silent 700 in the EOF, 49 East Avenue.On/Off-push switch to forward position (located top right corner)On Line-depressed to right Dial-9-524-5711.

When computer tone is heard, insert phone in acoustic coupler with mouthpiece to the left.Wait for the word"connected" to be printed.Enter command AV77[return]to print all last 15 minute averages.To sign off, hang up phone and the word"disconnected" will be printed.There are short time periods when the phone connections are disabled while internal calculations are taking place.Whenever the 1200 BAUD line is in use, the 300 BAUD line is disabled.Normal communication times from the master MIDAS computer is a 30 minute period centered around 3: 30, 7: 30 and 11: 30 EST.2'~4 To obtain: Last 15 minute average-Type AVXX[RETURN]Last collected value-Type PPXX[RETURN]NOTE: If ILLEGAL REQUEST appears, retype the command again.Illegal request is returned if the command was typed wrong or a spurious character was included, i.e.-line feed.For AVXX printout: XX 01 02 04 10 20 40 77 Prints Prints Prints Prints Prints Prints Prints all speed averages all direction averages all temperature averages all delta temperature averages miscellaneous averages rain averages all averages Revision 3 June 1986

~~141 For PPXX printout: ESP 20/2 Channel XX Number 01 02 03 04 05 08 09 10 ll 12 14 15 16 17'8 19 20 21 22 23 24 25 32 Name WS 33A WS 33B WS 150A WS 150B WS 250 WD 33A WD 33B WD 150A WD 150B WD 250 TER 33A TER 33B TE 150A TE 150B, TE 250A TE 250B DT 150A DT 150B DT 250A DT 250B DEW 33 TEG 33 RAIN INTERPRETATION OF DATA 15 min.averages for'01-15 min;16-30 min;31-45 min;46-60 min.WS WD TE DT DEW TEG RAIN NAME AVGE ST.DEV MIN.MAX.I MNDR AVRN CNT Wind Speed-Average divided by 10=measured value Wind Direction-Average is read directly Temperature

-Average divided by 10='measured value Delta Temperature

-Average divided by 10=calculated value Dewpoint Temperature

-Average divided by 10 measured value Ambient Temperature at Dewpoint Monitor-Average divided by 10=measured value Rainfall-Average divided by 100=accumulated inches of rain Parameter and height in meters on tower Average of values collected in last 15 minutes average Standard deviation of average'data Minimum value for last 15 minute average Maximum value for last 15 minute average Index code: 0=Good;1=Questionable; 2=Bad;3=Unsteady wing data;4=Calm Wind;5=Flat direction Meander range for wind direction Average of meander range No longer used for data Revision 3 June 1986

<cA Il I't, I I 4 r ATTACHMENT I P']7ff R P~IA'I i so y'f sf~~~(OIL'I'CITE ROCHESTER GAS AND ELECTRIC CORPORATION

~89 EAST AVENUE, ROCHESTER, N.Y.14649-0001

<f LC>w04f i~fa cooa fib 546-2700 May 20, 1986 Mr.James Papile Radiological Emergency Preparedness Group Empire State Plaza 22nd Floor, Corning Tower II Albany, NY 12237~l Dear This letter is to inform you that the"Ginna Access" system for monitoring plant conditions is not available while the new Plant Parameter Computer System (PPCS)and Safety Assessment System (SAS)is being installed.

According to our computer people some form of"Ginna Access" will again be available, later in the year.In the interim you have been supplied with appropriate phone numbers.If you have any questions on this letter do not hesitate to call me on (716)724-8022.Sincerely,/David W.Burke Corporate Emergency Planner Copies: Mr.B.A.Snow Mr.D.L.Piede l~

OFFSITE AGENCY LIAISON CALL LIST ESP 22/1 1.0 PURPOSE: To=provide the Offsite Agency Liaison with phone numbers to alert RG&E advisors to the New York State, Monroe and Wayne County Emergency Operations Centers.2.0 INSTRUCTIONS:

4 2.1 Upon notification by the EOF/Recovery Manager of an emergency at Ginna Station, notify the following personnel to standby or report to their respective EOC post,.2.1.1 J.Robert Brown (N.Y.S.)Office: Home: 7'2 4 6 82-8=: unuse, 2~1.2 2~1.3 James F.Sweet (Wayne)Raymond B.Junot (Monroe)Office: Home: Office: Home: 5 6-2700 ex.71-283 815 483-6 334-2690 Revision 0 June 1986

~\w 1 fJ