{{#Wiki_filter:~~REGULATLINFORMATION DISTRIBUTION
{{#Wiki_filter:~~REGULA TL INFORMATION DISTRIBUTION)STEM (AIDS)
)STEM(AIDS)


==SUBJECT:==
==SUBJECT:==
Discusses statusofplanstoperformfullscaletesttoconfirmoscillati'on loadspecs,Requestswitnesstestrunsduringweekof791112.Test matrix8,planwillbeforwarded inSept.DISTRIBUTION CODE:BOOIBCOPIESRECEIVED:LTR gENCL5SIZE:TITLE:PSAR/FSAR AMDTSANORFLATEDCORRESPONDENCE
Discusses status of plans to perform full scale test to confirm oscillati'on load specs, Requests witness test runs during week of 791112.Test matrix 8, plan will be forwarded in Sept.DISTRIBUTION CODE: BOOIB COPIES RECEIVED:LTR g ENCL 5 SIZE: TITLE: PSAR/FSAR AMDTS ANO RFLATED CORRESPONDENCE
~NOTES:5'E~~2<E',~Qg~+I'+Bg~/~2>Ti5.l.~8.g~E'G'E'+$7///LD'Cr COPIESRECIPIENTCOPIESLTTRENCLIDCODE/NAME LTTRENL1AO1LALEER4f/]IRECIPIENT IOCODE/NAME 05PMPf/4'EgBCACTION;ACCESSION NBR:7908060256 OQCSEDATE:79/07/31NOTARIZED:
~NOTES: 5'E~~2<E',~Qg~+I'+B g~/~2>Ti5.l.~8.g~E'G'E'+$7///LD'Cr COPIES REC IP IENT COPIES LTTR ENCL ID CODE/NAME LTTR EN L 1 AO 1 LA LEER 4f/]I RECIPIENT IO CODE/NAME 05 PM Pf/4'Eg BC ACTION;ACCESSION NBR:7908060256 OQC SEDATE: 79/07/31 NOTARIZED:
'40DOCKETFACIL'uehanna SteamElectricStation>Unit1<Pennsylva 0500038750388SquehannaSteamElectricStationRUnit2RPennsylva 05000388UAUTHORAFFILIATION CVRTISEN,A.
'40 DOCKET FACIL'uehanna Steam Electric Station>Unit 1<Pennsylva 05000387 50 388 S quehanna Steam Electric StationR Unit 2R Pennsylva 05000388 U AUTHOR AFFILIATION CVRTISEN,A.
Pennsylvania PowerRLightCo.CIP~NAMERECIPIEN1'FFILIATION PARRROF0'ight'taterReactorsBranch3INTERNAL:
Pennsylvania Power R Light Co.C IP~NAME RECIP IEN1'FFILIATION PARRRO F 0'ight'tater Reactors Branch 3 INTERNAL: 01 0 I 8 E 09 GEOSCIEN BR 11 MECH ENG BH 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR.20 I 8 C SYS BH 22 AD SITE TECrl 27 EFFL TRT SYS 29 KIRKAOOO AO PLANT SYS AO SITE ANALYSIS HYDRO METEOR BR OELD EXTFRNAL: 03 LPOR 30 ACRS 1 10 1 02 NRC PDR 08 OPERA LIC BR 10 GAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 PQSvER sYs BR 26 ACCONT ANLYS 28 RAO ASMT BR AD FOR ENG AO REAC SAFETY DIRECTOR NRR MPA Oa NSIC AUG 8 1979 LQ rrleo'RE E/6'A HC cEEQ,H gag~w L/9 C7 TOTAL NUMBER OF COPIES REQUIRED: LTTR 5&E'kCL Op PPaL~e TWO NORTH NINTH STREET, ALLENTOWN, PA.18101 PHONE((2 I5)821-5151 July 31, 1979 Director of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, DC 20555 ATTN: Mr.Olan D.Parr, Chief Light Water Reactors Branch No.3 gggg~~8/(g p((L'gpss SUSQUEHANNA STEAM ELECTRIC STATION CONDENSATZON OSCILLATION TESTING SCHEDULE ER 100450 FILE 840-2, 172 PLA-386  
010I8E09GEOSCIENBR11MECHENGBH13MATLENGBR16ANALYSISBR18AUXSYSBR.20I8CSYSBH22ADSITETECrl27EFFLTRTSYS29KIRKAOOOAOPLANTSYSAOSITEANALYSISHYDROMETEORBROELDEXTFRNAL:
03LPOR30ACRS110102NRCPDR08OPERALICBR10GAB12STRUCENGBR15REACSYSBR17COREPERFBR19CONTAINSYS21PQSvERsYsBR26ACCONTANLYS28RAOASMTBRADFORENGAOREACSAFETYDIRECTORNRRMPAOaNSICAUG81979LQrrleo'REE/6'AHCcEEQ,Hgag~wL/9C7TOTALNUMBEROFCOPIESREQUIRED:
LTTR5&E'kCL OpPPaL~eTWONORTHNINTHSTREET,ALLENTOWN, PA.18101PHONE((2I5)821-5151July31,1979DirectorofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, DC20555ATTN:Mr.OlanD.Parr,ChiefLightWaterReactorsBranchNo.3gggg~~8/(gp((L'gpssSUSQUEHANNA STEAMELECTRICSTATIONCONDENSATZON OSCILLATION TESTINGSCHEDULEER100450FILE840-2,172PLA-386


==DearMr.Parr:==
==Dear Mr.Parr:==
ZnourMarch23,1979andJuly16,1979meetingswithyou,weoutlinedourplanstoperformafullscaletesttoconfirmthecondensation oscillation loadspecification tobeusedontheSusquehanna SESPlant.Thistestisbei.ngplannedbyKraftwerk UnionandwillberunattheGKMfacilityinMannheim, FederalRepublicofGermany.WeplantoforwardthetestmatrixandplantoyouduringthesecondweekofSeptember.
Zn our March 23, 1979 and July 16, 1979 meetings with you, we outlined our plans to perform a full scale test to confirm the condensation oscillation load specification to be used on the Susquehanna SES Plant.This test is bei.ng planned by Kraftwerk Union and will be run at the GKM facility in Mannheim, Federal Republic of Germany.We plan to forward the test matrix and plan to you during the second week of September.
Wealsoinviteyoutoviewtheperformance ofsomeofthetestruns.Atthepresenttime,theweekofNovember12,1979appearstobetheoptimumtimetowitnessthetests.WewillkeepyouinformedofanychangestoourplansandschedulefortheGKM-ZIMtestingprogram.Verytrulyyours,Qvv$N.W.CurtisVicePresident
We also invite you to view the performance of some of the test runs.At the present time, the week of November 12, 1979 appears to be the optimum time to witness the tests.We will keep you informed of any changes to our plans and schedule for the GKM-ZIM testing program.Very truly yours, Qvv$N.W.Curtis Vice President-Engineering a Construction DFR: dah A@1 PENNSYLVANIA POWER 8 LIGHT COPAPANY 7908 060+}}
-Engineering aConstruction DFR:dahA@1PENNSYLVANIA POWER8LIGHTCOPAPANY7908060+}}

Revision as of 04:09, 6 July 2018

Discusses Status of Plans to Perform Full Scale Test to Confirm Oscillation Load Specs.Requests Witnessing of Test Runs During Week of 791112.Test Matrix & Plan Will Be Forwarded in Sept
ML18031A206
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1979
From: CURTIS N W
PENNSYLVANIA POWER & LIGHT CO.
To: PARR O D
Office of Nuclear Reactor Regulation
References
PLA-386, NUDOCS 7908060256
Download: ML18031A206 (2)


Text

~~REGULA TL INFORMATION DISTRIBUTION)STEM (AIDS)

SUBJECT:

Discusses status of plans to perform full scale test to confirm oscillati'on load specs, Requests witness test runs during week of 791112.Test matrix 8, plan will be forwarded in Sept.DISTRIBUTION CODE: BOOIB COPIES RECEIVED:LTR g ENCL 5 SIZE: TITLE: PSAR/FSAR AMDTS ANO RFLATED CORRESPONDENCE

~NOTES: 5'E~~2<E',~Qg~+I'+B g~/~2>Ti5.l.~8.g~E'G'E'+$7///LD'Cr COPIES REC IP IENT COPIES LTTR ENCL ID CODE/NAME LTTR EN L 1 AO 1 LA LEER 4f/]I RECIPIENT IO CODE/NAME 05 PM Pf/4'Eg BC ACTION;ACCESSION NBR:7908060256 OQC SEDATE: 79/07/31 NOTARIZED:

'40 DOCKET FACIL'uehanna Steam Electric Station>Unit 1<Pennsylva 05000387 50 388 S quehanna Steam Electric StationR Unit 2R Pennsylva 05000388 U AUTHOR AFFILIATION CVRTISEN,A.

Pennsylvania Power R Light Co.C IP~NAME RECIP IEN1'FFILIATION PARRRO F 0'ight'tater Reactors Branch 3 INTERNAL: 01 0 I 8 E 09 GEOSCIEN BR 11 MECH ENG BH 13 MATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR.20 I 8 C SYS BH 22 AD SITE TECrl 27 EFFL TRT SYS 29 KIRKAOOO AO PLANT SYS AO SITE ANALYSIS HYDRO METEOR BR OELD EXTFRNAL: 03 LPOR 30 ACRS 1 10 1 02 NRC PDR 08 OPERA LIC BR 10 GAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 PQSvER sYs BR 26 ACCONT ANLYS 28 RAO ASMT BR AD FOR ENG AO REAC SAFETY DIRECTOR NRR MPA Oa NSIC AUG 8 1979 LQ rrleo'RE E/6'A HC cEEQ,H gag~w L/9 C7 TOTAL NUMBER OF COPIES REQUIRED: LTTR 5&E'kCL Op PPaL~e TWO NORTH NINTH STREET, ALLENTOWN, PA.18101 PHONE((2 I5)821-5151 July 31, 1979 Director of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, DC 20555 ATTN: Mr.Olan D.Parr, Chief Light Water Reactors Branch No.3 gggg~~8/(g p((L'gpss SUSQUEHANNA STEAM ELECTRIC STATION CONDENSATZON OSCILLATION TESTING SCHEDULE ER 100450 FILE 840-2, 172 PLA-386

Dear Mr.Parr:

Zn our March 23, 1979 and July 16, 1979 meetings with you, we outlined our plans to perform a full scale test to confirm the condensation oscillation load specification to be used on the Susquehanna SES Plant.This test is bei.ng planned by Kraftwerk Union and will be run at the GKM facility in Mannheim, Federal Republic of Germany.We plan to forward the test matrix and plan to you during the second week of September.

We also invite you to view the performance of some of the test runs.At the present time, the week of November 12, 1979 appears to be the optimum time to witness the tests.We will keep you informed of any changes to our plans and schedule for the GKM-ZIM testing program.Very truly yours, Qvv$N.W.Curtis Vice President-Engineering a Construction DFR: dah A@1 PENNSYLVANIA POWER 8 LIGHT COPAPANY 7908 060+