Discusses Status of Plans to Perform Full Scale Test to Confirm Oscillation Load Specs.Requests Witnessing of Test Runs During Week of 791112.Test Matrix & Plan Will Be Forwarded in Sept
ML18031A206
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
PLA-386, NUDOCS 7908060256
Download: ML18031A206 (2)


Text

~

REGULA TL INFORMATION DISTRIBUTION

~ )STEM (AIDS)

SEDATE:

ACCESSION NBR:7908060256 OQC 79/07/31 NOTARIZED: '40 DOCKET FACIL'uehanna 50 388 S quehanna Steam Steam Electric Station> Unit Electric StationR Unit 1<

2R Pennsylva Pennsylva 05000387 05000388

'ight U AUTHOR AFFILIATION CVRTISEN,A. Pennsylvania Power R Light Co.

C IP ~ NAME RECIP IEN1'FFILIATION PARRRO F 0 'tater Reactors Branch 3

SUBJECT:

Discusses status of plans to perform full scale test to confirm oscillati'on load specs, Requests witness test runs during week of 791112.Test matrix 8, plan will be forwarded in Sept.

DISTRIBUTION CODE: BOOIB COPIES RECEIVED:LTR g ENCL 5 SIZE:

TITLE: PSAR/FSAR AMDTS ANO RFLATED CORRESPONDENCE ~

NOTES: 5'E~~ 2 < E', ~ Qg ~+I'+ B g~ /~2>Ti5 . l. 8.

~

g~ E'G'E'+$ 7///LD'Cr RECIPIENT COPIES REC IP IENT COPIES IO CODE/NAME LTTR ENCL ID CODE/NAME LTTR EN L ACTION; 05 PM Pf/4'Eg 1 AO BC 1 LA LEER 4f/ ] I INTERNAL: 01 02 NRC PDR 0 I 8 E 08 OPERA LIC BR 09 GEOSCIEN BR 10 GAB 11 MECH ENG BH 12 STRUC ENG BR 13 MATL ENG BR 15 REAC SYS BR 16 ANALYSIS BR 17 CORE PERF BR 18 AUX SYS BR. 19 CONTAIN SYS 20 I 8 C ANALYSIS SYS BH 21 PQSvER sYs BR 22 AD SITE TECrl 26 ACCONT ANLYS 27 EFFL TRT SYS 28 RAO ASMT BR 29 KIRKAOOO AD FOR ENG AO PLANT SYS AO REAC SAFETY AO SITE DIRECTOR NRR HYDRO METEOR BR MPA OELD EXTFRNAL: 03 LPOR 1 Oa NSIC 30 ACRS 10 1 LQ rrleo'RE E/6'A HC AUG 8 1979 cEEQ,H gag ~w L/9 C7 TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 & E'kCL

Op ~e PPaL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE( (2 I5) 821-5151 July 31, 1979 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 gggg~~

ATTN: Mr. Olan D. Parr, Chief 8/(g Light Water Reactors Branch No. 3 p((

L'gpss SUSQUEHANNA STEAM ELECTRIC STATION CONDENSATZON OSCILLATION TESTING SCHEDULE ER 100450 FILE 840-2, 172 PLA-386

Dear Mr. Parr:

Zn our March 23, 1979 and July 16, 1979 meetings with you, we outlined our plans to perform a full scale test to confirm the condensation oscillation load specification to be used on the Susquehanna SES Plant. This test is bei.ng planned by Kraftwerk Union and will be run at the GKM facility in Mannheim, Federal Republic of Germany.

We plan to forward the test matrix and plan to you during the second week of September.

We also invite you to view the performance of some of the test runs. At the present time, the week of November 12, 1979 appears to be the optimum time to witness the tests.

We will keep you informed of any changes to our plans and schedule for the GKM-ZIM testing program.

Very truly yours, Qvv$