{{#Wiki_filter:OREGULATORY INFORMATION DISTRIBUTION SYST(RIDS)ACCESSION NBR:8404030350 DOC.~DATE:84/03/29NOTARIZED:
{{#Wiki_filter:O REGULATORY INFORMATION DISTRIBUTION SYST (RIDS)ACCESSION NBR:8404030350 DOC.~DATE: 84/03/29 NOTARIZED:
NODOCFACIL:50-387 Susquehanna SteamElectricStationiUnit1<Pennsylva 50-388Susquehanna SteamElectricStationiUnit2PPennsylva 05000388AUTHBYNAMEAUTHORAFFILIATION CURTISEN~W~Pennsylvania PowerLLightCo.RECIP~NAMERECIPIENT AFFILIATION SCHWENCEREA
NO DOC FACIL:50-387 Susquehanna Steam Electric Stationi Unit 1<Pennsylva 50-388 Susquehanna Steam Electric Stationi Unit 2P Pennsylva 05000388 AUTH BYNAME AUTHOR AFFILIATION CURTISEN~W~Pennsylvania Power L Light Co.RECIP~NAME RECIPIENT AFFILIATION SCHWENCEREA
~Licensing Branch2
~Licensing Branch 2


==SUBJECT:==
==SUBJECT:==
Amends'esponse toFSARQuestion110,57<per 840319telcon,VisualinsponUnit1linesrevealednoappreciable vibratory effects.FSAR revreflecting positionwillbeprovided, DISTRIBUTION CODE:BOOISCOPIESRECEIVED;I.TR JENCLSIZE:TITLE:Licensing Submittal:
Amends'esponse to FSAR Question 1 10,57<per 840319 telcon, Visual insp on Unit 1 lines revealed no appreciable vibratory effects.FSAR rev reflecting position will be provided, DISTRIBUTION CODE: BOO IS COPIES RECEIVED;I.TR J ENCL SIZE: TITLE: Licensing Submittal:
PSAR/PSAR AmdtsSRelatedCorrespondence NOTES:icy.NMSS/FCAF/PM, LPDR2cys.icyNMSS/FCAF/PM'PDR 2cys.0500038705000388RECIPIENT IDCODE/NAME NRR/DL/ADL NRRL82LAjINTERNAL; ELD/HDS4IE/DEPER/EPB 36IE/DQASIP/QAB21NRR/DE/CEB 11NRR/DE/EQB 13NRR/DE/MEB 18NRR/DE/SAB.
PSAR/PSAR Amdts S Related Correspondence NOTES: icy.NMSS/FCAF/PM, LPDR 2cys.icy NMSS/FCAF/PM'PDR 2cys.05000387 05000388 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L82 LA j INTERNAL;ELD/HDS4 IE/DEPER/EPB 36 IE/DQAS IP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB.
2QNRH/DHFS/HFEBOO NRR/DHFS/PSRB NRR/OSI/AEB26NRR/OSI/CP8 10NRR/OSI/ICSB 16NRR/DSI/PSB19NRR/DSI/RS823RGNiEXTERNAL:
2Q NRH/DHFS/HFEBOO NRR/DHFS/PSRB NRR/OS I/AEB 26 NRR/OSI/CP8 10 NRR/OSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RS8 23 RGNi EXTERNAL: ACRS 0 l.DMB/DSS (AMDTS)LPOR 03 NSIC 05 NOTES: COPIES LTTR ENCL 1.1 1 3 1 1 2 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR L82 BC PERCHER'1 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/AS 8 NRR/DSI/CSB 09 NRR/DS I/METB 12 NRR/DS I/RAB 22 dlECXKS RM/DDAMI/MI 8 BNL(AMOTS ONlY)FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 57 ENCL IS I W I I I'~'I Il 4I I ql'I" h I WII.ll III'II 4Il)II'14'I)l~I I)fy r Sf Ws lf"ff'l II s II il'll I''''ll')I jill)I t I y I)g I,,~Iu S I~g IS)I4 W'44.)I I I W W>Il W Is Is Il WI 14 k 7 y I~n Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215/770.5151 Norman W.Curtis Vice President-Engineering
ACRS0l.DMB/DSS(AMDTS)LPOR03NSIC05NOTES:COPIESLTTRENCL1.113112111111111RECIPIENT IDCODE/NAME NRRL82BCPERCHER'1 IEFILEIE/DEPER/IRB 35NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28NRR/DE/MTEB 17NRR/DE/SGEB 25NRR/DHFS/LQB 32NRR/DL/SSPB NRR/DSI/AS 8NRR/DSI/CSB 09NRR/DSI/METB12NRR/DSI/RAB22dlECXKSRM/DDAMI/MI 8BNL(AMOTS ONlY)FEMAREPDIV39NRCPDR02NTISCOPIESLTTRENC11TOTALNUMBEROFCOPIESREQUIRED:
&Construction-Nuclear 21 5/770-7501 eR s9 1984 Director of Nuclear Reactor Regulation Attention:
LTTR57ENCL ISIWIII'~'IIl4IIql'I"hIWII.llIII'II4Il)II'14'I)l~II)fyrSfWslf"ff'lIIsIIil'llI''''ll')Ijill)ItIyI)gI,,~IuSI~gIS)I4W'44.)IIIWW>IlWIsIsIlWI14k7yI~n Pennsylvania Power8LightCompanyTwoNorthNinthStreet~Allentown, PA18101~215/770.5151NormanW.CurtisVicePresident-Engineering
Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION AMENDED RESPONSE TO FSAR QUESTION 110.57 ER 100450/100508 FILE 841-2 PLA-2142 Docket Nos.50-387 50-388  
&Construction-Nuclear 215/770-7501 eRs91984DirectorofNuclearReactorRegulation Attention:
Mr.A.Schwencer, ChiefLicensing BranchNo.2DivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555SUSQUEHANNA STEAMELECTRICSTATIONAMENDEDRESPONSETOFSARQUESTION110.57ER100450/100508 FILE841-2PLA-2142DocketNos.50-38750-388


==DearMr.Schwencer:==
==Dear Mr.Schwencer:==


ThisletterisprovidedtoconfirmaMarch19,1984telephone conversation betweenMr.W.W.WilliamsandM.SagerofPPGLandMr.D.Teraoofyourstaffregarding ourresponsetoFSARQuestion110.57.Asaresultofourconversation, weare/amending partdtoourresponsetodeletethecommitment tovisuallyinspectforvibrational effectsonthecontrolroddrivesysteminsertandwithdrawlinesduringsteadystateconditionsQ Visualinspections onUnit1linesrevealednoappreciable vibratory effects.Inaddition, webelievethattheflowrateswithintheselines(2gpmfortheinsertlines,3gpmforthewithdrawlines)isnotsignificant enoughtocauseanyappreciable vibratory effectsonthelines.AnFSARrevisionreflecting thispositionwillbeprovided.
This letter is provided to confirm a March 19, 1984 telephone conversation between Mr.W.W.Williams and M.Sager of PPGL and Mr.D.Terao of your staff regarding our response to FSAR Question 110.57.As a result of our conversation, we are/amending part d to our response to delete the commitment to visually inspect for vibrational effects on the control rod drive system insert and withdraw lines during steady state conditionsQ Visual inspections on Unit 1 lines revealed no appreciable vibratory effects.In addition, we believe that the flow rates within these lines (2 gpm for the insert lines, 3 gpm for the withdraw lines)is not significant enough to cause any appreciable vibratory effects on the lines.An FSAR revision reflecting this position will be provided.Should you have any questions, please call.Very truly yours, N.W.Curtis Vice President-Engineering 6 Construction-Nuclear cc: R.Perch-NRC D.Terao-NRC 8q0q030350 840329 PDR ADOCK 05000387, F'DR goo i<o P'7 r'.1 P II , Pt/l~PP 1 P lr P 1'J I"iI/1I I r~r i I/r g I c I J y4~A.IPennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 i 770.5151 Norman W.Curtis Vice President-Engineering 8 Construction-Nuclear 21 5/770-7501 MAR 22 1984 Mr.Harold Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL FINANCIAL REPORT ER 100450 FILE 841 PLA-2145 Docket Nos.50-387 50-388  
Shouldyouhaveanyquestions, pleasecall.Verytrulyyours,N.W.CurtisVicePresident-Engineering 6Construction-Nuclear cc:R.Perch-NRCD.Terao-NRC8q0q030350 840329PDRADOCK05000387, F'DRgooi<o P'7r'.1PII,Pt/l~PP1PlrP1'JI"iI/1IIr~riI/rgIc IJy4~A.IPennsylvania Power8LightCompanyTwoNorthNinthStreet~Allentown, PA18101~215i770.5151NormanW.CurtisVicePresident-Engineering 8Construction-Nuclear 215/770-7501 MAR221984Mr.HaroldDenton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555SUSQUEHANNA STEAMELECTRICSTATIONANNUALFINANCIAL REPORTER100450FILE841PLA-2145DocketNos.50-38750-388


==DearMr.Denton:==
==Dear Mr.Denton:==
Inaccordance with10CFR50.71(b),
In accordance with 10CFR50.71(b), attached are ten copies of the 1983 annual report for Pennsylvania Power&Light Co.The annual report for Allegheny'lectric Cooperative, Inc., will be forwarded when it is issued later this year.Very truly yours, N.W.Curtis Vice President-Engineering
attachedaretencopiesofthe1983annualreportforPennsylvania Power&LightCo.TheannualreportforAllegheny
&Construction-Nuclear Attachments "1~V-~',~~;r V}}
'lectricCooperative, Inc.,willbeforwarded whenitisissuedlaterthisyear.Verytrulyyours,N.W.CurtisVicePresident-Engineering
&Construction-Nuclear Attachments "1~V-~',~~;rV}}

Revision as of 03:11, 6 July 2018

Amends Response to FSAR Question 110.57,per 840319 Telcon. Visual Insp on Unit 1 Lines Revealed No Appreciable Vibratory Effects.Fsar Rev,Reflecting Position,Will Be Provided
ML18040A735
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/29/1984
From: CURTIS N W
PENNSYLVANIA POWER & LIGHT CO.
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
PLA-2142, NUDOCS 8404030350
Download: ML18040A735 (6)


Text

O REGULATORY INFORMATION DISTRIBUTION SYST (RIDS)ACCESSION NBR:8404030350 DOC.~DATE: 84/03/29 NOTARIZED:

NO DOC FACIL:50-387 Susquehanna Steam Electric Stationi Unit 1<Pennsylva 50-388 Susquehanna Steam Electric Stationi Unit 2P Pennsylva 05000388 AUTH BYNAME AUTHOR AFFILIATION CURTISEN~W~Pennsylvania Power L Light Co.RECIP~NAME RECIPIENT AFFILIATION SCHWENCEREA

~Licensing Branch 2

SUBJECT:

Amends'esponse to FSAR Question 1 10,57<per 840319 telcon, Visual insp on Unit 1 lines revealed no appreciable vibratory effects.FSAR rev reflecting position will be provided, DISTRIBUTION CODE: BOO IS COPIES RECEIVED;I.TR J ENCL SIZE: TITLE: Licensing Submittal:

PSAR/PSAR Amdts S Related Correspondence NOTES: icy.NMSS/FCAF/PM, LPDR 2cys.icy NMSS/FCAF/PM'PDR 2cys.05000387 05000388 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L82 LA j INTERNAL;ELD/HDS4 IE/DEPER/EPB 36 IE/DQAS IP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB.

2Q NRH/DHFS/HFEBOO NRR/DHFS/PSRB NRR/OS I/AEB 26 NRR/OSI/CP8 10 NRR/OSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RS8 23 RGNi EXTERNAL: ACRS 0 l.DMB/DSS (AMDTS)LPOR 03 NSIC 05 NOTES: COPIES LTTR ENCL 1.1 1 3 1 1 2 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR L82 BC PERCHER'1 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/AS 8 NRR/DSI/CSB 09 NRR/DS I/METB 12 NRR/DS I/RAB 22 dlECXKS RM/DDAMI/MI 8 BNL(AMOTS ONlY)FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 57 ENCL IS I W I I I'~'I Il 4I I ql'I" h I WII.ll III'II 4Il)II'14'I)l~I I)fy r Sf Ws lf"ff'l II s II il'll I'll')I jill)I t I y I)g I,,~Iu S I~g IS)I4 W'44.)I I I W W>Il W Is Is Il WI 14 k 7 y I~n Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215/770.5151 Norman W.Curtis Vice President-Engineering

&Construction-Nuclear 21 5/770-7501 eR s9 1984 Director of Nuclear Reactor Regulation Attention:

Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION AMENDED RESPONSE TO FSAR QUESTION 110.57 ER 100450/100508 FILE 841-2 PLA-2142 Docket Nos.50-387 50-388

Dear Mr.Schwencer:

This letter is provided to confirm a March 19, 1984 telephone conversation between Mr.W.W.Williams and M.Sager of PPGL and Mr.D.Terao of your staff regarding our response to FSAR Question 110.57.As a result of our conversation, we are/amending part d to our response to delete the commitment to visually inspect for vibrational effects on the control rod drive system insert and withdraw lines during steady state conditionsQ Visual inspections on Unit 1 lines revealed no appreciable vibratory effects.In addition, we believe that the flow rates within these lines (2 gpm for the insert lines, 3 gpm for the withdraw lines)is not significant enough to cause any appreciable vibratory effects on the lines.An FSAR revision reflecting this position will be provided.Should you have any questions, please call.Very truly yours, N.W.Curtis Vice President-Engineering 6 Construction-Nuclear cc: R.Perch-NRC D.Terao-NRC 8q0q030350 840329 PDR ADOCK 05000387, F'DR goo i<o P'7 r'.1 P II , Pt/l~PP 1 P lr P 1'J I"iI/1I I r~r i I/r g I c I J y4~A.IPennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 i 770.5151 Norman W.Curtis Vice President-Engineering 8 Construction-Nuclear 21 5/770-7501 MAR 22 1984 Mr.Harold Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL FINANCIAL REPORT ER 100450 FILE 841 PLA-2145 Docket Nos.50-387 50-388

Dear Mr.Denton:

In accordance with 10CFR50.71(b), attached are ten copies of the 1983 annual report for Pennsylvania Power&Light Co.The annual report for Allegheny'lectric Cooperative, Inc., will be forwarded when it is issued later this year.Very truly yours, N.W.Curtis Vice President-Engineering

&Construction-Nuclear Attachments "1~V-~',~~;r V