IR 05000317/2015006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 38: Line 38:


===Enclosure:===
===Enclosure:===
Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ
Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ  
 
ML16061A169 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebroo/AAR ADimitriadis/AD MScott/MLS w/edits DATE 2/18/16 2/18/16 2/22/16 Page 1 of 202/29/201607:46:19Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan01/01/2016-12/31/2017EXM8/8-CALVERT CLIFFS INITIAL EXAM41 FY16-CC INITIAL OPERATOR LICENSING EXAMU0192305/16/201605/20/20161 FY16-CC INITIAL OPERATOR LICENSING EXAMU0192306/13/201606/24/2016ISI-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P02/16/201602/19/20161 IPInservice Inspection Activities - PWR7111108P02/29/201603/04/2016BI-RADIOLOGICAL SAFETY - HAZARDS O11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/22/201602/26/20161,2 IPOccupational ALARA Planning and Controls71124.0202/22/201602/26/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/22/201602/26/2016BI-RADIOLOGICAL SAFETY - AIRBORNE11,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/09/201605/13/201671003-U2 LR COMMITMENT INSPECTION - PHASE 21 2 IPPost-Approval Site Inspection for License Renewal7100305/16/201605/20/2016ISFSI-ISFSI LOADING CAMPAIGN41,2 IPOperation Of An ISFSI6085508/15/201608/19/20161,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/15/201608/19/2016BI-RADIOLOGICAL SAFETY - EXT EXPOSURE11,2 IPOccupational Dose Assessment71124.0408/22/201608/26/2016TRI FI-TRIENNIAL FIRE INSPECTION41,2 IPFire Protection - NFPA 805 (Triennial)7111105X09/12/201609/16/20161,2 IPFire Protection - NFPA 805 (Triennial)7111105X09/26/201609/30/2016EP-EP PROGRAM INSPECTION11,2 IPAlert and Notification System Testing711140209/12/201609/16/20161,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/12/201609/16/20161,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/12/201609/16/2016BI-RADIOLOGICAL SAFETY - ALARA11,2 IPOccupational ALARA Planning and Controls71124.0210/03/201610/07/2016BI-RADIOLOGICAL SAFETY - RAD HAZ & PIV11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/05/201612/09/20161,2 IPOccupational Exposure Control Effectiveness71151-OR0112/05/201612/09/20161,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0112/05/201612/09/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 202/29/201607:46:19Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan01/01/2016-12/31/201771124-RADIATION SAFETY - INSTRUMENTS11,2 IPRadiation Monitoring Instrumentation71124.0501/09/201701/13/201771124-RADIATION SAFETY - RETS11,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/06/201702/10/20177111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P02/21/201703/03/2017TI-191-FUKUSHIMA LESSONS-LEARNED11,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19104/17/201704/21/201771124-RADIATION SAFETY - RAD HAZ PIV11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/27/201703/03/20171,2 IPOccupational Exposure Control Effectiveness71151-OR0102/27/201703/03/20171,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0102/27/201703/03/201771124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/10/201704/14/2017MODS-PERMANENT PLANT MODIFICATIONS31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T04/24/201704/28/20171,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/08/201705/12/20177111107T-TRIENNIAL HEAT SINK11,2 IPHeat Sink Performance7111107T06/12/201706/16/201771152B-PI&R BIENNIAL TEAM INSPECTION71,2 IPProblem Identification and Resolution71152B07/31/201708/04/20171,2 IPProblem Identification and Resolution71152B08/14/201708/18/2017EP-EP EXERCISE EVALUATION41,2 IPExercise Evaluation711140109/11/201709/15/20171,2 IPPerformance Indicator Verification7115109/11/201709/15/20177111111B-CC REQUAL INSP WITH P/F RESULTS21,2 IPLicensed Operator Requalification Program7111111B11/13/201711/17/201771124-RADIATION SAFETY - REMP11,2 IPRadiological Environmental Monitoring Program71124.0710/02/201710/06/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 04:35, 20 May 2018

2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006)
ML16061A169
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/02/2016
From: Scott M L
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Dimitriadis A
References
IR 2015006
Download: ML16061A169 (6)


Text

March 2, 2016

Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2015006 AND 05000318/2015006)

Dear Mr. Hanson:

On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015.

This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Calvert Cliffs Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Calvert Cliffs Unit 2 was in the Regulatory Response Column of the NRC's ROP Action Matrix until the end of first quarter 2015, due to a finding of low to moderate safety significance (White) in the Emergency Preparedness cornerstone as documented in a White Notice of Violation (NOV) and Assessment Follow-Up Letter (ML14297A5471) dated October 27, 2014. Calvert Cliffs Unit 2 transitioned to the Licensee Response Column at the beginning of second quarter 2015 after a supplemental inspection for the White finding was successfully completed, in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," on February 6, 2015, as documented in NRC Supplemental Inspection Report 05000318/2015008 and Assessment Follow-Up Letter (ML15070A127) dated March 10, 2015. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

1 Designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," Inspection Procedure 71003, "Post Approval Site Inspection For License Renewal," and Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Calvert Cliffs Units 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans." As noted above, this inspection has been scheduled for Calvert Cliffs Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Anthony Dimitriadis at 610-337-6953 with any questions you have regarding this letter.

Sincerely,/RA/ Michael L. Scott, Director Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69

Enclosure:

Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16061A169 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebroo/AAR ADimitriadis/AD MScott/MLS w/edits DATE 2/18/16 2/18/16 2/22/16 Page 1 of 202/29/201607:46:19Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan01/01/2016-12/31/2017EXM8/8-CALVERT CLIFFS INITIAL EXAM41 FY16-CC INITIAL OPERATOR LICENSING EXAMU0192305/16/201605/20/20161 FY16-CC INITIAL OPERATOR LICENSING EXAMU0192306/13/201606/24/2016ISI-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P02/16/201602/19/20161 IPInservice Inspection Activities - PWR7111108P02/29/201603/04/2016BI-RADIOLOGICAL SAFETY - HAZARDS O11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/22/201602/26/20161,2 IPOccupational ALARA Planning and Controls71124.0202/22/201602/26/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/22/201602/26/2016BI-RADIOLOGICAL SAFETY - AIRBORNE11,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/09/201605/13/201671003-U2 LR COMMITMENT INSPECTION - PHASE 21 2 IPPost-Approval Site Inspection for License Renewal7100305/16/201605/20/2016ISFSI-ISFSI LOADING CAMPAIGN41,2 IPOperation Of An ISFSI6085508/15/201608/19/20161,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/15/201608/19/2016BI-RADIOLOGICAL SAFETY - EXT EXPOSURE11,2 IPOccupational Dose Assessment71124.0408/22/201608/26/2016TRI FI-TRIENNIAL FIRE INSPECTION41,2 IPFire Protection - NFPA 805 (Triennial)7111105X09/12/201609/16/20161,2 IPFire Protection - NFPA 805 (Triennial)7111105X09/26/201609/30/2016EP-EP PROGRAM INSPECTION11,2 IPAlert and Notification System Testing711140209/12/201609/16/20161,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/12/201609/16/20161,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/12/201609/16/2016BI-RADIOLOGICAL SAFETY - ALARA11,2 IPOccupational ALARA Planning and Controls71124.0210/03/201610/07/2016BI-RADIOLOGICAL SAFETY - RAD HAZ & PIV11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/05/201612/09/20161,2 IPOccupational Exposure Control Effectiveness71151-OR0112/05/201612/09/20161,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0112/05/201612/09/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 202/29/201607:46:19Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCalvert CliffsInspection / Activity Plan01/01/2016-12/31/201771124-RADIATION SAFETY - INSTRUMENTS11,2 IPRadiation Monitoring Instrumentation71124.0501/09/201701/13/201771124-RADIATION SAFETY - RETS11,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/06/201702/10/20177111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P02/21/201703/03/2017TI-191-FUKUSHIMA LESSONS-LEARNED11,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19104/17/201704/21/201771124-RADIATION SAFETY - RAD HAZ PIV11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/27/201703/03/20171,2 IPOccupational Exposure Control Effectiveness71151-OR0102/27/201703/03/20171,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0102/27/201703/03/201771124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/10/201704/14/2017MODS-PERMANENT PLANT MODIFICATIONS31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T04/24/201704/28/20171,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/08/201705/12/20177111107T-TRIENNIAL HEAT SINK11,2 IPHeat Sink Performance7111107T06/12/201706/16/201771152B-PI&R BIENNIAL TEAM INSPECTION71,2 IPProblem Identification and Resolution71152B07/31/201708/04/20171,2 IPProblem Identification and Resolution71152B08/14/201708/18/2017EP-EP EXERCISE EVALUATION41,2 IPExercise Evaluation711140109/11/201709/15/20171,2 IPPerformance Indicator Verification7115109/11/201709/15/20177111111B-CC REQUAL INSP WITH P/F RESULTS21,2 IPLicensed Operator Requalification Program7111111B11/13/201711/17/201771124-RADIATION SAFETY - REMP11,2 IPRadiological Environmental Monitoring Program71124.0710/02/201710/06/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.