ML19317E489: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:- - - ~     . -      -        -_                      -              .. -.            _      ..
{{#Wiki_filter:- - - ~
                                              -                                    .~
.~
          .                                                                    Umr       Ocon20 Unit 2 DATE       7/9/73 DOCKET NO.         50-270 PREPARED BY       M. S. Tuckman OPERATING STATUS
Umr Ocon20 Unit 2 DATE 7/9/73 DOCKET NO.
: 1. REPORTING PERIOD: June 1.1975                 THROUGH       June 30, 1975 GROSS HOURS IN REPORTING PERIOD:                 720.00
50-270 PREPARED BY M. S. Tuckman OPERATING STATUS 1.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):             871
REPORTING PERIOD: June 1.1975 THROUGH June 30, 1975 GROSS HOURS IN REPORTING PERIOD:
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)                     None
720.00 2.
: 4. REASONS FOR RESTRICTION (IF ANY)
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
                                                              'his Month     Year to Date         Cumulative
871 3.
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                       650.0           3037.5               4983.6
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
: 6. REACTOR RESERVE SHUTDOWN HOURS                 -              -                    -
None 4.
: 7. HOURS GENERATOR ON-LINE                       648.9           2938.3               4813.7
REASONS FOR RESTRICTION (IF ANY)
: 8. UNIT RESERVE SHUTDOWN HOURS
'his Month Year to Date Cumulative 5.
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1606911                   6922238             11229136
NUMBER OF HOURS THE REACTOR WAS CRITICAL 650.0 3037.5 4983.6 6.
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                         542710           2364300             3833276 1
REACTOR RESERVE SHUTDOWN HOURS 7.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                         518020           2243654             3631180 i
HOURS GENERATOR ON-LINE 648.9 2938.3 4813.7 8.
: 12. REACTOR SERVICE FACTOR                       90.3             69.9                 70.4             ,
UNIT RESERVE SHUTDOWN HOURS 9.
: 13. REACTOR AVAILABILITY FACTOR                   90.1             67.9                 68.3
GROSS THERMAL ENERGY GENERATED (MWH) 1606911 6922238 11229136 10.
: 14. UNIT SERVICE FACTOR                           90.1             67.7                 68.0
GROSS ELECTRICAL ENERGY GENERATED (MWH) 542710 2364300 3833276 1
: 15. UNIT AVILABILITY FACTOR                       90.1             67.7                 68.0
11.
: 16. UNIT CAPACITY FACTOR (Using Net               82.6             59.3                 58.9
NET ELECTRICAL ENERGY GENERATED (MWH) 518020 2243654 3631180 i
,              Capability)
12.
: 17. UNIT CAPACITY FACTOR a              (Using Design Mwe)                           81.1             58.2                 57.8 7
REACTOR SERVICE FACTOR 90.3 69.9 70.4 13.
18,  UNIT FORCED OUTAGE RATE                        9.9            31.8                31.6
REACTOR AVAILABILITY FACTOR 90.1 67.9 68.3 14.
UNIT SERVICE FACTOR 90.1 67.7 68.0 15.
UNIT AVILABILITY FACTOR 90.1 67.7 68.0 16.
UNIT CAPACITY FACTOR (Using Net 82.6 59.3 58.9 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 81.1 58.2 57.8 a
7
{
{
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
18, UNIT FORCED OUTAGE RATE 9.9 31.8 31.6 19.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
i REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100
20.
<                                                      HOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = Hol!RS REACTOR k'AS AVAIL \Bl.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR       = HOl'PS CD;ERATOR ON LINE
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
-                                                      HOURS IN REPORTING PERIOD UNIT AVAII.iBILITY FACTOR = 110CRS_ UNTT_ WAS AVAIISBLE TO CENERATE X 100 HOURS IN REPORTING PERIOD UNIT C.'JACITY FACTOR     = NET ELECTRICAL P0hER CENERATED (N t Capability or DNign (Mw-Net.).1 X !!OURS IN ME"OKTfd PERIOD UNIT FCRCED OUTACE RATE - FORCr3 OUTAGE HOURS                                   gg HOURS GC;EPaTOR ON !.INE + FORCED OUTAGE HOURS
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100 i
                                                                                -    -.2812180 73/           .    .
HOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = Hol!RS REACTOR k'AS AVAIL \\Bl.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR
= HOl'PS CD;ERATOR ON LINE HOURS IN REPORTING PERIOD UNIT AVAII.iBILITY FACTOR = 110CRS_ UNTT_ WAS AVAIISBLE TO CENERATE X 100 HOURS IN REPORTING PERIOD UNIT C.'JACITY FACTOR
= NET ELECTRICAL P0hER CENERATED (N t Capability or DNign (Mw-Net.).1 X !!OURS IN ME"OKTfd PERIOD UNIT FCRCED OUTACE RATE - FORCr3 OUTAGE HOURS gg HOURS GC;EPaTOR ON !.INE + FORCED OUTAGE HOURS
-.2812180 73/


DdCKET NO. 50-270                   ,
DdCKET NO. 50-270 UNIT SHUTDOWNS UNI l' N AMli Oconee Unit 2 DATli 7/9/75 REPORT MONTil June, 1975 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
UNIT SHUTDOWNS                                     UNI l' N AMli Oconee Unit 2 DATli 7/9/75 REPORT MONTil     June, 1975 TYPE                                 METHOD OF                                                           -
DATE S SCHEDULED (HOURS)
F FORCED   DURATION                   SHUTTING DOWN NO. DATE   S SCHEDULED (HOURS)   REASON (O       THE REACTOR (2)           CORRECTIVE ACTIONS / COMMENTS                           l 10   750628             F   71.2         A                 1           Unit shutdown to investigate low RC pump oil level and to perform surveillance tests.
REASON (O THE REACTOR (2)
(1) REASON                                 (2) METllOD A -EQUIPMENT F AILURE (tiXPLAIN)           1-MANUAL B - MAINT. OR TLST.                       2-MANUAL C- RLi'ULLING                                 SCRAM             >
CORRECTIVE ACTIONS / COMMENTS l
D-REGULATORY RESTRICTION                   3- AUTOM ATIC E-OPER ATOR TRAINING AND                     SCRAM LICLNSE EXAMINATION F- ADMINIST R AllVE G-OPLR ATION AL ERROR (LXPLAIN)
10 750628 F
71.2 A
1 Unit shutdown to investigate low RC pump oil level and to perform surveillance tests.
(1) REASON (2) METllOD A -EQUIPMENT F AILURE (tiXPLAIN) 1-MANUAL B - MAINT. OR TLST.
2-MANUAL C-RLi'ULLING SCRAM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICLNSE EXAMINATION F-ADMINIST R AllVE G-OPLR ATION AL ERROR (LXPLAIN)
Il-0TilLR (EXPLAIN)
Il-0TilLR (EXPLAIN)


==SUMMARY==
==SUMMARY==
Unit remained base loaded unt-il June 28, 1975 when ahutdown to investigate low RC pump oil level.
Unit remained base loaded unt-il June 28, 1975 when ahutdown to investigate low RC pump oil level.


50-270 DOCKET NO.
50-270 DOCKET NO.
(JNIT     oconee Unit 2 DATE     7/9/75 AVERAGE DAILY UNIT POWER LEVEL MONTH           June. 1975 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                     DAY               (MWe-net s           .
(JNIT oconee Unit 2 DATE 7/9/75 AVERAGE DAILY UNIT POWER LEVEL MONTH June. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
827 794                         17 1
DAY (MWe-net s 827 794 17 1
819                         18                   829 2
819 18 829 2
805                                               827 3                                                 19 817                         20                   827 4
827 805 19 3
817                         21                   822 5
4 817 20 827 5
816                         22                   822 6
817 21 822 816 22 822 6
819                         23                   813 7
819 23 813 7
812                         24                   809 8
809 812 24 8
811                         25                   794 9
794 811 25 9
818                         26                   599 10 818                           27                 604 11
818 26 599 10 818 27 604 11 821 28 12 822 29 13 1
                                                                              -                          l 12 821                           28 13 822                           29 1
818 30 14 817 31 15 16 j
14                    818                           30                   -
822 i
817                           31 15 16 822                                                                           j i
DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100'"e line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.}}
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100'"e line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.}}

Latest revision as of 22:56, 1 January 2025

Monthly Operating Rept for June 1975
ML19317E489
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/09/1975
From: Tuckman M
DUKE POWER CO.
To:
Shared Package
ML19317E484 List:
References
NUDOCS 7912180731
Download: ML19317E489 (3)


Text

- - - ~

.~

Umr Ocon20 Unit 2 DATE 7/9/73 DOCKET NO.

50-270 PREPARED BY M. S. Tuckman OPERATING STATUS 1.

REPORTING PERIOD: June 1.1975 THROUGH June 30, 1975 GROSS HOURS IN REPORTING PERIOD:

720.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY)

'his Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 650.0 3037.5 4983.6 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 648.9 2938.3 4813.7 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 1606911 6922238 11229136 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 542710 2364300 3833276 1

11.

NET ELECTRICAL ENERGY GENERATED (MWH) 518020 2243654 3631180 i

12.

REACTOR SERVICE FACTOR 90.3 69.9 70.4 13.

REACTOR AVAILABILITY FACTOR 90.1 67.9 68.3 14.

UNIT SERVICE FACTOR 90.1 67.7 68.0 15.

UNIT AVILABILITY FACTOR 90.1 67.7 68.0 16.

UNIT CAPACITY FACTOR (Using Net 82.6 59.3 58.9 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 81.1 58.2 57.8 a

7

{

18, UNIT FORCED OUTAGE RATE 9.9 31.8 31.6 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100 i

HOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = Hol!RS REACTOR k'AS AVAIL \\Bl.E TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR

= HOl'PS CD;ERATOR ON LINE HOURS IN REPORTING PERIOD UNIT AVAII.iBILITY FACTOR = 110CRS_ UNTT_ WAS AVAIISBLE TO CENERATE X 100 HOURS IN REPORTING PERIOD UNIT C.'JACITY FACTOR

= NET ELECTRICAL P0hER CENERATED (N t Capability or DNign (Mw-Net.).1 X !!OURS IN ME"OKTfd PERIOD UNIT FCRCED OUTACE RATE - FORCr3 OUTAGE HOURS gg HOURS GC;EPaTOR ON !.INE + FORCED OUTAGE HOURS

-.2812180 73/

DdCKET NO. 50-270 UNIT SHUTDOWNS UNI l' N AMli Oconee Unit 2 DATli 7/9/75 REPORT MONTil June, 1975 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (O THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS l

10 750628 F

71.2 A

1 Unit shutdown to investigate low RC pump oil level and to perform surveillance tests.

(1) REASON (2) METllOD A -EQUIPMENT F AILURE (tiXPLAIN) 1-MANUAL B - MAINT. OR TLST.

2-MANUAL C-RLi'ULLING SCRAM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICLNSE EXAMINATION F-ADMINIST R AllVE G-OPLR ATION AL ERROR (LXPLAIN)

Il-0TilLR (EXPLAIN)

SUMMARY

Unit remained base loaded unt-il June 28, 1975 when ahutdown to investigate low RC pump oil level.

50-270 DOCKET NO.

(JNIT oconee Unit 2 DATE 7/9/75 AVERAGE DAILY UNIT POWER LEVEL MONTH June. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net s 827 794 17 1

819 18 829 2

827 805 19 3

4 817 20 827 5

817 21 822 816 22 822 6

819 23 813 7

809 812 24 8

794 811 25 9

818 26 599 10 818 27 604 11 821 28 12 822 29 13 1

818 30 14 817 31 15 16 j

822 i

DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100'"e line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.