Monthly Operating Rept for June 1975
ML19317E494
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/09/1975
From: Tuckman M
DUKE POWER CO.
To:
Shared Package
ML19317E484 List:
References
NUDOCS 7912180735
Download: ML19317E494 (3)


Text

,a m

.m U. U5..t Ocones Unit 3 DATE 7/9/75 DOCKET NO. 50-287 PREPARED BY M. S. Tuc1==n

' OPERATING STATUS

1. REPORTING PERIOD: June 1, 1975 THROUGH June 30, 1975 GROSS HOURS IN REPORTING PERIOD: 720.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) None
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 426.7 2855.2 3039.1
6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 411.6 2755.6 2938.4
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWH) 987720 5879582 6324232
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 334850 2024050 2172964
11. NET ELECTRICAL ENERGY GENERATED (MWH) 317024 1920207 2061343
12. REACTOR SERVICE FACTOR 59.3 65.7 64.3
13. REACTOR AVAILABILITY FACTOR 57.2 73.7 71.6
14. UNIT SERVICE FACTOR 57.2 63.5 ,

62.2

15. UNIT AVILiBILITY FACTOR 57.2 63.5 62.2
16. UNIT CAPACITY FACTOR (Using Net 50.6 50.8 50.1 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 49.6 49.9 49.2
18. UNIT FORCED OUTAGE RATE 1.1 16.0 15.2
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100 HOURS IN REPORTING PERIOD REACTOR AVAILiBILI1Y FACTOR = Hot?HS REACTOR k'AS AVAIL \nLE TO OPERATE 110Ul;S IN REFORTING PERIOD *X 100 UNIT SERVICE TACT 0:1 = H0lff?S CD:ERATOR ON i.iNE HOURS IN REPORTING PERIOD "

UNIT AVAIL \BILITY FACTOR = IIOURS UNTT w'AS A'.'Af f.\Bt.E TO GE:ERATE X 100 HOURS IN REPokTING PERIOD UNIT CAPACITY FACTCR = NET ELECTRICAL PCbER GENERATFD

[Not C.apability or Design (be-Net).1 X !!OURS IN REPOKTfN PERIOD UNIT FORCD OLTTACE RATE e FORCrD OUTAGE IIOURS X 100 HOURS GENEPaTOR ON LINE + FORCED CUTAGE HOURS 7912180738

D CKET NO. 50-287 UNIT SHUTDOWNS UNIT NAMI: oconee Unit 3 DATil 7/9/75 REPORT MONTil June, 1975 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON O) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 11 750613 S 303.8 B 1 Reactor coolant pump seal maintenance 12 750627 F 4.6 B 1 Shutdown to balance reactor coolant pump (1) REASON 0) METIIOD A--EQUIPMENT F AILURE (EXPLAIN) 1 -M ANtfAL B- MAINT. OR TES r. 2-MANUAL r C- REI UELING SCR AM f D-RIGULA10RY RESTRICTION 3- AUTOM ATIC E-Off R ATOR TRAINING AND SCRAM l.lCENSE EXAMINATION F- ADMINIS T R AllVE G-OPER ATION AL ERROR (EXPLAIN) ll -Ollli R IEXrl.AIN)

SOMMARY: The unit was shutdown for two weeks for reactor coolanti pump seal replacement.

\ .

e

_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _________m.. - -__ _.

-s DOCKET NO. 50-287 UNIT oconee Unit _3 DATE 7/9/75 AVERAGE DAILY UNIT POWER LEVEL MONTil June. 1975 AVERAGE DAILY POWER LEVEL AVE". AGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

808 17 1

2 840 18 3 827 19 4 842 20 5 _

840 21 6 842 22 7 842 23 8 828 24 9 843 25

~ 841 26 198 10 840 27 346 11 841 28 639 12 454 29 811 13

- 30 831 14 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usmg maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily l

average power level exceeds the 1007o line (or the re.tricted power lesel linel. In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly. l l