| OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No. 1 DATE 810102 COMPLETED BY A.A. Hunntad TELEPHONE 612-388- 1121 MONTH December, 1980 | | OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No. 1 DATE 810102 COMPLETED BY A.A. Hunntad TELEPHONE 612-388-1121 MONTH December, 1980 The unit was in Lead Follow operation this month; no shutdowns. |
| - The unit was in Lead Follow operation this month; no shutdowns.
| |
| a A | | a A |
| 8 5
| | 85 a. |
| a. | |
| f 8101200gq7 | | f 8101200gq7 |
|
| |
|
| a . | | a DAILY UNIT POWER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No. |
| l DAILY UNIT POWER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No. 1 DATE 810102 COMPLETED BY A.A. Hunstad TELEPHONE 612-388- 1121 MONTH December, 1980 DAY AVERAGE LOAD MWe-Net DAY AVERAGE LO.l) MWe-Net s
| | 1 DATE 810102 COMPLETED BY A.A. Hunstad TELEPHONE 612-388-1121 MONTH December, 1980 DAY AVERAGE LOAD MWe-Net DAY AVERAGE LO.l) MWe-Net s |
| s 1 462 17 516 E | | s 1 |
| . 2 521 18 517
| | 462 17 516 E |
| ~
| | 2 521 18 517 3 |
| ! 3 522 19 516 G
| | 522 19 516 |
| $ @ 4 522 20 518 5 518 21 520 6 520 22 516 7 520 23 517 8 522 24 518 9 520 25 516 10 519 26 494 11 523 27 514 12 521 28 515 13 521 29 516 14 494 30 513 15 521 31 516 16 493 4
| | ~ |
| | G 4 |
| | 522 20 518 5 |
| | 518 21 520 6 |
| | 520 22 516 7 |
| | 520 23 517 8 |
| | 522 24 518 9 |
| | 520 25 516 10 519 26 494 11 523 27 514 12 521 28 515 13 521 29 516 14 494 30 513 15 521 31 516 16 493 4 |
| i Average loads above 503 MWe-Net are due to cooler condenser circulating water. | | i Average loads above 503 MWe-Net are due to cooler condenser circulating water. |
| 1 4 | | 1 4 |
| J | | J |
|
| |
|
| OPERATING DATA REPORT DOCKET NO 50- 282 DATE 810102 COUPLETED BY A.A. Hunstad 4 | | OPERATING DATA REPORT DOCKET NO 50- 282 DATE 810102 COUPLETED BY A.A. Hunstad OPERATING STATUS TELEPHONE 612-388-1121 4 |
| OPERATING STATUS TELEPHONE 612-388-1121 | | 1. |
| : 1. Unit Name: Prairie Island No. 1 1
| | Unit Name: |
| : 2. Reporting Period: December, 1980 Notes
| | Prairie Island No. 1 1 |
| : 3. Licensed Thermal Power (MWt): 1650 4 Nameplate Rating (Gross MWe): 593
| | Notes 2. |
| : 5. Design Electrical Rating (Net MWe): 530
| | Reporting Period: |
| : 6. Maximum Dependable Capacity (Gross MWe): 534 g 7. Maximum Dependable Capacity (Net MWe): 503 g 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
| | December, 1980 3. |
| 5 Give Reason: | | Licensed Thermal Power (MWt): |
| ??
| | 1650 4 |
| [ 9. Power Level To Which Restricted, If Any (Net MWe): | | Nameplate Rating (Gross MWe): |
| N | | 593 5. |
| : 10. Reasons for Restrictions, If Any:
| | Design Electrical Rating (Net MWe): |
| This Month Yr-To-Date Cumulative | | 530 6. |
| : 11. Hours In Reporting Period 744 8784 61752
| | Maximum Dependable Capacity (Gross MWe): |
| : 12. Number Of Hours Reactor Was Critical 744.0 6958.7 48167.1
| | 534 g |
| : 13. Reactor Reserve Shutdown Hours 0.0 6.2 5538.1
| | 7. |
| : 14. Hours Generator On Line 744.0 6867.1 46990.6
| | Maximum Dependable Capacity (Net MWe): |
| : 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
| | 503 g |
| : 16. Gross Thermal Energy Generated (MWH) 1212882 10641687 72720681
| | 8. |
| : 17. Gross Electrical Energy Generated (MWH) 405960 3327840 23481510
| | If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report: |
| : 18. Net Electrical Energy Generated (MWH) 382554 3106355 21945607
| | 5 Give Reason: |
| : 19. Unit Service Factor 100.0. 78.2 76.1 20 .' Unit Availability Factor 100.0 78.2 76.1
| | ?? |
| : 21. Unit Capacity Factor (Using MDC Net) 102.2 70.3 70.7
| | [ |
| : 22. Unit Capacity Factor (Using DER Net) 97.0 66.7 67.1
| | 9. |
| : 23. Unit Forced Outage Rate 0.0 2.6 12.2
| | Power Level To Which Restricted, If Any (Net MWe): |
| : 24. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
| | N 10. |
| _ Refueling, September 1981, 6 weeks | | Reasons for Restrictions, If Any: |
| : 25. Il Shut Down at End Of Report Period, Estimated Date of Startup:
| | This Month Yr-To-Date Cumulative 11. |
| __m.-________-mam____._-..__-c.-- --.____-a
| | Hours In Reporting Period 744 8784 61752 12. |
| | Number Of Hours Reactor Was Critical 744.0 6958.7 48167.1 13. |
| | Reactor Reserve Shutdown Hours 0.0 6.2 5538.1 14. |
| | Hours Generator On Line 744.0 6867.1 46990.6 15. |
| | Unit Reserve Shutdown Hours 0.0 0.0 0.0 16. |
| | Gross Thermal Energy Generated (MWH) 1212882 10641687 72720681 17. |
| | Gross Electrical Energy Generated (MWH) 405960 3327840 23481510 18. |
| | Net Electrical Energy Generated (MWH) 382554 3106355 21945607 19. |
| | Unit Service Factor 100.0. |
| | 78.2 76.1 20.' Unit Availability Factor 100.0 78.2 76.1 21. |
| | Unit Capacity Factor (Using MDC Net) 102.2 70.3 70.7 22. |
| | Unit Capacity Factor (Using DER Net) 97.0 66.7 67.1 23. |
| | Unit Forced Outage Rate 0.0 2.6 12.2 24. |
| | Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each): |
| | _ Refueling, September 1981, 6 weeks 25. |
| | Il Shut Down at End Of Report Period, Estimated Date of Startup: |
| | m.- |
| | -mam |
| | -c.-- |
| | -a |
|
| |
|
| PINCP 120, Rev. 5 W | | PINCP 120, Rev. 5 W |
| .en.. m.
| | .en. m. |
| en m O O C D* M D on n | | en m O O C |
| : o. e fD C o. | | D* M D |
| | on n |
| | : o. e fD C o. |
| | W OC. |
| | l Type N |
| | Duration |
| | = 0 m M C o tz > W (Hours) i e i e e i a e c O O > 0 W x ~C.m m n m am @ (D O vb 7C B (D 00 m ** C O C M >~ M C C D >~ D M N D D WO tt m 2 |
| | ft W nW Wc9 Reason |
| | ^W u) O rt WD (D MO rt M O 3 D D xD M M om D n v u o HM o |
| | Method of C |
| | W WnM am Z |
| | m W mW Shutting |
| | -m<W e 3 |
| | H |
| | " " " 3." |
| | " E' Down Reactor to O |
| | D M HM M |
| | M QQ ** |
| | (b c M |
| | 2 O |
| | U) A m |
| | H |
| | ^ |
| | P ft rt M W |
| | r* |
| | O c |
| | M x |
| | (D M >= |
| | W O |
| | x t* O T |
| | T < n H |
| | t |
| | >a D W |
| | O c ft W |
| | D D |
| | M Q D Z |
| | Cn D |
| | (D rt et in O |
| | D D |
| | (D |
| | .Z D |
| | U2 v |
| | *ek C |
| | -] |
| | 3 (D |
| | w M |
| | N M |
| | O System |
| | ? |
| | 4 E |
| | Code M |
| | n er m |
| | O c |
| | S Component 5 |
| | 5 d |
| | ~ |
| | Code 5 |
| W O | | W O |
| C.
| |
| l
| |
| . Type N
| |
| Duration
| |
| = 0 m M C o tz > W i e i e e i a e c (Hours)
| |
| O mOam n > 0@ W(D x ~C.mO vb m 7C B (D 00 m ** C O C M >~ M C C D >~ D M N D D WO tt m 2 ft W nW Wc9
| |
| ^W u) O rt WD (D Reason MO rt M O 3 D D xD M M om D n v u o HM o Method of C W WnM am Z m W mW Shutting -
| |
| -m<W e 3 H O
| |
| 3."
| |
| DM "HME' Down Reactor M
| |
| to M QQ ** (b c M 2 O U) A m H
| |
| ^ P ft rt M W r* O c M ** x (D M >= W O x t* O T T < n H t >a D W O c ft W D D M Q D Z Cn D (D ** rt et in O
| |
| >* D D (D
| |
| .Z C
| |
| D U2 (D
| |
| v *ek -]
| |
| :::" 3 w
| |
| M N M O
| |
| $ System ?
| |
| 4
| |
| * E Code @ M n er m
| |
| >* O c S Component 5
| |
| ~ d 5
| |
| W Code $
| |
| O 5
| |
| 2: | | 2: |
| AWNWZ t i I I C O > | | AWNWZ t i I I C O > |
| * T ft rt C F U D' D" rt D D C (D O C C Q. | | * T ft rt C F U D' D" rt D D C (D O C C Q. |
| M 9 4 4 .. | | M 9 4 4 b W >-* |
| b W >-* | | ^ rt MW *4 x0 M t |
| ^ rt MW *4 x0 M **
| | O W HT N |
| t O W HT N O O 4 M M 4 % C
| | O O |
| *> C C Hm CO U *O' < V) M r* =n v C >Q r* M M /:
| | 4 M M |
| D 0 MH HM rt rt P NM H | | 4 C |
| ** =0CZ u d WO O O >>Z mD 0 Z to H v O M ^ W m C 'O t/J M O
| | C C |
| C re M M MMMM. | | Hm CO U *O' V) |
| M ZQ O D M ft X M O c &
| | M r* |
| D" Ct M rt C M 7 M n * .M 5 | | =n v |
| ** WO 2t C >* c eg Cr MM t" Q O C' D n.
| | C >Q r* M M /: |
| v g > CD ,m. vi O
| | D 0 MH HM rt rt P NM H |
| >* OM W MM ft >= n < w .
| | =0CZ u |
| * M l rt I nD D **. rt p c cn > O W
| | d WO O O |
| O ^ (D ft rt O cp . > | | >>Z mD 0 Z to H v O O |
| O c N W t" 3 M *a D O e
| | M MMMM. |
| & M U) M O (A I w = tv w CD l WWO Q M WC to N vvG Ch mD tO 3
| | M |
| * th D* O O t m in O D MMC mM rt D 3 > = < C 4 a O >.* O rw O.
| | ^ W m C 'O t/J M C re M M |
| C D UJ Z (n rt O .O C | | ZQ O D M ft X M O c |
| M W D
| | .M D" |
| | Ct M rt C M 7 |
| | M n |
| | 5 WO 2t C c |
| | ,m. vi n. |
| | eg v |
| | g > |
| | CD Cr MM t" Q O C' |
| | D O |
| | OM W MM ft >= |
| | n w |
| | M l |
| | rt I |
| | nD D **. rt p |
| | c cn > O O ^ (D ft rt O cp c |
| | W W t" 3 M |
| | *a D O e |
| | O N |
| | & M U) M O (A I w = |
| | tv w CD l |
| | WWO Q |
| | M W C to N |
| | vvG Ch mD tO 3 in O |
| | th D* O O t m |
| | D MMC mM rt D |
| | 3 |
| | > = < C 4 |
| | a O |
| | >.* O rw O. |
| | C D UJ Z |
| | (n rt |
| | .O O |
| | C M |
| | W D |
| C | | C |
|
| |
|
| 1 | | 1 |
| ~
| | ~ |
| NARRATIVE | | NARRATIVE |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 810102 COMPLETED BY A.A. Hunstad JELEPHONE 612-388- 1121 MONTH December, 1980 | | OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 810102 COMPLETED BY A.A. Hunstad JELEPHONE 612-388-1121 MONTH December, 1980 |
| 'I l s The unit was in Load Follow operation this month. On 12-21, load was reduced j g to 44% for several hours for condenser cleaning and the monthly turbine valves y test. | | 'I The unit was in Load Follow operation this month. On 12-21, load was reduced l |
| n . | | s j |
| E 1,
| | g to 44% for several hours for condenser cleaning and the monthly turbine valves y |
| i i | | test. |
| 4 i
| | n E |
| I | | 1, i |
| )
| | i 4 |
| I l | | i I |
| h yw** >ry m er p 's t m *M+-W T '--7'- 9''+ g *- ** * | | ) |
| 'r9 -****F wP P 1 p s P1 u,-i-----e --efg * , - - * - - - - * *- --7m*W-9'-'*"st1 ***-w7*
| | I l>- |
| * NPP'-'f T-''e $TC'**"'-'CT- "-@ T+*=2$-'8
| | h |
| | 'r9 |
| | -****F wP yw** |
| | P 1 |
| | p s P1 u,-i-----e |
| | --efg |
| | >ry m |
| | er |
| | --7m*W-9'-'*"st1 |
| | ***-w7* |
| | NPP'-'f T-''e p |
| | $TC'**"'-'CT- |
| | 's t m *M+-W T |
| | T+*=2$-'8 |
| | '--7'- |
| | 9''+ |
| | g |
|
| |
|
| DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 810102 COMPLETED BY A.A. Hunstad TELEPHONE 612-388- 1121 MONTH December, 1980 DAY AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net g' 1 513 17 501 m | | DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 810102 COMPLETED BY A.A. Hunstad TELEPHONE 612-388-1121 MONTH December, 1980 DAY AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net g' |
| . 2 511 18 506 5
| | 1 513 17 501 m |
| ~
| | 2 511 18 506 5 |
| 3 512 19 501 e | | ~ |
| { 4 509 20 503 5 500 21 309 6 508 22 507 7 510 23 508 8 514 24 511 9 514 25 507 10 511 26 509 11 516 27 506 12 510 28 506 13 511 29 508 14 512 30 505 15 510 31 509 16 504 Average loads above 500 !!We-Net are due to cooler condenser circulating water. | | 3 512 19 501 e |
| \. | | { |
| .c ,.n
| | 4 509 20 503 5 |
| | 500 21 309 6 |
| | 508 22 507 7 |
| | 510 23 508 8 |
| | 514 24 511 9 |
| | 514 25 507 10 511 26 509 11 516 27 506 12 510 28 506 13 511 29 508 14 512 30 505 15 510 31 509 16 504 Average loads above 500 !!We-Net are due to cooler condenser circulating water. |
| | \\. |
| | .c |
| | ,.n |
|
| |
|
| OPERATING DATA REPORT DOCKET NO 50- 306 DATE 810102 COMPLETED BY A.A. Hunstad OPERATING STATUS TELEPHONE 612-388-1121 | | OPERATING DATA REPORT DOCKET NO 50- 306 DATE 810102 COMPLETED BY A.A. Hunstad OPERATING STATUS TELEPHONE 612-388-1121 1. |
| : 1. Unit Name: Prairie Island No. 2 1 2. Reporting Period: December, 1980 Notes 1 3. Licensed Thermal Power (MWt): 1650 I 4 Nameplate Rating (Gross MWe): 593
| | Unit Name: |
| : 5. Design Electrical Rating (Net MWe): 530
| | Prairie Island No. |
| : 6. Maximum Dependable Capacity (Gross MWe): 531 g 7. Maximum Dependable Capacity (Net Kle): 500 g 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
| | 2 1 |
| I S Give Reason: | | 2. |
| | Reporting Period: |
| | December, 1980 Notes 1 |
| | 3. |
| | Licensed Thermal Power (MWt): |
| | 1650 I |
| | 4 Nameplate Rating (Gross MWe): |
| | 593 5. |
| | Design Electrical Rating (Net MWe): |
| | 530 6. |
| | Maximum Dependable Capacity (Gross MWe): |
| | 531 g |
| | 7. |
| | Maximum Dependable Capacity (Net Kle): |
| | 500 g |
| | 8. |
| | If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report: |
| | I S |
| | Give Reason: |
| [ | | [ |
| o
| | 9. |
| : 9. ' Power Level To Which Restricted, If Any (Net MWe):
| | ' Power Level To Which Restricted, If Any (Net MWe): |
| " 10. Reasons for Restrictions, If Any:
| | o" 10. |
| This Month Yr-To-Date Cumulative | | Reasons for Restrictions, If Any: |
| : 11. Hours In Reporting Period 744 8784 52870 744.0 46381.8
| | This Month Yr-To-Date Cumulative 11. |
| ~
| | Hours In Reporting Period 744 8784 52870 12. |
| : 12. Number Of Hours Reactor Was Critical 7253.0
| | Number Of Hours Reactor Was Critical 744.0 7253.0 46381.8 |
| : 13. Reactor Reserve Shutdown Hours 0.0 102.0 1508.0
| | ~ |
| : 14. Hours Generator On Line 744.0 7169.9 45570.9
| | 13. |
| : 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
| | Reactor Reserve Shutdown Hours 0.0 102.0 1508.0 14. |
| : 16. Gross Thermal Energy Generated (MWH) 1207125 11426487 71098990 j 17. Gross Electrical Energy Generated (MWH) 396770 3704810 __
| | Hours Generator On Line 744.0 7169.9 45570.9 15. |
| 22758940 | | Unit Reserve Shutdown Hours 0.0 0.0 0.0 16. |
| : 18. Net Electrical Energy Generated (MWH) 373448 3469171 21307903
| | Gross Thermal Energy Generated (MWH) 1207125 11426487 71098990 j |
| : 19. Unit Service Factor 100.0 81.6 86.2
| | 17. |
| : 20. Unit Availability Factor 100.0 81.6 86.2
| | Gross Electrical Energy Generated (MWH) 396770 3704810 22758940 18. |
| : 21. Unit Capacity Factor (Using MDC Net) 100.4~ 79.0 80.6
| | Net Electrical Energy Generated (MWH) 373448 3469171 21307903 19. |
| : 22. Unit Capacity Factor (Using DER Net) 94.7 74.5 76.0
| | Unit Service Factor 100.0 81.6 86.2 20. |
| : 23. Unit Forced Outage Rate 0.0 0.6 4.2
| | Unit Availability Factor 100.0 81.6 86.2 21. |
| : 24. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
| | Unit Capacity Factor (Using MDC Net) 100.4~ |
| k- Refueling, February 1981, 6 weeks | | 79.0 80.6 22. |
| : 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
| | Unit Capacity Factor (Using DER Net) 94.7 74.5 76.0 23. |
| ;
| | Unit Forced Outage Rate 0.0 0.6 4.2 24. |
| _ - - , - , , , , , , . . ,,e . --. - ,.,rm - - , , . - , . - _ ,_.,-m..._ _ - - _ . _ . - . - - - _ _ , , - - -
| | Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each): |
| | k-Refueling, February 1981, 6 weeks 25. |
| | If Shut Down at End Of Report Period, Estimated Date of Startup: |
| | ,,e |
| | ,.,rm |
| | ,_.,-m..._ |
|
| |
|
| Y UNIT GHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 306 REPORT MONTil December 1980 UNIT NAME Prairic Island No. 2 DATE 810102 COMPLETED BY A.A. Ilunstad TELEP110NE 612-388-1121 e4 c n % oc% Licensee a4 u Cause & Corrective Date $. 37 $ 38 Event 8 .$ $n Action to N N$ $ 3 I$ $ Report # | | Y UNIT GHUTDOWNS AND POWER REDUCTIONS DOCKET NO. |
| $0 $ .8 Prevent Recurrence US AV 5 ?E$
| | 50- 306 REPORT MONTil December 1980 UNIT NAME Prairic Island No. 2 DATE 810102 COMPLETED BY A.A. Ilunstad TELEP110NE 612-388-1121 oc% |
| OM
| | Licensee a4 u |
| $0 O
| | Cause & Corrective e4 c |
| m * " | | n Date 37 38 Event 8.$ |
| S a:
| | $n Action to N |
| "i
| | N$ |
| - 801221 S 0.0 B N/A N/A N/A N/A Load was reduced to 44% for
| | 3 I$ $ |
| @ several hours for condenser j5 cleaning and the monthly turbine valves test.
| | Report # |
| | $0 |
| | $.8 Prevent Recurrence US 5 |
| | ?E$ |
| | $0 AV OM O |
| | m S |
| | a: |
| | "i |
| | - 801221 S |
| | 0.0 B |
| | N/A N/A N/A N/A Load was reduced to 44% for several hours for condenser j5 cleaning and the monthly turbine valves test. |
| 4 1 | | 4 1 |
| F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREC-0161) | | F: Forced Reason Method: |
| G-Operational Error (Explain) | | Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREC-0161) |
| H-Other (Explain 5 Exhibit 1 - Same Source | | G-Operational Error (Explain) 5 H-Other (Explain Exhibit 1 - Same Source s}} |
| _-__ -____ ___ - -_ ___ ____ __ s}}
| |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211J2851999-08-26026 August 1999 Safety Evaluation Supporting Amends 146 & 137 to Licenses DPR-42 & DPR-60,respectively ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with 05000282/LER-1999-007-01, :on 990625,loss of CR Special Ventilation Function Was Noted.Caused by Broken Door Latch Pins on CR Chiller Door.Ts Amend Request to Establish Allowed OOS Time Was Submitted1999-07-23023 July 1999
- on 990625,loss of CR Special Ventilation Function Was Noted.Caused by Broken Door Latch Pins on CR Chiller Door.Ts Amend Request to Establish Allowed OOS Time Was Submitted
ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 05000282/LER-1999-005-01, :on 990508,containment Inservice Purge Sys Was Not Isolated During Heavy Load Movement Over Fuel.Caused by Missing Procedure Step in D58.1.6.PINGP 1224 Was Initiated to Communicate Event & Forestall Repeating Event1999-05-0808 May 1999
- on 990508,containment Inservice Purge Sys Was Not Isolated During Heavy Load Movement Over Fuel.Caused by Missing Procedure Step in D58.1.6.PINGP 1224 Was Initiated to Communicate Event & Forestall Repeating Event
ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205B3351999-03-17017 March 1999 Safety Evaluation Supporting Amends 143 & 134 to Licenses DPR-42 & DPR-60,respectively ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 05000306/LER-1999-001-01, :on 990206,TS Required Reactor Protection Logic Test Was Missed.Caused by Personnel Error.Sd Banks Were Inserted at 0544,RT Breakers Were Opened & Test Was Performed.With1999-03-0808 March 1999
- on 990206,TS Required Reactor Protection Logic Test Was Missed.Caused by Personnel Error.Sd Banks Were Inserted at 0544,RT Breakers Were Opened & Test Was Performed.With
ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety 05000306/LER-1998-006-01, :on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted1999-01-18018 January 1999
- on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted
ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 05000306/LER-1998-005-02, :on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With1998-12-0909 December 1998
- on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With
ML20198L2211998-12-0707 December 1998 Safety Evaluation Supporting Amends 141 & 132 to Licenses DPR-42 & DPR-60,respectively ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With 05000282/LER-1998-016, :on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With1998-11-24024 November 1998
- on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With
ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20195D3821998-11-0404 November 1998 Safety Evaluation Supporting Amends 140 & 131 to Licenses DPR-42 & DPR-60,respectively ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195D3761998-10-30030 October 1998 Safety Evaluation Supporting Amends 139 & 130 to Licenses DPR-42 & DPR-60 05000306/LER-1998-004-01, :on 980910,shield Building Integrity Was Breached.Caused by Inadequate TS Change.Revised Affected Procedures.With1998-10-0505 October 1998
- on 980910,shield Building Integrity Was Breached.Caused by Inadequate TS Change.Revised Affected Procedures.With
ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20198R8061998-09-30030 September 1998 Rev 1 to NSPLMI-96001, Prairie Island Nuclear Generating Plant Ipeee ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With 05000282/LER-1998-009-01, :on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures1998-08-27027 August 1998
- on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures
ML20237D6491998-08-13013 August 1998 Safety Evaluation Supporting Amends 137 & 128 to Licenses DPR-42 & DPR-60,respectively ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
.
(~)
'w)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No. 1 DATE 810102 COMPLETED BY A.A. Hunntad TELEPHONE 612-388-1121 MONTH December, 1980 The unit was in Lead Follow operation this month; no shutdowns.
a A
85 a.
f 8101200gq7
a DAILY UNIT POWER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No.
1 DATE 810102 COMPLETED BY A.A. Hunstad TELEPHONE 612-388-1121 MONTH December, 1980 DAY AVERAGE LOAD MWe-Net DAY AVERAGE LO.l) MWe-Net s
s 1
462 17 516 E
2 521 18 517 3
522 19 516
~
G 4
522 20 518 5
518 21 520 6
520 22 516 7
520 23 517 8
522 24 518 9
520 25 516 10 519 26 494 11 523 27 514 12 521 28 515 13 521 29 516 14 494 30 513 15 521 31 516 16 493 4
i Average loads above 503 MWe-Net are due to cooler condenser circulating water.
1 4
J
OPERATING DATA REPORT DOCKET NO 50- 282 DATE 810102 COUPLETED BY A.A. Hunstad OPERATING STATUS TELEPHONE 612-388-1121 4
1.
Unit Name:
Prairie Island No. 1 1
Notes 2.
Reporting Period:
December, 1980 3.
Licensed Thermal Power (MWt):
1650 4
Nameplate Rating (Gross MWe):
593 5.
Design Electrical Rating (Net MWe):
530 6.
Maximum Dependable Capacity (Gross MWe):
534 g
7.
Maximum Dependable Capacity (Net MWe):
503 g
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
5 Give Reason:
??
[
9.
Power Level To Which Restricted, If Any (Net MWe):
N 10.
Reasons for Restrictions, If Any:
This Month Yr-To-Date Cumulative 11.
Hours In Reporting Period 744 8784 61752 12.
Number Of Hours Reactor Was Critical 744.0 6958.7 48167.1 13.
Reactor Reserve Shutdown Hours 0.0 6.2 5538.1 14.
Hours Generator On Line 744.0 6867.1 46990.6 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1212882 10641687 72720681 17.
Gross Electrical Energy Generated (MWH) 405960 3327840 23481510 18.
Net Electrical Energy Generated (MWH) 382554 3106355 21945607 19.
Unit Service Factor 100.0.
78.2 76.1 20.' Unit Availability Factor 100.0 78.2 76.1 21.
Unit Capacity Factor (Using MDC Net) 102.2 70.3 70.7 22.
Unit Capacity Factor (Using DER Net) 97.0 66.7 67.1 23.
Unit Forced Outage Rate 0.0 2.6 12.2 24.
Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
_ Refueling, September 1981, 6 weeks 25.
Il Shut Down at End Of Report Period, Estimated Date of Startup:
m.-
-mam
-c.--
-a
PINCP 120, Rev. 5 W
.en. m.
en m O O C
D* M D
on n
- o. e fD C o.
W OC.
l Type N
Duration
= 0 m M C o tz > W (Hours) i e i e e i a e c O O > 0 W x ~C.m m n m am @ (D O vb 7C B (D 00 m ** C O C M >~ M C C D >~ D M N D D WO tt m 2
ft W nW Wc9 Reason
^W u) O rt WD (D MO rt M O 3 D D xD M M om D n v u o HM o
Method of C
W WnM am Z
m W mW Shutting
-m<W e 3
H
" " " 3."
" E' Down Reactor to O
D M HM M
M QQ **
(b c M
2 O
U) A m
H
^
P ft rt M W
r*
O c
M x
(D M >=
W O
x t* O T
T < n H
t
>a D W
O c ft W
D D
M Q D Z
Cn D
(D rt et in O
D D
(D
.Z D
U2 v
-]
3 (D
w M
N M
O System
?
4 E
Code M
n er m
O c
S Component 5
5 d
~
Code 5
W O
2:
AWNWZ t i I I C O >
- T ft rt C F U D' D" rt D D C (D O C C Q.
M 9 4 4 b W >-*
^ rt MW *4 x0 M t
O W HT N
O O
4 M M
4 C
C C
Hm CO U *O' V)
M r*
=n v
C >Q r* M M /:
D 0 MH HM rt rt P NM H
=0CZ u
d WO O O
>>Z mD 0 Z to H v O O
M MMMM.
M
^ W m C 'O t/J M C re M M
ZQ O D M ft X M O c
.M D"
Ct M rt C M 7
M n
5 WO 2t C c
,m. vi n.
eg v
g >
CD Cr MM t" Q O C'
D O
OM W MM ft >=
n w
M l
rt I
nD D **. rt p
c cn > O O ^ (D ft rt O cp c
W W t" 3 M
O N
& M U) M O (A I w =
tv w CD l
WWO Q
M W C to N
vvG Ch mD tO 3 in O
th D* O O t m
D MMC mM rt D
3
> = < C 4
a O
>.* O rw O.
C D UJ Z
(n rt
.O O
C M
W D
C
1
~
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 810102 COMPLETED BY A.A. Hunstad JELEPHONE 612-388-1121 MONTH December, 1980
'I The unit was in Load Follow operation this month. On 12-21, load was reduced l
s j
g to 44% for several hours for condenser cleaning and the monthly turbine valves y
test.
n E
1, i
i 4
i I
)
I l>-
h
'r9
-****F wP yw**
P 1
p s P1 u,-i-----e
--efg
>ry m
er
--7m*W-9'-'*"st1
NPP'-'f T-e p
$TC'**"'-'CT-
's t m *M+-W T
T+*=2$-'8
'--7'-
9+
g
DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 810102 COMPLETED BY A.A. Hunstad TELEPHONE 612-388-1121 MONTH December, 1980 DAY AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net g'
1 513 17 501 m
2 511 18 506 5
~
3 512 19 501 e
{
4 509 20 503 5
500 21 309 6
508 22 507 7
510 23 508 8
514 24 511 9
514 25 507 10 511 26 509 11 516 27 506 12 510 28 506 13 511 29 508 14 512 30 505 15 510 31 509 16 504 Average loads above 500 !!We-Net are due to cooler condenser circulating water.
\\.
.c
,.n
OPERATING DATA REPORT DOCKET NO 50- 306 DATE 810102 COMPLETED BY A.A. Hunstad OPERATING STATUS TELEPHONE 612-388-1121 1.
Unit Name:
Prairie Island No.
2 1
2.
Reporting Period:
December, 1980 Notes 1
3.
Licensed Thermal Power (MWt):
1650 I
4 Nameplate Rating (Gross MWe):
593 5.
Design Electrical Rating (Net MWe):
530 6.
Maximum Dependable Capacity (Gross MWe):
531 g
7.
Maximum Dependable Capacity (Net Kle):
500 g
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
I S
Give Reason:
[
9.
' Power Level To Which Restricted, If Any (Net MWe):
o" 10.
Reasons for Restrictions, If Any:
This Month Yr-To-Date Cumulative 11.
Hours In Reporting Period 744 8784 52870 12.
Number Of Hours Reactor Was Critical 744.0 7253.0 46381.8
~
13.
Reactor Reserve Shutdown Hours 0.0 102.0 1508.0 14.
Hours Generator On Line 744.0 7169.9 45570.9 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1207125 11426487 71098990 j
17.
Gross Electrical Energy Generated (MWH) 396770 3704810 22758940 18.
Net Electrical Energy Generated (MWH) 373448 3469171 21307903 19.
Unit Service Factor 100.0 81.6 86.2 20.
Unit Availability Factor 100.0 81.6 86.2 21.
Unit Capacity Factor (Using MDC Net) 100.4~
79.0 80.6 22.
Unit Capacity Factor (Using DER Net) 94.7 74.5 76.0 23.
Unit Forced Outage Rate 0.0 0.6 4.2 24.
Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
k-Refueling, February 1981, 6 weeks 25.
If Shut Down at End Of Report Period, Estimated Date of Startup:
,,e
,.,rm
,_.,-m..._
Y UNIT GHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50- 306 REPORT MONTil December 1980 UNIT NAME Prairic Island No. 2 DATE 810102 COMPLETED BY A.A. Ilunstad TELEP110NE 612-388-1121 oc%
Licensee a4 u
Cause & Corrective e4 c
n Date 37 38 Event 8.$
$n Action to N
N$
3 I$ $
Report #
$0
$.8 Prevent Recurrence US 5
?E$
$0 AV OM O
m S
a:
"i
- 801221 S
0.0 B
N/A N/A N/A N/A Load was reduced to 44% for several hours for condenser j5 cleaning and the monthly turbine valves test.
4 1
F: Forced Reason Method:
Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREC-0161)
G-Operational Error (Explain) 5 H-Other (Explain Exhibit 1 - Same Source s