| {{#Wiki_filter:OBSERVATIONS DEVELOPED DURING THE ACCEPTANCE REVIEW TO SUPPORT THE TRISO-X APPLICATION FOR A FUEL FABRICATION FACILITY | | {{#Wiki_filter:1 OBSERVATIONS DEVELOPED DURING THE ACCEPTANCE REVIEW TO SUPPORT THE TRISO-X APPLICATION FOR A FUEL FABRICATION FACILITY The following observations represent information the U.S. Nuclear Regulatory Commission (NRC) identified during the acceptance review for the TRISO-X, LLC license application (LA) issued on November 18, 2022 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML22320A110). These observations are provided for early awareness of the applicant and no formal response is needed. The NRC staff will follow up on these observations during the development of requests for additional information as the review proceeds. |
| | | : 1. Environmental Report The public health evaluation in the environmental report does not include certain radiological and chemical release scenarios and may not be conservative in terms of the atmospheric dispersion modeling and distances at which maximum radiological and chemical concentrations occur. Additionally, staff noted that surface water drainage from areas at higher elevations that would enter onto the site was not included in the surface water evaluation. Finally, the cultural resource information is complete but may not be in a format acceptable to the States Historic Preservation Office. |
| The following observations represent information the U.S. Nuclear Regulatory Commission (NRC) identified during the acceptance review for the TRISO-X, LLC license application (LA) issued on November 18, 2022 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML22320A110 ). These observations are provided for early awareness of the applicant and no formal response is needed. The NRC staff will follow up on these observations during the development of requests for additional information as the review proceeds. | | : 2. Geotechnical Figures 1-4 through 1-8 of LA: Please provide a larger scale to allow the NRC staff to read the details (geological cross-sections). |
| : 1. Environmental Report | |
| | |
| The public health evaluation in the environmental report does not include certain radiological and chemical release scenarios and may not be conservative in terms of the atmospheric dispersion modeling and distances at which maximum radiological and chemical concentrations occur. Additionally, staff noted that surface water drainage from areas at higher elevations that would enter onto the site was not included in the surface water evaluation. Finally, the cultural resource information is complete but may not be in a format acceptable to the States Historic Preservation Office. | |
| : 2. Geotechnical | |
| | |
| Figures 1-4 through 1-8 of LA: Please provide a larger scale to allow the NRC staff to read the details (geological cross -sections). | |
| | |
| For the following items, the NRC staff is interested in reviewing the supporting information through an electronic reading room, portal, or other means. | | For the following items, the NRC staff is interested in reviewing the supporting information through an electronic reading room, portal, or other means. |
| * On page 1-7 under Subsurface Bearing Capacity: The text says an analysis has been done which shows no soil failure.
| | On page 1-7 under Subsurface Bearing Capacity: The text says an analysis has been done which shows no soil failure. |
| * On page 1-6 under Site Topography: The text says a slope stability analysis will be conducted to show the design is adequate.
| | On page 1-6 under Site Topography: The text says a slope stability analysis will be conducted to show the design is adequate. |
| * On page 1-6/1-7 under Differential Settlement: The LA discusses additional design elements (such as, Rigid Inclusion, Load Transfer Platform). They appear appropriate conceptually. Provide the design calculations needed to show the design achieves the goal of acceptable differential settlement throughout the process building and some monitoring program is provided during operations to detect any deviation from design.
| | On page 1-6/1-7 under Differential Settlement: The LA discusses additional design elements (such as, Rigid Inclusion, Load Transfer Platform). They appear appropriate conceptually. Provide the design calculations needed to show the design achieves the goal of acceptable differential settlement throughout the process building and some monitoring program is provided during operations to detect any deviation from design. |
| | | The information is needed to demonstrate compliance with Title 10 of the Code of Federal Regulations (10 CFR) Paragraph 70.22(d) for additional information to support the NRCs review, 10 CFR 70.22I for complete and accurate information, and 10 CFR 70.22(a)(7), 10 CFR 70.65(b)(1), and (2) for facility and site information. |
| The information is needed to demonstrate compliance with Title 10 of the Code of Federal Regulations (10 CFR) Paragraph 70.22(d) for additional information to support the NRCs review, 10 CFR 70.22I for complete and accurate information, and 10 CFR 70.22(a)(7), 10 CF R 70.65(b)(1), and (2) for facility and site information. | |
| : 3. Material Control and Accounting (Fundamental Nuclear Material Control Plan) | | : 3. Material Control and Accounting (Fundamental Nuclear Material Control Plan) |
| * In the Abbreviations and Acronyms section, MC&A is defined as material control and accountability. In Section 1.1, it is defined as material control and accounting. Both are used throughout the fundamental nuclear material control (FNMC) plan. Ensure consistent usage throughout the document.
| | In the Abbreviations and Acronyms section, MC&A is defined as material control and accountability. In Section 1.1, it is defined as material control and accounting. Both are used throughout the fundamental nuclear material control (FNMC) plan. Ensure consistent usage throughout the document. |
| | |
| 1 Enclosure 2
| |
| * Appendix A of the FNMC plan provides supplementary information about the facility and the material control and accounting program in the form of process flow diagrams. The scale of the drawings is such that even in electronic form (where the drawings can be digitally enlarged), the text is difficult to read. The NRC staff will ne ed readable versions of the drawings in Appendix A.
| |
|
| |
|
| | 2 Appendix A of the FNMC plan provides supplementary information about the facility and the material control and accounting program in the form of process flow diagrams. The scale of the drawings is such that even in electronic form (where the drawings can be digitally enlarged), the text is difficult to read. The NRC staff will need readable versions of the drawings in Appendix A. |
| The information is needed to demonstrate compliance with 10 CFR 70.22(e) for complete and accurate information. | | The information is needed to demonstrate compliance with 10 CFR 70.22(e) for complete and accurate information. |
| : 4. Electrical/I&C Observations | | : 4. Electrical/I&C Observations |
|
| |
| [REDACTED] | | [REDACTED] |
| : 5. Chemical | | : 5. Chemical |
|
| |
| [REDACTED] | | [REDACTED] |
| : 6. Structural | | : 6. Structural |
|
| |
| [Redacted] | | [Redacted] |
| : 7. Integrated Safety Analysis | | : 7. Integrated Safety Analysis |
| | | [REDACTED]}} |
| [REDACTED] | |
| | |
| 2}}
| |
Letter Sequence Acceptance Review |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARML22101A2002022-03-31031 March 2022, 5 April 2022 TRISO-X, LLC Fuel Fabrication Facility License Application Submittal Project stage: Request ML22101A2052022-04-0505 April 2022 TRISO-X, LLC Fuel Fabrication Facility License Application Submittal Project stage: Other ML22166A0422022-08-0909 August 2022 Cover Letter - NRC Requests for Supplemental Information (Rsis) for TRISO-X License Application Project stage: Other ML22166A0412022-08-0909 August 2022 NRC Request for Supplemental Information for the TRISO-X License Application Project stage: Request ML22166A0432022-08-0909 August 2022 Enclosure 1 - Requests for Supplement Information for the TRISO-X License Application Review Project stage: Other ML22266A2692022-09-23023 September 2022 TRISO-X Fuel Fabrication Facility Environmental Report Submittal Project stage: Request ML22286A1442022-10-13013 October 2022 Response to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal Project stage: Request ML22286A1472022-10-13013 October 2022 Responses to Requests for Supplemental Information to Support the TRISO-X License Application Project stage: Supplement ML22308A2512022-11-0404 November 2022 Triso-X, LLC, License Application and ISA Summary Changes Associated with Responses to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal Project stage: Request ML22320A5632022-11-16016 November 2022 Triso-X, LLC - Additional Information Supporting the Response to Rsi Question 8.1 Concerning the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Project stage: Other ML22320A1102022-11-18018 November 2022 NRC Acceptance of the TRISO-X, LLC - Application for a Fuel Fabrication Facility Project stage: Acceptance Review ML22348A0162022-12-16016 December 2022 Enclosure 1 - Observations Developed During the Acceptance Review to Support the TRISO-X Application for a Fuel Fabrication Facility (Public) Project stage: Acceptance Review ML22348A0132022-12-16016 December 2022 NRC Observations Developed During the Acceptance Review of the TRISO-X License Application Project stage: Request ML22348A0142022-12-16016 December 2022 Cover Letter - Nuclear Regulatory Commission Observations to Support the TRISO-X License Application for a Fuel Fabrication Facility Project stage: Other ML23104A4192023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility Project stage: Request ML23127A0132023-05-31031 May 2023 Enclosurai for the TRISO-X Application Project stage: RAI ML23127A0122023-05-31031 May 2023 Request for Additional Information (Set 1) for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) Project stage: RAI ML23127A0112023-05-31031 May 2023 Triso-X RAIs for License Application Project stage: Request ML23198A2592023-07-27027 July 2023 Request for Additional Information for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) Project stage: RAI ML23198A2572023-07-27027 July 2023 NRC Letter Request for Additional Information on Chp 1, 2, EP for the TRISO-X, LLC License Application Project stage: Request ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility Project stage: Response to RAI ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application Project stage: Supplement ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application Project stage: Response to RAI ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application Project stage: RAI ML23254A3812023-09-29029 September 2023 Letter to Triso-X for the Fourth Set of RAIs That Includes an Enclosure for Geotechnical and an Enclosure for Hydrology Project stage: Request ML23285A3442023-10-12012 October 2023 Response to Request for Additional Information Set 3 (ISA and Security) for the TRISO-X License Application Project stage: Response to RAI ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 Project stage: RAI ML23312A2482023-11-0808 November 2023 7-5-23 Email Summary of Meeting to Discuss Draft ISA RAIs for Alignment Project stage: Request ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application Project stage: Response to RAI ML23313A1142023-11-17017 November 2023 Cover Letter - Triso-X License Application Sixth Set of RAIs for Material Control and Accounting, Fire, and Structural Project stage: RAI ML23313A1102023-11-17017 November 2023 Triso-X for the Sixth Set of RAIs Including Material Control & Accounting and Fire Safety Project stage: Request ML23320A2052023-11-17017 November 2023 Enclosure 1 - Request for Additional Information for (Programmatic) Structural Review Regarding the TRISO-X License Application Project stage: RAI ML23235A2262023-11-20020 November 2023, 27 November 2023 TRISO-X Fff Environmental RAI Part 2 Project stage: Request ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application Project stage: Response to RAI ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application Project stage: Response to RAI ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis Project stage: Draft RAI ML23353A1822023-12-27027 December 2023 Summary of Meeting Held on December 4, 2023, to Discuss the TRISO-X Draft Responses to the Requests for Additional Information Project stage: Request ML23353A1842023-12-27027 December 2023 Enclosure 1 - Participants List for Summary of Meeting Held December 4, 2023, with TRISO-X, LLC to Align on Draft Responses to Requests for Additional Information for Chemical Safety Analysis Project stage: Draft RAI ML23362A0632024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information Project stage: Request ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application Project stage: RAI ML23321A0512024-02-26026 February 2024 Enclosure - RAIs Set Seven for the Environmental Safety Review Regarding TRISO-X License Application Project stage: RAI ML24065A3132024-03-0404 March 2024 Response to Request for Additional Information Part 2-2 for the TRISO-X Environmental Report and License Application Project stage: Response to RAI ML24057A3632024-03-11011 March 2024 Memorandum - Summary of Meeting 2-12-24 with TRISO-X to Discuss Draft RAIs on Environmental Protection Project stage: Draft RAI ML24057A3622024-03-11011 March 2024 Enclosure - Participants in Meeting Held 2-12-24 with TRISO-X to Discuss the Draft RAIs on Environmental Protection Project stage: Draft RAI ML24057A3612024-03-11011 March 2024 Summary of Meeting on 2-12-24 with TRISO-X to Discuss Draft Requests for Additional Information on Environmental Protection Project stage: Request ML23354A1652024-03-25025 March 2024 Cover Letter - Set Eight Containing a Programmatic Request for Additional Information for the Integrated Safety Analysis Review Regarding the TRISO-X License Application Project stage: RAI ML24087A2352024-03-27027 March 2024 Triso-X, LLC, Response to Request for Additional Information Set 7 (Environmental Safety) for the TRISO-X License Application Project stage: Response to RAI ML24085A2702024-04-0202 April 2024 Request TRISO-X, LLC to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Management Measures and Quality Assurance Portion of the License Application Project stage: RAI ML24095A3412024-04-0404 April 2024 Response to Request for Additional Information Part 3 for the TRISO-X Environmental Report Project stage: Request ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application Project stage: RAI 2023-12-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24249A3172024-09-0505 September 2024 TRISO-X, LLC, Supplemental Information for Management Measures and Quality Assurance RAI Responses ML24183A3912024-07-0101 July 2024 Supplemental Information for ISA RAI 1-9 Responses and RAI-10 Response for the TRISO-X License Application ML24089A2012024-05-0808 May 2024 Cover Letter - RAI Status Update for the Safety and Safeguards Requests for Additional Information for the TRISO-X License Application ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application ML24095A3422024-04-0404 April 2024 Response to Request for Additional Information Part 3 for the TRISO-X Environmental Report ML24085A2702024-04-0202 April 2024 Request TRISO-X, LLC to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Management Measures and Quality Assurance Portion of the License Application ML24082A2222024-04-0202 April 2024 Cover Letter - Request TRISO-X, Llc., to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Integrated Safety Analysis Portion of the License Application ML24087A2352024-03-27027 March 2024 Triso-X, LLC, Response to Request for Additional Information Set 7 (Environmental Safety) for the TRISO-X License Application ML23354A1652024-03-25025 March 2024 Cover Letter - Set Eight Containing a Programmatic Request for Additional Information for the Integrated Safety Analysis Review Regarding the TRISO-X License Application ML24065A3132024-03-0404 March 2024 Response to Request for Additional Information Part 2-2 for the TRISO-X Environmental Report and License Application ML24060A2392024-02-29029 February 2024 TRISO-X, LLC, Submittal of Supplemental Information for the Electrical/I&C Review of IROFS for the TRISO-X License Application ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application ML24046A1642024-02-15015 February 2024 Triso-X, LLC, Submittal of Environmental Report Reference in Support of the TRISO-X Fuel Fabrication Facility License Application ML24020A0102024-01-20020 January 2024 Project Update Letter Regarding the TRISO-X License Application ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application ML23349A2082023-12-15015 December 2023 TRISO-X, LLC, Response to Request for Additional Information Set 6 (Structural, Material Control and Accounting, and Fire Safety) for the TRISO-X License Application ML23342A2152023-12-13013 December 2023 Letter to J Wheeler Re TRISO-X Fff Environmental Review Request for Additional Information Part 2 -2 ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application ML23324A1542023-11-21021 November 2023 Letter to TRISO-X Re Change in Back-up Project Manager ML23235A2232023-11-20020 November 2023 Letter to J Wheeler Re TRISO-X Fff EIS RAIs Part 2 -1 ML23313A1142023-11-17017 November 2023 Cover Letter - Triso-X License Application Sixth Set of RAIs for Material Control and Accounting, Fire, and Structural ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 ML23290A1942023-10-13013 October 2023 Submittal of Revision 3 of the TRISO-X Fuel Fabrication Facility Physical Security Plan ML23285A3442023-10-12012 October 2023 Response to Request for Additional Information Set 3 (ISA and Security) for the TRISO-X License Application ML23293A0352023-10-12012 October 2023 20231012_2022-0019326_DOE-NRC Triso-X Fuel Fabrication Facility_Section 7 Nlaa Concurrence_Roane Co_Signed ML23254A3822023-09-29029 September 2023 Letter to Triso-X for Fourth Set of RAIs Including Geotechnical and Hydrology ML23214A2652023-09-20020 September 2023 Letter to S. Alexander TRISO-X Fff Section 7 Informal Consultation Request ML23258A1752023-09-15015 September 2023 Supplemental Response to Chapter 1 RAI-10 and RAI-11 (Set 2) for the TRISO-X License Application ML23223A2082023-09-0505 September 2023 Tn SHPO Letter Transmitting Report and Findings ML23187A6292023-08-28028 August 2023 Cover Letter - Approval of Exemption from 10 CFR 73-67(d) and (E) for Physical Security of TRISO-X ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility ML23198A2592023-07-27027 July 2023 Request for Additional Information for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) ML23121A1512023-07-0303 July 2023 TRISO-X At-Risk Construction Letter ML23127A0122023-05-31031 May 2023 Request for Additional Information (Set 1) for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) ML23142A2952023-05-22022 May 2023 Submittal of Revision 3 of the TRISO-X Facility Safeguards Information Plan ML23124A2042023-05-19019 May 2023 Acceptance of TRISO-X, LLC Request for an Exemption from Portions of 10 CFR 73.67(D) and (E) for Physical Security ML23111A2632023-04-21021 April 2023 Request for an Exemption Pursuant to 10 CFR 73.5 from the Requirements of Specified Portions of 10 CFR 73.67(d) and (E) for Physical Security of the Proposed TRISO-X Fuel Fabrication Facility ML23104A4202023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility ML23072A4562023-03-22022 March 2023 TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure ML23032A5012023-02-0202 February 2023 Letter to S. Alexander Re TRISO-X Fws Section 7 Consulation ML23012A2052023-01-12012 January 2023 TRISO-X, LLC, Fuel Fabrication Facility Online Reference Portal Information Access Agreement (Fully Executed) ML23005A0802023-01-0505 January 2023 Ltr. to Wilson Yargee, Chief, Alabama-Quassarte Tribal Town, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A1362023-01-0505 January 2023 Ltr. to Marcellus W. Osceola, Jr., Chairman, Seminole Tribe of Florida, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A0782023-01-0505 January 2023 Ltr. to Nita Battise, Chairwoman, Alabama-Coushatta Tribe of Texas, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A0732023-01-0505 January 2023 Ltr. to John Johnson, Governor, Absentee Shawnee Tribe, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23004A1782023-01-0505 January 2023 Ltr. to Ron Sparkman, Chief, Shawnee Tribe of Oklahoma, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff 2024-09-05
[Table view] |
Text
1 OBSERVATIONS DEVELOPED DURING THE ACCEPTANCE REVIEW TO SUPPORT THE TRISO-X APPLICATION FOR A FUEL FABRICATION FACILITY The following observations represent information the U.S. Nuclear Regulatory Commission (NRC) identified during the acceptance review for the TRISO-X, LLC license application (LA) issued on November 18, 2022 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML22320A110). These observations are provided for early awareness of the applicant and no formal response is needed. The NRC staff will follow up on these observations during the development of requests for additional information as the review proceeds.
- 1. Environmental Report The public health evaluation in the environmental report does not include certain radiological and chemical release scenarios and may not be conservative in terms of the atmospheric dispersion modeling and distances at which maximum radiological and chemical concentrations occur. Additionally, staff noted that surface water drainage from areas at higher elevations that would enter onto the site was not included in the surface water evaluation. Finally, the cultural resource information is complete but may not be in a format acceptable to the States Historic Preservation Office.
- 2. Geotechnical Figures 1-4 through 1-8 of LA: Please provide a larger scale to allow the NRC staff to read the details (geological cross-sections).
For the following items, the NRC staff is interested in reviewing the supporting information through an electronic reading room, portal, or other means.
On page 1-7 under Subsurface Bearing Capacity: The text says an analysis has been done which shows no soil failure.
On page 1-6 under Site Topography: The text says a slope stability analysis will be conducted to show the design is adequate.
On page 1-6/1-7 under Differential Settlement: The LA discusses additional design elements (such as, Rigid Inclusion, Load Transfer Platform). They appear appropriate conceptually. Provide the design calculations needed to show the design achieves the goal of acceptable differential settlement throughout the process building and some monitoring program is provided during operations to detect any deviation from design.
The information is needed to demonstrate compliance with Title 10 of the Code of Federal Regulations (10 CFR) Paragraph 70.22(d) for additional information to support the NRCs review, 10 CFR 70.22I for complete and accurate information, and 10 CFR 70.22(a)(7), 10 CFR 70.65(b)(1), and (2) for facility and site information.
- 3. Material Control and Accounting (Fundamental Nuclear Material Control Plan)
In the Abbreviations and Acronyms section, MC&A is defined as material control and accountability. In Section 1.1, it is defined as material control and accounting. Both are used throughout the fundamental nuclear material control (FNMC) plan. Ensure consistent usage throughout the document.
2 Appendix A of the FNMC plan provides supplementary information about the facility and the material control and accounting program in the form of process flow diagrams. The scale of the drawings is such that even in electronic form (where the drawings can be digitally enlarged), the text is difficult to read. The NRC staff will need readable versions of the drawings in Appendix A.
The information is needed to demonstrate compliance with 10 CFR 70.22(e) for complete and accurate information.
- 4. Electrical/I&C Observations
[REDACTED]
- 5. Chemical
[REDACTED]
- 6. Structural
[Redacted]
- 7. Integrated Safety Analysis
[REDACTED]