ML22320A563

From kanterella
Jump to navigation Jump to search

Triso-X, LLC - Additional Information Supporting the Response to Rsi Question 8.1 Concerning the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application
ML22320A563
Person / Time
Site: Triso-X
Issue date: 11/16/2022
From: Wheeler J
Triso-X
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
References
TX0-LTR-0012-0
Download: ML22320A563 (1)


Text

TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852

+1 301.358.5600 TX0-LTR-0012_0 ELECTRONIC DELIVERY November 16, 2022 Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

References:

1) Docket No. 70-7027
2) TRISO-X letter from Jennifer Wheeler to Director, Office of Nuclear Material Safety and Safeguards, TRISO-X Fuel Fabrication Facility License Application Submittal, dated April 5, 2022
3) NRC letter from Senior Project Manager, Office of Nuclear Material Safety and Safeguards, to Jennifer Wheeler, Requests for Supplemental Information for the Acceptance Review of the TRISO-X, LLC License Application for a Fuel Fabrication Facility, dated August 9, 2022
4) TRISO-X letter from Jennifer Wheeler to Director, Office of Nuclear Material Safety and Safeguards, Response to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal, dated October 13, 2022

Subject:

Additional Information Supporting the Response to RSI Question 8.1 Concerning the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application As a result of discussions with Nuclear Regulatory Commission (NRC) staff regarding the response to Request for Supplemental Information Question 8.1 (Reference 4), TRISO-X, LLC (TRISO-X) hereby submits additional information.

Procedures related to methods for documenting electrical, instrumentation, and controls detailed design information for IROFS at the component-level will be available for staff review August to December 2023. Detailed design documentation for IROFS that require electrical power and/or instrumentation and controls will be available for staff review January to June 2024.

TX0-LTR-0012_0 If there are questions or if additional information is required, please contact me at (865) 850-0893 or jwheeler@x-energy.com.

Sincerely, Jennifer K. Wheeler, P.E.

Director, Regulatory Affairs TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852 Copy: Mr. Matthew Bartlett, US NRC, NMSS TRISO-X Regulatory Records File