MONTHYEARML22101A2002022-03-31031 March 2022, 5 April 2022 TRISO-X, LLC Fuel Fabrication Facility License Application Submittal Project stage: Request ML22101A2052022-04-0505 April 2022 TRISO-X, LLC Fuel Fabrication Facility License Application Submittal Project stage: Other ML22166A0422022-08-0909 August 2022 Cover Letter - NRC Requests for Supplemental Information (Rsis) for TRISO-X License Application Project stage: Other ML22166A0412022-08-0909 August 2022 NRC Request for Supplemental Information for the TRISO-X License Application Project stage: Request ML22166A0432022-08-0909 August 2022 Enclosure 1 - Requests for Supplement Information for the TRISO-X License Application Review Project stage: Other ML22266A2692022-09-23023 September 2022 TRISO-X Fuel Fabrication Facility Environmental Report Submittal Project stage: Request ML22286A1442022-10-13013 October 2022 Response to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal Project stage: Request ML22286A1472022-10-13013 October 2022 Responses to Requests for Supplemental Information to Support the TRISO-X License Application Project stage: Supplement ML22308A2512022-11-0404 November 2022 Triso-X, LLC, License Application and ISA Summary Changes Associated with Responses to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal Project stage: Request ML22320A5632022-11-16016 November 2022 Triso-X, LLC - Additional Information Supporting the Response to Rsi Question 8.1 Concerning the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Project stage: Other ML22320A1102022-11-18018 November 2022 NRC Acceptance of the TRISO-X, LLC - Application for a Fuel Fabrication Facility Project stage: Acceptance Review ML22348A0162022-12-16016 December 2022 Enclosure 1 - Observations Developed During the Acceptance Review to Support the TRISO-X Application for a Fuel Fabrication Facility (Public) Project stage: Acceptance Review ML22348A0132022-12-16016 December 2022 NRC Observations Developed During the Acceptance Review of the TRISO-X License Application Project stage: Request ML22348A0142022-12-16016 December 2022 Cover Letter - Nuclear Regulatory Commission Observations to Support the TRISO-X License Application for a Fuel Fabrication Facility Project stage: Other ML23104A4192023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility Project stage: Request ML23127A0132023-05-31031 May 2023 Enclosurai for the TRISO-X Application Project stage: RAI ML23127A0122023-05-31031 May 2023 Request for Additional Information (Set 1) for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) Project stage: RAI ML23127A0112023-05-31031 May 2023 Triso-X RAIs for License Application Project stage: Request ML23198A2592023-07-27027 July 2023 Request for Additional Information for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) Project stage: RAI ML23198A2572023-07-27027 July 2023 NRC Letter Request for Additional Information on Chp 1, 2, EP for the TRISO-X, LLC License Application Project stage: Request ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility Project stage: Response to RAI ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application Project stage: Supplement ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application Project stage: Response to RAI ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application Project stage: RAI ML23254A3812023-09-29029 September 2023 Letter to Triso-X for the Fourth Set of RAIs That Includes an Enclosure for Geotechnical and an Enclosure for Hydrology Project stage: Request ML23285A3442023-10-12012 October 2023 Response to Request for Additional Information Set 3 (ISA and Security) for the TRISO-X License Application Project stage: Response to RAI ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 Project stage: RAI ML23312A2482023-11-0808 November 2023 7-5-23 Email Summary of Meeting to Discuss Draft ISA RAIs for Alignment Project stage: Request ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application Project stage: Response to RAI ML23313A1142023-11-17017 November 2023 Cover Letter - Triso-X License Application Sixth Set of RAIs for Material Control and Accounting, Fire, and Structural Project stage: RAI ML23313A1102023-11-17017 November 2023 Triso-X for the Sixth Set of RAIs Including Material Control & Accounting and Fire Safety Project stage: Request ML23320A2052023-11-17017 November 2023 Enclosure 1 - Request for Additional Information for (Programmatic) Structural Review Regarding the TRISO-X License Application Project stage: RAI ML23235A2262023-11-20020 November 2023, 27 November 2023 TRISO-X Fff Environmental RAI Part 2 Project stage: Request ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application Project stage: Response to RAI ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application Project stage: Response to RAI ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis Project stage: Draft RAI ML23353A1822023-12-27027 December 2023 Summary of Meeting Held on December 4, 2023, to Discuss the TRISO-X Draft Responses to the Requests for Additional Information Project stage: Request ML23353A1842023-12-27027 December 2023 Enclosure 1 - Participants List for Summary of Meeting Held December 4, 2023, with TRISO-X, LLC to Align on Draft Responses to Requests for Additional Information for Chemical Safety Analysis Project stage: Draft RAI ML23362A0632024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information Project stage: Request ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application Project stage: RAI ML23321A0512024-02-26026 February 2024 Enclosure - RAIs Set Seven for the Environmental Safety Review Regarding TRISO-X License Application Project stage: RAI ML24065A3132024-03-0404 March 2024 Response to Request for Additional Information Part 2-2 for the TRISO-X Environmental Report and License Application Project stage: Response to RAI ML24057A3632024-03-11011 March 2024 Memorandum - Summary of Meeting 2-12-24 with TRISO-X to Discuss Draft RAIs on Environmental Protection Project stage: Draft RAI ML24057A3622024-03-11011 March 2024 Enclosure - Participants in Meeting Held 2-12-24 with TRISO-X to Discuss the Draft RAIs on Environmental Protection Project stage: Draft RAI ML24057A3612024-03-11011 March 2024 Summary of Meeting on 2-12-24 with TRISO-X to Discuss Draft Requests for Additional Information on Environmental Protection Project stage: Request ML23354A1652024-03-25025 March 2024 Cover Letter - Set Eight Containing a Programmatic Request for Additional Information for the Integrated Safety Analysis Review Regarding the TRISO-X License Application Project stage: RAI ML24087A2352024-03-27027 March 2024 Triso-X, LLC, Response to Request for Additional Information Set 7 (Environmental Safety) for the TRISO-X License Application Project stage: Response to RAI ML24085A2702024-04-0202 April 2024 Request TRISO-X, LLC to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Management Measures and Quality Assurance Portion of the License Application Project stage: RAI ML24095A3412024-04-0404 April 2024 Response to Request for Additional Information Part 3 for the TRISO-X Environmental Report Project stage: Request ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application Project stage: RAI 2023-12-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24249A3172024-09-0505 September 2024 TRISO-X, LLC, Supplemental Information for Management Measures and Quality Assurance RAI Responses ML24183A3912024-07-0101 July 2024 Supplemental Information for ISA RAI 1-9 Responses and RAI-10 Response for the TRISO-X License Application ML24089A2012024-05-0808 May 2024 Cover Letter - RAI Status Update for the Safety and Safeguards Requests for Additional Information for the TRISO-X License Application ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application ML24095A3422024-04-0404 April 2024 Response to Request for Additional Information Part 3 for the TRISO-X Environmental Report ML24085A2702024-04-0202 April 2024 Request TRISO-X, LLC to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Management Measures and Quality Assurance Portion of the License Application ML24082A2222024-04-0202 April 2024 Cover Letter - Request TRISO-X, Llc., to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Integrated Safety Analysis Portion of the License Application ML24087A2352024-03-27027 March 2024 Triso-X, LLC, Response to Request for Additional Information Set 7 (Environmental Safety) for the TRISO-X License Application ML23354A1652024-03-25025 March 2024 Cover Letter - Set Eight Containing a Programmatic Request for Additional Information for the Integrated Safety Analysis Review Regarding the TRISO-X License Application ML24065A3132024-03-0404 March 2024 Response to Request for Additional Information Part 2-2 for the TRISO-X Environmental Report and License Application ML24060A2392024-02-29029 February 2024 TRISO-X, LLC, Submittal of Supplemental Information for the Electrical/I&C Review of IROFS for the TRISO-X License Application ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application ML24046A1642024-02-15015 February 2024 Triso-X, LLC, Submittal of Environmental Report Reference in Support of the TRISO-X Fuel Fabrication Facility License Application ML24020A0102024-01-20020 January 2024 Project Update Letter Regarding the TRISO-X License Application ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application ML23349A2082023-12-15015 December 2023 TRISO-X, LLC, Response to Request for Additional Information Set 6 (Structural, Material Control and Accounting, and Fire Safety) for the TRISO-X License Application ML23342A2152023-12-13013 December 2023 Letter to J Wheeler Re TRISO-X Fff Environmental Review Request for Additional Information Part 2 -2 ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application ML23324A1542023-11-21021 November 2023 Letter to TRISO-X Re Change in Back-up Project Manager ML23235A2232023-11-20020 November 2023 Letter to J Wheeler Re TRISO-X Fff EIS RAIs Part 2 -1 ML23313A1142023-11-17017 November 2023 Cover Letter - Triso-X License Application Sixth Set of RAIs for Material Control and Accounting, Fire, and Structural ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 ML23290A1942023-10-13013 October 2023 Submittal of Revision 3 of the TRISO-X Fuel Fabrication Facility Physical Security Plan ML23285A3442023-10-12012 October 2023 Response to Request for Additional Information Set 3 (ISA and Security) for the TRISO-X License Application ML23293A0352023-10-12012 October 2023 20231012_2022-0019326_DOE-NRC Triso-X Fuel Fabrication Facility_Section 7 Nlaa Concurrence_Roane Co_Signed ML23254A3822023-09-29029 September 2023 Letter to Triso-X for Fourth Set of RAIs Including Geotechnical and Hydrology ML23214A2652023-09-20020 September 2023 Letter to S. Alexander TRISO-X Fff Section 7 Informal Consultation Request ML23258A1752023-09-15015 September 2023 Supplemental Response to Chapter 1 RAI-10 and RAI-11 (Set 2) for the TRISO-X License Application ML23223A2082023-09-0505 September 2023 Tn SHPO Letter Transmitting Report and Findings ML23187A6292023-08-28028 August 2023 Cover Letter - Approval of Exemption from 10 CFR 73-67(d) and (E) for Physical Security of TRISO-X ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility ML23198A2592023-07-27027 July 2023 Request for Additional Information for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) ML23121A1512023-07-0303 July 2023 TRISO-X At-Risk Construction Letter ML23127A0122023-05-31031 May 2023 Request for Additional Information (Set 1) for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) ML23142A2952023-05-22022 May 2023 Submittal of Revision 3 of the TRISO-X Facility Safeguards Information Plan ML23124A2042023-05-19019 May 2023 Acceptance of TRISO-X, LLC Request for an Exemption from Portions of 10 CFR 73.67(D) and (E) for Physical Security ML23111A2632023-04-21021 April 2023 Request for an Exemption Pursuant to 10 CFR 73.5 from the Requirements of Specified Portions of 10 CFR 73.67(d) and (E) for Physical Security of the Proposed TRISO-X Fuel Fabrication Facility ML23104A4202023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility ML23072A4562023-03-22022 March 2023 TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure ML23032A5012023-02-0202 February 2023 Letter to S. Alexander Re TRISO-X Fws Section 7 Consulation ML23012A2052023-01-12012 January 2023 TRISO-X, LLC, Fuel Fabrication Facility Online Reference Portal Information Access Agreement (Fully Executed) ML23005A0802023-01-0505 January 2023 Ltr. to Wilson Yargee, Chief, Alabama-Quassarte Tribal Town, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A1362023-01-0505 January 2023 Ltr. to Marcellus W. Osceola, Jr., Chairman, Seminole Tribe of Florida, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A0782023-01-0505 January 2023 Ltr. to Nita Battise, Chairwoman, Alabama-Coushatta Tribe of Texas, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A0732023-01-0505 January 2023 Ltr. to John Johnson, Governor, Absentee Shawnee Tribe, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23004A1782023-01-0505 January 2023 Ltr. to Ron Sparkman, Chief, Shawnee Tribe of Oklahoma, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff 2024-09-05
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24249A3182024-09-0505 September 2024 Enclosure 1 - Supplemental Information for Management Measures and Quality Assurance RAI Responses ML24095A3432024-04-0404 April 2024 Enclosure - RAI Part 3 Responses for the TRISO-X Environmental Report ML24087A2362024-03-27027 March 2024 Triso-X, LLC, Response to Request for Additional Information Set 7 Environmental Safety ML24065A3132024-03-0404 March 2024 Response to Request for Additional Information Part 2-2 for the TRISO-X Environmental Report and License Application ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application ML23349A2082023-12-15015 December 2023 TRISO-X, LLC, Response to Request for Additional Information Set 6 (Structural, Material Control and Accounting, and Fire Safety) for the TRISO-X License Application ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application ML23258A1752023-09-15015 September 2023 Supplemental Response to Chapter 1 RAI-10 and RAI-11 (Set 2) for the TRISO-X License Application ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility ML23104A4212023-04-14014 April 2023 TRISO-X, LLC, Reference Material for Responses to Observation ER-GW-1 and RAIs ER-TES-1, ER-TES-2, and ER-TES-3 ML23104A4202023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility ML22320A5632022-11-16016 November 2022 Triso-X, LLC - Additional Information Supporting the Response to Rsi Question 8.1 Concerning the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application ML22286A1472022-10-13013 October 2022 Responses to Requests for Supplemental Information to Support the TRISO-X License Application 2024-09-05
[Table view] |
Text
TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852
+1 301.358.5600 TX0-LTR-0021 ELECTRONIC DELIVERY August 18, 2023 Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
References:
- 1)
Docket No. 70-7027
- 2)
TRISO-X letter from Jennifer Wheeler to Director, Office of Nuclear Material Safety and Safeguards, TRISO-X Fuel Fabrication Facility License Application Submittal, dated April 5, 2022
- 3)
NRC letter from Matthew Bartlett, Senior Project Manager, Fuel Facility Licensing Branch, to Jennifer K. Wheeler, Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005), dated May 31, 2023
- 4)
TRISO-X letter from Jennifer Wheeler to Director, Office of Nuclear Material Safety and Safeguards, Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility, dated July 28, 2023
Subject:
Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application TRISO-X, LLC (TRISO-X) hereby submits a supplemental response to Request for Additional Information (RAI) question 3-2 Evaluation for Local Intense Precipitation, regarding the review of the License Application for the TRISO-X Fuel Fabrication Facility (Reference 2). This response is for the RAI set transmitted by letter dated May 31, 2023 (Reference 3) and supplements the response transmitted by letter dated July 28, 2023 (Reference 4).
Requests for Withholding None. The enclosed submittal contains public information.
Summary of this Submittal This submittal includes a response to RAI question 3-2 Evaluation for Local Intense Precipitation.
There are no associated enclosures or attachments to this letter.
TX0-LTR-0021 If there are questions or if additional information is required, please contact me at (865) 850-0893 or jwheeler@triso-x.com.
Sincerely, Jennifer K. Wheeler, P.E.
Vice President, Regulatory Affairs TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852 Copy: Mr. Matthew Bartlett, US NRC, NMSS TRISO-X Regulatory Records File
TX0-LTR-0021 Response to RAI 3-2 Page 1 of 2 RAI 3 Evaluation for local intense precipitation Regulatory Basis:
This information is necessary to demonstrate compliance with the regulations in 10 CFR 70.61 which states, in part, in sections (b) and (c) that the risk of credible high-and intermediate-consequence events must be limited, and section (e) which requires the implementation of items relied on for safety. The guidance in NUREG-1520, Revision 2, describes, in part, one acceptable approach to demonstrate compliance with the regulation and includes the acceptance criteria used for the NRC staffs review.
Description of Issue:
Section 1.1.1.3, Hydrology, of the LA and Sections 1.4.1, Flood, and 4.2.5.5, Design Basis Flood, of the ISA Summary describe and evaluate the effects of flooding due to nearby water bodies (e.g., river, wetland, creek, etc.). However, the application does not evaluate the effects of flooding due to other flood-related events like local intense precipitation and local storm runoff at the site. As discussed in Appendix D of NUREG-1520, Revision 2, flooding hazards may also be related to local intense precipitation/runoff, storm surge, and other similar events. Therefore, additional information is necessary to demonstrate how the facility was evaluated to prevent or mitigate the consequences of flooding events not related to nearby water bodies, and if additional items relied on for safety need to be identified to demonstrate compliance with the performance requirements in 10 CFR 70.61.
Information Needed:
Provide an evaluation of the effects of flooding due to local intense precipitation and local storm runoff.
TRISO-X Response:
TRISO-X evaluated local intense precipitation (LIP) and local storm runoff at the site following the guidelines specified in USNRC NUREG/CR-7046 for estimation of a design basis flood. National Oceanic and Atmospheric Administration (NOAA)
Hydrometeorological Report No. 56 (HMR 56) recommended probable maximum precipitation (PMP) values were used for the site. NUREG/CR-7046 defines LIP as a measure of the extreme precipitation at a given location. LIP values were determined using the data provided in NOAA HMR 56.
Using HMR 56, Figure 23, and identifying the TRISO-X site location, the 6-hour, 1-mi2 PMP value is 36.3 inches. The LIP analysis uses this PMP value to conclude that a maximum water depth of 19 inches above the top of the floor elevation of 811 feet could possibly be reached within the facility.
NUREG/CR-7046, Section 1.1 states, a probable maximum flood (PMF) is the hypothetical flood generated in the drainage area by a probable maximum precipitation (PMP) event. NUREG/CR-7046, Section 5.6 states, the cause of the flood is assumed to be a worst-case event that cannot be exceeded in terms of severity; however, at the same time, the PMF is defined to be the most severe, reasonably possible flood at a site. NUREG/CR-7046, Section 5.6 also includes reference to an additional study that concludes the "probability of occurrence of a PMF is less than 10-5. Based on these bounding conditions, the methodology followed in NUREG/CR-7046 corresponds to a highly unlikely event.
Nuclear criticality safety evaluations demonstrate that all individual components, vessels, and storage arrays remain subcritical when reflected and moderated with water; except for storage of fuel products in drums. The nuclear criticality safety
TX0-LTR-0021 Response to RAI 3-2 Page 2 of 2 evaluation for drum storage arrays demonstrates that up to 50 drums remain subcritical when reflected and moderated with water in each array. This flooding event also remains subcritical since 19 inches of water is less than the drum height such that water cannot reach the lid to enter the drums. A water depth of 19 inches will also not reach uranium materials located within bench top hoods or glovebox operations. As such, this flooding event will not lead to intermediate chemical/radiological exposures, nor to environmental effluent consequences due to only low contamination levels present on the building floor. This demonstrates compliance with the performance requirements in 10 CFR 70.61 since the highly unlikely LIP and local storm runoff does not lead to an ISA consequence level.
References
- 1. Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America, U.S. Nuclear Regulatory Commission (USNRC)
Regulatory Guideline CR-7046, PNNL-20091, November 2011.
- 2. Hydrometeorological Report No. 56 (HMR 56), Probable Maximum and TVA Precipitation Estimates With Areal Distribution for Tennessee River Drainages Less Than 3,000 Mi2 in Area, National Oceanic and Atmospheric Administration (NOAA),
Tennessee Valley Authority (TVA), October 1986.
- 3. NCSE-TRISO-023, Rev. 1, Nuclear Criticality Safety Evaluation for Shipping Container Loading and Storage.
License Application Changes None.