|
---|
Category:Letter
MONTHYEARML24020A0102024-01-20020 January 2024 Project Update Letter Regarding the TRISO-X License Application ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application ML23349A2082023-12-15015 December 2023 TRISO-X, LLC, Response to Request for Additional Information Set 6 (Structural, Material Control and Accounting, and Fire Safety) for the TRISO-X License Application ML23342A2152023-12-13013 December 2023 Letter to J Wheeler Re TRISO-X Fff Environmental Review Request for Additional Information Part 2 -2 ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application ML23324A1542023-11-21021 November 2023 Letter to TRISO-X Re Change in Back-up Project Manager ML23235A2232023-11-20020 November 2023 Letter to J Wheeler Re TRISO-X Fff EIS RAIs Part 2 -1 ML23313A1142023-11-17017 November 2023 Cover Letter - Triso-X License Application Sixth Set of RAIs for Material Control and Accounting, Fire, and Structural ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 ML23290A1942023-10-13013 October 2023 Submittal of Revision 3 of the TRISO-X Fuel Fabrication Facility Physical Security Plan ML23293A0352023-10-12012 October 2023 20231012_2022-0019326_DOE-NRC Triso-X Fuel Fabrication Facility_Section 7 Nlaa Concurrence_Roane Co_Signed ML23285A3442023-10-12012 October 2023 Response to Request for Additional Information Set 3 (ISA and Security) for the TRISO-X License Application ML23254A3822023-09-29029 September 2023 Letter to Triso-X for Fourth Set of RAIs Including Geotechnical and Hydrology ML23214A2652023-09-20020 September 2023 Letter to S. Alexander TRISO-X Fff Section 7 Informal Consultation Request ML23258A1752023-09-15015 September 2023 Supplemental Response to Chapter 1 RAI-10 and RAI-11 (Set 2) for the TRISO-X License Application ML23223A2082023-09-0505 September 2023 Tn Shpo Letter Transmitting Report and Findings ML23187A6292023-08-28028 August 2023 Cover Letter - Approval of Exemption from 10 CFR 73-67(d) and (E) for Physical Security of TRISO-X ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility ML23198A2592023-07-27027 July 2023 Request for Additional Information for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) ML23121A1512023-07-0303 July 2023 TRISO-X At-Risk Construction Letter ML23127A0122023-05-31031 May 2023 Request for Additional Information (Set 1) for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) ML23142A2952023-05-22022 May 2023 Submittal of Revision 3 of the TRISO-X Facility Safeguards Information Plan ML23124A2042023-05-19019 May 2023 Acceptance of TRISO-X, LLC Request for an Exemption from Portions of 10 CFR 73.67(D) and (E) for Physical Security ML23111A2632023-04-21021 April 2023 Request for an Exemption Pursuant to 10 CFR 73.5 from the Requirements of Specified Portions of 10 CFR 73.67(d) and (E) for Physical Security of the Proposed TRISO-X Fuel Fabrication Facility ML23104A4202023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility ML23072A4562023-03-22022 March 2023 TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure ML23032A5012023-02-0202 February 2023 Letter to S. Alexander Re TRISO-X Fws Section 7 Consulation ML23012A2052023-01-12012 January 2023 TRISO-X, LLC, Fuel Fabrication Facility Online Reference Portal Information Access Agreement (Fully Executed) ML23005A1362023-01-0505 January 2023 Ltr. to Marcellus W. Osceola, Jr., Chairman, Seminole Tribe of Florida, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23004A1782023-01-0505 January 2023 Ltr. to Ron Sparkman, Chief, Shawnee Tribe of Oklahoma, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A0782023-01-0505 January 2023 Ltr. to Nita Battise, Chairwoman, Alabama-Coushatta Tribe of Texas, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23005A0732023-01-0505 January 2023 Ltr. to John Johnson, Governor, Absentee Shawnee Tribe, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML22349A6792023-01-0505 January 2023 Ltr. to Chuck Hoskin, Jr., Principal Chief, Cherokee Nation of Oklahoma, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff ML23004A1742023-01-0505 January 2023 Ltr. to Joe Bunch, Chief, United Keetoowah Band of Cherokee Indians, Re., Section 106 Consultation for the TRISO-X SNM License for a Fff 2024-01-20
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
September 29, 2023 Jennifer K. Wheeler, Director Regulatory Affairs TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION SET 4 FOR THE GEOTECHNICAL AND HYDROLOGY REGARDING THE TRISO-X, LLC LICENSE APPLICATION FOR A NEW FUEL FABRICATION FACILITY (ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2022-NEW-0005)
Dear Jennifer Wheeler:
The U.S. Nuclear Regulatory Commission (NRC) staff has developed the fourth set of requests for additional information (RAIs) to support the geotechnical and hydrology review of the TRISO-X, LLC safety and safeguards license application. Your application for a new fuel fabrication facility located in Oak Ridge, TN was submitted via letter dated April 5, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22101A200) and supplemented by letters dated October 13, 2022 (ML22286A144) and November 4, 2022 (ML22308A251).
Please consider providing your draft responses in advance of the formal response letter and holding a meeting to ensure mutual understanding of the responses. The RAI responses are due within 45 days of the date of this letter.
We continue to anticipate completing our review by June 2025, as previously stated in our acceptance review dated November 18, 2022 (ML22320A110). The proposed completion date could change depending on submittal of supplements to the application, the status of the Electrical/I&C review, the resolution of RAIs, findings of our technical review, or other factors. We will promptly communicate any significant changes to this schedule.
In accordance with Title 10 of the Code of Federal Regulations, Part 2 Agency Rules of Practice and Procedure, a copy of this letter and enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.
J. Wheeler 2 If you have any questions regarding this communication, please contact me at 301-415-7154, or via email to Matthew.Bartlett@nrc.gov.
Sincerely, Signed by Bartlett, Matthew on 09/29/23 Matthew Bartlett, Senior Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 07007027
Enclosures:
- 1. RAI Geotechnical
- 2. RAI Hydrology cc: trisox@listmgr.nrc.gov
J. Wheeler 3 REQUEST FOR ADDITIONAL INFORMATION SET 4 FOR THE GEOTECHNICAL AND HYDROLOGY REGARDING THE TRISO X, LLC LICENSE APPLICATION FOR A NEW FUEL FABRICATION FACILITY DATE September 29, 2023 DISTRIBU TION: Docket No. 07007027 HArlt, NMSS/DUWP/RTAB AGhosh, NRR/DEX/ESEB CSafford, NMSS/DFM SHelton, NMSS/DFM ADAMS Accession No.: ML23254A381; Ltr ML23254A382 OFFICE NMSS/DFM/FFLB NSIR/DPR NMSS/DFM/FFLB NMSS/DFM/FFLB NAME SPoy SP JGoodridge JG Slav SL MBartlett MB DATE Sep 11, 2023 Sep 14, 2023 Sep 22, 2023 Sep 29, 2023 OFRCLRECORDCOPY