Submittal of Revision 3 of the TRISO-X Facility Safeguards Information Plan
ML23142A295
Person / Time
Site: Triso-X
Issue date: 05/22/2023
From: Wheeler J
Triso-X
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response, Document Control Desk
Shared Package
ML23142A294 List:
References
TX0-LTR-0019_0
Download: ML23142A295 (2)


Text

TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852

+1 301.358.5600 TX0-LTR-0019_0 THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION -

WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 WHEN DETACHED - HANDLE THIS PAGE AS DECONTROLLED THE ENCLOSURE TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION -

WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 ELECTRONIC DELIVERY May 22, 2023 Director, Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

References:

1)

Docket No. 70-7027

2)

NRC letter from Fuel Facility Licensing Branch Chief, Office of Nuclear Material Safety and Safeguards, to Jennifer Wheeler, Approval of TRISO-X Safeguards Protection Program, dated October 4, 2021

3)

TRISO-X letter from Jennifer Wheeler to Director, Office of Nuclear Material Safety and Safeguards, TRISO-X Fuel Fabrication Facility License Application Submittal, dated April 5, 2022

Subject:

Submittal of Revision 3 of the TRISO-X Facility Safeguards Information Plan TRISO-X, LLC (TRISO-X) hereby submits the enclosed revision to the Safeguards Information Plan (SGIP) for review and approval. Revision 2 of the SGIP was approved by NRC on October 4, 2021 (Reference 2). Due to recent efforts to consolidate office spaces, all local project TRISO-X office space is now located at 151 Lafayette Drive, Suite 300, in Oak Ridge, Tennessee.

TRISO-X needs to relocate the stand-alone computer equipment and security repository to the new office space. Revision 3 of the SGIP changes include updates to the discussion about protection while in use or storage; clarification that SGI includes other information necessary to complete design and implement elements of the Physical Security Plan; and addition of a stand-alone copier.

A few minor editorial updates were also made to acknowledge submittal of the License Application, including a Physical Security Plan, in 2022 (Reference 3).

The enclosure of this transmittal contains information that is considered Security-Related which is requested to be withheld from public disclosure in accordance with 10 CFR 2.390 and the instructions in RIS 2005-31, Revision 1.

TX0-LTR-0019_0 THE ENCLOSURE TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION -

WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION -

WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 WHEN DETACHED - HANDLE THIS PAGE AS DECONTROLLED If there are questions or if additional information is required, please contact my staff member Gerard Couture, Safeguards Manager, at (803) 216-4649 or gcouture@triso-x.com, or me at (865) 850-0893 or jwheeler@triso-x.com.

Sincerely, Jennifer K. Wheeler, P.E.

Vice President, Regulatory Affairs TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852

Enclosure:

TRISO-X Facility Safeguards Information Plan, Revision 3 (7 Pages)

Copy: Mr. Bernard Stapleton, US NRC, NSIR Mr. Matthew Bartlett, US NRC, NMSS TRISO-X Regulatory Records File Sincerely,