TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852
+1 301.358.5600 TX0-LTR-0019_0 THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION -
WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 WHEN DETACHED - HANDLE THIS PAGE AS DECONTROLLED THE ENCLOSURE TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION -
WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 ELECTRONIC DELIVERY May 22, 2023 Director, Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
References:
- 1)
Docket No. 70-7027
- 2)
NRC letter from Fuel Facility Licensing Branch Chief, Office of Nuclear Material Safety and Safeguards, to Jennifer Wheeler, Approval of TRISO-X Safeguards Protection Program, dated October 4, 2021
- 3)
TRISO-X letter from Jennifer Wheeler to Director, Office of Nuclear Material Safety and Safeguards, TRISO-X Fuel Fabrication Facility License Application Submittal, dated April 5, 2022
Subject:
Submittal of Revision 3 of the TRISO-X Facility Safeguards Information Plan TRISO-X, LLC (TRISO-X) hereby submits the enclosed revision to the Safeguards Information Plan (SGIP) for review and approval. Revision 2 of the SGIP was approved by NRC on October 4, 2021 (Reference 2). Due to recent efforts to consolidate office spaces, all local project TRISO-X office space is now located at 151 Lafayette Drive, Suite 300, in Oak Ridge, Tennessee.
TRISO-X needs to relocate the stand-alone computer equipment and security repository to the new office space. Revision 3 of the SGIP changes include updates to the discussion about protection while in use or storage; clarification that SGI includes other information necessary to complete design and implement elements of the Physical Security Plan; and addition of a stand-alone copier.
A few minor editorial updates were also made to acknowledge submittal of the License Application, including a Physical Security Plan, in 2022 (Reference 3).
The enclosure of this transmittal contains information that is considered Security-Related which is requested to be withheld from public disclosure in accordance with 10 CFR 2.390 and the instructions in RIS 2005-31, Revision 1.
TX0-LTR-0019_0 THE ENCLOSURE TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION -
WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION -
WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 WHEN DETACHED - HANDLE THIS PAGE AS DECONTROLLED If there are questions or if additional information is required, please contact my staff member Gerard Couture, Safeguards Manager, at (803) 216-4649 or gcouture@triso-x.com, or me at (865) 850-0893 or jwheeler@triso-x.com.
Sincerely, Jennifer K. Wheeler, P.E.
Vice President, Regulatory Affairs TRISO-X, LLC 801 Thompson Avenue Rockville, MD 20852
Enclosure:
TRISO-X Facility Safeguards Information Plan, Revision 3 (7 Pages)