DECONTROLLED WHEN 2,790 INFORMATION IS REMOVED ABB Combustion' Engineering, Inc.                                        kctmber 24, 1997 AT(N: Mr. Bruce Kaiser, Vice President, Fuel Operations
                                                                                ,
                    DECONTROLLED WHEN 2,790 INFORMATION IS REMOVED
                                                                                                                  '
        ABB Combustion' Engineering, Inc.                                        kctmber 24, 1997
        AT(N: Mr. Bruce Kaiser, Vice President, Fuel Operations
                 , Hematite Nuclear Fuel Manufacturing
                 , Hematite Nuclear Fuel Manufacturing
                                                                                             % b' 4 t %13e I
      ,
  ,      @300 Siate Road P Hematite, MO 63047
                                                                                             % b' 4 t %13e
                                                                                            I
                                                                                                                  .
                                                                                                                  '
  ,      @300 Siate Road P
        Hematite, MO 63047
*
        SUBJECT: NRC INSPECTION NO. 70-30/97 203                                                                  !
                                                                                                                  '
        Dear Mr. Kaiser:
        The Nuclear Regulatory Commission conducted a routine inspection of your facility's material
        control and accounting (MC&A) safeguaros program on November 17 21,1997. The scope
        and results of the inspection are summarized in the enclosure, which also includes details of the
        inspection.
        At the concluolon of the inspection, the findings were discussed with members of your staff.
        Within the scope of the inspection, one non cited violation was identified, and one violation and
        six inspector follow up items were closed.
        Under the provisions of Section 2.790(d), reports containing information related to a licensee's
        MC&A program are exempt from public disclosure. Accordingly, the enclosure will Dol be placed
        in the Public Document Room.
        Should you have any questions concerning this letter, please contact me.
                                                        Sincerely,
                                                        Original signed by Philip Tir,g                          l
                                                              a ns Br nch
      9801120200 971224              1                  Division of Fuel Cycle Safety
              ADOCK 070          6                    and Safeguards, NMSS
      {DR
                                                                                                    '
        Docket No. 70-36
        License No. SNM 33                                                                #['
                                                      *        '' '' '
        Encl wure: As stated
        cc w/ enclosure: R. W. Sharkey, Manager, Regulatory Compliance
        DISTRIBUTION:
      < Docket File 70-38              SSoong,FCLB        SCaudill    FCOB r/f
        PDR, LPDR (w/o encis)          TPham,FCLB        LOng        FCSS r/f
        NMSS r/f                      MMessler, T9E10 (w/o encis) EEckfeld
        MRodgers, PMDA (w/o encis;          PHiland, Rlli        Case File
        DOCUMENT NAME: Whaley: a: ABB97203.RPT
                                                                                                          __
          OFC          FCOB        E    FCOB      E        FCOB          E    FCOB      ,      FCOB
          NAME          THarich[ ' CCollina'k-              DWhaleyftM        WTrodski            PTing
          DATE          12////97'        12A//97            12/#/97            12)$97          12/497
              C = COVER                E = COVER & ENCLOSURE                N = NO COPY
                                            OFFICIAL RECORD COPY                                                l
                                                                                                      gg
  .                                                                                                              s
  1J00:2G          DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED


==SUBJECT:==
                        ..                                                             _ _ .   -        -
NRC INSPECTION NO. 70-30/97 203                                                                  !
'
 
         v        . DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
==Dear Mr. Kaiser:==
      f
 
    c. "cw<>%
The Nuclear Regulatory Commission conducted a routine inspection of your facility's material control and accounting (MC&A) safeguaros program on November 17 21,1997. The scope and results of the inspection are summarized in the enclosure, which also includes details of the inspection.
            .
At the concluolon of the inspection, the findings were discussed with members of your staff.
                                                  UNITE 3 STATES
Within the scope of the inspection, one non cited violation was identified, and one violation and six inspector follow up items were closed.
                                                                                                            '
Under the provisions of Section 2.790(d), reports containing information related to a licensee's MC&A program are exempt from public disclosure. Accordingly, the enclosure will Dol be placed in the Public Document Room.
                    j
Should you have any questions concerning this letter, please contact me.
.
Sincerely, Original signed by Philip Tir,g                          l a ns Br nch 9801120200 971224              1                  Division of Fuel Cycle Safety ADOCK 070          6                    and Safeguards, NMSS
  ,
{DR Docket No. 70-36 License No. SNM 33                                                                #['
    j,    *'
Encl wure: As stated cc w/ enclosure: R. W. Sharkey, Manager, Regulatory Compliance DISTRIBUTION:
                                  NUCLEAR REGULATORY COMMISSION
       < Docket File 70-38              SSoong,FCLB        SCaudill    FCOB r/f PDR, LPDR (w/o encis)          TPham,FCLB        LOng        FCSS r/f NMSS r/f                      MMessler, T9E10 (w/o encis) EEckfeld MRodgers, PMDA (w/o encis;          PHiland, Rlli        Case File DOCUMENT NAME: Whaley: a: ABB97203.RPT OFC          FCOB        E    FCOB      E        FCOB          E    FCOB      ,      FCOB NAME          THarich[ ' CCollina'k-              DWhaleyftM        WTrodski            PTing DATE          12////97'        12A//97            12/#/97            12)$97         12/497 C = COVER                E = COVER & ENCLOSURE                N = NO COPY OFFICIAL RECORD COPY                                                l gg
                                              WASHINGTON, D.C. 20$$54001
  .                                                                                                              s 1J00:2G          DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
       %,*****)#                              December 24, 1997
 
  ,
v        . DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED f
                                                                                                            !
: c. "cw<>%
        ABB Combustion Engineering, Inc.
UNITE 3 STATES j
        A1TN: Mr. Cruce Kaiser, Vice President, Fuel Operations
j,    *'
                                                                                                            '
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20$$54001
                  Hematite Nuclear Fuel Manufacturing
       %,*****)#                              December 24, 1997 ABB Combustion Engineering, Inc.
        3300 State Road P
A1TN: Mr. Cruce Kaiser, Vice President, Fuel Operations Hematite Nuclear Fuel Manufacturing 3300 State Road P Hematite, MO 63047
        Hematite, MO 63047
 
        SUBJECT: NRC INSPECTION NO. 70 36/97-203
==SUBJECT:==
        Dear Mr. Kaiser:
NRC INSPECTION NO. 70 36/97-203
                                                                                                            1
 
        The Nuclear Regulatory Commission conducted a routine inspection of your facility's material
==Dear Mr. Kaiser:==
        control and accounting (MC&A) safeguards program on November 17 21,1997. The scope
 
        and results of the inspection are summarized in the enclosure, which also includes details of the
1 The Nuclear Regulatory Commission conducted a routine inspection of your facility's material control and accounting (MC&A) safeguards program on November 17 21,1997. The scope and results of the inspection are summarized in the enclosure, which also includes details of the inspection.
        inspection.
At the conclusion of the inspection, the findings were discussed with members of your staff.
        At the conclusion of the inspection, the findings were discussed with members of your staff.
Within the scope of the inspection, one non cited violation was identified, and one violation and six inspector followup items were closed.
        Within the scope of the inspection, one non cited violation was identified, and one violation and
Under the provisions of Section 2.790(d), reports containing information related to a licensee's MC8 A program are exempt from public disclosure. Accordingly, the encH ure will not be placed in the Public Documont Room.                                                                      1 Should you have any questions concerning this letter, p! ease contact me.
        six inspector followup items were closed.
Sincerely, 3              - ,.
        Under the provisions of Section 2.790(d), reports containing information related to a licensee's
[/ 59 f            g Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS
        MC8 A program are exempt from public disclosure. Accordingly, the encH ure will not be placed
_ Docket No. 70 36 License No, SNM 33
        in the Public Documont Room.                                                                      1
 
        Should you have any questions concerning this letter, p! ease contact me.
==Enclosure:==
                                                      Sincerely,
As stated cc w/ enclosure: R W Sharkey, Manager, Regulatory Compliance DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
                                                          3              - ,.
                                                    [/ 59 f            g
                                                      Philip Ting, Chief
                                                      Operations Branch
                                                      Division of Fuel Cycle Safety
                                                      and Safeguards, NMSS
        _ Docket No. 70 36
        License No, SNM 33
        Enclosure: As stated
        cc w/ enclosure: R W Sharkey, Manager, Regulatory Compliance
                    DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED
           . DOCUMENT TRANSMITTED HEREWITH CONTAINS 2,790 INFORMATION
           . DOCUMENT TRANSMITTED HEREWITH CONTAINS 2,790 INFORMATION
_.}}
                            _.
}}

Latest revision as of 11:24, 8 September 2023

Forwards Partially Withheld Insp Rept 70-0036/97-203 on 971117-1121.One non-cited Violation Was Identified,One Violation & Six Inspector follow-up Items Were Closed.Rept Details Withheld (Ref 10CFR2.790)
ML20198G236
Person / Time
Site: 07000036
Issue date: 12/24/1997
From: Ting P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Kaiser B
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20070L124 List:
References
70-0036-97-203, 70-36-97-203, NUDOCS 9801120280
Download: ML20198G236 (2)


See also: IR 07100117/2011021

Text

-- _.

,

DECONTROLLED WHEN 2,790 INFORMATION IS REMOVED

'

ABB Combustion' Engineering, Inc. kctmber 24, 1997

AT(N: Mr. Bruce Kaiser, Vice President, Fuel Operations

, Hematite Nuclear Fuel Manufacturing

,

% b' 4 t %13e

I

.

'

, @300 Siate Road P

Hematite, MO 63047

SUBJECT: NRC INSPECTION NO. 70-30/97 203  !

'

Dear Mr. Kaiser:

The Nuclear Regulatory Commission conducted a routine inspection of your facility's material

control and accounting (MC&A) safeguaros program on November 17 21,1997. The scope

and results of the inspection are summarized in the enclosure, which also includes details of the

inspection.

At the concluolon of the inspection, the findings were discussed with members of your staff.

Within the scope of the inspection, one non cited violation was identified, and one violation and

six inspector follow up items were closed.

Under the provisions of Section 2.790(d), reports containing information related to a licensee's

MC&A program are exempt from public disclosure. Accordingly, the enclosure will Dol be placed

in the Public Document Room.

Should you have any questions concerning this letter, please contact me.

Sincerely,

Original signed by Philip Tir,g l

a ns Br nch

9801120200 971224 1 Division of Fuel Cycle Safety

ADOCK 070 6 and Safeguards, NMSS

{DR

'

Docket No. 70-36

License No. SNM 33 #['

  • '

Encl wure: As stated

cc w/ enclosure: R. W. Sharkey, Manager, Regulatory Compliance

DISTRIBUTION:

< Docket File 70-38 SSoong,FCLB SCaudill FCOB r/f

PDR, LPDR (w/o encis) TPham,FCLB LOng FCSS r/f

NMSS r/f MMessler, T9E10 (w/o encis) EEckfeld

MRodgers, PMDA (w/o encis; PHiland, Rlli Case File

DOCUMENT NAME: Whaley: a: ABB97203.RPT

__

OFC FCOB E FCOB E FCOB E FCOB , FCOB

NAME THarich[ ' CCollina'k- DWhaleyftM WTrodski PTing

DATE 12////97' 12A//97 12/#/97 12)$97 12/497

C = COVER E = COVER & ENCLOSURE N = NO COPY

OFFICIAL RECORD COPY l

gg

. s

1J00:2G DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED

.. _ _ . - -

'

v . DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED

f

c. "cw<>%

.

UNITE 3 STATES

'

j

.

,

j, *'

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D.C. 20$$54001

%,*****)# December 24, 1997

,

!

ABB Combustion Engineering, Inc.

A1TN: Mr. Cruce Kaiser, Vice President, Fuel Operations

'

Hematite Nuclear Fuel Manufacturing

3300 State Road P

Hematite, MO 63047

SUBJECT: NRC INSPECTION NO. 70 36/97-203

Dear Mr. Kaiser:

1

The Nuclear Regulatory Commission conducted a routine inspection of your facility's material

control and accounting (MC&A) safeguards program on November 17 21,1997. The scope

and results of the inspection are summarized in the enclosure, which also includes details of the

inspection.

At the conclusion of the inspection, the findings were discussed with members of your staff.

Within the scope of the inspection, one non cited violation was identified, and one violation and

six inspector followup items were closed.

Under the provisions of Section 2.790(d), reports containing information related to a licensee's

MC8 A program are exempt from public disclosure. Accordingly, the encH ure will not be placed

in the Public Documont Room. 1

Should you have any questions concerning this letter, p! ease contact me.

Sincerely,

3 - ,.

[/ 59 f g

Philip Ting, Chief

Operations Branch

Division of Fuel Cycle Safety

and Safeguards, NMSS

_ Docket No. 70 36

License No, SNM 33

Enclosure: As stated

cc w/ enclosure: R W Sharkey, Manager, Regulatory Compliance

DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED

. DOCUMENT TRANSMITTED HEREWITH CONTAINS 2,790 INFORMATION

_.