ML20204J298

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-0036/99-01 on 990301-05 & NOV Re Failure to Implement Program,As Required,For Testing,Calibr & Insp of Component Defined by Integrated Sa/Hazard Analysis
ML20204J298
Person / Time
Site: 07000036
Issue date: 03/23/1999
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaiser B
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20204J301 List:
References
70-0036-99-01, 70-36-99-1, NUDOCS 9903300054
Download: ML20204J298 (2)


Text

E 3,..

]

March 23, 1999' - I Dr. Bruce Kaiser Vice President, Fuel Operations ABB Combustion Ervneering, Inc.

3300 State Road P Festus, MO 63028

SUBJECT:

NRC INSPECTION REPORT 070-00036/99001(DNMS) AND NOTICE i OF VIOLATION

Dear Dr. Kaiser:

On March 5,1999, the NRC completed a routine, announced inspection of operational safety, training, transportation safety, emergency preparedness, and maintenance at your Hematite -

facility. .The purpose of the inspection was to determine whether activities authorized by your license were conducted safely and in accordance with NRC requirements.

During the inspection, the conduct of activities observed at the Hematite facility was generally characterized by the effective implementation of applicable requirements. However, based on the results of the inspection, the NRC has deterrsed that a violation of NRC requirements

. occurred, The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violation are described in detail in the enclosed report. This violation is of I concern because your staff did not implement a program, as required, for the testing, f calibration and inspection of a component defined by your Integrated Safety AssessmenUHazard Analysis as important to safety. The as-found condition of the safety component represented an increased risk for the failure of a cylinder within your cold trap system.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with <

regulatory requirements. l i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosures and your response will be placed in the NRC Public Document Room. .

l l

l 1

9903300054 990323 PDR ADOCK 07000036 C PDR

W.

4 B. Kaiser 2-We will gladly discuss any questions you have concerning this inspection.

]

Sincerely,

/s/ P.L. Hiland Patrick L. Hiland, Chief Fuel Cycle Branch Docket No. 070-00036 License No. SNM-33

Enclosures:

1. Notice of Violation
2. Inspection Report 070-00036/99001(DNMS) cc w/encis: R. W. Sharkey, Director, Regulatory Affairs R. A. Kucera, Director, Intergovernmental Cooperation I

Distribution: 1 Docket File w/encls PUBLIC IE-07 w/encls C. Emeigh, NMSS w/encls R. Soong, NMSS w/encls I P. Ting, NMSS w/encls //

J. L. Caldwell, Rlil w/encls  ;

C. D. Pederson, Rlli w/encls Rlli Enf. Coordinator w/encls -

R. Bellamy, RI w/encls EJM, Rll (e-mail) -

D. B. Spitzberg, RIV/WCFO w/encls IEO (e-mail)

DOCDESK (e-mail)

Greens w/o encls DOCUMENT NAME: G:\SEC\COM99001.DNM To receive a co py of this document Indicate in the box: "C" = Copy w/o attach /enci "E" = Copy w/ attach /enci "N" = No copy OFFICE Rill A/ qu\ f lM l l NAME Hiland:ib PAR Eeu\c A(/f DATE 036%99 si:Alqq9 OFFICIAL RECORD COPY 300033