Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217M14519 October 1999Forwards Amend 29 to License SNM-33,allowing Requested Time Extension to Certain Commitments in Fundamental Nuclear Matl Control Plan Re Temporary Change to UF6 Receipt Sampling Procedure.Safeguards Evaluation Rept,Encl
ML20212J01629 September 1999Forwards Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted
ML20216E74413 September 1999Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds
ML20211B42919 August 1999Forwards Amend 28 to License SNM-33,changing Name of Licensee to Abb Combustion Engineering Nuclear Power,Inc & Incorporating Date of 990618,for Decommissioning Financial Assurance.Ser Also Encl
ML20210V09718 August 1999Confirms Meeting Scheduled for 990915 at Licensee Facility in Festus,Missouri.Purpose of Meeting to Discuss Current Plant Performance,Future Plant Activities,Recent Insp Activities & Pond Decommissioning
ML20210Q37811 August 1999Forwards Insp Rept 70-0036/99-03 on 990803-04.No Violations Noted
ML20209B30328 June 1999Ack Receipt of Transmitting Hydrogeologic Investigation & ground-water,soil & Stream Characterization & Ltr Transmitting Second Sampling Event Rept. Proposed Actions Appear Appropriate
ML20195C9992 June 1999Forwards License SNM-33,amend 26,allowing Time Extension for Distributing Result Repts for Apr 1999,physical Inventory.Temporary Safeguards License Condition SG-1.9,is Being Issued to Read as Listed,Effective Immediately
ML20207A60321 May 1999Forwards Insp Rept 70-0036/99-02 on 990426-30.No Violations Noted
ML20206U57019 May 1999Confirms Cancellation of 990524 Meeting in Festus,Mo.Meeting Will Be Rescheduled in Future
ML20196L27619 May 1999Forwards Amend 25 to License SNM-33 & Ser.Amend Revised Fundamental Nuclear Matl Control Plan.Nrc Has Completed Review of Submitted Changes & Determined That Changes Do Not Decrease Effectiveness of MC&A Program
ML20196L13918 May 1999Forwards Partially Withheld Insp Rept 70-0036/99-203 Conducted on 990419-23.No Violations Noted.Major Areas Inspected:Mc&A Safeguards Program.Rept Details Withheld,Per 10CFR2.790(d)
ML20196L27218 May 1999Ack Receipt of ,Transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 981001-990331
ML20206G9343 May 1999Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/99-01 Issued on 990323
ML20206B03726 April 1999Forwards Insp Rept 70-0036/99-202 on 990405-09.No Violations Noted
ML20205R61619 April 1999Confirms Meeting Scheduled for 990524 in Festus,Missouri to Discuss Current Plant Performance,Future Plant Activities, Recent Insp Activities & Progress of Nuclear Criticality Safety Upgrade Program
ML20205P5249 April 1999Forwards Amend 24 to License SNM-33,changing Mailing Addresses of Corporate Ofc & of Facility at Which Licensed Activity Will Be Conducted.Ser Also Encl
ML20204J29823 March 1999Forwards Insp Rept 70-0036/99-01 on 990301-05 & NOV Re Failure to Implement Program,As Required,For Testing,Calibr & Insp of Component Defined by Integrated Sa/Hazard Analysis
ML20205M43218 March 1999Forwards Amend 23 to License SNM-33 & Ser.Amend Incorporates Changes Made to Emergency Plan.Safety Condition S-1 Revised to Include Date of 990115
ML20207M12311 March 1999Informs That Encl Ltr Explains How NRC Plans to Institute Round Robin Sample Exchange Program Administered by Nbl for Verifying Quality of Licensee U Destructive Measurement Sys.Invoice FL0232-99 Encl
ML20207K2714 March 1999Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-204. Implementation of Corrective Actions Will Be Reviewed During Future Insps
ML20206S5095 February 1999Forwards Insp Rept 70-0036/99-201 on 990118-22.No Violations Noted.One Violation,Nine Inspector Followup Items & Two Unresolved Items Closed
ML20203B29427 January 1999Forwards Amend 22 to License SNM-33.Amend Allows Requested Time Extension to Certain Specified Commitments in Fundamental Nuclear Matl Control Plan.Safeguards Evaluation Rept,Encl
ML20202B47926 January 1999Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-04 Issued on 981021.Response Indicated That Licensee Conducted Root Cause Analysis & Scheduled 990209 Meeting to Discuss Issues
ML20202B55426 January 1999Confirms Meeting Scheduled for 990209 in Lisle,Illinois to Discuss Recent Insp Findings on CE Assessment of Lapel Air Samples & Results of Root Cause Assessment & Procedure non-conformance
ML20199G38519 January 1999Forwards Partially Withheld Insp Rept 70-0036/98-204 on 981207-11 & Notice of Violation.Violations Noted.Rept Details Withheld (Ref 10CFR2.790)
ML20199D8764 January 1999Requests Addl Info for Info Not Found During Review of Listed Licensing Documents.Nrc Is in Process of Preparing Rtm Suppl for Each Fc Facility,Per .Suppl Assist NRC Incident Response Staff as Emergency Assessment Tool
ML20198E80018 December 1998Informs That NRC Received Ltr Dtd 981201,clarifying Intent of Section 4.2 of Hematite Evaporation Ponds Dcommissioning Plan
ML20197H4117 December 1998Discusses 981030 Meeting with Hematitle Fuel Operations & NRC at Region III Office Re General Plant Topics Which Included Part 70 Rulemaking & Nuclear Criticality Safety Program Updates
ML20196C36024 November 1998Forwards Insp Rept 70-0036/98-05 on 981102-06 & Notice of Violation.Violation of Concern Because of Indication of Lack of Attention to Detail in Implementation of Posted Criticality Safety Controls for Routine Operations in Plant
ML20196D23424 November 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-04 & 990115 Commitment to Provide Addl Steps to Be Taken Subsequent to Mgt Review of Root Cause Assessment Team Findings
ML20196A93320 November 1998Ack Receipt of Ltrs & 1103,which Provided Biennial Update for Demonstration Sections of License SNM-33.Update Reflects Current Operations & Includes Operational Data & Info on Current Environmental Release
ML20155B71428 October 1998Informs That Staff Reviewed Response to Violations Noted in Insp Rept 70-0036/98-202 & Determined Response Meets Requirements of 10CFR2.201.Implementation of Licensee Corrective Actions Will Be Reviewed During Future Insps
ML20154R42521 October 1998Forwards Insp Rept 70-0036/98-04 on 980914-18 & Nov.One Violation Identified & of Concern Because Examples Indicate Weakness in Implementation of Mgt Program for Performance of Certain Operations
ML20154L48614 October 1998Ack Receipt of 980827 & 1005 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-03 Issued on 980730.C/As Will Be Examined During Future Insp
ML20155A63313 October 1998Ack Receipt of Ltr Dtd 980925,transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 980331-0930
ML20154J83713 October 1998Confirms Meeting Scheduled for 981030 in Lisle,Il to Discuss General Facility Performance
ML20154D5112 October 1998Forwards Nuclear Criticality Safety Insp 70-0036/98-203 on 980804-07.One Unresolved Item & One non-cited Violation Was Noted.Unresolved Item Involved Need to Identify Un Tank in Recovery Area as Single Parameter Control Component
ML20236V57630 July 1998Forwards Insp Rept 70-0036/98-03 on 980713-17 & Notice of Violation
ML20236V01823 July 1998Forwards Amend 21 to License SNM-33 & Ser.Amend Reflects Changes & Improvements in Chapter 4, Nuclear Criticality Safety of License Application.Safety Condition S-1 Has Been Revised to Include 980710 Date
ML20236K8812 July 1998Forwards Partially Withheld Insp Rept 70-0036/98-202 on 980608-12 & Notice of Violation.Violation Is of NRC Concern Because It Indicates Complete Understanding of Licensee Requirements.Rept Details Withheld,Per 10CFR2.790
ML20249B16017 June 1998Informs That Staff Determined That Results of Field Work Specified in Hydrogeolic Investigation Plant Should Provide Reasonable Amount of Hydrogeological Characterization of Site,To Determine Appropriate Decommissioning Actions
ML20249B20016 June 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-01 on 980506
ML20249B2918 June 1998Informs of NRC Plans to Develop Emergency Response Technical Manual Suppls for Fuel Fabrication Facilities
ML20248D8061 June 1998Ack Receipt of ,Transmitting C-E Response to .Nrc Determined Licensee Response Consistent W/ 10CFR70.22(d),as Result
ML20247M91019 May 1998Forwards Insp Rept 70-0036/98-02 on 980512-13.No Violations Noted
ML20247E3087 May 1998Summarizes 980430 Public Meeting W/Listed Attendees to Discuss NRC Evaluation of Plant Performance in Five Major Areas of Safety Operations,Safeguards,Radiological Controls, Facility Support & Licensing ActivitiesFire Protection Program
ML20247D3316 May 1998Forwards Insp Rept 70-0036/98-01 on 980406-09 & Notice of Violation.Nrc Completed Operations Review,Mgt & Organization,Operator Training & Environ Insp at Facility
ML20247N2716 May 1998Ack Receipt of Transmitting Copy of Semiannual Status Rept of CE Criticality Safety Program Update Covering Period from 971001-980331.NRC Continues to Endorse Methods Described in Alche Handbook
ML20217K40728 April 1998Ack Receipt of Response to Violations Noted in Insp Rept 70-0036/98-201 & Have Determined That Response Is Adequate & Corrective Actions Should Prevent Recurrence