ML20202B554

From kanterella
Jump to navigation Jump to search
Confirms Meeting Scheduled for 990209 in Lisle,Illinois to Discuss Recent Insp Findings on CE Assessment of Lapel Air Samples & Results of Root Cause Assessment & Procedure non-conformance
ML20202B554
Person / Time
Site: 07000036
Issue date: 01/26/1999
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaiser B
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 9901290114
Download: ML20202B554 (2)


Text

..

- ~

f

-s i

January 26, 1999 i

i l

,.i 3

Dr. Bruce Kaiser

)

Vice President, Fuel Operations ABB Combustion Engineering, Inc.

3300 State Road P

. Hematite, MO. 63047

SUBJECT:

MANAGEMENT MEETING O.'4 FEBRUARY 9,1999

Dear Dr. Kaiser:

This letter is to confirm the meeting scheduled for February 9,1999, at 9:00 a.m. (CT), in the Executive Conference Room at the U.S. Nuclear Regulatory Commission Region ill Office, 801.Warrenville Road, Lisle, Illinois. ~ The purpose of the meeting is to discuss: (1) recent

' inspection focusing on CE assessment of lapel air samples; and (2) the results of a Root Cause -

assessment and procedure non-conformance.

If you would like to discuss this letter, please contact me at (630) 829-9603.

Sincerely,

/s/ P. L. Hiland Patrick L. Hiland, Chief Fuel Cycle Branch Docket No. 070-00036 License No. SNM-33 cc:

. R. W. Sharkey, Director, Regulatory Affairs R. A. Kucera, Director, Mirsouri Department of Natural Resources I D DOCUMENT NAME: G.GEC\\ COMB _MTG.992_

To receive a copy of this document, Indicato in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy lDFFICE Rlli

- l /V l

l 1

94AME PHiland/dp 91 14 DATE-01/al/99 -

OFFICIAL RECORD COM

~9f01290114 990126

~

PDR ADOCK 07000036 C

PDR

1 i

B. Kaiser l

,.'s.

Distribution:

1 Docket File PUBLIC4E=07-h C. Emeigh, NMSS R. Soong, NMSS -

P. Ting, NMSS J. L. Caldwell, Rlli C. D. Pederson, Rill R. Bellamy, RI j

EJM, Ril (e-mail)

]

D. B. Spitzberg, RIV/WCFO Greens 1

4 i

i w-,y

--4w-