ML20216E744

From kanterella
Jump to navigation Jump to search
Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds
ML20216E744
Person / Time
Site: 07000036
Issue date: 09/13/1999
From: Adams M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Sharkey R
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 9909170167
Download: ML20216E744 (2)


Text

rg$ ,

September 13, 1999 h 'i Mr. Robert W. Sharkey, Director .-

. Regulatory Affairs L ABB Combustion Engineering L Nuclear Power, Inc.

L 3300 State Road P

l. Festus, Missouri 63028

SUBJECT:

EXTENSION OF TIME TO DEVELOP AND REFINE IN-SITU URANIUM t RECOVERY PLAN

Dear Mr. Sharkey,

- As requested in your letter dated August 13,1999, this letter grants a six-month extension of

. time for you to further develop and refine the in-situ leaching (ISL) process for the recovery of uranium from soils beneath the evaporation ponds. Since this extension will result in a time to l complete decommissioning that exceeds 24 months from NRC approval of the ponds decommissioning plan (January 1998), then you should request an altemate schedule for completion of decommissioning under 10 CFR 70.38(i) as soon as possible.

If you have any questions, please contact Mr. Sean Soong at 301-415-8155.

Sincerely, Original signed by:

Mary T. Adams, Team Leader Licensing Team 1 Licensing and International Safeguards Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-36 License SNM-33 Distribution:

~

Dealest70 38;f (PUB (.lC7 WilsidaiterEr FCSS r/f Region lil LIB r/f .

NMSS r/f TReidinger, Rll!

G:\ lib \cepondextensionmta.wpd]

OFFICE LIB hdC LIB it C LIB h L.lB g

-q o NAME MAdamds:mm SSoong )'/ PShea Q 6 CEmeigh 3 l DATE- 9//8 /99 9/ h /99 I 9/ /J/99 1

9/D/99 l e

3 i

\

kO) 9909170167 990913 '

PDR ADOCK 07000036.

C PDR o

g"A REOp ge *i UNITED STATES

< < e NUCLEAR REGULATORY COMMISSION If WASHINGTON, D.C. 205fM)D01

%..... September 13, 1999 Mr. Robert W. Sharkey, Director Regulatory Affairs ABB Combustion Engineering Nuclear Power, Inc.

3300 State Road P Festus, Missouri 63028

SUBJECT:

EXTENSION OF TIME TO DEVELOP AND REFINE IN-SITU URANIUM RECOVERY PLAN

Dear Mr. Sharkey,

As requested in your letter dated August 13,1999, this letter grants a six-month extension of time for you to further develop and refine the in-situ leaching (ISL) process for the recovery of uranium from soils beneath the evaporation ponds. Since this extension will result in a time to complete decommissioning that exceeds 24 months from NRC approval of the ponds decommissioning plan (January 1998), then you should request an alternate schedule for completion of decommissioning under 10 CFR 70.38(i) as soon as possible. ,

if you have any questions, please contact Mr. Sean Soong at 301-415-8155.

Sincerely, 9

Mary T. Adams, Team Leader Licensing Team 1 Licensing and International Safeguards Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-36 License SNM-33

/