Informs That Staff Determined That Results of Field Work Specified in Hydrogeolic Investigation Plant Should Provide Reasonable Amount of Hydrogeological Characterization of Site,To Determine Appropriate Decommissioning Actions
ML20249B160
Person / Time
Site: 07000036
Issue date: 06/17/1998
From: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Sharkey R
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
TAC-L31022, NUDOCS 9806220123
Download: ML20249B160 (2)


Text

_ _.

June 17, 1998 A

[ " '

Mr. Robert W. Sharkey. Director Regulatory Affairs Combustion Engineering. Inc.

3300 State Road P

' Hematite, MO 63047

SUBJECT:

'HYDROGE0 LOGIC INVESTIGATION (TAC NO. L31022)

Dear Mr. Sharkey:

This is in reference to your submittal dated April 28, 1998, of the "Hydrogeologic Investigation and Groundwater / Surface Water Monitoring Work

-Plan for the Combustion Engineering. Hematite Missouri Site. Revision 1."

The

-NRC staff.has completed its review of this Plan. The staff has determined that the results of the field work specified in the Plan should provide a reasonable hydrogeological characterization of the site, which will enable you to determine appropriate decommiss'ioning actions for the 10 CFR 20.304 burial 1

area at your facility.

Therefore, we expect you to initiate the hydrogeologic investigation promptly.

As indicated in your letter of October 21, 1997, we expect to receive the hydrogeological report on the results of this investigation by November 1999.

If you have any questions, please contact Sean Soong, the NRC Project Manager for your facility, at (301) 415-8155.

Sincerely, a

Original signed by:

Michael F. Weber. Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards. NMSS Docket-70-36 bf License SNM-33 D

Distribution:

(Control No. 710S) [ Complete]

/[J 5tDocketT70:36 TPUBLIC s TNRCJE11e:Centerg FCSS R/F Region III

-FCLB R/F NMSS R/F RNelson. LLDP-JHickey. LLDP PHiland. RIII KStablein. ENGB DBrooks, ENGB p4#4 Tp=, u60

[c:\\chotoo\\ hematite \\ burial. app]

0FC FCLB 0

FCLB-C-

FCLB C.-

FCLB U

FCLB NAME-SChotoofG SSoong $

PSheaM3 Mb%y MWeber[

I DATE 6/10 /98 6/ /(

/98 6/ Mj

/98' 6/ ' /l '/98 6/ ll /98 I

9906220123 980617 !*

l PDR ADOCK 07000036 hh Ms3}[

i

.:m_

[ I870g 4

UNITED STATES

[

j NUCLEAR REGULATORY COMMISSION f

f WASHINGTON, D.C. 20666-0001 k.....o/

June 17, 1998 Mr. Robert W. Sharkey, Director Regulatory Affairs Combustion Engineering Inc.

3300 State Road P Hematite, M0 63047

SUBJECT:

HYDR 0GE0 LOGIC INVESTIGATION (TAC NO. L31022)

Dear Mr. Sharkey:

This is in reference to your submittal dated April 28, 1998, of the "Hydrogeologic Investigation and Groundwater / Surface Water Monitoring Work Plan for the Combustion Engineering Hematite Missouri Site, Revision 1."

The NRC staff has completed its review of this Plan. The staff has determined that the results of the field work specified in the Plan should provide a reasonable hydrogeological characterization of the site, which will enable you to determine appropriate decommissioning actions for the 10 CFR'20.304 burial area at your facility.

Therefore, we expect you to initiate the hydrogeologic investigation promptly.

As indicated in your letter of October 21, 1997, we expect to receive the hydrogeological report on the results of this investigation by November 1999.

If you have any questions, please contact Sean Soong, the NRC Project Manager for your facility, at (301) 415-8155.

Sincerely,

'S Y

Michael F. Weber,. Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-36 License SNM-33 l

- - - - - - - -