ML20076K916: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1,007: Line 1,007:
In addition to the referenced ASME Code.Section XI, the RBS                ;
In addition to the referenced ASME Code.Section XI, the RBS                ;
IST Program Plan was prepared in compliance with the.                        I following NRC guidance documents: Draft document dated .                  ,
IST Program Plan was prepared in compliance with the.                        I following NRC guidance documents: Draft document dated .                  ,
1/1978, " Guidance for Preparing Pump and Valve Testing                    i Programs and Associated Relief Requests Pursuant to 10CFR50.55a (g)"; NRC Letter dated 11/1976,        "NRC staff Guidance for Complying with Certain Provisions of 10CFR50.55a (g)"; NRC Generic Letter #89-04 dated April 3, 1989, " Guidance on Developing Acceptable Inservice Testing Programs"; bdC letter dated August 31, 1987, "NRC Staff-Os            Interim Review of the RBS Pump and Valve Inservice Testing Program (IST) Revision 3"; NRC letter dated October 9, 1987, "NRC Staff Consultants Preliminary Review of the-RBS Pump and Valve IST Program"; NRC letter dated January 6, 1988, "NRC Meeting Minutes of Pump and Valve IST Program Plan"; NRC letter dated    January 2, 1991, " Staff Review of the First Ten Year Interval IST Program for Pumps and Valves"; GSU Response Letter dated July 26, 1991, " Response to NRC IST Evaluation "; and NRC Safety Evaluation for Revised Relief Requests dated July 16, 1992. These documents provide the basis for selecting components, testing requirements, and Requests for Relief.
1/1978, " Guidance for Preparing Pump and Valve Testing                    i Programs and Associated Relief Requests Pursuant to 10CFR50.55a (g)"; NRC Letter dated 11/1976,        "NRC staff Guidance for Complying with Certain Provisions of 10CFR50.55a (g)"; NRC Generic Letter #89-04 dated April 3, 1989, " Guidance on Developing Acceptable Inservice Testing Programs"; bdC {{letter dated|date=August 31, 1987|text=letter dated August 31, 1987}}, "NRC Staff-Os            Interim Review of the RBS Pump and Valve Inservice Testing Program (IST) Revision 3"; NRC {{letter dated|date=October 9, 1987|text=letter dated October 9, 1987}}, "NRC Staff Consultants Preliminary Review of the-RBS Pump and Valve IST Program"; NRC {{letter dated|date=January 6, 1988|text=letter dated January 6, 1988}}, "NRC Meeting Minutes of Pump and Valve IST Program Plan"; NRC letter dated    January 2, 1991, " Staff Review of the First Ten Year Interval IST Program for Pumps and Valves"; GSU Response Letter dated July 26, 1991, " Response to NRC IST Evaluation "; and NRC Safety Evaluation for Revised Relief Requests dated July 16, 1992. These documents provide the basis for selecting components, testing requirements, and Requests for Relief.
Regarding Containment Isolation (CIV)/ Pressure Isolation (PIV) function valves, this program incorporates.these into the RBS Pump and Valve IST Program. Per Valve IST Position 3.5.3 to perform leak rate testing in acco'rdance with 10CFR50, Appendix J, the River Bend Leak Rate Testing guidelines and compliance with the requirements of Section XI IWV-3 4 2 6 and IWV-34 27 (a) have been incorporated.
Regarding Containment Isolation (CIV)/ Pressure Isolation (PIV) function valves, this program incorporates.these into the RBS Pump and Valve IST Program. Per Valve IST Position 3.5.3 to perform leak rate testing in acco'rdance with 10CFR50, Appendix J, the River Bend Leak Rate Testing guidelines and compliance with the requirements of Section XI IWV-3 4 2 6 and IWV-34 27 (a) have been incorporated.
into the IST Program.
into the IST Program.

Latest revision as of 11:24, 27 September 2022

Updates to IST Pump & Valve Program Manual
ML20076K916
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/27/1994
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20076K909 List:
References
PROC-941027, NUDOCS 9411020187
Download: ML20076K916 (248)


Text

('

~

V TO: Controlled Copy Holders ofIST Pump and Valve Program manual.

Please insert the attached changes into your manuals as follows:

1. Minor editorial changes and the addition of page revision numbers have been made to Sections 1,2 and 3, remove and replace entire ,

sections:

Section 1, pages 1-1 through 1-3 l Section 2, pages 2-1 through 2-5 Section 3, pages 3-1 through 3-9 l J

2. ISTCR #0001 - Remove and replace Appendix C (entire); the affected pages of Section 3 were incorporated in item 1; place  :

ISTCR #0001 in the back of the manual.

3. ISTCR #0002 - Remove and replace Pump Relief Request No. 4.;

place ISTCR # 0002 in the back of the manual.

4. ISTCR #0003 - Place ISTCR #0003 in the back of the manual; the affected pages of Appendix C were incorporated in item 2.
5. ISTCR #0004 - Remove and replace Valve Relief Request No. 24.;

place ISTCR #0004 in the back of the manual. i i

l

6. ISTCR #0005 - Place ISTCR #0005 in the back of the manual; the affected pages of Appendix C were incorporated in item 2.  ;

E NTERGY OPE RAT:ONS gfa n HOLDER #

,g 2 3 '94 05 RrWR E'IND STATION CCNTM.Gl L,ED ACCOUNTAELE a RETURNACLt t O

9411020187 941027 i PDR ADOCK 05000458 4 P PDR l u.

C O O IST CI!ANGE REQUEST FORM STCH #: c - . s  % w.P ~ # >

000I

. .[gh';ggg;[@dk 9s etSqWynkhjj hi gM$.%Y '$MM3@h[;M.y, W

$4dc ~)

x .

, s

,, W.n nate: Requester: Departeneet: Phone:

May 31.1994 James K Roberts Engineering - Mech / BOP X 4554 ssue date and resision of IST Testing Program for Pumps and Valves: Affected responent(s):

WS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 All ASME Valves in the IST Plan (Appendix C) sffected Pages:: ' SW- Relief Regvests: CR's, M R*s, MWO's:

IST Plan Appendix C (Entire), N/A N/A N/A pages 3-4 & 3-5 ipettiled Description of the Requested change:

1,m imJe ,nearLeJ my avses of the 15T14cg,am plo,e o, RetrefRequest of appbcable)

Replace Inservice Test Plan (Rev. 6) Appendix C with attached rewrite. New appendix has been reformatted, minor editorial changes have ecen made, and valve reference and limiting stroke times have becn deleted. Section 3, delete ' STROKE TIME LIMITS * (page 3-4 & 3-5, para 3.3.6, I,2 & 3, and NOTE I & 2), also ' MISC INFO'(page 3-5, para.1). Delete the number 2 and begin new Section 3.3.6 with ' REM ARKS'.

lustification for the Requested Change:

Change results in a valve table more in line with drall NUREG-1482 Appendix B. This will negate the requirement to update the IST Plan each time a reference value changes. Valve reference and limiting stroke times are now maintained in a separate database.

t Reviewed: Jos m M7 / Approved: --N, _u b n!6-<<N

,r3w g. ,,, cm.,a,,a,.mcy m.,,, rypse,,, gg

/ t v unmM ova <wnous DATE ' " ' " ' "

Once completed, submit to IST Engmcer / Coordmator for incorporation into IST Program 05 Jd 23 94 RojcR BEND OTATION CCN rP.0LLCD ACCCUNTABLE & RETURN ABLE o --- --_-_------a - - - --'n~' e w ,~ w r- -w s? ,---a-.,---- - - - -_ e- - -_ ' - - - -_ m

O O O

& RIVER BEND STATION INSEllVICE TEST PL AN - VALVES Page I el IOS ggggacy APPE50lX C P&lD Syste_m1; Svstem Alpha: P_ age Rev. Date ISICRL System Name 361A 052 RDS Gil194 0001 CHUllVUHAUllC VALVE.lNf0RMAT10N TEST INFORMAT10N REMARKS Ilseek 5 ember G Cat. Siao Type Act- Peeities Dws. Type Freg. Reisef Class linj meter BermellSafety Ceard.

IC11*MOVf 003 2 A 2 GL MG 0 C t2 ISE CS 06 Pi RF LR HF 10 CIR 50. APP.J Iest ICll*Vil22 2 AC 2 CK SA 0 C F-16 ISE Rf 26 1R HF 10 CIR 50, APP.J Iest 4

L_-_-____-_-___---____-__._-_. __ - _ _ - . - - . _ - - - _ . -, _ ._- . . _ . _ . . _ , . . - _ _ - . _. -. _. _ _ - -

O 0 (vO G

& RIVER BEND STATION INSERVICE TEST PLAN . V ALVES

,,,,,,,,,o,,

APPEW0lX C

$tRGY g .

System Alpha: Pane Rev. Date ISICHL System Name:

P_&_l0 Systemi 052 RDS Gills 4 0001 CHD llVI)HAUllC 36 IC val.VE.INFORMATION TEST INFORMATION REMARKS Rierh uomber 0 Cat. Sise Type Act- Posities Del. Type Freg. Reint Class lisj meter Hermell Safety Coord.

A0 C D E7 ISI V 33 Sciam iest; 145 ea.

IC11*A0V126 2 8 I GA FS V IC11*ADV127 2 B 314 GA A0 C 0 F9 iSt V 33 Scram lest.145 ea IS W ICll' ADVf 010 2 B 1 GL A0 0 C H 16 FSE D FS 0 Pt RF A0 0 C A 17 ISE D ICll'A0Vf 0il 2 B 2 GL IS 0 Pl RF ICll'A0Vil80 2 B 1 GL A0 0 C H 17 ISE O IS 0 Pl Rf ICll'A0Vil81 2 B 2 Cl A0 0 C A 18 ISE O IS 0 Pl Rf CK SA C 0 I9 iSE V 33 Scram Test.145 ea.

ICll*Vl14 2 C 314 f

ICit*V115 2 C ll2 CK SA C C 01 IS! V 33 Scsam lest.145 ea LR Rf Speualleak lest l

ICll'V138 2 C ll? CK SA 0 C D1 ISE U. Scram lest.145 e4 9

r '

O O O O RIVER BEND STATION lilSERVICE TEST PLAN - V4LVES tNTERGy ,

APPERDIX C Systemt S stem Alpha:

_t Pane Rev. Date ISICRK. System Name MtI}

25 iC 053 RCS 6lllS4 0001 Hi AClUH lit ClittUl AIluN VALVE INFORMATION TEST INFORMATION REMARKS Meek Beashot 0 Cat. Sire Type Act- Posities Dws. Type Freg. Rehet Close lie.) ester Netweell Selety Coord.

IB33*A0 VIOL 9 2 A 314 GL A0 0 C 19 ISE O 2 IS 0 PI HI LR Rf Drywell Bypass lest IB33*A0Vf 020 2 A 34 GL A0 0 C [8 ISE G 2 IS 0 Pl RF LR Rf Drymed Bypass test 1833*Vf013A 2 AC 314 CK SA 0 C I5 iSE RF 02 LA RF Drywed Bypass Test IB33*VI0l38 2 AC 314 CK SA 0 C I 11 ISE RI 02 LR RF Drywed Bypass Test IB33'V1011A 2 AC 314 CK SA 0 C E-7 ISE RF 02 LR Rf Drywed Bypass Test IB33*VIO11B 2 AC 314 CK SA 0 C E 16 ISE Rf 02 LR Rf Dryweil Bypass lest

(- -

o o o O HlVER BEND STATION INSERVICE TEST Pi AN . VALVES ENTERGY APPENDIX C P&lD S

_Istem #: System Alpha: Faae Rev Date ISICH E System Name:

25 10 053 RCS Sills 4 0001 R1 ACIDH lil CIHCUI AI10N VALVE INFORMATION TEST INFORMATION REMARKS Mark Nember G Cat. Siao Type Act- Peeities Dws. Type Frog Relwl Class En.) entw Normell Selety Cemd.

IRCS*MOV50A 2 A 1 GL MO O C f 14 f61 CS 16 PI RF LR Rf Drywd Bypass test IHCS*MOV58B 2 A I Gt MG 0 C F -14 ISE CS 16 PI RF LR RF Drywd Bypass Iest IRCS*MOV59A 2 A I Gt M0 O C E-14 FSE CS 16

. PI RF LR Rf Drywd Bypass iest IRCS*MOV59B 2 A 1 GL MG 0 C E 14 ISE CS 16 PI Rf LR RF Drywd Bypass iest IRCS* MOV60A 2 A 1/2 GL M0 O C D 14 iSE CS 16 PI RF tR Rf Drywd Bypass less IRCS*MOV60B 2 A l/2 GL MG 0 C D 14 ISE CS 16 Pl RF LR HF Dr ywd Bypass lest IRCS*MOV6tA 2 A 314 GL MG 0 C C 14 ISE CS , 16 PI Rf LR Rf Drywell Bypass test

r-O O O g

RIVER BEND STATION INSERVICE TEST PLAN - VALVES g,,,,,,,,,,,,

Mg:.,y . APPEB0lX C System Alpha: ISICR #: Systeie!Name.

E F System 1 Pane Rev. Date 25 10 053 RCS 611/9 4 0001 HI AC10H NICIHCul All0N VALVE INFORMATION TEST INFORMATION REMARKS Nierk Benhor Q Cet. Sias Type Act- Positsee Dws. Type Fieg. Reisel Class linj enter Bernall Safety Coert

.CS*t0V61B 2 A 314 GL M0 C C 14 ISE CS 16 Pl RF LR HF Drywell Bypass Iest O

4

_ _ --- , . - - - - - , - ,c

e rN O RIVER BEND STATION INSERVICE TEST PLAN - VALVES btTERoy ,

APPENDIX C P&l0 Systeml; S 3 stem Alpha: Paee fiev Date ISICR #: Srstem Nanw 4 3C 106 CNS 61119 4 0001 CONU, MU SIUHilliANSI.

VALVE INFORMATION TEST INFORMATION REMARKS almk Nember G Cat. Sise Type Act Posities Des. Type Freq. Releet Close Enj motee Norsnell Selety Coord.

ICNS*MOV125 2 A 4 GA M0 O C G 15 iSE O Pi Rf LR HF 10 Cl R 50, APP. J Iest LR RF PV1CS Valve less lR Rf PV1CS Div. less ICNS*MOV130 2 A 4 GA MG 0 C G 14 ISE o PI RF LR Rf 10 CIR 50, APP. J Test LR Rf PVLCS Dw. Test ICNS*V86 2 AC 4 CK SA C C G-18 ISE RF 26 LR RF 10 CTR 50. APP.J Test IE12*Vf044A 2 AP 4 GA MA C C J 20 (R RT 10 CIR 50. APP.J Iest 1E12*Vf044B 2 AP 4 GA MA C C K 20 LR Rf 10 CIR 50. APP.J Iest

O O O

& RIVER BEND STATION INSERVICE TEST PLAN V ALVES g,,,,,,,,,

APPEB0lX C ENTERGY ,

P&LD System F System Aloha: Pase Rev Date ISICH #: System Nane 6 IB 101 iWS Silt 94 0001 , lilliwAll H VALVE.INFORMATION TEST INFORMATION REMARKS Afeek Besehes N Cat. Sies Type Act- Posities Dws. Type Freg. Releet Cloes lie.) enter Besseell Safety Ceard.

IB21* A0Vf 032A 1 AC 20 CK SA 0 0 J 12 ISE RF 28 lest& Check Valve PI Rf C LR RI 10 CIR 50. APP.J Iest 1821* A0VIO328 1 AC 20 CK SA 0 0 N 15 ISE RI 28 lest& Check valve Pl RF C 1R Rf 10 ClR 50. APP. J iest 1821*MCVl065A 2 A 20 GA M0 O C J 15 ISE CS 03 Pl Rf LR Rf PVICS Valve Test IR RF PVLCS Dev. les:

1821*MOVf 065B 2 A 20 GA MG 0 C N 18 FSE CS 03 Pl Rf LR RF PVLCS Valve lest lR Rf PVLCS 0iv. Test IB21*V1010A l AC 20 CK SA 0 0 J 10 ISE Rf 28 C (R RF 10 CFR 50. APP.J 1est l 1821*VIO10B 1 AC 20 CK SA 0 0 N 13 ISI Rf 28 I C tR Rf 10 CIR 50. APP. J Iest IIWMOV/A 2 A 20 GA MG 0 C J 14 ISE CS .- 03 l Pl RF la Rf 10 CIR 50. APP. J Iest lR RI. PVICS uiv lest

_ _ _2-___ _ , _ , - . =~ - _ _ _ _ _ _ _ _ _ , -

O O o N

RIVER BEND STAT 10N luSERVICE TEST PLAN V ALVES

  • APPENDIX C

~gw hERGY P Rev Date ge ISICH F: System Nauw System #: System Alcha:

P&lD IWS 61119 4 0001 IIIDWAllH 6 18 101 TEST INFORMATION REMARKS VALVE INFORMATl0N Act- Posities Dws. Type Freg. Releef Q Cet. Siao Type Cwk Bomber linj eeter Normell S21 sty Coord.

Class 2 A 20 GA M0 O C N il ISE CS 03 IFCS*MOV1B Pl Rf IR RF 10 ClR 50. APP.J lest (R Rf PVICS Dw. lest

o o o O RIVER BEND STATION INSERVICE TEST PLAM VALVES

~

APPENDIX C tNTERGY Sistem Alph1 Pane Rev Date ISfCHL Sistim Name, P_&lD S_Jstemi 109 MSS GilI94 0001 MAIN Sil AM 31 A VALVE INFORMATION TEST MFORMATION REMARKS 0 Cet. I siao Type Act. Peeities Dws. Type Freg. Reisel Isak member Class liej ester Bernal[ Selety Coord.

1 A 24 GL A0 0 C D 16 ISE CS 40 821* A0VF022 A PSE D FS CS PI Rf LR RI PV1CS Div. last 821*A0VIO228 i A 24 GL A0 0 C N5 ISE CS 40 PSE o TS CS

  • PI RF IR RF pvt CS Div. lest A 24 GL A0 0 C N 16 ISE CS 40 821*A0VF 022C 1 PSE G IS CS P1 Rf lR RF PV1CS Div. lest 821* A0VF0220 1 A 24 GL A0 0 C E5 ISE CS 40 PSE O IS CS Pl Rf LR RI PV1CS Div. Test iB21*V1024A 3 AC 2. CK SA C C f 14 iSE CS

l O O O N

RIVER BEND STATION INSERVICE TEST PLAN -V ALVES i.,,, , o ,, , o.,

, APPE80lX C NERGY System Alpha: Pace Rev. Date ISICH2 Sypem Name P&lD Sjstemf; 611/9 4 0001 MAIN Sil AM 31 A 109 MSS VALVE INFORMATION TEST INFORMATION REMARKS O Cat. Sias Type Act- Posities Dws. Type frog Reisel C'w k menihes Class fesj omew Swanell Safety Ceard.

CK SA C C G1 FSt CS 39 121*Vl024D 3 AC 2 4

p g CT O & Y

& RIVER BEND STATION g,,, , , ,, , g.,

N ~

luSERVICE TEST PLAN VALVES APPENDIX C tNTERGY ,

P&l0 Systeml; System Alpha. Pane Rev Date ISICR #; S tstem N 4me_

3 18 109 SVV Elll94 0001 MAIN Sil AM VALVE INFORMATION TEST INFORMATION REMARKS aseek member o Cat. Sise Type Act- Peeities Dws. Type freg. Relief Class lim.) meter Neemell Selety Coord.

IB21*RVf041A I B.C 8X10 RV AD C D&C I 13 ISE RT 22 SA PI Rf SP Rf Il65 pus IB21*RVf041B 1 B.C 8X10 RV A0 C O&C F7 ISE Rf 22 SA PI Rf SP RI i165 pug 1821*RVf 041C 1 B.C 8110 RV A0 C D&C H 18 ISE RT 22 SA P1 Rf SP RI 1165 pug IB21*RVf0410 i BC 8X10 RV AD C D&C H 10 ISE Rf 22 SA M Rf SP RF 1165 pus IB21*RVf041f I B.C 8X10 RV AD C 0&C I4 ISE Rf 22 SA Pl Rf SP Rf I165 pas IB21*RVf041G 1 B.C 8X10 RV AD C D&C H 17 ISE Rf 22 SA PI Rf SP Rf Il65 pug IB21*RvF041l 1 B.C 8X10 RV AD C O&C H l9 ISE Rf .. 22 SA Pl Rf SP RI i165 pug

O O O RIVER BEND STATION ,,,,,,,,,,o.,

N INSERVICE TEST PLAN - V ALVES APPENDIX C

'INY E ISICR#: Sntem Naisir S Pase Rev. Date P&lD Sagy _nf; 3 5 tem Alpha: 0001 MAIN Sll AM SVV Gills 4 3 IB 109 TEST INFORMATION REMARKS VALV6INFORMATION Dws. Type Freg. Relief sies Type Act- l Positeen 0 Cat.

Meek Bomber Coord.

Class lin) estes l Nwmalj Seirty f 14 ISE Rf 22 RV AD C D&C 1 B.C 8X10 IB21*RVf 041A PI RI SA SP RI 1180 pseg A0 C O&C I8 ISE fil 22 i B.C 8X10 RV IB21*RV10418 Pl Rf SA SP Rf 1180 pseg H 14 ISE Rf 22 AD C D&C 1 B,C 8X10 HV IR21*RV1041C Pt RF SA SP RI 1180 psig D&C ll 8 ISE Rf 22 1 B,C 8X10 RV A0 C IB21*RVIO41D Pl RF SA SP Rf 1180 psig C O&C F3 IS[ ftf 22 I 8,C 8X10 HV AD IB21*RVf041f Pt Rf SA SP Rf 1180 pseg D&C F6 ISE Rf 22 8X10 HV AD C IB21*RV1051B i B,C P1 Hf SA SP Rf 1190 psig D&C H 16 ISE RI .. 22 1 B.C 8X10 RV A0 C IB21*RV1051C PI Rf SA SP HF 1190 pug l

9 9

e-__- - _ - _ - _ _ _ _ _ _ . - _ _ _ - . _ _ _ _ - - - _ - _ _ _ . . _ _ _ - - _ _ _ _ - _ . _ _ _ _ . _ - - - _ _ _ _ _ _ - . - _ - _ _ - . _ - _ _ . - - - _ . _ _ . _ _ _ _ . - _ -_ ~ - - - . .- - - _ - _ _ _ - - _ . _ . - - _ _ . _ _ - - -- _- . _ - _ . - _ - . - _ _ - _ . - - _ _ _ - . - _ - _ _ . - . - . _ _ _ . _ _ - - . - - _ . _ . _ . _ _ - _ - _ ,

%d '% )

RIVER BEND STATION '

O lESERVICE TEST PLAN VALVES

- APPENDIX C ENTERGY ISICRL SIstemName.

System Alpha: Paec Rev. Date Pg 5 stemg; 3 MAIN Sil AM 6/1/94 0001 109 SVV 3 18 TEST INFORMATION REMARKS VALVE INFORMATION Owg. Type freg. Rehef Cet Siao Type Act Posities IR wk Nesehee O linj ontw Emsnell Safety Cowd.

Class H5 ISE RI 22 RV A0 C D&C Il*RVf051D I 8C 8X10 SA Pt til SP RF 1190 psig D&C H 2O ISE Rf 22 B,C 8X10 RV AD C 21*RVIO51G I Rf Il SA SP RF 1190 pssg l-13 ISE RT 09 AC 1.5 CK SA 0 C 621*VID36A 2 SRV As leak lest IR Rf K 11 ISE RF 09 AC 1.5 CK SA 0 C 121*VID36F 2 SRV Au leak lest 1R Rf K-19 ISE RF 09 AC I.5 CK SA 0 C d21*VID36G 2 SRV As leak lest LR Rf K9 ISE RF 09 AC 1.5 CK SA 0 C B21*Vf036J 2 SRV As leak lest 1R' Rf K8 iSI Rf 09 AC CK SA 0 C B21*Vl036L 2 .l .5 SHV As leak less IR RF 0 C K2 ISE Rf 09 AC 1.5 CK SA iB21*Vf 036M 2 ** SHV An leak lest 1R Rf 0 C K5 FS[ Rf 09 AC 1.5 CK SA IB21*V1036N 2 SHV Au leak lest IR RF

v C]

ON l

I

& RIVER BEND STATION INSERVICE 1EST PL AN V ALVES

-l APPER0lX C

~~hERGY tw .

\

F8,1D Sjs.1_em_L System Alpha: Page Rev. Date ISICR #. System Nanw; 31B 109 SVV Elll94 0001 K'IN sitAM VALVE INFORMATION TEST INFDRMATION REMAHKS R Cat. Eine Pea k Dws. Type Fseg. Reint 34mk Bember Type l Act Close lia) l ustw EmmallSelety Cowd.

2 AC 1.5 CK SA 0 C K 16 ISE RF 09 321*Vf036P 1R Rf SHV As led les 121*Vf03SR 2 AC 1.5 CK SA 0 C K4 ISL Hf 09 LR Rf SRV Au lea les:

321'Vf031A 3 C 10 CK SA C D&C [ 13 FSI CS 08 821*Vf0318 3 C 10 CK SA C D&C E1 ISE CS 08 821*Vf03/C 3 C 10 CK SA C O&C f 16 ISE CS 08 821*Vf031D 3 C 10 CK SA C O&C G9 ISE CS 08 B21'Vf0311 3 C 10 CK SA C O&C E4 ISE CS 08 B21*Vf031f 3 C 10 CK SA C O&C l-Il iSE CS 08 SHV Au led lest 821*Vf031G 3 C 10 CK SA C O&C l-20 ISI CS 08 SRV Awlea lest 821*Vf031H 3 C 10 CK SA C O&C E 14 ISE CS 08 SHV Au led lest 821*Vf031J 3 C 10 CK SA C O&C E9 iSt CS 08 SRV Aw led les:

B21*Vl031K 3 C 10 CK SA C O&C G 18 IS[ CS

  • 08 SHV Au led lest iB21*V10311 3 C 10 CK SA C D&C G8 iSt CS 08 SHV Au led lest 4821*Vl031M 3 C 10 CK SA C D&C l3 IS[ CS 08 SHV Au led les:

o .

V,o.

V 's

& RIVER BEND STATION ,,,,,,s,,,,,,,

N INSEllVICE TEST PLAN VALVES APPENDIX C EITERGY .

I ID SystentL S J stem Alpha: P R Date E ev. ISIERL Sntem Nang J

3 iB 109 SVV 6 ills 4 0001 MAIN Sil AM VALVE INFORMATION TEST INFORMATION REMARKS Mark Nesiber G Cat. Siae Type Act Positsee Dws. Type Frog Rehef Class Go.) meter Beranell Selety Coord.

IB21*Vl031N 3 C 10 CK SA C D&C E5 iSE CS 08 SRV Au leak less IB21*VID31P 3 C 10 CK SA C O&C C 11 ISE CS 08 SHV Au leak lest IB21*Vf031R 3 C 10 CK SA C O&C G2 ISE CS 08 SRV Aw leak lest I

IB21*VIO31S 3 C 10 CK SA C O&C G 21 IS[ CS 08 SHV Awleak lest 1821*VIO39B 2 AC 1.5 CK SA 0 C K7 ISE RI 09 (R Rf SRV Awled lest IB21*V1039C 2 AC 1.5 CK SA 0 C K-14 ISE Rf 09 LR Rf SRV As taak lest 1821*VIO39D 2 AC 1.5 CK SA 0 C K 10 fSt Rf 09 1R RI SRV As leak lest IB21*VID39E 2 AC 1.5 CK SA 0 C ~ K-3 ISE RF 09 1R RF SRV As leak lest IB21*Vf039H 2. AC 1.5 CK SA 0 C l 13 ist af 09

. tR Rf SRV Au leak lest IB21*Vl039K 2 AC 1.5 CK SA 0 C K 18 ISE RF 09 tR RI s SHV Au leak lest IB21*V1039S 2 AC 1.5 CK SA 0 C K 20 ISI Rf 09 LR Rf SHV Au leak les:

,m ,

g%

O RIVER BEND STATION N .

INSERVICETEST FLAN V ALVES APPEN0lX C ENTERGY P&l0 SE em1; System Alpha: Page Hev. Date ISICH #: Supen!Nanie_

3 IB 109 SVV 6ll194 0001 . MAIN Sit AM VALVE INFORMATION TEST INFORMATION REMARKS Mark Besser G Cet Sise Type Act- Peeities Dws. Type Freq. Reisel

[ Class Sm.) seter Bermell Safety Coord.

1821*VIO18A 3 C 10 CK SA C D&C E 13 ISE CS 08 IB21*Vf0188 3 C 10 CK SA C D&C E1 ISE RI 51 IB21*Vf018C 3 C 10 CK SA C O&C I 16 ISE CS 08 IB21*Vf0180 3 C 10 CK SA C D&C G9 ISE CS 08 1821*Vf018E 3 C 10 CK SA C O&C E4 ISE CS 08 IB21*ViO18f 3 C 10 CK SA C O&C I 11 ISE CS 08 IB21*Vf 018G 3 C 10 CK SA C O&C i 20 ISE CS 08 IB21*Vf018H 3 C 10 CK SA C D&C E 14 ISE CS 08 IB21*Vf018J 3 C 10 CK SA C 0&C E9 ISE RF bl IB21*V1018K 3 C 10 CK SA C D&C i 18 ISE CS 08 i

IB21*VIO18t 3 C 10 CK SA C O&C G8 ISE CS 08 IB21*Vf 018M 3 C 10 CK SA C O&C E3 fSE CS 08 IB21*Vf018N 3 C 10 CK SA C D&C I5 ISE CS 08 IB21*V1018P 3 C 10 CK SA C D&C f Il ISE CS 08 IB21'V1018H 3 C 10 CK SA C D&C G2 ISE CS 08

O O O RIVER BEND STATION INSERVICE TEST PLAN - VALVES P ge 11 el 105

~Itacy g . APPENDIX C S_ystem #: Svstem Alpha: Paae llev. Date ISICR #. System Nang P_&lD 3 .IB 109 SVV Sill 94 0005 MAIN S11 AM VAINE INFORMATION TEST INFORMATION REMARKS Cash Neober G Cat. Sire Type Act- Position Dws. Type Freg. Rehel Class Us.) metw Numall Safety Coord.

121*ViolBS 3 C 10 CK SA C 0&C E-21 FSE CS 08 ivv'MOVI A 2 A 1.5 GL M0 O O&C M-17 ISE O PI RI LR RF 10 Cf R 50. APP. J Iest SVV'MOVlB 2 A 1.5 Gt M0 O D&C M7 FSE D PI Rf lR RF 10 Cf R 50, APP.J hst 40 9

9 D

9

__. _ __ --- _ _ _ _________________m_ ___._._._______._.___.m . _ _ _

O O O

& RIVER BEND STATION Page 18 el 105 M INSERVICE TEST PLAM VALVES

~[j[TERGY APPENDIX C P&lIJ Systemi System Alpha: Pace Rev. Date ISICH #- Setem Name;.

3 iB 109 SVV 6/1/94 0005 MAIN S11 AM VALVE INFORMATION TF" "lMATION REMARKS I ark Nember 0 Cat. Size Type Act Posities Dwg. Type tr eg. Relief Class (ie.) satw Nwsnell Selety Coord.

VV'V9 2 AC 1.5 CK SA 0 C M6 ISE RF 61 LR RF 10 Cf R 50, APP. J iest iVV'V31 2 AC 1.5 CK SA 0 C M 16 ISE RF 61 LR Rf 10 CFR 50, APP.J iest iVV*V121 2 C 1.5 CK SA C O&C N 20 ISE CS 34 iVV'V122 2 C 1.5 CK SA 0 C L 13 FSE RF 24 Disassembly iVV*V123 2 C 1.5 CK SA 0 C l-13 ISE RF 24 Disassemidy iVV*V128 2 C 1.5 CK SA C D&C N IO ISE CS 34
2 C 1.5 CK SA 0 C L ll FSE RF 24 Disassembly

.VV*V129

VV*V130 2 C 1.5 CK SA 0 C L-11 FSE Rf 24 Disassembly I 9

. _ _ _ - _ . _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - -- e._-

l d v .

V

& RIVEh BEND STATION Page 19 al 105 N INSERVICE TEST PLAN - VitilES

-[TtnGY ,

APPENDIX C Paid Svstem L Ststem Alpha: Paae Rev. Date ISICH #. Sy5:em bme 31C 109 MSS 61119 4 0001 MAIN Sit AM VALVE INFORMATION TEST INFORMATION REMARKS Meek member G Cet. Siam Type Act- Pessties Dws. Type freq. Reisef Class lisj meter Bernalj Safety Ceard.

IB21*A0Vf 028A 1 A 24 GL A0 0 C J 16 ISI CS 40 PSE O IS CS Pl Rf IR Rf PVtCS Drv. iest IB21* A0Vf 028B 1 A 24 GL A0 0 C M 16 ISE CS 40 PSE O IS CS

. Pt RI LR Rf PVICS Dev. Test iB21* ADVf 028C 1 A 24 GL A0 0 C G 16 ISE CS 40 PSE O fS CS Pl RF LA Rf PVICS Dev. Test IB21* A0Vf 0280 i A 24 GL A0 0 C l 16 ISL CS 40 l PSE O IS CS I

PI Rf 1R Rf pvt CS Div. Test IB21*MOVIOSSA 2 A 24 GA MG 0 C J 12 ISE CS . 05 Pl Rf tR fif IR Rf PVICS Dev less l

l

v (d BlVER BEND STATION

& INSERVICE TEST PLAN - V ALVES N

  • APPEB0lX C

~{g~ytacy System Nang ISICH #:

P_ age Rev Date MAIN Sil AM SAem Alpha; 0001 P&l0 Systenti; Gill 34 MSS 109 3 IC REMARKS TEST INFORMATION VALVE INFORMATION Type Freg. Reisel Penines Ows.

o Cet. Sire Typ Act-Meet Nessher Bermall Safety Coord.

lin] meter Class _ _

iSt CS 05 O C M 12 A 24 GA MO RF 2 Pt 1*t0Vf0988 LR Rf Rf PVICS Dw. f est tR iS[ CS 05 0 C G 12 24 GA N0 2 A Pl Rf 21*tDVIO98C IR RI RI PVLCS Dw. Test 1R ISE CS US O C 1-12 24 GA M0 2 A PI RF 121*CGVf098D LR Rf Hi PvtCS Dn. Test 1R ISE CS 39 C C K 11 2 CK SA 3 AC B21*VID29A CS 39 SA C C N il FSF AC 2 CK 3

.B21*Vf0298 FSE CS 39 C C H 11 2 CK SA 3 AC IB21*VIO29C ist CS 39 SA C C t 11 AC 2 CK 3

IB21*VF0290

. m

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ . _ _ _ m_ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _ - _ -______-__.__________.-___-..s_-___:. ___

e  % .

%.) .

%)

& RIVER BEND STATION Pdue 71 of 10$

. - . - . . INSERVICE TEST PLAN VALVES ENTERGY . APPENDIX C P&lD System L Srstem Alpha: Page Rev. Date ISICll #: System Name 91 A 115 CCP Id1194 0001 CluS10 000l!NO Wall H lil ACillH PL ANI VALVE INFORMATION TEST INFORMATION REMARKS Mark member G Cet. Siao Type Act- Peeities Dws. Type Frog. Rehef Class Enj metw Namell Selety Cowd.

iCCP*MOV138 2 A 10 GA MG 0 C B 18 FSL CS 14 PI Rf LR RF 10 Cf R 50. APP. J lest CCP*MOVl42 2 A 6 BF M0 O C B 16 FSE CS 14 Pl RF lit lif 10 Cf R 50. APP.J lest CCP*MOV143 2 A 6 BF M0 O C J9 ISE CS 14 Pt RF LR Rf Drywe8 Bypass Iest CCP*COV144 2 A 6 BF M0 O C H9 FSE CS 14 PI RF LR RF Drywe8 Bypass Test CCP*MOVl58 2 A 10 GA MG 0 C J 17 FSi CS 14 PI Rf LR flF 10 CIR 50. APP. J Iest CCP*MOV159 2 A 10 GA M0 O C J 19 iSE CS 14 PI RF LR Rf 10 Cf R 50. APP.J lest CCP*Vil8 2 AC 10 CK SA 0 C B 11 ISE ilf '26 LR fif Drywell Bypass les CCP*V119 2 AC 6 CK SA 0 C B 15 ISE fif 02 LR RF Dryweit Bypass lest

O O O g

RIVER BEND STATION INSERVICE TEST PLAN . VALVES Pne ?? vl tira

_- 7 , APPE50lX C ENTERGY S Page Rev. Date ISICR #: Srprem Natise P&l{l S_ntemi _1stem Alpha:

Gil194 0001 010Stil C001INIi WA11 H 111 ACIDH Pl ANI 91A i15 CCP VALVE INFORMATION TEST INFORMATION REMARKS Type Act Peeities Sws. Type Freg. Rel=f Nierk Bassber G Cet Sias Close linj meter perseell Safety Caeed.

2 AC 1.5 CK SA C D&C H9 ISE CS 14 ICCP'V133 LR RI 10 CIH S0. APP. J lest SA C C&C K 17 ISE CS 14 ICCP*VISO 2 AC 1.5 CK LH RI 51 10 Cf R 50, APP. J lest 5

9 0

o O U X

& RIVER BEND STATION g

Page 23 el 105 15 SERVICE TEST PLAN - VALVES ENTERGY APPEbelX C P&lD Systeml; SJ stem Alpha: Pace Rev. Date ISICR #.

91B 115 Srstem Name CCP 6lllS4 0001 010 Sill Coul!NU WAllH Hl4C10H PI ANT VALVE INFORMATION TESTINFORMATION Maen meseer REMARKS o Cat. Sise Type Act- Posities Dws. Type freq. Relui class lie) enter Berseell Safety Coord.

ICCP*MOV129 3 8 12 Bf MJ 0 O&C N 16 ISE CS Pl RF ICCP*MOV130 3 8 12 Bf MG 0 D&C J 16 ISE CS PI RF ICCP*MOVl63 3 8 2 GL M0 O C M? ISE CS 14 P1 HF ICCP*MOVl69 3 8 2 MG 0 GL C M7 ISE CS 14 PI Rf ICCP*MOV16A 3 B 12 Bf M0 O O&C J2 IS[ CS Pl Rf ICCP*MOVl68 3 8 12 Bf M0 O D&C L8 ISE CS P1 Rf ICCP'MOV335 3 8 12 Bf M0 O D&C J 16 ISE CS Pl RF ICCP*MOV336 3 B 12 Bf M0 O O&C N 15 ISE CS Pi Rf ICCP*V12 3 C 12 CK SA 0 C t8 ISL CS

  • 15 ICCP*V13 3 C 12 CK SA 0 C J3 IS[ CS 15 1CCP*V83 3 C 1.5 CK SA 0 0 1 15 ISE O

o r3 Oi u u

& RIVER BEND STATION ,,,,,..,,o.,

N INSERVICE TEST PLAN -V ALVES

~g TERGY APPENDIX C S l_SiCR L Spiem Nang P&ll) Sntemt 3 stem Alpha: Pane llev. Date 010SID 0001ING WA lill Hi ACIDH Pt ANI CCP 6/1/94 0001 9 IB 115 TEST INFORMATION REMARKS VALVE INFORMATION Sian Type Act- Peeities Deg. Type freg. Releet Mark Nombw 0 Cat.

Class 6aj meter Neronell Selety Coord.

CK SA 0 0 ff 13 ISE D CP'V92 3 C 1.5 3 C 10 CK SA 0 0 N f3 ISE O CP*V204 3 C 10 CK SA 0 0 J 13 fSt 0 CP'V209 3 C 1.5 CK SA 0 0 J8 FSE O CP*V300 0 C M 13 ISE Rf 24 Disassembly 3 C 2 CK SA

.CP*V331 SA 0 C M 13 ISI Rf 24 Disassedly

CP*V338 3 C 2 CK O b

O o o

& RIVER BEND STATION INSERVICE TEST PLAN VALVES APPEtelX C rNTERGY Page Rev. Date ISICH #: Sgstem Naiig P&la ytem S L: Sjstem Alpha:

0001 i;tHVICL WA11H NUHMAL 9 108 118 SWP 61119 4 i

VALVE INFORMATION TEST INFORMATION REMARKS i I

Freg. Rehet j Cet Siao Type Act- Positwo Dws. Type '

tash Nessber G taj meter Beranell Salety Coord.

Class 6 BF M0 O D&C M 19 ISE Q

'COV2/A 3 8 Pt Rf Bf M0 C O&C J 20 ISE G

  • t0V218 3 L 6 PI Rf 3 6 6 BF MG 0 D&C l-19 ISE G
    • t0V2 /C PI Rf M0 C O&C H 2O ISE O

?*t0V210 3 8 6 BF Pt Rf 3 8 8 BF M0 O D&C N5 ISE D P*COV506A PI RF l N2 lSE O 8 8 BF M0 O D&C P*t0V!,068 3 PI Rf MG 0 C A 16 iSE RF 63 P*t0V51A 3 8 30 BF PI RF Bf MG 0 C C 15 ISE Rt 63 iP*t0V518 3 B 30 '

PI HF 8 BF M0 O D&C P1 ISI Q VP*t0VilA 3 B PI RF 6

J V' U i

& RIVER BEND STATION INSERVICE TEST PLAW VALVES Page 7tivt lih ENTERGY , APPENDIX C l

P&l0 Sptem #:

dniem Alpha: Page Rev. Date ISICR f. Spiem Nane 9 108 118 SWP Silt 94 0001 SlHVICI WAllH NDHMAt VALVE INFORMATION TEST INFORMATION REMARKS RRerk Beanor G Cet. Sise Type Act- Peeities Dws. Type Freg. Relief Class Sm.) unter Normal l Selety Coord.

SWP*MOVilB 3 8 8 BF M0 O O&C P4 lSE O Pt Rf SWP*MOV96A 3 8 30 BF M0 O C 0 18 ISE O PI Rf SWP*MOV968 3 B 30 Bf M0 O C E 17 ISE O Pt RI SWP*Vil 3 C 6 CK SA 0 0 M 17 ISE D SWP*VIS 3 C 6 CK SA 0 0 E-18 ISE G SWP*Vl9 3 C 6 CK SA 0 0 J 19 ISE O iSWP*V80 3 C 6 CK SA C 0 G-19 ISE O

.SWP*Vl35 3 C 8 CK SA 0 D&C P6 ISE RF 25 iSWP*Vl36 3 C B CK SA 0 D&C PS ISE RF 25 iSWP*V143 3 C 8 CK SA 0 D&C N4 ISE Rf 25 iSWP*V144 3 C 8 CK SA 0 D&C N3 ISE RI 25 i

iSWP*V153 3 C 6 CK SA C C M il ISE O iSWP'V154 3 C 6 CK SA C C 1 11 ISE O

__ _ _ _____ _ ____ _ _ _ _ _ _ _ _ _ ________________________________________.__.___J _

O' O o

& RIVER BEND STATION INSERVICE TEST PLAM - V ALVES 14 9e 21 el 1815 APPENDIX C

'-g'g3gacy ISICH E. Sy stem N4_nw S stem Alpha: Page Rev. Da e P&lD S_ntemL J SERVICl WAlill NOHMAI Glll94 0001 118 SWP 9 108 TEST INFORMAll0N REMARKS VALVE INFORMATION Dwg. Type Freg. Rehef Sies Type Act- Peeitsee Anek Nasher G Cat.

liej ester Bernal] Safety Cooed.

Class C C J 18 ISE O C 6 CK SA "V155 3 C C G 18 ISE O C 6 CK SA "V156 3 D&C M6 ISE CS C 8 CK SA 0

"V201 3 D&C M1 FSE CS C 8 CK SA 0 P*V202 3 l A 16 ISE RF 58 C 30 CK SA 0 C P'V326 3 C-16 ISE RF 58 C 30 CK SA 0 C P*V327 3 l

e 9

-w a O-~ U

& RIVER BEND STATION b3 INSERVICE TEST PLAN VALVES innacy , APPENDIX C PilD Systemg; System Alpha: IMe Hev. Date ISICH #. Sistem N4ne 9 IDC 118 SWP Gil194 0001 SifiVICL WA11H NtillMAl VALVE INFORMATION TEST INFORMATION REMARKS Cash bassber G Cat. Size Type Act Pesetese Dws. Type Freg. Releet Class liej enter BorsasI] Salety Coord.

SCT*A0V51A 3 B 2 GL A0 C 0 J 18 ISE O IS 0 PI lif S;T*MOV13A 3 8 4 GA M0 O 0&C IB ISE D PI RI SCP*COV14A 3 B 4 GA M0 O D&C K6 ISE D Pl RF SWP*SOV523A 3 8 3I4 GA SD C O&C M 13 FSE CS 30 Pl Rf SWP*SOV523C 3 B 314 GA SG C D&C M 12 FSE CS 30 PI RF SWP*V1102 3 C 3/4 CK SA C 0 M 13 ISE CS 30

p V U V O RIVER BEND STATION INSERVICE TEST PLAN VALVES

~

ENTI:RGy APPENDIX C P&l0 Systpti SJtem Alpha; Page Rev. Hate ISICH#. Sygem Nane 9 100 118 SWP Silt 94 0001 St HVILI WAllit NullMAl VALVE INFORMATION TEST INFORMATION REMARKS Mesh Beedw 0 Cat. Siao Type Act- Posities Des. Type Freg. Rehet Class liej entw Namell Selety Caerd.

WP'ZOV4A 3 A 12 GA M0 O C B il ISE CS 52 Pi RF 1R RF U ywellBypass lest
WP*EDV4B 3 A 12 GA MD 0 0 0 11 ISE CS 52 P1 RF LR RF DrywellBypass Test
WP*COV5A 3 A 10 GA MG 0 C 1 18 ISI CS 52

- PI RF LR RI 10 CI R 50. APP. J Iest iWP*t0V5B 3 A 10 GA M0 O C H 18 iSE CS 52 Pt RF LR RF 10 CIR 50. APP.J Iest

WP*COV81 A 3 A 12 GA M0 0 O&C N 20 FSt 0 52 PI RF tR RF 10 CIR 50. APP. J Iest SWP*COV818 3 A 12 GA M0 O O&C H 2O FS[ c. 52

. PI RF LR RF 10 CIR 50. APP. J 1est

WP*MOV501 A 3 8 18 BF MG 0 C N1 '*

FSE G Pl RF SWi"COV501B 3 B 18 Bf MD 0 C N3 FSt 0 Pl Hf

O O O

& RIVER BEND STATION INSERVICE TEST PLAN - VALVES

~{Ermcv .

APPEg0lxC P&to Systemj; S 3 stem Alpha: Pane Rev. Date ISICH #. Srs:em None 9 100 118 SWP E11/94 0001 SlHVICI WAllH NdHMAI VALVE INFORMATiON TEST INFORMATION REMARKS task member G Cat. She Type Act. Posities Dws. Type freg. Reluf Class linj ester NormellSelety Coord.

VP*COV502A 3 8 8 GA M0 C O&C B 18 ISE Rf 11 P1 Rt vr*COV5028 3 8 8 GA M0 C D&C E 18 ISE RI 11 PI Rf WP*t0V503A 3 A 6 GA M0 C D&C l 18 ISE Rf 11 P1 RF LR Rf 10 CIR 50. APP. J Iest WP*COV503B 3 A 6 GA M0 C 0&C H 18 ISE Rf 11 P1 Rf 1H Rf 10 Cf R 50. APP. J Iest f WP*E0V504A 3 8 12 GA M0 C D&C , N 19 ISE RF 11 Pl Rf vP*C0V5048 3 B 12 GA MD C O&C J 21 ISE Rf 11 PI RI l VP*t0V501A 3 A 12 GA M0 O O&C B 20 ISI O 52 PI Rf 1R Rf 10 CIR 50. APP. J lest l .

l l

-s ~g

\/ \

& RIVER BEND STATION INSERVICE TEST PL AN - V ALVES Page Jiut105

._ ~

'~ . APPENDIX C gNTEnGY ISICH #. Syss con Nane

.$ystem Alpha; Page Rev. Date P&lU Stiremt 0001 SlHVICI WAIIH NUHMAL SWP Sill 94 9 100 118 TEST INFORMATION REMARKS VALVE INFORMATION Act- Posities Dag. Type Freg. Reliel G Cat. Size Type Meek sember liej ester Moreall Safety Coord. ,

Class O D&C D 20 iSE O 52 3 A 12 GA M0 P*t0V5018 Rf PI IR RI 10 CIH 50. APP. J Iest B 12 GA M0 C O&C B 21 IS[ RF 11 P*t0V510A 3 Pl RF M0 C O&C E 21 ISE Rf 11 3 B 12 GA IP*t0V510B RF PI M0 O C G-1 ISE O 3 8 18 Bf iP*t0V5t l A Pl RF M0 O C G3 ISE O 3 8 18 Bf VP*t0V5118 Pl RF D&C B 16 LR Rf DryweE Bypass lest 3 AC 1 RV SA C NP*RVil9 SP Rf3 O&C N ll tR Rf Drywell Bypass iest AC 3/4 RV SA C

  1. P*RV140 2 SP Rf3 SA C 0 P5 ISL RI 21 3 C 30 CK WP*Vil?

C 30 CK SA C 0 N5 ISE Rf

.CP*VI /3 3 0 D&C D 18 ISE CS 42 3 AC 12 CK SA

.WP*Vl/4 10 ClH SU. APP _ J lest LR Rf

..__m__ - _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ . - _ _ _ _ _ _ . _ _ _ _ _ _ . - _ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . - - - - _ _- -- -__. 2 .- +

O O O

& RIVER BEND STAT!ON ,,,,, 3, ,, , n.,

-M INSERVICE TEST PLAN VALVES

~((gggy . APPENDIX C Systemg; System Alpha: Page Rev. Date ISICHf; S istem Name P&lD SWP 6l119 4 0001 SlHVICI Wall 11 NOHMAt 9100 118 .

VALVE INFORMATION TEST INFORMATION REMARKS Cel. She Type Act. Peeiteen Dus. Type freg. Rebel Cmk Emmeer a Class Gnj meter Bassell Safety Coord.

3 AC 12 CK SA 0 D&C B 18 ISf CS 42 ism 7*Vil5 tR RF 10 CIR 50. APP. J Iest C 8 CK SA C 0 E 18 ISL Rf Il ISWP*V203 3 8 CK SA C 0 C 18 ISE Rf Il ISWP'V204 3 C C 10 CK SA 0 O&C l ll ISE CS 52 ISWP*V650 3 C 10 CK SA 0 O&C H 11 ISE CS 52 ISWP'V651 3 G

f I V V 's/

& RIVER REND STATION INSERVICE TEST PLAN - VALVES Page JJ .: 105 cIymoy , APPENDIX C P&lD SntemL System Alphr 3e P Rev. Date ISICR f. System Nane 910f 118 SWP Sills 4 0001 SlHVitt WAIIR NuHMAl VALVE INFORMATION TEST INFORMATION REMARKS Mash Number 0 Cat. Siao Type Act- Position Dws. Type Freg. Rebel Class linj maler Normal l Salety Coord.

Ill2*MOVf 068A 3 8 18 BF M0 0 0 K6 ISI O Pl Rf Ill2*MOVf 068B 3 8 18 Bf M0 C 0 J3 ISL 0 Pl RI ISWP* A0V518 3 B 2 GL A0 C 0 [-21 ISI O IS 0 PI RF ISWP*MOV13B 3 B 4 GA M0 O D&C 0 11 ISE O P1 Rf ISWP* MOV14B 3 8 4 GA MD 0 O&C K 14 ISE O PI RI ISWP*SOV522A 2 A 1 El S0 C O&C B 18 FSI CS 30 Pl RF tR RF 10 CIR 50, APP. J lest ISWP*SOV522B 2 A I Gl S0 C O&C B 13 ISE CS 30 PI RF tR Rf 10 CIR 50. APP. J Iest ISWP*S0V522C 2 A 1 Gl S0 C O&C B 11 ISE CS 30 Pl Rf 1R Rf 10 LIR $0. APP J lest

~

/]

V (J

N M

RIVER BEND STATION INSERVICE TEST PLAN - V ALVES Page 31 ut 105 T'

~

APPENDIX C tNhERGY .

System f Entem A_lpha: Page Hev. Date ISICH L Sy stem Nanw P&lu SWP 61119 4 000I StHVICI WAILH NUHMAl 9 lof 118 VAI.VE INFORMATION TEST INFORMATION REMARKS Cat. She Type Act Posities Dws. Type Freg. Releet Meek Neehes i

0 Close lia) seter BessellSelety Coord.

A GL S0 C D&C B 12 ISE CS 30 WP'S0VS22D 2 1 Pt HI 1R Hf 10 Cl H 50. APP. J Iest GA SD C O&C N i2 iSE CS 30 WP*S0V5238 3 B 314 Pt RF

.WP'SOV523D 3 8 314 GA SD C O&C N 11 iS[ CS 30 PI RF 3/4 GL SD 0 C B 15 ISE CS 30

WP*SOV%2A 3 B PI RF 8 Gt 50 0 C B-10 ISE CS 30
WP*SOV%2B 3 314 PI Rf 3 C 18 CK SA C 0 J6 ISE O SWP*Vl99 SWP*V200 3 C 18 CK SA C 0 J3 ISE O CK SA C D&C B 16 ISE CS 30 SWP*V1086 3 C 314 SWP'V1081 3 C 314 CK SA C D&C B ll ISE CS 30 C 314 CK SA C 0 A 11 ISE CS 30 SWP*V1091 2 C 3/4 CK SA C 0 B 12 ISE CS 30 SCP'V1092 2

O O O RIVF9 BEND STATION 1

lilSLRV!CE TEST PL AE V ALVES APPEN0lXC Spinn Nmne

[NTUlGY ISICH #:

Pye Hev. Date SlHVILL WAllH NullMAt P&lO Sntemf; SmAh SilI94 0001 SWP 118 9 10f REMARKS TEST INFORMATION VALVE INFORMATION Type Freg. Relief Positsee Dws.

Sian Type Act.

0 Cat. Coord.

Cash Member meter Sweall Safety lisj j Class ,

CS 30 0 B 18 ISE CK SA C 2 C 3l4 P*V1095 30 0 B 13 ISI CS SA C 314 CK 2 C P'V1098 CS 30 M 11 FSE SA C 0 3l4 CK 3 C JP*V1103 D

e 8

- - - _ _ _ _ _ _ _ . _ _ - - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - - _ - - ---_--~--______-__-__x - - _ _ _ _ _ - _ _ _ - - _ - -

v v\

& RIVER BEND STATION Pa.je Jt ul ltr.,

N ~-

INSERVICE TEST PLAM - V ALVES APPENDlX C gNTIAGV .

i P&l0 SI steral; Sntem Alpha; Page Hev. Date ISIER r Srstem Nme 121 SAS Sill 94 0001 Alid SlHVlti & HHI AlliiNt; 12 2C VALVE INFORMATION TEST INFORMATION REMARKS Mak Nowher 0 t cet. Siao Type Act Positsee Dws. Type Freg. Reisel Class Es.1 entw Nwanell Safety Cowd.

ISAS*MDb l02 2 A 4 GA M0 D C B 16 ISI O PI HI (R RI 10 CIR 50. APP. J Iest l

IR RI PVlCS Valve lest lR Rf PVLCS Div. lest ISAS*MOV103 2 A 4 GA M0 O C B 11 ISE O PI RI 1R RI PVlCS Valve lest tR Rf PVlCS Div. lest ISAS*V48E 2 AC 4 CK SA 0 C C 15 ISE RF 26 LR RF 10 CIR 50. APP. J Iest l

2 A 4 GA MA LC LC  ! 14 LH RI Da ywe8 8ypass lest 1SAS*V489 l

g~g .s , "x

\

f  ! \

'%,,.l  %.Y 'v

,,,,,,,,,o.,

RIVER BEND STATION

~M INSERVICE TEST PLAN VALVES APPENDIX C

~~~

LNTLRGY ISICH #. Spictu None Page Hev. Date Snem_1; Sptem Aloha: AlH INSlHUMiNI PMID 0001 61119 4 LAS 12 IB 122 REMARKS TEST INF0HMAT10N VALVE INFORMATION Frog Reliet Position Dws. Type Cat. She Type Act-Mask Number d i linj natw Numall Safety Cent Class H3 IS[ 0 2 GA SD 0 C 3 B 0 IIAS*S0)t36A fS Pl Hf SD 0 C HS fSI O 8 2 CA 3 IS 0 IIAS SOV368 PI El C M 16 ISE O 2 GA SD 0 3 B 0 llAS*SOV45A FS Pl HF M 18 ISE O GA SD 0 C 3 8 2 llAS*S0V458 FS 0 Pi Hf JS ISE CS 29 CK SA 0 O&C 3 C 2 11AS*V514 J3 ISE CS 29 CK SA 0 0&C 3 C 2 IIAS*V515 M 11 ISI CS 29 SA 0 D&C 3 C .2 CK IIAS*V608 M 17 ISE CS 29 CK SA D O&C 3 C 2 lIAS*V609 '

8

F O O O

& RIVER BEND STATION .

I'due Jd ul 105 N ~~-

INSERVICE TEST PLAN - VALVES ggTERGY APPENDIX C P&LD

_ MstemL S

_Islem Alpha: Page Rev. Date ISICH L System Name.

121C 121 lAS 611/9 4 0001 AlH INSlHUMINI VALVE INFORMATION TEST INFORMATION REMARKS Mask Nanber G Cat. She Type Act- Posities Dws. Type Freq. Releef Class l lie.) matw Normal l Salerr Cow d.

IAS*t0V106 2 A 3 GA k0 0 C GB fSt CS 12 PI Rf IR RI 10 CIH 50. APP.J Iest IR Rf PVlCS Valve less IR Rf PViCS Div. les DS*E0V101 2 A 3 GA MG 0 C G8 ISE CS 12 Pt Rf LR Rf PVtCS Valve les:

1R Rf PVICS Du. iest DS*SOV41A 3 8 2 GA SD 0 C L3 ISE O IS 0 Pl Rf DS*SOV418 3 B 2 GA SD 0 C M3 ISE O IS 0 Pl Rf DS*V18 2 AC 3 CK SA 0 C H 11 ISI Rf 02 til RI 0:rwell Bypass les DS*V80 2 AC 3 CK SA 0 C G9 ISE Rf 26 (R RF 10 ElH 50. APP. J lest QS*V562 3 C 2 CK SA 0 O&C l3 ISE CS 29 DS*V563 3 C 2 CK SA 0 O&C M3 ISt CS . 29 t.__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ __. _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _

s N.) '\._ I '\,-)

RIVER BEND STATION ..

l'dueJ3ul105 m~~

INSERVICE TEST Pt AN - VALVES gNTEFIGY APPENDIX C P&l0 S

_1stem L S_ystem Alpha: Page Rev Date ISil:R #: Sperm Name 21 LEA 201 SIC 6/1/94 00'11 Si ANUBY liutills ulNiliul VALVE INFORMATION TEST INFORMATION REMARKS Mark Number 0 Cat. Sire Type Act Posities Dws. Type Freq. Rehef Class (ia.) mater Normal l Salety Caerd.

  • E0Vf 001A 2 'l 3 GL M0 C 0 H 15 ISE CS 18 Pl Rf
  • COVI0018 2 B 3 GL M0 C 0 0 15 ISE CS 18 PI Rf

'RVf029A 2 C 15 RV SA C O&C J 11 SP RfI 1400 pug

'RVf0298 2 C 1.5 RV SA C 0&C E 11 SP Hl3 1400 psig

'VlXf004A 1 0 15 XP XP C ti J1 ET Rf

'VEXf0048 1 0 1.5 XP XP C D E1 EI Rf

'Vf006 1 AC 1.5 L. SA C C FS ISE Rf 13 0 LR RF Orywell Bypass test

'Vf001 1 AC 1.5 CK SA C C I-3 ISE HF 13 0 LR Rf Drywell Bypass lest

'Vf033A 2 C 1.5 CK SA C 0 J 10 fSI O

'V10338 2 C 1.5 CK SA C 0 1-10 iSE O

-m ,

%J G1 (;

~M RIVER BEND STATION INSERVICE TEST PLAN VALVES

,,,,,,,n.,

~-

ggTERGY AMEDM C System Alpha. bge Rev. Date ISI Cli #: Spicy %nie P&lu Sntemt CSil Gill 94 0001 HIGilPHtSSuut Cupi SPHAy 2/4A 203 VALVE INFORMATION TEST INFORMATION REMARKS Mark kenbe O Cat. the Type Act. Position Dws. Type freq. Rehal Class Gaj natu Normal l Safety Ceard.

SH*V12 2 C 1.5 CK SA 0 0 C 15 iSL U 22* A0Vl005 1 AC 10 CK SA C D&C H4 ISE CS 01 Testable Cheth Valve Pt HF LR Rf HCS Boundary lest lH ltf 10 CIH 50. APP. J Iest 2 8 16 GA M0 O O&C 1119 lSL 0 22*C0Vf 001 Pi RF 22*COVl004 1 A 10 GA M0 C O&C H8 fSE CS 19 P1 fif LR RF HCS Boundary lest LR flf 10 Cf R 50. APP. J Iest 22*MOVf010 2 8 10 GL M0 C C L-10 IS[ 0 Pt Rf L22*M0Violl 2 B 10 GL M0 C C N 12 ISL 0 Pl HF L22*COVf012 2 A 4 GA M0 C O&C F 14 ISE Q Pl HF lH Rf Water lest L22*C0v1015 2 A 20 GA M0 C D&C A9 Ist a Pi Hf LH HF, Water les

] () (~~].

'\_

O RIVER BEND STATION INSERVICE TEST PL AN - VALVES T- _- APPENDIX C ENTERGY P&ll! System #: SutentAlyt.a; Pane Rev. Date ISICH #. System Napic 214A 203 CSH 611/9 4 0001 tilGil PHISSulil CUHi Sl' HAY VALVE INFORMATION TEST INFORMATION REMARKS Mark Bunnber a Cat. She Type Act- Posities Ows. Type Freg. Reliel Class lis.) water Nor.aall Safety Ceard.

Il22*C'0Vf023 2 A 10 GL M0 C C I 10 ISE O Pl HI lH III Water lest il22'VI002 2 C 16 CK SA C 0 K IS ISE O ll22*Vf001 2 C 15 CK SA 0 D&C 0 14 ISL 0 1[22*Vf016 2 C 20 CK SA C 0 A-11 ISE O ll22*VF024 2 C 14 CK SA C O&C H 13 fSE O

O O O

& RIVER BEND STATION INSERVICE TEST PLAN VALVES gnytacy APPENDIX C J

P 10 System #: System Alpha: se P Rev. Date ISICH #. System the 211A 204 Alls Sill 94 0001 filth IPCI VALVE INFORMATION TEST INFORMATION REMARKS Math Womber G l Cat. Sire Type Act- Peeities Dws. Type Freg. Relief Clase liej ester Nwmal] Selety Cowd.

[12* RVf 025A 2 C 1.5 RV SA C D&C f 16 SP Rf 500 pug

)[12* RVID36 2 C 6 RV SA C D&C N 12 SP 44 15 psig inen tested)

-)L12* flVl055A 2 C 4 RV SA C D&C K 13 SP 500 pug (not tested)

.)t l2* A0Vl041 A 1 AC 10 CK SA C D&C M3 ISE CS 01 lestable check Valve PI Rf tR Rf RCS Boundary les

'll2*t0VID03A 2 B 14 GL MG 0 0 L-11 ISE O Pl Rf

)[12*COVf 004A 2 4 20 GA M0 O O&C B-11 ISE O PI Rf IR lif water lest

)[12*t0VF006A 2 B 16 GA M0 C D&C B Il ISE Q Pl Rf

)E12*MOVl0068 2 8 IG GA M0 C O&C D7 ISE G Pi af

)t l2*MOVF008 i A 18 GA M0 C O&C 0 18 ISE CS 19 PI Rf .

LR Rf itCS Boundary less lit Hf 10 CfIl 50, APP. J les 4

O O O O

g --

RIVER BEND STATION INSERVICE TEST PLAN VALVES Page 43 el 10$

APPENDIX C E ERGY Sntem Alpha: lMe Rev. 04te ISICR #: System Name P&_IO S_ystem t; Rilli IPCI 204 flHS 6/6/94 0003 211A VALVE INFORMATION TEST INFORMATION REMARKS Q Cet. Site Type Act Position Dws. Type Freg. Relief Cesk Number Class (ie.) meter Normell Safety Coord.

18 GA M0 C D&C F 20 ISE CS 19

[12*COVf 009 1 A Pl RF LR 11f RCS Boundary Test LR RF 10 CFfl 50. APP.J lest 2 A 4 GL M0 C C M 11 FSE O

}12* MOVf Oll A Pl RF 1H flF Water lest M0 C 0&C J 20 ISE CS 19 112*COVf023 1 A 4 GL PI RF LR RF RCS Boundary lest tR Rf 10 Cf R 50. APP.J Iest A 14 BF M0 C D&C E-18 FSE D

.E12*MOVF024A 2 PI RF LR RF Water Test M0 C C N 11 ISE ' Valve De energued

[12*COVF 026A 2 0 4 GA Pl 2 A 10' CA M0 C O&C M6 ISE O

)E12*C0VF02/A Pl Rf LR RF 10 CIR 50. APP. J Iest 2 A 10 Gt M0 C O&C N5 ISE CS  ?!

lil2*MOVl037A PI RF 1R Rf 10 CIR 50. APP.J lest

O O O

& RIVER BEND STATION INSERVICE TEST PLAN V ALVES

,,,,y,,,,,,

~~ ~ APPENDIX C ENTERGY ISICR #- SrpentNanie.

Sniern Alpha: Pave Rev. Date P&tu Snurnf; luth LPCI 6l119 4 0001 204 RHS 21/A TEST INFORMATION REMARKS VALVE INFORMATION

' Penties Dws. Type Freg. Relec t Q Cat. She Type Act-Cark Bomber unter Normalj Safety Coord.

Class lie.)

C C N IB fSE i:S 45 2 8 6 GL M0 "12*COVf 040 Ill PI D&C M4 ISE CS 19 1 A 10 GA M0 C 12*COVf042A RF PI LR RF RCS Boundary Test LR RF 10 ClIl50. APP.J lest M0 O 0 H-4 FSE O 2 B 14 GA

112*M0Vf041A PI fil M0 O 0&C K-15 ISE O 2 8 14 GL

[112*COVf048A Pi llf O C M 19 iSE CS 45 2 B 6 GA M0 iE12*COVl049 flf Pi C D&C G 18 ISE CS 19 2 A 10 GL M0

)E12*MOVf053A flf PI (R flf 10 CIR 50. APP. J Test M0 O D&C E-15 ISE O 2 A 4 GA

)E12*C0Vf064A ill Pi tR RF Wain lest A 2 GL M0 C C H9 iSE O It12*t0V1013A 2 PI Rf lit flf Water lest

~'

()/% (\ G\v g.----

RIVER BEND STATION i, age 45 cl 105 INSERVICE TEST PLAN - V ALVES ENTERGY APPENDIX C P&lD System _I; System Alpha: Paae Rev. Date ISICR #: System Name; 21/A 204 RilS 61619 4 0003 AllH LPCI VALVE INFORMATION TESTINFORMATION REMARKS Ctrk Number Q Cat. Size Type Act Position Dws. Type Freq. Relief Class (ia) unter Normal l Safety Coord.

1E 12*MOVf 0/4A 2 B 2 GL M0 C C C9 ISE 0 Pi RF II12*MOVf 081A 2 8 8 GL M0 C C L6 FSE 44 Valve 0e energned PI 1E12*Vf019 1 C 4 CK SA C 0 L-20 ISE CS 01 1E12*Vf03tA 2 C 14 CK SA C O&C 0-14 ISE O 1E 12*VIO46A 2 C 4 CK SA C 0 F-15 FSE O 1E12*VF050A 2 C 10 CK SA C C H 18 FSE RF 20 0 FSE CS 62 Normal 0ps 1[12*Vf084A 2 C 1.5 CK SA 0 C E 13 FSE RF 24 Disassenely 0 FSE G IE12*Vf085A 2 C 1.5 SC SA 0 C E-13 ISE RF 24 Disassembly 0 FSE O 1E12*VIO99A 2 AP '8 GL MA C N5 LR RF 10 CFR 50. APP.J Iest 1RiiS* RV3A 2 C 4 RV SA C O&C J 14 SP 485 psig (not tested) 1RitS*V34 2 N/A 14 N/A N/A NlA N/A C-18 N/A N/A Valveinternals Henwved Not Tested 9

- _ . . - - _ _ _ _ _ - . . _ _ _ . _ _ . _ _ _ _ - - _ _ _ _ . _ _ - _ _ _ - - _ _ _ _ _ _ . _ . _ _ . - - _ _ _ _ - _ _ _ _ _ _ _ . _ _ - - _ - _ - - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . - _ - - - _ - _ - _ - . . - -_-2 - - - _ - - -- . _ _ _ - - . _ . . -- - - - -

O O O O RIVER BEND STATION INSERVICE TEST PLAN VALVES APPENDIX C ENTERGY Svstem Alpha: Pace Rev. Date ISICR #: Spinn Narite.

PR Sntem #;

21-?A 204 HHS 6l119 4 0001 HiiH IPCI VALVEINFORMATION TEST INFORMATION REMARKS Cuk Neanber Q Cat. Size Type Act- Posities Dws. Type Freg. Relief

[ Class Gej natu Numall Safety Cowd.

IRHS*V240 i AC 1 CK SA C O&C E-20 (S[ Rf 23 LH Rf 10 CIH 50. APP. J 1est

p' v

f'T V Q

\._/

& RIVER BEND STATION Pa,e 4, el ius "M INSERVICETESTPLAN VALVES E ERGY APPENDIX C P&lD Sistem #: System Alpha: Page Rev. Date ISICR #: System Name:

21-1B 204 RHS 6/6/94 0003 RilR iPCI VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat  ! Size Type Act-- Position Dws. Type Freg. Relief Class , l tie.) mater Normal l Safety Caerd.

IE12*A0VF041B 1 AC 10 CK SA C O&C N4 FSE CS 01 Testable Check Valve Pt RF (R RF RCS Boundary Test

- IE 12*A0VF098 2 C 10 CK SA C O&C GS FSE O Testahie Check Valve PI RF IE12*MOVF003B 2 B 14 GL M0 O O E6 FSL 0 PI RF 1E12'MOVI0048 2 A 20 GA M0 O O&C B-19 FSE D Pl RF LR RF Water Test IE12*MOVF011B 2 A 4 GL M0 C C H7 FSE Q Pl RF LR RF Water Test IE12*MOVF0248 2 A 14 BF M0 C O&C L7 FSE O PI RF LR RF Water Test I

1E12*MOVF0268 2 8 4 GA M0 C C J9 FSE Valve De energbed

! PI IE12*MOVF0278 2 A iC GA M0 0 0&C M1 FSE D PI RF LR RF -

10 ClH 50 APP.J Iest l

O O O

& RIVER BEND STATION INSERVICE TEST PLAN -VALVES Page 48 el 105

~'

APPENDIX C tuycacy System #: System Alpha: Paae Rev. Date ISICH #: System Nanw.

P&lo RHS 61119 4 0001 HitH LPCI 21 18 204 VALVE INFORMATION TEST INFORMATION REMARKS Q Cat. Site Type Act- Position Dws. Type Freq. Relief Cask Number Clas, l.a.i mater NwmallSofsty Cowd.

10 GL MD C O&C N1 FSE CS 21 1E12*MOVl031B 2 A Pl RI 1R RF 10 CIR 50. APP. J 1est IE12*M0Vf042B 1 A 10 GA M0 C 0&C N3 ISE CS 19 PI RF LR RF 10 CIR 50. APP. J Iest lR Rf RCS Boundary Test 2 B 14 GA M0 O O F-11 fSE O IE12*MOVf 0418 Pl RF j

2 B 14 GL M0 O 0&C G9 ISE O 1[12*t0VIO48B Pl RF l

1E12*t0VIO53B 2 A 10 GL MD C O&C N9 ISE CS 19 Pi RF LR RF 10 Cf R 50. APP.J Iest i

2 A 4 GA M0 O O&C C-15 FSE O 1E12*C0VIO648 Pl RF LH RF Water Test A 2 GL M0 C C I-10 ISE O 1[12*'40Vf 013B 2 '

Pl RF LR RF Water ies:

2 B 2 Gt M0 C C E-10 ISE O 1[12* MOVl0148 PI RF

y n

,e-O  %

RIVER BEND STATION INSERVICETEST PLAN VALVES l' age 49 al 10$

~

APPENDIX C ENTERGY System #: System Alpha: Paae Rev. Date ISTCRc: 53 tem Nanw:

P&i_0 204 RitS 6l1!94 0001 RitR tPCI 217B VALVE INFORMATION TEST INFORMAT10N REMARKS Meek Number 0 Cat. Siae 4 Type Act. Posities Ows. Type Freg. Relief Class (ie.)

ester Numell Safety Coord.

B 8 GL M0 C C K-12 FSE 44 Valve 0e energued IE12'MOVf081B 2 PI 3 8 10 GA M0 C O&C G-3 ISE O 1E12*COVf094 PI RF 1E12*C0VIO96 2 B 10 6A M0 C O&C G4 ISE O PI Rf 2 C 1.5 RV SA C O&C G-15 SP RFI 500 pssg IE12*flVf025B .

2 C 4 liv SA C D&C H 12 SP 500 psig (not tested) 1E12*RVf055B lE12*Vf031B 2 C 14 CK SA C D&C B.13 ISE D 1E12*Vf046B 2 C 4 CK SA C 0 0 15 ISE Q 1E12*Vf050B 2 C 10 CK SA C C N9 ISE RF 20 0 iSE CS 62 Normal Ops 1E12*VIO848 2 C 1.5 CF SA 0 C B-14 ISE flf 24 Disassenely 0 ISE O 2 C 1.5 SC SA 0 C B 13 ISE RF , 24 Disassembly 1E12*Vf085B 0 (SE O 2 AP 8 GL MA C P2 LR HF 10 01R 50, APP J Iest 1[12*Vf0998 IRitS*flV3B 2 C 4 IIV SA C O&C li 12 SP 485 psig (not tested)

(-~

'\. ] (,] '\,_l O

'N RIVER BEND STATION INSERVICE TEST PLAN VALVES r,,, so ,, ios

~

E ERGY APPENDIX C P&lD System #: System Alpha: h2e Rev. Date ISICH #: System Naipe; 21 IB 204 RilS 6l6/94 0003 HHH IPCI VALVE INFORMATION TEST INFORMATION REMARKS M;rk Ember o Cat. Size Type Act- Position D wg. Type Freq. Relief Class (ia.) uator Normal l Safety Coord.

RiiS*V65 2 N!A 14 N!A N/A NlA N/A E 21 N!A N!A Valve litternials Removed Not Tested 9

8

-p p ~N O G J O RIVER BEND STATION INSERVICE TEST PLAN - VALVES APPENDIX C bTERGv System Alpha: Paae Rev. Date ISICR #: Srstem Name:

P&J- Svstem #:

204 IlllS 6l1/94 0001 Hilli IPCI 211C VALVE INFORMATION TEST INFORMATION REMARKS

~

Q Cat. Size Type Act- Posities Dws. Type Freq. Reliel t ook ni W us Claes , lie.) hatu Nwsnall Safety Cowd.

AC 10 CK SA C O&C K-5 ISE CS 01 Testable Check Valve 1E12*A0Vf 041C 1 PI RF LR flF RCS Boundary Iest tR 9f 10 CfR 50. APP.J Ies 1[12*MOVf 021 2 A 14 GL M0 C C F8 FSE Q PI Rf LR RF Water Test A 10 GA M0 C D&C K-3 FSE CS 19 IE12*t0Vf 042C 1 Pt RF LR RF RCS Boundary Test LR RF 10 CfR 50. APP.J Test 2 A 4 GA M0 0 D&C E 10 FSE 0 1[12*MOVf 064C Pl RF LR RF Water Test 1El2*COVF105 2 A 2J GA M0 O D&C B 20 ISE O Pl RF LR RF Wate: Iest 2 C 1.5 RV SA C D&C G6 SP Rf2 500 psig If12*RVf025C 1E12*Vf031C 2 C 14 CK SA C D&C D 11 ISE Q -

IE12*V1046C 2 C 4 CK SA C D E9 ISE O

- _ _ _ _ _ _ + __ -__- _ _ _ m - -- .z__

O O O O

M RIVER BEND STATION Page 52 of 105

--r- INSERVICE TEST PLAN - V ALVES ENTERGY APPENDIX C

_P_&l0 System #: System Alpha- Page Rev. Date ISICR #: System Name:

271C 204 AliS 61619 4 0003 HHR-IPCI VALVE ;NFORMATION TEST INFORMATION REMARKS Caek Number Q Cat. Sin Type Act. Positier Dws. Type Freg. Relief Class Gn.) unter Normal l Safety Caerd.

IE12*Vf 084C 2 C 1.5 CK SA 0 C E-13 ISE Rf 24 Disassembly 0 ISE Q IE12*Vf085C 2 C 1.5 SC SA 0 C E-12 ISE HF 24 Disassembly 0 ISE O 1RHS*V64 2 N!A 14 N!A N/A N!A N/A 0 19 N!A N/A Valve Internals Removed Not fested 4

\ .

1

_ _____-_ _:____-______________ _____-___ - __-__-__ _ _ _ _--____ - _ -__- - _- - -- - - - -_ _ _ --__ - - - - - -- - - - _-----__- _ _ - _ _ _ - _ - - - - _ = - - - - - - - - - -

O O Cr RIVER BEND STATION Page 53 el 105

_ _ _ INSERVICE TEST PLAN . V ALVES

%gy APPEhpiX C P&lD Srstem #: Svstem Alpha: Pane Rev. Date ISICR #: Sjstem Nane 215A 205 CSL 6l119 4 0001 LOW PRESSUHL COHL SPHAY I VALVE INFORMATION TEST INFORMATION REMARKS Mark Womber G Cet size Type Act- Posities Dws. Type Freg. Rehef Class Gej meter Bermal[Sately Coord.

@St*VID 2 C 4 CK SA C 0 1116 FSE D G21'ADVf006 1 AC 10 CK SA C O&C M1 FSE CS 01 Testable Check Valve Pt RF LR RF RCS Boundas;lest tR RF 10 CIR 50, APP.J Test Q21*COV1001 2 A 20 GA MG 0 O&C C 11 FSE Q Pl RF LR RF Water Test 021*t0Vf005 1 A 10 GA M0 C D&C M-12 ISE CS 19 PI RF LR RF RCS Boundary Test LR RF 10 CIR 50. APP.J Test Q21*E0Vf 011 2 A 4 GA M0 O 0&C H 16 FSE O PI RF LR RF Water lest 021*C0Vf012 2 A 10 , GL M0 C C K-15 FSE O Pl RF LR RF Water Test .

021*RVf 018 2 C 2 RV SA C D&C K-13 SP R11 510 psig (121*RVf 031 2 C 2 RV SA C O&C D 12 SP Ri1 100 psig

O O O O RIVER BEND STATION ' '

INSERVICE TEST PLAN - VALVES ENTERGY APPENDIX C P&l0 System #: Svstem Alpha: ye P Rev. Date BM_(;

I Sy gem Nang 215A 205 CSL 6/1/94 0001 10W PHESSUHl Culil SPHAY VALVE'INFORMATION TEST INFORMATION REMARKS Cork Nember Q Cat. Sin Type Act- Posities Dws. - Type Freg. Reisel l Class fas.) metw Normal l Safety Cowd.

l It21*Vf003 2 C 12 CK SA C O&C J 21 ISE O 1[21*t'l033 2 C 1.5 CK SA 0 D&C F-17 iSE o 4

_--. _ _ _ _ . _ _ _ _ = _ _ _ _ . _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ .

C O

.C v V)

O RIVER BEND STATION INSERVICE TEST PLAN . VALVES ENTERGY APPENDIX C Pg hstem #. Svstem Alpha: Paoe Rev Date ISICR #; hstem Name:

27 20A 208 MSI 611 -4 0001 MSIV POSillVI 11 AKAGI CONIRtli VALVE INFORMATION TEST INFORMATION REMARKS Meek Neseber 0 Cat. She Type Act- Posittee Dws. Type Frog. Rehel Class Es.) eetw Nwsoell Safety Cowd.

1821'COVf027A 2 B 3/4 GL M0 O O&C K 13 iSE O PI RF 1821'C0Vf027P 2 B 3/4 GL M0 O D&C K 14 ISE D PI RF 1821'C0Vf 027C 2 B 314 GL MD 0 D&C K-12 ISE O PI RF 1821'C0Vl02/D 2 B 3/4 GL M0 O D&C K-13 ISE O PI RF 1[33'COVIO05 2 B 2 Gt M0 C D&C M 16 iSE O PI RF IE33't0VI006 2 B 2 Gl M0 O D&C L-16 ISE O P1 RF IE33*t0VI007 2 B 2 GL M0 C D&C L-15 ISE O Pl RF IE33*t0VIO08 1 A ~2 Ci M0 C O&C K-15 ISE O PI RF LR RF ,

PVLCS Div. lest 1E33*%0Vf025 2 B 2 Gt M0 C D&C M8 ISE O PI Hf 4

. . _ _ _ _ _ - - . - _ _ _ . _ _ _ - _ _ _ _ - - _ . _ - _ _ _ - - . . - . - - _ _ - - - - - . . ~ -

r J V)

RIVER BEND STATION '** *'

'O INSERVICE TEST PLAN -V ALVES APPENDIX C ENTERGY Page Rev. Date ISICH #. System Name S

_1 stem Alpha:

Pgjtj Svstem f: MSIV POSillVI ll AKAGI CONIHul 6fl194 0001 208 MSI 2120A

[ REMARKS VALVE INFORMATION TEST INFORMATION Type Freg. Releet Cat. Site Type Act Position Dws.

i Cash Number 0 estw Neamall Safety Coord.

Class lie.)

C&C L1 ISE O 2 B 2 GL M0 O 433*t0Vf076 PI f1f O&C t6 ISE O 2 B 2 GL M0 C (133'MOVf027 PI Rf M0 C O&C L6 iSE O 2 B 2 Gt 433*t0V1028 PI Rf S0 C O&C t 18 ISE O 2 B 2 Gt

[33*S0Vf014 IS 0 C

PI HF CK SA 0 0 M 17 ISE O 2 C 2 bE33'VI004 2 CK SA 0 0 M8 ISE CS 2 C DE33'Vf024

___________m-

_ . _ _ - _ . _ _ _ _ _ _ . __- . _._m_____ _ _ ______ _ _ _ _ _ _ _ _ . _ _ _ _

fs Cw U O~g RIVER BEND STATION INSERVICE TEST PLAli- V ALVES Paue 51 of IOS

~~~ APPENDIX C ENTERGY ISICR #: Sgueg Napie; Svstem Alpha: Pase Rev. Date PM Sntem #: 0001 Rt AC10ll COHL 1501 ail 0N C00llNG ICS 6/1/94 216A 209 TEST INFORMAT10N REMARKS VALVEINFORMATION Type Freq. Rehof Sire Type Act- Position Dws.

Cork Neeser 0 Cet.

Gej meter Namell Sofety Cowd.

Close ISL CS 01 lestable check Valve SA C O&C N 12 i AC 6 CX

[51*ADVf 065 PI Rf RCS Boundary Iest tR RF LR Rf 10 Cf R 50. APP J Iest ISE CS 01 Testable check Valve CK SA C O&C P 19 1 AC 6 LS1*A0Vf 066 Pi RF Rf 10 CIR 50, APP.J Iest 1R O&C K7 fSE D 12 GA MG 0 2 B

)[51*t0VC002 Pi RF OSC B 13 FSE D 6 GA M0 O 2 B BE51*t0Vf010 PI RF N 11 ISE CS 53 6 GA M0 C O&C 1 A

'1E51*COVf 013 Pl RF Rf RCS Boundary Test LR IR RF 10 Cf R 50. APP. J Iest C D&C M 13 ISE O A 2 GL M0 1151*t0Vf019 2 RI Pl 1R Rf 10 Cf R 50 APP.J lest C l-1 ISE D .

B 4 GL M0 C

lt51*t0Vf022 2 RF P1 S

w-, , - , , - - , e - - , - - .. . ,,_ -

- - - - - . .- -- - _---._- --- a

I ( ( \

V '

V

& RIVER BEND STATION INSERVICE TEST PLAN - VALVES Page 58 of 105 APPENBlX C

~~$mGY Ds System #: System Alpha: Pane Rev. Date ISICR #: System Name:

P&l0 209 ICS 611/9 4 0001 HE AC10H CORE ISul AIldN Cout(NG 216A VALVE INFORMATION TEST INFORMATION REMARKS Meek Number Q Cet She Type Act- Posities Dws. Type Freg. Relief Class Gej unter Norsmall Safety Cowd.

IE51*t0Vf031 2 A 6 GA M0 C O&C A-13 ISE O Pl RF LR flf Water Test 1[51*MOVIO45 2 B 12 GE NO C D K8 ISE O PI RF 1[51*MOVIO46 2 B 2 GL M0 C 0 NS ISE o Pl llf IE51'MOVf 059 2 B 4 GA M0 C C L5 ISE O PI RF 1E51*COVIO63 1 A B GA M0 O D&C K-15 ISE CS 60 Pl Rf LR HF 10 CIR 50. APP.J Iest IE51*COVf064 1 A 8 GA M0 O D&C K-13 ISE CS 60 Pl Rf LR RF 10 CIR 50, APP. J Iest

~

1E51*COVf068 2 A 12 GA MG 0 O&C F-11 ISE O PI RF Lil RF 10 Cf R 50, APP. J Test 1151*t0Vl016 i A 3/4 GL M0 C 0&C J 15 ISE CS 60 PI Rf ill RF 10 CIR 50. APP.J Iest

O O O O RIVER BEND STATION INSERVICE TEST PLAN VALVES ENTERGY APPENDIX C M

P System #:

Srstem Alpha: bge Rev. Date ISICH #: Srstem Neg; 216A 209 ICS Sills 4 0001 H[ ACIDH CURI 1S01 AllGN CUOllNG VALVE INFORMATION TEST INFORMATION REMARKS MashNumber G Cat. Sire Type Act- Position Dws. Type Freq. Rehef Class Gs.) matw Nwmall Safety Cowd.

IE51*t0VIO11 2 A 1.5 GL M0 O O&C G 11 ISE 0 PI Rf IR Rf 10 CIR 50, APP.J lest IE51*COVf018 2 A 2.5 GL M0 O O&C G-13 ISE O PI Rf lR Rf 10 CIR 50. APP.J Iest IE51*RVf018 ,2 C 1.5 RV SA C D&C P-2 SP Rf2 125 psig IE51'Vf0ll 2 C 6 CK SA C O&C B9 ISE O IL51*Vic3C 2 C 6 CK SA C O&C A 11 ISE RI IE51*Vf040 2 C 12 CK SA C C F 10 ISE CS 0 ISE O lE51*VF061 2 C 1.5 CK SA 0 C C8 fSE CS 0 ISE Q 1E51*Vf 079 2 C 1.5 CK SA C 0 G-11 FSE CS i 1E51*Vf081 2 C 1.5 CK SA C 0 G 12 ISE CS llCS*V21 2 C 2 CK SA C 0 M ll ISE O I

I

O O O

& RIVER BEND STATION INSERVICETESTPLAN VALVES Page 60 of 105

--=-- -

gyTERGY APPENDIX C S

J stem #: System Alpha: Paoe Rev. Date ISICRL Sntem N,s3w; P&_10 15 IC 251 IPW Sill 94 0001 flHf PHolitil0N WAllH VALVE INFORMATION TEST INFORMATION REMARKS Mark Noseber Q Cat. Siao Type Act- Posities Dws. Type Freg. Releef Class Gs.) satu Numall Safety Cowd.

1FPW'MOV121 3 A 6 GA MD C C P 16 iSL 0 Pt RF LR RF 10 Cf R 50. APP. J lest LR RF PVL CS Valve lest IR RF PVlCS Div. Test IFPW'MOV122 3 A 6 GA M0 C C P-17 FSE O PI RF LR RF PVLCS Valve Test IR RF PVL CS 0iv. Test ifPW'V263 3 AC 6 CK SA C C P-14 FSE RF 26 LR RF 10 CFR 50, APP.J Iest b

i

a s-U,m O

& RIVER BEND STATION INSERVICE TEST PLAN VALVES APPENDIX C ENTERGY ISICR #: Sntem Nang System #: System Alpha: P3e Rev. Date P&l0 H2 MIXING. PUHGE & HlCUMBINlH CPM 611/9 4 0001 2121A 254 TEST INFORMATION REMARKS VALVE INFORMATION Posities Dws. Type Freq. Relief Q l Cat Tare Type Act.

Mark Number linj ester Normell Safety Cowd.

Class D&C J 18 FSE CS 54 2 A 6 BF M0 C ICPM*C0VIA RF Pi tR RF Drywell Bypass Test 0&C J 14 ISE CS 54 2 A 6 BF M0 C ICPM'C0VlB RF Pl LR RF Daywen Bypass Test D&C G 14 FSE CS 54 2 A 6 BF M0 C 00PM'C0V2A Pl RF LR RF Oryweg Bypass f est O&C G-1B FSE CS $4 2 A 6 BF M0 C ICPM'COV2B Pl RF LR RF Drywe# Bypass Test M0 C O&C J.17 FSE CS 54 2 A 6 BF ICPM*COV3A Pl RF LR RF Dryweg Bypass Test MD C D&C J 15 ISE CS 54 2 A 6 BF l1CPC*COV3B

  • Pl RF LR RF Drywen Bypass Test M0 C D&C G-14 ISE CS , 54 ICPM*t0V4A 2 A 6 BF Pi RF 1 LR HF 0:ywell Bypass test

, n. ,--

i

%_/

/ (w,) t w/

O RIVER BEND STATION INSERVICE TEST PLAN - VALVES ENTERGY APPENDIX C P&l0 S_ystem g; System Alpha- Pace flev. Date ISICH #. System Name; 2121 A 254 CPM Sills 4 0001 H2 MIXING. PUHGi & Hf COMulNiH VALVE INFORMATION TEST INFORMATION REMARKS I

Cark Number Q Cat. She Type Act. Pesition Dws. Type Fre g. Relief Class (ie.) sater Normal l Safety Coord.

ICP'J MOV4B 2 A 6 BF M0 C D&C G il ISE CS 54 PI fif lH fif Drywell Bypass lest ICPP*MOV104 2 A 3 GA M0 C O&C F-3 ISE O PI flI LR flf 10 Cf H 50. APP. J Iest ICPP*C:0V105 2 A 0 GA M0 C O&C H-2 fSE Q Pl Hf LR HF 10 Cf H 50. APP.J Test ICPP*SOV140 2 A 1 GA S0 C D&C H 10 ISE O C FS 0 Pl Hf LR Hf 10 Cf R 50 APP.J Iest ICPP*V2 2 C 1 CK SA C 0 K 10 FSE O G

,. ~

Nj ] NY RIVER BEND STATION INSERVICE TEST PLAN . V ALVES Page ti3 et i.05

-na APPENDIX C TERGY Systea #: Srstem Alpha: Paae Rev. Date ISICH#: Sntem Nm_ie:

PalD 255 LSV 6/1/94 0001 MSIV & PINI.VlV ll AKAlit CONIHul 2120B VALVE INFORMATION TEST INFORMATION REMARKS Type Act- Position Dws. Type Fre g. Rehef Mark Number 0 Ca t. Size Class Ga,) unter Normal l Safety Ceard.

2 B 1 GL M0 C O&C E-10 ISE D ILSV'MOV11 A Pl RF 2 8 1 GL M0 C O&C F9 FSE O llSV*COV11B Pi RF ILSV'C'0V13A 2 B 1 GL M0 C 0&C MB FSE O PI RF 2 8 1 GL M0 C D&C PB FSE G ILSV*COV138 PI RF 2 B 1 Gl M0 C 0&C L9 FSE O llSV*COVISA Pl RF llSV'MOV158 2 8 1 GL M0 C O&C L8 FSE D PI RF ILSV*COV16A 2 B 1 GL M0 C O&C L9 FSE O PI RF ILSV*COV168 2 B 1 GL M0 C O&C LB ISE O Pl RF llSV*COV19A 2 B 2 GA M0 C 0 D 11 ISE O' Pl RF ILSV*MOV19B 2 B 2 GA M0 0 0 N 11 ISE O Pl Rf

O oJ O,

& RIVER BEND STATION INSERVICE TEST PLAN -V ALVES y,,, ,, ,, , g, '

~' APPENDIX C ENTERGY IS1CR #. Sntem Name; Svstem Alpha: Paae Rev. Date P_&l0 Sntem_1; 0001 MSIV & PINE.VlV 11 AK AGE CON 1HOL LSV 6/1!94 2/ 208 255 TEST INFORMATION REMARKS l

VALVE INFORMATION Posities Dws- Type Freg. Reliet G Cat. Size Type Act.

Meek Number setw Normeij Safety Cowd.

Class fie.)

E 14 SP RF2 140 psig IXI.5 RV SA C D&C LSV*RV8A 2 C P-14 SP RF3 140 psig C IX1.5 RV SA C O&C 2

)tSV'HVBB C 0 E-16 ISE o 2 B GL

)LSV*S0VX26A C D P-16 FSE O 2 8 GL

)tSV*S0VX268 0 C E 18 FSE Q

. 2 B GL DtSV'SOVY26A 0 C P 18 FSE O 2 B GL OtSV*SOVY268 C O&C H-17 FSE RF 04 2 C 1 CK SA OtSV'V12 C O&C F-18 FSt RF 04 2 C 1 CK SA OLSV*V18 C O&C 08 ISE RF 04 2 C 1 CK SA ILSV'V20 C D&C C9 FSE RF 04 2 C 1 CK SA 11SV'V22 C O&C A9 FSE RF 04 2 C 1 CK SA ILSV'V24 D&C N6 FSE RF 04 2 C 1 CK SA C ItSV'V26 C O&C L6 ISE RF - V4 2 C 1 CK SA ILSV'V28 C 0&C J6 ISE RF 04 2 C 1 CK SA ILSV'V30 C D&C H6 ISE RF 04 2 C 1 CK SA ItSV'V32

n. .

& RIVER BEND STATION INSERVICE TEST PLAN . VALVES Page 6$ el 105 APPENDIX C ENTERGY P&l0 System #: System Alpha: Pane Rev. Date ISICR #: Srstem %ne; 27208 255 LSV Bill 94 0001 MSIV & P[NE.VlV li AKAGE CON 1R0t VALVE INFORMATION TEST INFORMATION REMARKS Cask Number G Cet. Size Type Act- Position Dws. Type Freq. Relief Class (iej mater Numall Safety Coord.

2 C 1 CK SA C O&C H 17 iSE RF 04 11SV'V35 ILSV'V36 2 C 1 CK SA C 0&C J-14 FSE RF 04 ILSV'V42 2 C 1 CK SA C O&C H-17 FSE RF 04 ILSV'V46 2 C 1 CK SA C O&C H-17 FSE RF 04 ILSV'V48 2 C 1 CK SA C D&C G 17 FSE RF 04 ILSV'V50 2 C 1 CK SA C O&C E8 FSE HF 04 ILSV'V52 2 C 1 CK SA C O&C C9 FSE RF 04 ILSV'VS4 2 C 1 CK SA C O&C A9 FSE RF 04 ILSV'V56 2 C 1 CK SA C O&C ~N6 ISE RF 04 ILSV'VS8 2 C 1 CK SA C O&C M6 FSE RF 04 ILSV'V60 2 C 1 CK SA C O&C K6 FSE RF 04 1LSV'V62 2 C 1 CK SA C 0&C J6 FSE RF 04 ILSV'V12 2 C 1 CK SA C D&C K-14 FSE RF - 04 ILSV'V76 2 C 1 CK SA C O&C K-14 FSE RF 04 ItSV'V82 2 C 2 CK SA C 0 N 12 ISE D

O O O O

N RIVER BEND STATION INSERVICE TEST PLAN -VALVES Page 66 cl 105

-r--r- APPENDIX C ENTERGY System Alpha: ISICR #; S_ygem Name:

Pg System #: Pace Rev. Date 27 208 255 LSV 611/9 4 0001 MSIV & PENE. VlV LE AKAGE CON 1HOL VALVE INFORMAT10N ' TEST INFORMATION REMARKS Mark Number 0 Cat. Size Type Act- Position Dws. Type Freg. Reliel Class Gs.) ester Normell Safety Coord.

ILSV'V90 2 C 1 CK SA C D&C K 14 FSE RF 04 ILSV'V98 2 C 2 CK SA C 0 D-12 ISE O llSV'V112 2 C 314 CK SA 0 C E-18 fSE O ILSV'V114 2 C 3/4 CK SA C C 0-15 iSE RF 24 Disassenely ILSV'V118 2 C 3/4 CK SA 0 C P 18 FSE O llSV'V120 2 C 1 CK SA C C N 14 FSE RF 24 Disassenely l

l

__ = + - _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . _ _ _

O tV v

& RIVER BEND STATION INSERVICE TEST PLAN - VALVES APPENDIX C ENTERGY Svstem #: System Alpha: Pace Rev. Date ISICR #: S1stem Nanw:

MID 910E 256 SWP 6!119 4 0001 SERVICE WAllR SIANOBY VALVE INFORMATION TEST INFORMATION REMARKS Mark Number e l Cat. Size Type Act- Position Dws. Type Freg. Relief Class l Gej unter Normal l Safety Cowd.

IS?;;P*A0V599 3 B 16 BF A0 O&C H-16 FSE O MR 92 0012 ISWP*MOV40A 3 B 18 BF M0 C D&C G-10 FSE Q Pt RF IS"lP'MOV408 3 8 18 BF M0 C O&C G6 FSE O PI RF IS'!;P*MOV40C 3 B 18 BF M0 C O&C G-9 FSE O Pt RF 1SWP* MOV400 3 B 18 BF M0 C O&C G-7 FSE O Pi RF ISWP'MOVSSA 3 8 30 BF MD C O&C F-16 FSE O Pl RF ISWP'MOV558 3 8 30 BF M0 C O&C G-15 FSE D PI RF ISWP*V147 3 C 18 CK SA C D&C F 10 FSE O ISWP*V148 3 C 18 CK SA C 0&C F-9 FSE O IS"lP*V143 3 C 18 CK SA C O&C F6 FSE D-IS";P*V150 3 C 18 CK SA C O&C F1 ISE Q G

- , - e , y ,- - _ - - - - _ - - - __- _.- - _

O O O

& RIVER BEND STATION p,,, ,, ,, , os N -

INSERVICE TEST PLAN .V ALVES ggyggay APPENDIX C P&lD System Alpha: Pane Rev. Date ISTCR #: System Name:

Entem #:

8 9A 309 EGF 6!119 4 0001 DilSIL GENERATOR IUEL Olt VALVE INFORMATION TEST INFORMATION REMARKS Mark Number 0 Cat. She Type Act- Posities Dws. Type Freg. Relief Class Gej unter Numall Safety Cowd.

1EGF'V3 3 C 2 CK SA C 0 M 14 FSE O 1EGF'V33 3 C 2 CK SA C 0 .1 14 FSE Q IEGF*V63 3 C 2 CK SA C D E 14 FSE Q l

e 9

., ,- , , ,--- -c-

R. '%. .

% ,/  %/

O RIVER BEND STATION INSERVICE TEST PLAN -VALVES APPENDIX C ENTERGY System Alpha: Paae Rev. Date ISTCR #: System Name:

P&lD System #:

6l119 4 0001 DIESEt GIN. - AIR Si AHI 8 98 309 EGA VALVE INFORMATION TEST INFORMATION REMARKS G Cat. Size Type Act- Pesetion Dws. Type Freg. Relief 12sek Number Class (iej ester Normal l Safety Ceerd.

RV SA C O&C J 13 SP RF1 275 psig 1EGA*RVSA 3 C 3/4 RV SA C O&C C-13 SP RF2 275 psig IEGA*RV5B 3 C 3/4 RV SA C D&C K-10 SP RF2 275 psig IEGA*RV5C 3 C 3/4 3!4 RV SA C O&C G-10 SP RF3 275 psig IEGA*RV50 3 C 3/4 RV SA C D&C N 13 SP RF1 275 psig 1[GA*RV6A , 3 C RV SA C 0&C G-13 SP RF2 275 psig 1EGA*RV6B 3 C 314 RV SA C D&C N 10 SP RF3 275 psig IEGA*RV6C 3 C 314 RV SA C D&C G-10 SP RF3 275 psig IEGA*RV60 3 C 314 4 8 3 GA SD C O&C L5 FSE Q 56 1[GA*SOVX11A C FS 0 4 B 3 GA SD C O&C 0-5 FSE O 56 1EGA*S0VX11B C IS 0 1EGA*SOVYllA 4 B 3 GA S0 C O&C MS FSE o 56 C FS 0

' 4 8 3 GA S0 C D&C E-5 FSE O 56 1EGA*SOVY118 C FS 0 3 C 1.5 CK SA C C J 12 FSE Q 1[GA*V102

O O O O

N RIVER BEND STATION INSERVICE TEST PLAN - VALVES Page 10 of 105

_e APPENDIX C ENTERGY P&l0 Svstem #: Svstem Alpha: Paae Rev. Date ISICR #: StstemName; 8 98 309 [GA 6l119 4 0001 DitSil GIN. - AlH SI ARI VAI.VE INFORMATION TEST INFORMATION REMARKS Mark Number 0 Cat. Size Type Act- Posities Dws. Type Freg. Relief Class Ga.) seter Normal l Safety Coord.

IEGA*V115 3 C 1.5 CK SA C C M-12 ISE O 1[GA*V126 3 C 1.5 CK SA C C B 12 FSE D IIGA*V137 3 C 1.5 CK SA C C F 12 ISE O 1[GA*V141 3 C 1.5 CK SA C 0 M8 ISE Q 1[GA'V148 3 C 6 CK SA C 0 L-8 FSE Q 1[GA*V151 3 C 6 CK SA C 0 E-8 FSE O 1EGA*V152 3 C 6 CK SA C 0 08 ISE O e

0

- . . . . _ _ _ _ . . _ _ _ _ . _ _ _ _ - - _ _ - . - - _ . - _ . - _ _ _ _ . _ . - - _ . - - - - - - - - - _ - - - _ _ _ - - _ - - _ _ _ _ _ _ --- ---_ - _. - v

O O O Page 11 of 105 RIVER BEND STATION g& .

INSERVICE TEST PLAM -V ALVES APPENDIX C

~6~,7tacy ISICR #: System Name:

System #: System Alpha: P_aae Rev. Date P&l0 0001 OllS[L GENERA 10H -itPCS CSH 6/119 4 8 90 309 TEST INFORMATION REMARKS VALVE INFORMATION Relief Type Freg.

Size Type Act. Pesition Dws.

Q Cat.

M:rk Number Cowd.

(ie.) untu Numell Safety Class 0 M 20 fSE Q 2 GL AD C 4 8 ICSH'A0V233 0 FS 0 P1 RF 0 M-14 FSE Q 2 GL AD C 4 8 ICSH'A0V262 0 FS 0 P! Rf K-19 FSE O 56 GL SD C 0 4 8 1/2 1CSH'50V234 0 FS 0 Pl RF K.15 FSE O 56 GL SD C 0 4 8 1/2 1CSH*S0V247 0 FS 0 Pi RF C G 21 FSE D 1.5 CK SA C 4 C 1E22*SKDS1 V5 C G 14 FSE O 1.5 CK SA C 4 C IE22*SKDS1 V6 9

__m.._. --

_ , - - ._ w -A *

! O O O l & RIVER BEND STATION g,ge 72 of 10$

(

e. c INSERVICE TEST PLAN -VALVES gIgnoy APPENDIX C System #: Svstem Alpha: Paae Rev. Date ISICH#: System Name:

P&l0 22 9A 402 HVC Gill 94 0001 HVAC CON 1ROL BLDG l

l VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat. Size Type Act- Position Dws. Type Freq. Relief Class (inj unter Normail Safety Coord.

1HVC* MOVI A 3 8 24 BF MD 0 O&C J 12 FSE Q Pl RF 1HVC'MOVIB 3 B 24 BF M0 O O&C J-12 FSE Q PI RF 4

e 4

- _ - . _ - _ . _ . - . - - _ . - . . - _ . . _ . . _ . _ _ . - . - . _ . _ - - _ - . _ _ . _ - _ . - - - - _ _ _ . - _ _ _ - _ _ _ - _, , . - . +

J  %/

O RIVER BEND STATION INSERVICETEST PLAN VALVES APPENDIX C ENTERGY Svstem Alpha: Pace Rev. Date ISTCH #: Svstem Name:

P&ID Svstem #:

0001 HVAC CONI AINMENT BLDG 403 HVR 6fil94 22-18 TEST INFORMATION REMARKS VALVE INFDRMATION Type Act- Position Ows. Type Freg. Relief Cork Number Q Cat. She Gej watw Nerenall Safety Cowd.

Class A0 C O&C C 11 ISE Q 59 1HVR*A0V123 2 A 36 BF C FS 0 Pl RF LR Q 10 CFR 50, APP.J Test AD C O&C C9 ISE CS 37 1HVR* A0V125 2 A 24 BF C (S CS Pi RF LR RF Drywell Bypass Test A0 C D&C N 18 FSE CS 37 2 A 24 BF 1HVR* ADV126 C FS CS Pt RF LR RF Drywell Bypass Test A0 C D&C N 17 FSE O 59 1HVR* A0V128 2 A 36 BF C FS 0 Pt RF LR Q 10 CFR 50, APP.J Test 2 A 24 BF A0 C D&C 09 ISE CS 37 1HVR*ADV147 C FS CS PI RF LR RF Drywell Bypass Test A0 C D&C N 19 FSE CS 37 1HVR* A0V148 2 A 24 BF C FS CS PI RF LR RF Drywell Bypass Test

O O O O RIVER BEND STATION INSERVICE TEST PLAN -V ALVES

~

APPENDIX C ENTUlGY ISICR #: 5_ystem Nee.;

System #: System Alpha: Pane Rev. Date PS 0 IIVAC CONI AINMINI Bt0G HVR 611I9 4 0001 22 18 403 TEST INFORMATION REMARKS VALVE INFORMATION Act- Position Dws. Type Freq. Relief M:sk Number Q Cat. Size Type (in) mator Netmall Safety Coord.

Class O&C D-12 FSE O 59 2 A 36 BF A0 C 1HVR*A0V165 C FS 0 FI RF LR 0 10 Cf R 50. APP.J Test C 0&C N 14 ISE O 59 ,

2 A 36 BF AD 1HVR*ADV166 C FS 0 Pl RF LR Q 10 CFR 50, APP.J Test 8

\

v G v'

& RIVER BEND STATION Page 15 of 105

. INSERVICE TEST PLAN - VALVES ENTERGY APPENDIX C P&I0 System #: System Alpha: Paae Rev. Date ISICR #: System Name:

221C 403 HVR 611/9 4 0001 HVAC CONTAINMFNi BLDG VALVE INFORMATION TEST INFORMATION REMARKS Mark Number D Cat. Size Type Act- Posities Dws. Type Frog. Relief Class (in) unter Normal l Safety Coord.

1HVR*A0023A B IBX12 DP A0 0 O&C E-10 FSE O Damper, I.S. 4.6.5.3 C FS 0 Pl RF 1HVR*A00238 B 18X12 DP A0 0 O&C D 10 FSE O Damper. T.S. 4.6.5.3 C FS 0 PI RF 1HVR*A00161 -

B 18X12 DP A0 0 D&C 8 12 FSE 0 Damper, T.S. 4.6.5.3 C FS 0 Pl RF

O O O

& RIVER BEND STATION INSERVICE TEST PLAN -V ALVES g,,, ,, ,, ,os

~~~~ APPENDIX C ENTERGY ISIC11 #: Svstem Name:

Svstem Alpha: Pane Rev. Date P&lD Srstem #:

0001 HVAC IUFL Bl0G 406 HVF Sills 4 22 6A TEST INFORMATION REMARKS VALVE INFORMATION Act- Pesition Dws. Type Freq. Relief G Cat. Size Type C nk Neinber Gaj nata Normal l Safety Cowd.

Class B 17 FSE O Damper. I.S. 4.6.5.3 B 30X24 DP A0 0 O&C 1HVF*AOD102 C FS 0 PI RF D&C F-3 FSE O Damper. l .S. 4.6.5.3

- B 30X24 DP A0 0 1HVF*A00104 C FS 0 Pl RF I Damper, T.S. 4.6.5.3 A0 0 O&C B-16 FSE D 1HVF*A00112 . - B 30X24 DP C FS 0 Pl RF G3 ISE O Damper. T.S. 4.6.5.3 B 30X24 DP A0 0 O&C 1HVF*A00137 C FS 0 Pi RF

{

l

O O O

& RIVER BEND STATION e ,,,,,,ios N -

INSERVICE TEST PLAN . VALVES ggTERGY APPENDIX C P&to Svstem #: Svstem Alpha: Paae Rev. Date ISTCR #: Svstem Name:

22 68 406 HVF 6til94 0001 HVAC IUEL BLDG VALVE INFORMATION TEST INFORMATION REMARKS Mark Number 0 Cat. Size Type Act- Position Dwg. Type Freq. Relief Class lisj ester Normell Safety Coord.

1HVF* A00101 B 36X36 DP A0 0 D&C N 15 FSE O Damper. T.S. 4.6.5.3 FS 0 Pl RF 1HVF*A00122 B 36X36 DP A0 0 0&C N 16 FSE 0 Damper. T.S. 4.6.5.3 C FS 0 FI Rf e

4

_ . _ - - - . _ _ - - _ _ - . _ . - - . - - . - _ - . _ - - - _ _ . - _ _ . - - - _ - _ - _ - - _ _ . _ _ _ _ _ - _ - _ - _ _ . _ . _ . - - - - - _ - _ - - _ _ - . - - - - - - . - _ _ - _ - - _ - _ _ . - - _ - - - - - - - . , _ - . - - - - - +-- -- _ , -__

Q (v)

,,,, ,, ,, , os

& RIVER BEND STATION INSERVICE TEST PLAN -V ALVES APPENDIX C ENTERGY ISICR #- System Name; System Alpha: Paae Rev. Date P&lD Svstem # 0001 ilVAC AUXILLARY BLDG HVR 6fil94 221D 409 TEST INFORMATION REMARKS val.VE INFORMATION Type Freg. Relief Size Type Act- Posities Dws.

Mark Neanber 0 Cat.

Gn.) matw Numall Safety Cow d.

Class O Dasaper, T.S. 4 6.5.3 30X24 DP A0 0 D&C N6 FSE B

1HVR*A0010A FS 0 C

Pi RF O D amper. l .S. 4.6.5.3 30X24 DP AD 0 O&C M6 ISE

- B 1HVR*A0010B FS 0 C

PI RF D Damper, T.S. 4.6.5.3 DP A0 0 O&C L 19 FSE 8 36X48 1HVR*A00143 FS 0 C

PI RF ISE O Damper, T.S. 4.6.5.3 DP AD 0 O&C M-19 B 36X48 1HVR* ADD 164 FS 0 C

Pl RF FSE O Damper, T.S. 4.6.5.3 DP AD 0 0&C N-13 8 36X3G 1HVR*A00214 FS 0 C

PI RF 0 D&C N5 FSE D Danver. T.S. 4.6.5.3 30X24 DP AD 1HVR*A00249 8 ,

C FS 0 PI RF O* Damper, I.S. 4.6.5.3 DP A0 0 O&C N 13 FSE B 36X36 IHVR*A00262 FS 0 C

PI RF

- _ . _ _ _ _ _ _ _ . . __.__._________._._:-mm.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _____.__-__u_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . . _ _ . - - _ _ _ _ _ - -

[

C[~ u a e

RIVER BEND STATION INSERVICE TEST PLAN - V ALVES Page 19 of 105 -

--c5 APPENDIX C ENTERGY ISTCR #: System Name:

System #; System Alpha: Paae Rev. Date P&fD HVAC CllilllD WAlIH 61119 4 0001 410 HVN 22 140 TEST INFORMATION REMARKS val.VE INFORMATION Posities Dws. Type Freg. Relief 0 Cat. Size Type Act-Cark Number Class Gaj untu Numall Safety Coord.

M0 O C K3 FSE O 3 8 6 GA 1HVN'MOV22A Pl RF 3 8 6 GA M0 O C J3 ISE O 1HVN'MOV22B Pl RF 8 GA M0 O C K-2 iSE O 1HVN'MOV102 2 A Pl RF LR RF 10 Cf R 50, APP.J Test MD 0 C J-11 FSE O 2 A 8 GA IHVN*MOV127 Pi RF LR RF 10 Cf 8 50, APP.J Test LR RF PVtCS Valve Test LR RF PVLCS Div. Test GA M0 O C D3 FSE O 1HVN*C0V128 2 A 8 PI RF LR RF 10 CFR 50. APP.J Test LR RF PVLCS Valve Test LR RF PVLCS Div. Test GA M0 O C J 11 FSE O 1HVN'E0V129 2 A 8 PI RF LR RF PVLCS Valve Test LR flF PV!CS Div. Test

O O O Page 80 el 105 RIVER BEND STATION C

INSERVICE TEST PLAN V ALVES

~~

APPENDIX C ENTERGY ISTCR #; Syst_em Nee:

System Alpha; Pane Rev.Date System # 0001 HVAC ClilltID WAllR P&l0 Bill 94 410 HVN 22 140 REMARKS TEST INFORMATION VALVE INFORMATION Freg. Relief Posities Dws. Type Cat. Site Type Act-Cask Number G metw Normel] Sately Cowd.

Class Gej 04 FSE O 8 GA MG 0 C 2 A RF 1HVN* MOV130 PI RF PVLCS Valve Test LR LR Rf PVtCS Div. Test FSE BF 26 SA 0 C L 10 AC 8 CK 10 Cf R 50. APP. J Test 1HVN'V541 2 LR RF RF Drywell Bypass Test MA C C K8 LR A 8 GA 1HVN*VS42 2

RF Drywell Bypass Test C C K-4 LR A 8 GA MA 2

1HVN'V543 0 K-6 FSE O 6 CK SA 0 3 C 1HVN*V544 0 H8 FSE O 6 CK SA 0 3 C 1HVN'VS45 0 M3 ISE O 6 CK SA 0 3 C 1HVN'V546 0 G-3 ISE O 6 CK SA C 3 C 1HVN*VS47 J2 FSE RF 26 CK SA C C 2 AC , 3!4 RF 10 CIR 50. APP.J Test IHVN'V1316 LR s

m Q U

,,,,,,,,,,3 RIVER BEND STATION M

INSERVICETEST PLAN V ALVES APPENDIX C ENTERGY System Name:

ISICR #;

SJstem Alpha: Paae Rev. Date HV AC Chill 10 WAllR f&lD SM HVK 6(II94 0001 2214H 410 TEST INFORMATION REMARKS VALVE INFORMATION Type freg. Reliet Act- Position Dws.

Cat. Sire Type Mark Number G Coord.

unter Nerniell Safety Class Ga.)

N 14 iSE O M0 C C 8 2 GL 3 PI RF 1HVK'COV10B K 14 ISE 0 GL M0 C O&C 3 8 2 RF P1 1HVK'COV11B K-9 ISE O Bf MD 0 OSC 3 8 6 Ilf i 1HVK'C0V20B PI I i

l H9 ISE O Bf M0 C 0&C 3 8 6 Rf 1HVK'C0V200 PI Rf1 50 psig O&C K 17 SP ilV SA C 3 8 6 1HVK*RV45B K-10 TSE D SA C 0 C 6 CK 3

1HVK'V82 0 H9 ISE O )

CK SA C 3 C 6 1HVK'V83 24 Disassenely 0 K 14 FSE Rf CK SA C 3 C 2 1HVK'V97 M-14 ISE O CK SA C 0 3 C , 2 1HVK'V98

O O O

& -E .-

RIVER BEND STATION INSERVICE TEST PLAN .V ALVES r,,, ,, ,, ,os

~

APPENDIX C j ENTERGY Svstem F: Svstem Alpha: Pace Rev. Date ISICR #: S stem Nanw:

3 P_&l0 2214J 410 tiVK Sills 4 0001 liVAC CH!ttlD WAIlR VALVE INFORMATION TEST INFORMATION REMARKS Q Cat. Size Type Act- Posities Dws. Type Freg. Relief Merk Number Class (ie.) meter Normal l Safety Coord.

3 B 2 GL M0 C C M 14 FSE O 1HVK*MOVIDA PI RF 1HVK* MOV11 A 3 8 2 GL M0 C O&C K 14 ISE O PI RF 1HVK*MOV20A 3 B 6 BF M0 O D&C K9 FSE O PI RF 1HVK'MOV20C 3 8 6 BF MD C O&C H9 FSE O P1 RF 1HVK*RV45A 3 C 2 RV SA C O&C K 17 SP Rf3 50 psig l IHVK*V33 3 C 6 CK SA C 0 K 10 FSE 0 1HVK'V34 3 C 6 f.K SA C 0 - H9 FSE O 3 C 2 CK SA C 0 K 14 FSE RF 24 Disassembly 1HVK*V48 1HVK*V49 3 C 2 CK SA C 0 L-14 FSE Q t

D

_ - _ . _ _ _ - - - - _ - _ - _ - - - - - _ _ - _ - _ - - - _ - - - - _ - _ - - - - _ _ - - x-__. -

O O O g,,,33,, ,os

& RIVER BEND STATION INSERVICE TEST PLAN .V ALVES -

' APPENDIX C ENTERGY ISTCR #: System Name; System Alpha: Paoe Rev. Date Pg System #;

0001 CONIAINMINI AIMOS.& LEAKAGE MON 110 RING CMS 6/1/94 332A 552 TEST INFORMATION REMARKS val.VE INFORMATION Type Freg. Relief Cat. Size Type Act- Position Dws.

Mark Number 0 liej unter Numall Lefety Cowd.

Class AI GS fSE D Fail Asis A 3/4 GL SO O ICMS*S0V31B 2 fS 0 PI Rf LR RF 10 CFR 50. APP.J Iest AI F-5 fSE Q fail As is A 3!4 GL SO O 1 CMS *SOV310 2 FS 0 Pl RF RF 10 CFR 50, APP.J Test LR C D&C J 13 FSE O 2 S 3/4 GL S0 ICMS*SOV33B FS 0 C

PI Rf C 0&C K-6 FSE D 2 B 3I4 GL S0 ICMS*SOV33BB FS 0 C

Pi RF O&C K 13 ISE D B 314 GL S0 C ICMS*SOV33D 2 C FS 0 PI Rf O&C J-14 FSE O 2 B 314 GL S0 C ICMS*SOV33F 0 C FS PI RF -

SG C O&C K 12 FSE D 2 B 314 GL ICMS*SOV33H 0 C IS PI RF

O O O RIVER BEND STATION INSERVICE TEST PLAN -V ALVES Page 84 of 105

~

APPENDIX C ENTERGY ISICR #: System Ng System #: System Alpha: Ne Rev. Date Pf&l_D 6l1194 0001 CONI AINM[NI AIMOS.&(I AKAGI MONIIORING 552 CMS 33 2A TEST INFORMATION REMARKS VALVE INFORMATION Posities Dws. Type Freg. Relief Q Cat. Site Type Act-sfark Nussber liej ontw Numall Safety Coord.

Class C O&C J-11 FSE O 2 B 3i4 GL S0 ICMS*SOV33K FS 0 C

Pl RF C O&C K-10 FSE O 2 B 314 GL S0 ICMS*SOV33T FS 0 C

F1 RF 8 3/4 GL S0 C O&C J9 FSE O ICMS*SOV33V 2 C FS 0 Pl RF 314 GL S0 C O&C K8 FSE O 2 B 1 CMS *SOV33X 0 C FS Pi RF B 314 GL SD C O&C J1 FSE O 1C"S*S0V33Z 2 C FS 0 PI RF S0 C O&C G 15 FSE O 2 A 314 GL 1 CMS *S0V348 0 C FS 1 Pl RF LR RF Drywell Bypass Test GL S0 C O&C H 15 FSE D ICMS*SOV340 2 A 314 C FS 0 PI RF LR HF Drywell Bypass Test

O O O

& RIVER BEND STATION g,,, ,s ,, ,os INSERVICE TEST PLAN .V ALVES APPENDIX C YbGY Svstem Alpha: Paae Rev. Date ISTCR #: System Name:

P&!D System #:

CMS Bll!94 0001 CONTAINMLNi AIMOS.& LEAKAGE MONITORING 33 2A '552 VALVE INFORMATION TEST INFORMATION REMARKS Cat. - Size Type Act. Position Dws. Type Freg. Relief Mark Number Q Class Gej unter Normal l Safety Coord.

GL SD 0 Al F6 ISE 0 Fail Asis ICMS* SOV35B 2 A 3/4 IS 0 Pl RF LR RF 10 CFR 50. APP.J Iest A 3/4 GL SD 0 AI G6 iSE O f ail Asis ICMS*SOV350 2 FS 0 Pl RF LR RF 10 Cf R 50. APP.J Iest AC CK SA 0 C F 15 FSE RF 02 ICMS*V41 2 314 LR RF Drywell Bypass Test 4

'l 4

f

. - , , - . -w ~ ,,m- - - - , -- y- y , , , . - - . - ~, eiwa

O O O y,gs ,, ,os

& RIVER BEND STATION INSERVICE TEST PLAN -V ALVES

~

APPENDIX C ENTERGY ISICR #: System Name:

System Afpha: Paae Rev. Date P&l0 System #:

611/94 0001 CONT AlNMLNI AlMOS. & l[ AKAGE MONIIDHING 33 28 552 CMS TEST INFORMATION REMARKS VALVE INFORMATION Posities '

Dws. Type Freg. Relief Q Cat. Sire Type Act-Cask Number (ie.) unter Normal l S{ety Ceerd.

Class O A1 G 19 ISE O Fail Asis 2 A 314 GL SO ICMS*SOV31A iS 0 Pt RF LR RF 10 CFR 50, APP. J Test O A-1 G 19 ISE O Fail Asis 2 A 3!4 GL SO ICMS*S0V31C IS 0 Pl RF LR RF 10 CFR 50, APP.J Test 0 A1 H7 FSE Q Fail Asis 2 A 314 GL SO ICMS*SOV32A FS 0 Pi RF LR RF Drywell Bypass Test SO O A1 F7 FSE Q Fail Asis 2 A 314 GL ICMS*SOV32G IS Q PI RF

' LR RF Drywell Bypass Test l

B GL S0 C O&C K 15 iSE O 1 CMS'S0V33A 2 314 C FS 0 Pl RF S0 C D&C K-7 ISE O, 2 B 314 GL ICMS*SOV33AA C FS 0 PI RF

O O O

& RIVER BEND STATION INSERVICE TEST PLAN .V ALVES g,,, ,, ,, , os APPENDIX C

~ITERGY E

ISICR #: Sygem Nang System #: System Alpha: Pane Rev. Date P&lD 6/1/94 0001 CONI AINMENI AIMOS. & ll AKAGt MONI10HING 33 2B 552 CMS TEST INFORMATION REMARKS VALVE INFORMATION Act- Posities Dws. Type Frog. Relief Q Cat. Size Type Cark Nember Ga.) ester Normal l Safety Ceer d.

Class S0 C O&C K 16 FSE O 2 B 314 GL ICMS*SOV33C C FS 0 Pi RF GL S0 C O&C K-17 FSE Q ICMS*S0V33E 2 B 314 C FS 0 Pl RF GL S0 C O&C K 14 FSE Q ICMS*SOV33G 2 B 314 C FS 0 Pl RF GL SD C O&C K-13 FSE Q ICMS*SOV33J 2 B 3/4 C IS 0 ,

PI RF ICMS*SOV33S 2 B 3/4 GL S0 C O&C ' K-12 FSE Q C FS 0 PI RF GL S0 C O&C K 11 FSE O ICOS*S0V33U 2 B 314

~

C FS 0 Pl RF GL S0 C 0&C K 10 FSE Q' ICMS*SOV33W 2 8 314 C FS 0 Pl RF 9

- - e n - - - - - _ _ . _ _ _ - - - - - - _ - - . _ - - - - _ . - -

O O O y,,, ,, ,, , ,s RIVER BEND STATION

& INSERVICETEST PLAN VALVES N ~-

APPENDIX C ggTEllGY ISTCH #; System Name:

System Alpha: Pge Rev. Date System #: 0001 CONT AINMENT AlMOS. & tl AKAGt MUNIIORING P_&lD CMS 6/1/94 33 2B 552 REMARKS TEST INFORMATION VALVE INFORMATION Freg. Relief P osition Dws. Type Cat. Size Type Act-lark Number 0 Coord.

meta Nwmall Safety Class Ga.)

K9 ISE O GL SD C O&C Z B 3/4 0 ICMS*S0V33Y C IS Pl RF G-7 FSE O GL SD C O&C 2 A 3/4 0 1 CMS *SOV34A C FS Pl RF RF Drywen Bypass Test LR G-7 FSE O GL SD C O&C 2 A 3i4 0 1 CMS *S0V34C C fS Pt RF RF Drywell Bypass Test LR FSE D fail Asis 0 A-1 G-16 A 3I4 GL SD ICMS*SOV35A 2 FS 0 Pl Rf LR Rf 10 CFR 50. APP.J Test D fad Asis GL SO O AI G 16 FSE 2 A 3/4 0 ICMS*SOV35C FS Pl RF RF 10 CFR 50 APP.J Test 1H F7 FSE RF . 02 CK SA C C 2 AC 3I4 RF Drywell Bypass Test 1 CMS *V40 LH

O O O O RIVER BEND STATION h_I INSERVICE TEST PLAN VALVES APPENDIX C ENTERGY P&l0 System it: System Alpha: Paae Rev. Date ISICR #: System Name; 33 2C 552 LMS 6/1!94 0001 CONI AINMINT AIMOS. & lf AKAGI MUNIIORING VALVE INFORMATION TEST INFORMATION REMARKS Math Number 0 Cat. Size Type Act- Position Dws. Type Freg. Relief Class (ie.) unter Normal l Safety Coord. l ItMS'V3 2 AP 3/4 GA MA LC LC J 11 tR RF UryweII Bypass iest ILMS*V7 2 AP 3/4 GA MA LC LC J-15 LR RF 10 CFR 50. APP.J Test itMS*V12 2 AP 314 GA MA LC LC N 12 tR RF 10 Cf R 50. APP. J Ies ILMS*V14 2 AP 314 GA MA LC LC L-15 LR RF 10 Cf R 50, APP.J Test It'2S*V16

. 2 AP 3/4 GA MA LC (C J 13 LR RF 10 ClR 50, APP. J Iest

'l e

_ _ _ _ _ . _u---__-___--.___.---- - __--._.--- - - - -._ - - - - - _ _ --- -- _.--- - v - - - - - - - .- +-.

p, ry -

V '\_j

& RIVER BEND STATION p,,,30 ,, ,os N INSERVICE TEST PLAN -V ALVES

-[gggy APPENDIX C ISICR #: S stemName:

J Svstem Alpha: Paoe Rev. Date P&lD Svstem #:

6/1/94 0001 Rt ACIOR WAIER Clf ANUP & IIlllH 26 3A 601 WCS TEST INFORMATION REMARKS VALVE INFORMATION Act- Position Dws. Type Freg. Reliet Cstk Number Q Cat. Size Type (ie.) mater Normal l Safety Caerd.

Class C K9 ISE CS 55 1 A 6 GA M0 O 1G33* MOVf 001 Pl fil LR RF 10 CIR 50. APP. J iest C K 12 ISE CS 55 1 A 6 GA M0 O IG33*MOVf 004 Pl RF LR RF 10 Cf R 50. APP. J iest M0 C C E 16 FSE 0 1G33*MOVF028 2 A 4 GA PI RF lR RF 10 CFR 50. APP.J Test 4 GA M0 C C E 15 ISE O 1G33* MOVf 034 2 A PI RF LR RF 10 CFR 50, APP.J Iest LR RF PVLCS Valve Test LR RF PVLCS Div. Test GA M0 O C H3 fSE CS 55 1G33*MOVf039 2 A 6 Pl RF LR RF 10 CFR 50, APP.J Test GA M0 O C H5 FSE CS 55 IG33*MOVF040 2 A 6 Pl RF '

LR RF 10 Cf R 50. APP.J Iest

O O O M RIVER BEND STATION INSERVICE TEST PLAN .V ALVES APPENDIX C ENTERGY System Alpha: Paae Rev. Date ISICR #: System Nanw:

&lD System #:

601 WCS 611/9 4 0001 RI AC10R WAi[R Cl[ ANUP & IIlllR 26 3A VALVE INFORMATION TEST INFORMATION REMARKS Q Cat. Size Type Act- Position Dws. Type Freg. Relief Cark Nember Class (iaj nator Normal l Safety Ceard.

2 A 4 GA M0 O C J 21 FSE CS 55 1G33 MOVF053 Pl RF LR RF 10 0FR 50. APP. J Iest 2 A 4 GA MO 'O C t-20 FSE CS 55 IG33*MOVF054 Pi RF IR RF 10 CFR 50. APP.J 1est ICCS*MOV111 *2 A 4 GA M0 C C E-14 FSE Q PI RF LR RF PVLCS Valve Test LR RF PVLCS Div. Test 2 AC 314 RV SA C O&C G 16 LR RF 10 CIR 50 APP.J Test ICCS*RV144 SP RF1 1410 psig l

l I

l ,

x bq b

& RIVER BEND STATION INSERVICE TEST PLAN -V ALVES

~ APPENDIX C ENTERGY ISTCH #: System Nag System Alpha: Paae Rev. Date P&Iu System #

0001 R[ ACIOR WAilR Cli ANUP & IItIER WCS 611/9 4 26 38 601 TEST INFORMATION REMARKS val.VE INFORMATION Position Dws. Type Freg. Relief 0 Cat. She Type Act.

Cork Number (inj meter Normal l Safety Ceerd.

Class L-10 SP RF2 1410 psig 1.5 RV SA C 0&C IG36*RVF081A 2 C D 10 SP RF3 1410 psig C 1.5 RV SA C O&C Ir,36*RVf0818 2 C D4 FSE O 2 A 2.5 GA M0 O l'J!CS* MOV172 PI RF LR RF 10 CIR 50, APP.J 1est LR HF PVtCS Valve Test IR RF PVLCS Div. Test C D4 FSE O 2 A 2.5 GA MD D ICCS* MOVi?3 PI RF LR RF PVLCS Valve Test LR RF PVICS Div. Test M0 O C 0-2 FSE O 2 A 2.5 GA ICCS*MOV178 PI RF RF 10 CFR 50, APP. J Test LR LR RF 10 CFR 50, APP.J Test RV SA C O&C D-2 ICCS*RV154 2 AC 314 SP RF2 150 psig 8

9

es (m, bs V J y,,, 3 3 ,, , g.,

& RIVER BEND STATION INSERVICE TEST PLAN - V ALVES

' APPENDIX C ENTERGY ISICR K: SysJem Name; S Pace Rev. 3 ate P&l0 System # J stem Airha: IUIL P00i C00 LING WIS4 0001 602 SIC 34 2A TEST INFORMATION REMARKS val.VE INFORMATION Type Freg. Relief Cat Size Type Act- Posities Dws.

Cark Nember Q (iej eater Normal l Safety Ceard.

Class C J 11 ISE Q A 12 GA M0 O ISIC* MOV119 2 Pl RF LR RF 10 CFR 50. APP.J Iest C C L-10 ISE 0 2 A 12 GA M0 ISFC*MOV120 Pt RF LR RF 10 Cf R 50. APP.J lest N 11 ISE D A 8 GA MD 0 C ISIC'MOV121 2 PI RF LR HF 10 Cf R 50. APP.J Test C C M-11 FSE 0 2 A 12 GA MD ISFC*MOV122 Pi RF 1R RF 10 CF R 50. APP. J 1est 0 C N 10 FSE Q 2 A 8 GA MD ISFC* MOV139 PI RF 1R RF 10 CFR 50. APP.J Test C 0 H-18 FSE O C 12 CK SA ISFC'V39 3 ,

0 0 E-19 FSE O C 12 CK SA ISFC'V40 3 CK SA 0 0 0 19 ISE Q-3 C 12 ISFC'V41

~

0 0 0 13 FSE Q C 10 CK SA ISFC'V59 3

O O O O RIVER BEND STATION INSERVICE TEST PLAN - VALVES APPENDIX C ENTERGY ISICH #: System Name:

System Alpha: Pace Rev 0 ate P&l0 System #: lull POOL C00llNG 6/1/94 0001 602 SFC 34 2A TEST INFORMATION REMARKS VALVE INFORMATION Posities Dws. Type Freg. Relief Q Cet. Size Type Act-Cask Number entw Normalj Sefety Cowd.

Class (ie) 0 0 0-10 ISE Q 3 C 10 CK SA ISFC*VG0 0 0 G-13 FSE O 3 C 10 CK SA ISFC*V61 0 0 G9 ISE Q 3 C 10 CK SA ISFC*V62 0 C J9 FSE RF 26 2 AC 12 CK SA ISFC'V101 LR RF 10 CFR 50, APP.J Test SA C 0 L.10 ISE 0 51 2 AC 314 CK ISFC'V350 LR RF 10 CFR 50, APP.J Test C

0 N9 FSE O 51 AC 314 CK SA C

> 1 SIC *V351 2 10 CFR 50, APP.J Test C LR RF

.=

0 O O O RIVER BEND STATION

$ ENTERGY INSE""**1 TEST PLAM - V ALVES APPENDIX C P&lu SLstem #: System Alpha: Paae Rev. Date ISTCR #: System Name:

32 58 609 01M Gl1I94 0001 DRAINS Il00R & LOUIPMENT VALVE INFORMATION TEST INFORMATION REMARKS Cark Number Q. Cat. Size Type Act- Position Dws. Type Freg. Reliet Class (ie.) unter Normal l Safety Coord.

1821

  • MOVF016 1 A 3 GA M0 O C D-12 FSE O Pl RF LII RF IB21
  • MOVF019 1 A 3 GA M0 O C D.10 ISE 0 PI RF LR RF PVLCS Div. Test IB21*MOVF067A 1 A 1.5 GL M0 0 C K-14 FSE Q Pl RF LR RF PVLCS Div. Test 1821*MOVF0678 1 A 1.5 GL M0 O C K-19 FSE O Pl RF LR RF PVLCS Div. Test 1821*MOVF067C 1 A 1.5 Gl MG 0 C K 12 FSL 0 Pl RF LR RF PVLCS Div. Test 1821*MOVF0670 1 A 1.5 GL M0 O C K 17 ISE O Pl RF LR RF PVlCS Div. Test 1821 *MOVF085 2 A 3 GA M0 O C D 10 FSE Q' Pl RF LR RF PVLCS Div. lest

O o a O RIVER BEND STATION INSERVICE TEST PLAM -V ALVLS APPENDIX C ENTERGy ISICR g; Sntem Name:

S Pace Rev. Date P&lD System #: _Istem Alpha: ORAINSIl00R & [QUIPMLNI 6/1/94 0001 609 DIM 32 5B TEST INFORMATION REMARKS VALVE INFORMATION Type Freg. Relief Cat. Size Type Act- Position Dws.

Mask Number Q unter Normail Safety Coord.

Class lin.)  !

C K 11 FSE D 2 A 3 GA M0 O 1821*MOVf 086 PI RF LR RF PVLCS Div. lest 0 O&C D 18 ISE D 2 8 1 GL A0 1L51*A0VIO25 FS 0 C

Pl RF ,

0 0&C C-18 ISE O 2 B 1 GL A0 1E51*A0Vf026 FS 0

  • C Pi RF C O&C B-18 ISE Q 2 8 1 GL A0 1E51* A0VF054 FS 0 C

Pi RF 1

0 4

6 I

e - -- ,,,, e .- -e-a ~ - - -

'% J N/

25j RIVER BEND STATION INSERVICE TEST PLAN - VALVES Page 97 of 105

~

APPENDlX C ENTERGY System Alpha: Paae Rev. Date ISICR #: System Name:

RD P System #.

32 SA 609 DFR 6!119 4 0001 DRAINS ILOUR & E QUIPMENT VALVE INFORMATION TEST INFORMATION REMARKS Cark Nember G Cat. Size Type Act- Position Dws. Type Freg. Relief Class (ie.1 mater Normal l Safety Caerd.

IDfR*VI 2 AC 8 CK SA 0 C C-20 FSE RF 02 IR RF Drywell Bypass Test IDFR*V2 2 AC 8 CK SA 0 C C 20 ISE RF 02 lR RF Drywell Bypass Test IDIR*V3 2 AC 8 CK SA 0 C C-13 FSE RF 02 LR RF Drywell Bypass lest 1DFR*V4 2 AC 8 CK SA 0 C C-12 FSE RF 02 1R RF Drywell Bypass Test e

G

-r - , _ . _. -* , _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

O O O O RIVER BEND STATION INSERVICE TEST PLAN - VALVES APPENDIX C ENTERGY System #: Srstem Alpha: Paae Rev. C ate !SICR #: Sytem Nang_;

P&l_D 32 98 609 DER 611/9 4 0001 DHAiNS It00R & EQUIPMENI VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat. Site Type Act. Position Dws. Type Freg. Relief Class (ie.) unter Nerniall Safety Coord.

IDER*A0V126 2 A 4 GL A0 0 C B9 FSE O C IS 0 Pl RF LR RF 10 CFR 50. APP.J Test IDER*ADV127 2 A 4 GL A0 0 C B8 ISE O C FS 0 P1 RF tR RF 10 CFR 50. APP.J Test IDER*V4 2 AC 3/4 CK SA C 0 89 ISE CS 41 C LR RF 10 CIR 50. APP.J Test IDER*V16 2 AC 8 CK SA 0 C H-2 ISE RF 02 .

LR RF Drywell Bypass Test IDER*V17 2 AC 8 CK SA 0 C H2 FSE RF 02 LR RF DryweX Bypass Test

O O O O RIVER BEND STATION ***

5$ INSERVICE TEST PLAN V ALVES APPEND!X C ENTERGY P&l0 System #; System Alpha: Paae Rev. Date ISICR #: Sntem Name:

609 DFR 6!1/94 0001 DRAINS f LOOR & lubiPM:N1 32-9F VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat. Size Type Act. Position Dws. Type Freq. Reliel Class (ie.) mater Normell Safety Coord.

2 A 4 GL A0 0 C C-8 FSE O 1DFR*A0V101 C fS 0 PI RF LR RF 10 CFR 50. APP.J les:

1DFR*V180 2 AC la CK SA C D&C B8 FSE CS 39 LR RF 10 CFR 50. APP.J Iest

-__________________._.__________.___.-._-m___

O O O

& RIVER BEND STATION INSERVICE TEST PLAN .V ALVES Page 100 o1105

~

APPENDIX C

-QTERGY ISICR 0 System Name:

System #; System Alpha: Paae Rev. Date P&lD DRAINS Il00R & E0uiPMENT Gill 94 0001 609 DER 32 9G TEST INFORMATION REMARKS VALVE INFORMATION Positsen Dws. Type Freg. Relief Q Cat. Site Type Act-Cark Nember unter Normal l Safety Coord.

Class fia.)

0 C F 19 ISE RF 02 2 AC 8 CK SA 1DIR*V14 DrywellBypass Test tR RF 0 C F.18 ISE RF 02 2 AC 8 CK SA 1 DER *V15 Drywell Bypass Test LR RF l

^^ ~' - - - - - - - - _ - _ _ _ _ __ _ _ _ _ _ _ _

O O O O RIVER BEND STATION INSERVICE TEST PLAN - V ALVES APPENDIX C ENTERGY System #: System Alpha: Paoe Rev. Date ISICR #: System Name:

PalD 609 DFR 61119 4 0001 DRAINS fl00R & f uulPMENI 32 9J VALVE INFORMATION TEST INFORMATION REMARKS

- C:rk Numeer Q Cat. Sire Type Act- Position Dag. Type Freg. Reluf Class (in) eater Bermall Safety Coord.

3 C 4 CK SA 0 C D-7 ISE RF 24 Disassembly 1DIR*V87 IDIR*V88 3 C 4 CK SA 0 C 07 ISE RF 24 Disassembly IDIR*V97 3 C 4 CK SA 'O C l2 FSE RF 24 Disassen6fy 3 C 4 CK SA 0 C L-1 ISE RF 24 Disassembly IDfR*V98 3 C 4 CK SA 0 C L 13 FSE RF 24 Disassembly 1DIR*V107 ,

3 C 4 CK SA 0 C L-12 FSE RF 24 Disassembly 1DFR*V108 IL51* A0VF004 2 B 1 GA A0 0 0&C K9 FSE O C FS 0 PI RF 1E51*A0VI005 2 B 1 GA A0 0 O&C K.9 FSE O C FS 0 PI RF 1E51*Vf047 2 C 12 CK SA 0 0 L9 ISE O Normal 0ps b

_____________._______._____m______________. _ _ _ . , -__ - _ _ _ _ _ _ _ _ _ . _ _ _

_ - - - . , - -. -. w - - w -- . _ . _ _ _ _

O O O RIVER BEND STATION "*

O INSERVICE TEST PLAN -VALVES APPENDIX C E TERGY ISICR #; S_ntem Nanie; System Alpha; Paae Rev. Date System g; DRAINS FLOUR & 100!PMENI PE DFR 611/94 0001 32 9K 609 TEST INFORMATION REMARKS VALVE INFORMATION Relief Type Freg.

Type Act- Position Dws.

G Cat. Size Eksk Number Coord.

Ga.) unter Normal l Safety Class C F8 FSE Q 4 GL A0 0 2 A Q 1DFR*A0V102 C FS PI RF LR HF 10 CFR 50 APP.J Fest HF 24 Disassently 0 C K-2 FSE C 4 CK SA 1DFR*V117 3 RF 24 Disassenely SA 0 C K1 FSE 3 C 4 CK 1DFR*V118 RF 24 Disassenely 0 C G-13 FSE 4 CK SA 3 C IDFR'V121 HF 24 Disassenely C G 12 FSE 4 CK SA 0 3 C IDFR*V128 HF 24 Disassenely CK SA 0 C C6 FSE 3 C 4 IDFR*V78 RF 24 Disassenely CK SA 0 C C6 FSE 3 C 4 1DIR*Vl9 O

e

O O O O RIVER BFND STATION INSERVICE TEST PLAN - V ALVES APPENDIX C ENTERGY ISfCR #: Sprem Name System #: Svstem Alpha: Pace Rev. Date P&l0 DRAINS FLOOR & [0VIPME N1 6/1/94 0001 609 DFR 32 9P TEST INFORMATION REMARKS VALVE INFORMATION Act- Position Dws. Type Freg. Relief Cark Number Q Cat. Sire Type Ga.) satw Nwmall Safety Caerd.

Class A0 0 C M3 FSE 0 IDFR* A0V144 2 B 3 GL C FS 0 Pl RF A0 0 C 0-12 FSE Q 1DFR*A0V145 2 B 3 GL C FS 0 PI RF GA M0 O D&C D 11 FSE O 2 A 4 1DFR*MOV146 PI RF LR RF Water Test CK SA C D&C C-10 FSE O IDFR*V181 2 AC 4 LR RF Water Test CX SA C O&C C 12 FSE Q 1DIR*V182 2 AC 4 LR RF Water Test 4

. - . _ _ _ _ _ _ _ _ _ _ _ _ _ ____.__________._m _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ ._ _ _ _ _ . _

O O O g,,,io,,,,os RIVER BEND STATION

& INSERVICE TEST PLAN -VALVES

~~ APPENDIX C ENTERGY (SICR #; Sntem Name;.

System Alpha: Paae Rev. Date System #: 0001 SAMPilNG RI ACIOR Pl ANI P&_ID

. 6/1/94 SSR 21 28 610 REMARKS TEST INFORMATION VALVE INFORMATION Relief Dws. Type freq.

Size Type Act- Position G Cat.

Mark Number Normal l Safety Coord.

Class (inj mater C L 18 FSE O GL SD C 2 A 1/2 ISSR*S0V130 C FS 0 PI RF la RF 10 CIR 50. APP. J Iest C L 17 FSE O GL S0 C 2 A 1/2 ISSR*SOV131 C FS 0 PI RF 10 CFR 50, APP.J 1est 1R RF C N-18 FSE O GL SD C 2 8 3/4 1SSR*SOV133 C FS 0 P1 RF C N 17 FSE D 3/4 GL S0 C 2 8 0 1SSR*SOV134 C FS Pi RF C G-16 ISE O GL SD C 2 A ISSR*S0V139 C FS 0 Pl RF

' LR RF 10 CFR 50. APP.J Test C F-16 FSE O 1 GL S0 C 2 B 1SSR*SOV140 C FS 0.

Pl RF FSE RF 24 1 CK SA C 0 G-17 2 C ISSR*V705

O .

O O O

N RIVER BEND STATION INSERVICE TEST PLAN -V ALVES Page 105 of 105 c- _~ APPENDIX C ENTERGY System Alpha: ISTCH #: System Name; Pg System #: Paae Rev. Date 610 SSR 6/1!94 0001 SAMPilNG RI ACIDH Pt ANI 21 28 VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat. Sue Type Act- Posities Dws. Type Freg. Reliet Class Ga.) mater Normal l Safety Coeri 1SSR*V706 2 C 1 CK SA C 0 f 16 ISE RF l

O l

- _ _ . - . - - _ - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ - - _ - _ _ _ _ - - - - - - - - _ - - - - a - __

e ENTERGY OPERAT!ONS DME HOWCR #

JJM 2 3 '94 05 1.0. INTRODUCTION g i p, j{[y[.y[gh This document represents the First Ten Year Interval for Inservice Testing (IST) of Pumpe and Valves at the River Bend Suclear. Station Unit 1.

The program was developed in compliance with the requirements of 10CFR50.55a (g), Technical Specification 4.0.5, and in accordance with the rules of the ASME Boiler and pressure Vessel Code,Section XI, 1980 Edition through Winter 1981 Addenda.

The River Bend Station Pump and Valve Program has been reviewed by the NRC in the receipt of our Safety Evaluation Report (SER),

dated 1-2-91 and 7-16-92, which approved Requests for Relief from certain ASME Section XI Testing which cannot be met.

The Program Plan specifiesSection XI testing requirements for certain pumps and valves providing a safety-related function.. By definition, a safety-related function is one that is required to assure:

  • A. integrity of the reactor coolant pressure boundary; B. capability to achieve and maintain safe shutdown; C. capability to prevent or mitigate the consequences of

N postulated accidents which could result in off-site exposure comparable to the 10CFR50 Part 100 requirements.

The selection criteria used for components included in this Program Plan are safety-related active components. Only those safety-related passive valves which have leakage values and position indication requirements have been included in the Program Plan. There are certain components that are included in this program which are specific commitments and are not necessarily IST. Station Technical Specifications, Manufacturer's recommendations, and system operating conditions may include additional components or reference valves which should be included in the overall IST testing program.

Section XI requires that an Inservice test shall be run on each pump and valve every 3 months (quarterly) during normal plant operation. If this testing is not practical during plan,t operation, -it shall be tested during Cold Shutdowns (see Cold Shutdown Justifications for each system / component). In cases which functional testing of pumps nnd valves cannot be performed in either quarterly or Cold Shutdowns because it is determined impractical for the following reasons, a Request for Relief shall be generated.

bM l-1 Rev. 6

4 f3

1.0 INTRODUCTION

(Cent.)

! l A. renders a safety-related system incperable; B. causes a reactor scram or turbine trip; C. requires significant deviations from normal cperations; D. requires entries into the drywell and inaccessible a aas during power operation; E. increases the probability of an accident or inner system LOCA.

NOTE: Requests for Relief must be approved by the NRC staff and its contractor prior to implementation.

For each component for which testing cannot be performed or which is excluded from quarterly testing or testing performed at Cold Shutdowns has been analyzed and documented in a Cold Shutdown Justification or a Request for Relief. ASME Section XI allows valve testing at Cold Shutdowns; this IST Program lists these in Appendix D along with the Requests for Relief. This section provides a justification for the delay of testing until cold shutdown in the same format as the Requests for Relief.

In addition to Cold shutdown Justifications and Requests for Relief, there are general "IST Positions" established at River Bend Station which address specific testing policies. These positions are the result of: 1) responses to the NRC, 2) NRC (7-~)

Generic Letter #89-04 Positions, and 3) general RBS operating l

procedures. These items will be discussed in the General Information 2.0 and 3.0 of the program.

The IST Pump and Valve Program is broken down into 3 sections j with 4 Appendices. Section 1 is the Introduction and Basis  !

portion. Section 2, Inservice Testing of Pumps, discusses the l applicable ASME Class 1, 2, and 3 pumps which were selected.

Section 3, Inservice Testing of Valves, discusses the applicable ASME Class 1, 2, and 3 valves.

1.1 BASIS The RBS IST Program uses the River Bend Unit 1 Engineering P&I Diagrams in conjunction with the ASME Section XI Code, RBS USAR, RBS Tech. Spec., NRC Generic Letter #89-04, and ASME/OM-1990 Code ISTB and ISTC.

The basis for inclusion of certain safety-related ASME Class 1, 2, and 3 components was performed in conjunction with ASME Section XI IWA-1000, IWP-1100, INV-1100, NRC Generic Letter #89-04, Position 11, the River Bend Station USAR, and ANSI /ASME Operations and Maintenance (O&M) Part 6 to prepare the RBS IST

( Program.

1-2 Rev. 5

ib l'

9 1.0- INTRODUCTION (Cont.) i E 'TT 1 Th'e following basis is for excluding components:

. .The components were exempt from testing per IWP-1200 or INV-1200. This includes Pumps and Valves used for operating convenience-(i.e. valves used as manual vents and drains, system control, and maintenance valves); I pumps supplied with emergency power solely for operating convenience.

. Components that are safety-related but have no specific function (considered passive) in shutting down a i reactor or in mitigating the consequences of an j accident.

In addition to the referenced ASME Code.Section XI, the RBS  ;

IST Program Plan was prepared in compliance with the. I following NRC guidance documents: Draft document dated . ,

1/1978, " Guidance for Preparing Pump and Valve Testing i Programs and Associated Relief Requests Pursuant to 10CFR50.55a (g)"; NRC Letter dated 11/1976, "NRC staff Guidance for Complying with Certain Provisions of 10CFR50.55a (g)"; NRC Generic Letter #89-04 dated April 3, 1989, " Guidance on Developing Acceptable Inservice Testing Programs"; bdC letter dated August 31, 1987, "NRC Staff-Os Interim Review of the RBS Pump and Valve Inservice Testing Program (IST) Revision 3"; NRC letter dated October 9, 1987, "NRC Staff Consultants Preliminary Review of the-RBS Pump and Valve IST Program"; NRC letter dated January 6, 1988, "NRC Meeting Minutes of Pump and Valve IST Program Plan"; NRC letter dated January 2, 1991, " Staff Review of the First Ten Year Interval IST Program for Pumps and Valves"; GSU Response Letter dated July 26, 1991, " Response to NRC IST Evaluation "; and NRC Safety Evaluation for Revised Relief Requests dated July 16, 1992. These documents provide the basis for selecting components, testing requirements, and Requests for Relief.

Regarding Containment Isolation (CIV)/ Pressure Isolation (PIV) function valves, this program incorporates.these into the RBS Pump and Valve IST Program. Per Valve IST Position 3.5.3 to perform leak rate testing in acco'rdance with 10CFR50, Appendix J, the River Bend Leak Rate Testing guidelines and compliance with the requirements of Section XI IWV-3 4 2 6 and IWV-34 27 (a) have been incorporated.

into the IST Program.

1-3 Rev. 6 u

I

o 2.0 INSERVICE TESTING OF PUMPS l 2.1. GENERAL INFOPMATION The Inservice Testing Plan for ASME Class 1, 2, and 3 pumps was developed in accordance with the requirements of l ASME. Boiler and Pressure Vessel Code,Section XI, Subsection IWP, 1980 Edition thru Winter 1981 Addenda.

The Inservice Testing Plan for pumps will remain in effect through the first 10 year Inservice inspection interval commencing at commerciel operation, June 16, 1986.

Appendix A identifies the Class 1, 2, and 3 pumps that are tested, along with the applicable parameters that are measured. This listing is arranged by RBS system number, then by P&ID number, and finally by pump number.

l 2.2 PLAN INFORMATION The following information is provided in the computer generated Pump Inservice Plan (Appendix A) :

2.2.1 ' SYSTEM NAME': The name of the system which the pump is a part of.

2.2.2 'SYS NO': The RBS number of the system which corresponds with the System Name.

2.2.3 'P&ID NO': The Process and Instrument Diagram number on which the listed pumps are shown.

2.2.4 ' PUMP INFORMATION':

1. ' MARK NUMBER': This is the pump identification number.
2. ' DESIGN AND DESCRIPTION': Listed are important design characteristics and general descriptive information for the pump.

(Changes in this information will not by itself initiate a revision to the IST Plan.

It is for information only.)

3. ' NORMAL STATUS':

ENTERGY OPE MWW DATE HOLDER #

STBY - Standby RUN'NG - Runnino g 3 94 05 Rivert GEND STATION %'@# j ACCOUNTABLE & RETut{_;,,il,,,j

\

2-1 Rev. 6

'o 2.2.5 ' TEST INFO': Information relating to the ASME tests required for the pump.

O Surveillance test frequency.

_/ 1. ' FREQUENCY':

Q- Quarterly (every 92 days) (Note -

the test frequency will be increased to once e"ery 46 days if any pump test parame".er value is found in its alert range.)

CS- During Cold Shutdown but not less chan ;

every 92 days. (Testing shall ce" .ence l within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of achieving Co'  !

j Shutdown and shall continue un :

testing is complete, but shall not l prevent plant startup. Completion of I

)

Cold Shutdown testing is not a l prerequisite for returning to commercial generation of power. Tests I not completed prior to startup will y

be rescheduled for the next Cold Shutdown starting with the last 92 days, if acceptable. If the test results are in the Alert Range, the pump shall be repaired or an Engineering Justification initiated for O continued limited operation until next outage.

the

2. ' PARAMETER': The test parameter which is measured or observed during the pump test. l 1

PI-I- Idle Pump inlet pressure l PI-R- Running Pump inlet pressure PI- Pump calculated inlet pressure PO- Pump outlet pressure DP- Pump differential pressure Q- Pump developed flow V- Pump bearing housing vibration BRG- Pump bearing temperature LUB- Pump bearing lubrication SPD- Pump shaft speed in RPMs STM- Steam supply pressure for turbine driven pumps NOTE: Because deepwell pumps are lubricated by the pumped medium, lube level will not be checked for these pumps.

2-2 Rev. 6

6

/~' 3. ' RELIEF REQUEST': The request for relief

\ numbers which correspond to the associated l ASME test parameter. (See Appendix B.) The l relief request numbering sequence is used for Cold Shutdown Justifications.

2.2.f ' TEST PARAMETER LIMITS':  !

t

1. ' ACCEPTABLE RANGE': The acceptable range of ,

the associated test parameter as specified by i the ASME Code,Section XI, Subsection IWP and  ;

as modified by the relief requests.

LVL- Lubrication Level P- Pressure in psig V- Vibration in inches per second velocity N/A- Not Applicable ,

NOTE: R is used to refer to the test .

reference value or " baseline" value.

2. ' ALERT RANGE': The range of the associated C) test parameter which increases the surveillance test frequency to less than or equal to every 46 days as specified by the ASME Code.
3. ' UNACCEPTABLE RANGE': The required action range of the associated test parameter which requires the pump to be immediately declared '

inoperable as specified by the ASME Code.

4. ' TECH SPEC ALLOWABLE': If applicable, this ,

is the Technical Specification allowable range for the associated test parameter. If found unacceptable, then specific action shall be taken in accordance with the <

specific Tech. Spec. statement.

4 i

a O

2-3 Rev. 6

i i

,-s,g .2.3. REQUESTS FOR RELIEF U' Where ASME Section XI requirements are determined to be impractical, a Request for Relief has been submitted with the Plan. A Request for Relief will require NRC approval prior to the incorporation into this Program- '

Plan. Pump Requests for Relief and Cold Shutdown Justifications are provided in Appendix B.

2.4 PUMP IST POSITIONS 2.4.1 Per NRC Generic Letter #89-04, Position #8, I and IWP-3230 (b), if deviations fall within the Required Action Range of Table IWP-3100-2 the pump shall be declared inoperative and ,

not returned to service until the cause of deviation has been determined and the condition corrected. River Bend's IST  !

Surveillance Test Program is performed by' Operations personnel. If the test value is found to be in the Required Action Range, it would be checked unacceptabJe by the personnel performing the test. Then the data package would be'given to the Shift

,-s Supervisor / Control Room Operations Foreman i for their review and analysis and then a determination would be made as to whether or not the data meets the requirements on the IST Data Sheet and all appropriate Tech.

Spec. actions would be taken as specified.

The determination of Required Action and Declaration of Required Action.to coincide with Tech. Spec. Action shall be made during that shift period only.

2.4.2 Per IWP-4600, flow rate shall be measured using a rate or quantity mete installed in a pump test circuit. The meter may be in any class that provides an overall readout repeatability within the accuracy limits of Table IWP-4110-1. Where the meter does not indicate the flow rate directly, the record shall include the method used to reduce the data. In the case of certain pumps, the instruments used for flow measurement receive a signal only. In this case, the use of a multimeter ( 2% accuracy) to read millivolts (DC) in lieu of a flow meter or temporarily gg installed gauge is recommended.

U 2-4 Rev. 6

i i

~ 2.4.3 For the Reactor Core Isolation Cooling pump test, to establish a running inlet suction '

pressure of-the RCIC pump, the

  • low and speed-parameters of the RCIC turbine and pump will be adjusted (IWP-3100) prior to obtaining the running suction' pressure.

f r

i i

D O

?

6 O ,

2-5 Rev. 6 l

ENTERGY OPERATTONS

  • DATE HOLDER #

3.0 INSERVICE TESTING OF VALVES JJN 2 3 '94 05 ,

RIVER DEND STATfpN cor, (D

3.1 GENERAL INFOBMATION ACCOUNTABLE u RETUR_

The Inservice Testing Plan for ASME Class 1, 2, and 3 valves was developed in accordance with the requirements of ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWV, 1980 Edition thru Winter 1981 Addenda.

The Inservice Testing Plan for valves will remain in effect through the first 10 year inservice inspection interval commencing at commercial operation June 16, 1986.

Appendix C identifies the Class 1, 2, and 3 valves that are tested. This listing is arranged by RBS sstem number, then ,

by P&ID number, and finally by valve number.

3.2 PRESERVICE TESTING Each valve was tested after installation and prior to service. These tests were conducted under conditions  ;

similar to those to be experienced during subsequent inservice tests. Safety and relief valves which will be removed and bench tested during subsequent inservice tests-were not necessarily installed prior to their preservice i

[V T test. ,

3.3 PLAN INFORMATION The following information is provided in the computer generated Valve Inservice Testing Plan (Appendix C):

3.3.1 ' SYSTEM NAME': The name of the system which the ,

valve is a part of.

3.3.2 'SYS NO': The RBS number of the system which corresponds with the System Name.

3.3.3 'P&ID NO': The Process and Instrument Diagram number on which the listed valves are shown.

3.3.4 ' VALVE INFORMATION': ,

1. ' MARK NUMBER': This is the valve identification number. (A few dampers are listed which are required to be tested pursuant to the ASME Code Section XI, Subsection IWV by Tech. Spec. 4.6.5.3.C even though they do not fall within the scope of b),

IWV itself.)

3-1 Rev. 6 i

e-l i

l

2. 'P&ID CORD.': The coordinates on the associated :

P&ID where the valve will be located. ]

3. ' CLASS': The ASME Code Class of the valve.

1

4. ' TYPE': The valve type or design.

BF- Butterfly PG- Plug CK- Check RV- Relief DP- Damper SC- Stop Check GA- Gate XP- Explosive GL- Globe i

5. ' CATEGORY': The Valve Category as defined by ASME Code,Section XI, Subsection IWV-2200.

NOTE: When more than one category is applicable, the categories will be i combined (e.g. AC). If the valve is not required to change position to accomplish i a specific function it will be categorized "P" (for passive). With the exception of Cat. A passive valves, all  !

valves in the program are assumed to be active.  ;

O 6. ' SIZE-INCHES': The nominal diameter of the valve i in inches. For valves with the outlet size different from the inlet, the inlet size.is shown first. For dampers, it is the width by height in  !

inches. ,

7 ' ACTUATOR': The type of actuator used to change the valve position.

AC- Air operator SA- Self actuated HY- Hydraulic operator SO- Solenoid operator MA- Manual operator XP- Explosive charge MO- Motor operator r

8. ' NORMAL POSITION': Valve positions during normal plant operation. .

j C- Closed LC- Locked closed 0- Open LO- Locked open T- Throttled O/C- Open or Closed 3-2 Rev. 6 i

a O

N-

9. ' SAFETY POSITION': This is the position to which the valve must move to meet a safety function and the corresponding test i which verifies it. For a fail safe test (FS), the position to which the valve will move upon a loss of power is shown.

C- Closed O&C- Open and Closed O- Open A-I- As Is 3.3.5 ' TEST INFO': Information relating to the ASME tests required for the valve.

ET- Explosive charge test FS- Fail safe test FSE- Full stroke exercise NOTE: For some check valves, FSE may ,

exercise only the safety position.

LR- Leak rate test PI- Local position indication verification PSE- Partial stroke exercise  ;

SP- Setpoing verification  !

() 2. 'FREQ':

Q-Surveillance test frequency.

Quarterly (every 92 days). See 2.2.5.1 for definition.

CS- During Cold Shutdown but not less than every 92 days. (Testing shall commence within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after achieving Cold shutdown, but shall not prevent plant startup. Completion of Cold Shutdown testing is not.a prerequisite for returning to commercial generation of power. Tests not completed prior to startup will be rescheduled for the next Cold Shutdown starting with the last test performed). Cold Shutdown testing is not required if testing is performed in the last 92 days, if acceptable. If the test results are in the Alert Range, the valve shall be repaired or Engineering Justification initiated for continued limited operation until next outage.

O 3-3 Rev.6 8

s

RF- Testing deferred to the refueling outage ks ,T/ or 2 years, whichever occurs first, f shall be completed prior to returning to power operation.

NOTE:

RF-1: 1ST refueling outage (4th, 7th, 10th, etc.)

RF-2: 2nd refueling outage (5th, 8th,.

lith, etc.)

RF-3: 3rd refueling outage (6th, 9th, 12th, etc.)

NOTE: At least 1/3 of the total relief valves will be tested each refueling outage, such that 100% of all relief valves will be tested by the end of the five year interv51 required by INV-3511.  ;

V- Test occurs at varying frequencies but shall never exceed 2 years. .

3. ' RELIEF REQUEST': The request.for relief s, numbers.which correspond to the associated ASME test requirement. (See Appendix D. ) l The relief request numbering sequence is used for Cold Shutdown Justifications.

3.3.6 ' REMARKS' Provides information or clarification of tests or test requirements as needed:

SRV AIR LEAK TEST indicates the associated valve is leak tested as part of the air leakage test on the main steam line safety-relief valve actuator air system.

DISASSEMBLY indicates the associated check valve is disassembled for inspection and  :

exercising in accordance with STP-000-3607 and CMP-9173 as explained in Relief Request

  1. 24.

3-4

( 6/1/94 - 0001

R.  ;

a PENT LOCKED CLOSED indicates that the f:)

containment penetration associated with the valve is locked closed by another val've and therefore testing is not required on the valve. ,

RCS BOUNDARY TEST indicates the valve is leak valve. The testing is required by Tech.

spec. 4.4.3.2.2.

NORMAL OPS indicates that the operability of the valve is verified by the normal operation of the associated system.

DAMPER, TS 4.6.5.3 indicates the component is a damper that is tested per the ASME Code,Section XI, Subsection IWV as required by Tech. Spec. 4.6.5.3.

10CFR50 APP J TEST indicates the leak test on ,

the valve is performed in accordance with 10CFR50 Appendix J, Relief Request #59 and Valve IST Position 3.5.3.

SCRAM TEST indicates the valve is tested for O operability by the successful performance of the individual control rod drive scram time test as explained by Relief Request #33.

SPECIAL LEAK TEST indicates the valve has a leak test which is not containment related but is required to ensure s'i stem or valve operability.

DRYWELL BYP. TEST indicates the valve leak test is satisfied by the integrated drywell  ;

steam bypass leak test and by the valve ,

stroke tests as explained by Relief Request

  1. 2.

PVLCS VALVE TEST indicates the valve is tested locally for leakage as part of the Penetration Valve Leakage Control System.

The leakage value obtained will be added with total PVLCS division leakage.

PVLCS DIV. TEST indicates the valve leakage ra* is combined with other valve leakage races in the same division to obtain the divisional leakage rate.

3-5 Rev. 6 .

4

(~T TESTABLE CK VALVE indicates the associated (ms/ valve is an air operated testable check valve which can be remotely exercised.

NOTE: MR 87-0780 removed the air actuator arm from several of the ECCS injection check valves in the drywell.

3.4 REQUESTS FOR RELIEF Where ASME Section XI requirements are determined to be impractical, a Request for Relief has been submitted with the Plan. A Request for Relief will require NRC approval prior to the incorporation into this Program Plan. Valve Requests for Relief and Cold Shutdown Justifications are provided in Appendix D.

3.5 VALVE IST POSITIONS .

3.5.1 NRC Generic Letter #89-04, Position #5, " Limiting Values of Full-Stroke Times for Power Operated Valves" and RBS Policy states the Code intent with respect to measuring the full-stroke times of power operated valves is to verify operability and

(~N to detect valve degradation. The purpose of this

\ value is to establish taking corrective action on a degraded valve before the valve reaches failure. The NRC has, therefore, established the guidelines regarding the limiting values of full-stroke time for power operated valves.

Reference values for power operated valve stroke times will be established when the valves are known to be operating acceptably. The acceptable range will be plus 25% of the reference value for valves with stroke times greater than 10 seconds and plus 50% of the reference value for valves with stroke times less than or equal to 10 seconds. If the stroke time exceeds this range but is below the maximum allowable stroke time, test frequency shall be increased to once each month (31 days) until corrective action is taken.

NOTE: Stroke times greater than the maximum allowable stroke time will require the valve to be immediately declared inoperable.

When the TS or safety analysis limit for a valve is less than the value established using the above

(~T guidelines, the TS or safety limit shall be used (ms) as the limiting value of full-stroke time.

3-6 Rev. 6

b ,

l r- 3.5.2 NRC Generic Letter 89-04 Position 6 & RPS Policy (s). Stroke Time Measurements for Rapid-Acting Valves The Code requires the following for power operated valves with stroke times 10 seconds or less:

(a) limiting values of full-stroke times shall be specified [IWV-3413 (a)], (b) Valve stroke times I shall be measured to (at least) the nearest second i

[IWV-3413 (b)], and (c) If the stroke time increases by 50% or more from the previous test, then the test frequency shall be increased to once each month until corrective action is taken [IWV-3 417 (a) ] . Paragraph INV-3417 (b) specifies corrective actions that must be taken.

With reference to (c) above, measuring changes in stroke times from a reference value as opposed to measuring changes from the previous test is an acceptable (and possibly better) alternative.

However, since this is different from the Code requirement, this deviation is documented in the IST Program as an IST Position, i

Most plants have many power operated valves that are capable of stroking in 2 seconds or less. In  !

Os '

these cases, it is difficult to apply the Code criteria for 50% increase of stroke time corrective action requirements. The purpose of that requirement is to detect and evaluate the degradation, but much of the deviation comes from the operator reaction time or timing deviation comes from the operator reaction time or timing device gathering the data from test to test. .In addition, the problem is compounded if the data is

" rounded off" as allowed by the Code. Thus, these results are not beneficial or representative of the actual valve performance.

Power operated valves (Solenoid Operated Valves) with normal stroke times of 2 seconds or less are referred to as " rapid-acting valves." For these valves, the maximum limiting value of full-stroke time is 2 seconds and, upon exceeding this limit, declare the valve inoperable and take corrective action in accordance with IWV-3417(b). Since this is a deviation from the Code requirements, this deviation is documented in the IST Program as an IST Position.  !

O 3-7 Rev. 6

-A i

<g 3.5.3 NRC Generic Letter #89-04. Position #10

(\-} " Containment Isolation Valve Testing" states that Containment Isolation Valve (CIVs) will be conducted pursuant to Appendix J and included in our IST Program. The limitations of Appendix J shall be met and the NRC has determined that 10CFR50 Appendix J requirements are equivalent to ASME Section XI IWV-3421 through 3426 and comply with IWV-3427 (a) . The River Bend Leak Rate Program will provide a more limiting and conservative overall leak rate program. Analysis will be used to determine predicted failures and rat of degradation, if any. Results will be used to enhance predictive maintenance and allow River Bend flexibility in order to comply l with ALARA concerns and maximum utilization of resources. Guidelines wi]l also be set as

}

to maximum allowable predicted leak rate based on past performances. Corrective action shall be taken whenever tested valve exceeds the maximum allowable leak rate as set forth by the River Bend Leak Rate Program (Reference ANSI /ASME OM Code-1990, Section

[~)

s_-

ISTC 4.3).

1 l

l l (N '

x- 3-8 Rev.6 i

j

( j t

O  :

VALVE IST POSITION #3.5.3  !

CONTAINMENT ISOLATION VALVE LISTING i

Subject to Appendix J Leak Rate Testing'  !

i 1B21*VF010A,B 1E12*MOVF008 1G33*MVOF028 ISFC*V101 ,

1B21*AOVF032A,B 1E12*MOVF009 1G33*MOVF034 1SFC*V350  ;

1CCP*V118 1E12*MOVF023 1G33*MOVF039 ISFC+V351

-1CCP*V160 1E12*MOVF027A,B 1G33*MOVF040 1SFC*MOV119 ,

1CCP*MOV138- 1E12*MOVF037A,B 1G33*MOVF053 ISFC*MOV120 l 1CCP*MOV158 1E12*MOVF042A,B,C 1G33*MOVF054 ISFC*MOV121 ,

ICCP*MOV159 1E12*MOVF053A,B 1HVN*V541 ISFC*MOV122 4 1 CMS *SOV31A,B,C,D 1E21*AOVF006 1HVN*V1316 ISFC*MOV139  !

1 CMS *SOV35A,B,C,D 1E21*MOVF005 1HVN*MOV102 1SSR*SOV130  !

1CNS*V86 1E22*AOVF005 1HVN*MOV127 1SSR*SOV131 '

1CNS*MOV125 1E22*MOVF004 1HVN*MOV128 ISVV*V9  :

1CPP*MOV104 1E22*AOVF065 1HVR*AOV165 ISVV*V31 1CPP*MOV105 1E22*AOVF066 1HVR*AOV123 '1SVV*MOV1A,B +

O1CPP*SOV140 1E51*MOVF013 1HVR*AOV128 ISWP*V174 O C11*VF122 1E51*MOVF063 1HVR*AOV166 1SWP*V175 -;

'1C11*MOVF083 1E51*MOVF064 lIAS*V80~ 1SWP*MOV5A,B 1 DER *V4 1E51*MOVF068 lIAS*MOV106 ISWP*MOV81A,B  !

1 DER *AOV126 1E51*MOVF076 1LMS*V12 1SWP*MOV503A,B 1 DER *AOV127 1E51*MOVF077 1LMS*V14 ISWP*MOV507A,B 1DFR*V180 1E51*MOVF078 ILMS*V16 ISWP*SOV522A,B,C,D l 1 DER *AOV101 1FPW*V263 1LMS*V7 1WCS*RV144  :

1DFR*AOV102 1FPW*MOV121 1RHS*V240 1WCS*RV154 i 1E12*VF044A,B 1G33*MOVF001 1SAS*V486 1WCS*MOV172 e 1E12*VF099A,B 1G33*MOVF004 1SAS*MOV102 1WCS*MOV178 1E12*AOVF041C

  • i 1

v 3-9 Rev. 6 )

i l

oW o o IST CilANGE REQUEST FORM ISTCR #:

0002 Department: Phone:

Utte: Requester:

Systems Engineering - IST X 4452 June 6,1994 G. C. Ilockman Affected component (s):

issue date and resision of IST Testing Program for Pumps and Valves:

N/A RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 CR's, Mit's, MWO's:

STP: Relief Requests:

AITeeted Pages: N/A N/A PRR-4 Pump Relief Request No. 4 r--~ ~ ~ __.

_ ,, f~7 Detriled Description of the Requested change:

f f ._. _ ' - --

'~

timiuJe marleJ up copses of the tST Program plan or Rehef Hequest ufapplicabiel r-:: L _.; y. y l

4 JUN 2 3 '94 05 Delete Pump Relief Request No.4 NFR EENO Sten;cy. p.

yC0UNTAStr e m@. W. NOLLED 5

Justification for the Requested Change:

NRC SER dated Oct. 22,1993 (ref. RBC44648) section 31.4, the NRC recommends that Pump Relief Request No 4 as written, be deleted The gauge issue will be addressed by ASME Operation and Maintenance Code-1990.

A n A M27 Y Approved: b knLC [o2%.[6M/9y Reviewed:

itsrens,neeri nasmawr in x < oaua .,.

G Q15 s,.n r ~ J w x tuaa ' ~

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

F

' (CONT.)

PUMP REQUEST FOR RELIEF NO. 4

" DELETED" Reference NRC SEB dated Octocer 22, 1993 (RBC-44645),

se::10n 3.1.4.

I l

{

h

  • 6/6/94 - 0002

s s IST CIIANGE REQUEST FORM ISTCR #: ,

<i' +

0003 ,'.' , p. 4, .

V.g gi x , & >

in " '*

--g -: g-c .

D:te: Requester: Department: Phone:

June 6,1994 C. W. Walling Systems Engineering - IST X 4842 Issue date and resision of IST Testing Prograni for Pumps and Valses: Affected component (s): ,

I E12*MOVF024 A, I E12*MOVF024B, I RilS* V64, IRilS* V65 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 IRilS*V34 Affected Pages: STP: Relief Requests: CR's, M R's, MWO's:

Appendix C, Pages 43,45,47,50 & 52 STP-204-6302 N/A MR 93-0047 Iktriled Description of the Requested change:

t imiude marked up copres of the IsTProgram plan or Reloef Request afappfwablet 1 E12*MOVF024 A,1E12*MOVF024B - Gate valves were replaced by a new type of Butterlly valve - change TYPE ( Append.~x C, pages 43

& 47) from G A to BF.

IRilS*V34, IRilS*V64, IRilS*V65 - the internals were removed from these valves and they should be removed from IST testing, since they no longer perform a safety function -indicate under REMARKS (Appendix C, pages 45,50 & 52), Valve Internals Removed-Not Tested.

J::stification for the Requested Change:

The described change has been implemented by the completion of MR 93-0047. The IST Program needs to be revised to reflect this activity.

Reviewed: Aw/ 8047 W Approved: \d zh[6dIV ISESugwn/nKAllMr5 f asT Engu.ieer / Coordsnator / M M lktel Once completed, submit ic is C Engineer / Coordinator for incorporation Uto ISTPiograme! "'

~~,jgfggs g T {

ce s u-gg 3 'g4 05 gg egg,o t;TATiott CONTROLLED ACCOUNTABLE a RETURNABu:

. - . - _ _ - _ _ - _ - - - - . _ _ . _ _ _ _ _ - - - _ - _ . _ . _ - _ _ - - _ - -- -- -- -,a

IST CIIANGE REQUEST FCAM l

ISTCR #: . , fp g s l 0004 y.m 7 ,

, ye g,+,j - >>

l @ ~

al .

l Dr.te: Requesten Departement: Phone:

June 6,1994 G. C. Ilockman Systems Engineering - IST X 4452 Iswe date and resisioe of IST Testing Program for Punips and Valves: Affected component (s):

II.SV*VI 14, ILSV'V' 20, IEl2*VF085 A, B C & IDFR*VI 18 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP: Relief Requests: ,, 7 CR's, MR%Mwofs:.

Valve Relief Request No. 24 STP-000-3607 VRi v24 (7 "y%_..d6,6,1, ldi4'_ a h1R 89-105 Det iled Description of the Requested change: y 2 j '94 05 i t im lude marked up corses 4the IST Program plan or ReliefRequest ufarpfwable)

RikG EEf 30 OTATIOfI CCNT;iOLLcD Revise Valve Relief Request No. 24 as follows (see attached markup): i ACCOUNTABLE a p;qnpfag Change IE12*VF085A, B, C TYPE from I to 5, and GROUP from 3 to 10. Change ILSV*VI14 and ILSV*V120 TYPE from I to 6, and GROUP from 4 to i1. Add the description under TYPE: 5 - VKS060-A '31* Globe Stop Check valve 600lb SW A105 GR 11 CS body stellited trim bolted bonnet piston type integral seat. Add the description under TYPE: 6 - VCS060-R '4I* Check valve 600lb SW A182 F316 Type 316 SS Body stellited bolted cap piston type renewable seat. Increase the Inspection Schedule for I DFR*VI 18 to include RF-6 &

7. Adjust the Insocction Schedule to ensure groups 3,10 & 11 are scheduled for each refuel outage.

Justification for the Requested Change:

NRC SER dated October 22,1993, Section 3.2.3, para. 4 (ref. RBC-44648) states that, " The licensee should ensure that all valve groupings in this relief request conform to the guidance provided in GL 89-04, Position 2.. " GL 89-04, Position 2 states "The sampling technique requires that each valve in the group be the same design (manufacturer, size, model number, and materials of construction) and have the same service conditions including valve orientation" Based on the review conducted and the disposition of CR 94-0361 the alrected components were improperly grouped. The above stated changes to Valve Relief Request No. 24 make it consistent with NRC GL 89-04. The increase in the inspection schedglgrfor i DFR*VI 18 is due to recommendations made during a prior inspection Reviewed: 7 Wf/ Approved: J t. t u ,' . N/ d -2 @

u f gist Engmeer i Coordmator i KCN / EkteQ gg {! } ISESurrrmd/ WN '!!hieb Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

A A

VALVE REQUEST FOR RELIEF NO. 24 (CONT.)

TYPE 1 - VCS060-A *13* Check valve 600 lb SW SA 105 GR II CS bcdy stellited trim bolted cap piston type integral seat 2 - VCWO15-E *33* Check valve spring loaded 150 lb BW SA105 CS body stellited trim bolted cap piston type renewable seat 3 - VCWO15-D *33* Check valve 150 lb BW A105 GR II CS body stellited trim bolted cap swing type renewable seat 4 - VCS150E *31* Check valve spring loaded 1500 lb SW SAiO5 GB II CS body stellited trim welded cap piston type integral seat 5 - VKS060-A *31* Globe stop check valve 600 lb SWA105 GR II CS

() body stellited trim bolted bonnet piston type integral seat 6 - VCS060-R *41* Check valve 600 lb SW A182 F316 Type 316 SS body stellited trim bolted cap piston type renewable seat Note 1: For these check valves between line-fill pumps and the process lines only one of the pairs of valves (i.e. VF084A and VF085A) is required to be disassembled, inspected and exercised. However, if the valve tested fails, then both of the valves in the pair need to be disassembled, tested and reworked if necessary.

g 6/7/94 - 0004

l 1

t ,

s  !

l

/) VALVE REQUEST FOR RELIEF NO. 24 (CONT.)

V VALVE LIST INSPECTION VALVE TYPE SIZE GROUP SCHEDULE 1CCP*V337 1 2" 1 RF-6,8 1CCP*V338 1 2" 1 RF-5,7 l 1DFR*V78 2 4" 2 RF-5,8 l 1 DER *V79 2 4" 2 RF-6 1DFR*V87 2 4" 2 RF-7 1DFR*V88 2 4" 2 RF-5,8 1DFR*V97 2 4" 2 RF-6 1 DER *V98 2 4" 2 RF-7 1DFR*V107 2 4" 2 RF-5,8 1DFR*V108 2 4" 2 RF-6 1 DER *V117 2 4" 2 RF-7 -

1 DER *V118 2 4" 2 RF-5,8,6,7 1DFR*V127 2 4" 2 RF-6 1 DER *V128 2 4" 2 RF-7 1E12*VF084A (Note 1) 1 1.5" 3 RF-5,8 1E12*VF084B (Note 1) 1 1.5" 3 RF-6 1E12*VF084C (Note 1) 1.5" RF-7

()

~ 1 3 1E12*VF085A (Note 1) 5 1.5" 10 RF-6 lE12*VF085B (Note 1) 5 1.5" 10 RF-7 1E12*VF085C (Note 1) 5 1.5" 10 RF-5,8 lE51*VF030 3 6" 6 RF-5,6,7,8 1HVK*V48 1 2" 1 RF-7 1HVK+V97 1 2" 1 RF-5,8 1LSV*V12 1 1" 4 RF-7 1LSV*V35 1 1" 4 RF-5,8 1LSV*V36 4 1" 9 RF-6,8 ILSV*V42 1 1" 4 RF-6 1LSV*V46 1 1" 4 RF-5,8 ILSV*V72 4 1" 9 RF-6,8 ILSV*V76 4 1" 9 RF-5,7 1LSV*V90 4 1" 9 RF-5,7 1LSV*V114 6 1" 11 RF-6 1LSV*V120 6 1" 11 RF-7 ISVV*V122 1 1.5" 5 RF-5,6,7 ISVV*V123 1 1.5" 5 RF-5,6,7 ISVV*V129 1 1.5" 5 RF-5,6,7 ISVV*V130 1 1.5" 5 RF-5,6,7 1SSR*V705 1 1.5" 7 RF-5,6,7,8 6/7/94 - 0004 V

4

s IST CIIANGE REQUEST FORM ISTCR #: .

0005

, y u;; ,

Requester: Department: Phone:

D:te:

James K. Roberts Engineering: Mech / BOP X 4554 6/6/94 issue dite and resision of IST Testing Pavgram for Pumps and Vahes: Affected component (s):

ISVV*SOV20A,20B,21 A,21B,22A, & 22B RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP- Relief Requests: CR's, MR's, MWO's:

Affected Pages::

STP 202-6604 N/A MR 91-0001,i CN #9 IST Plan, App. C, Pages 17 & 18

~ ~ ', - y..-

Det iled Description of the Requested change. E I . ._ . *u jg t im-Inde marked up cop,es of she ISTProgram plan tw Reluf Request ofappiscublet . _

~3 2 3 'g4 05 l Delete the listed components from the IST Plan, Appendix C (valves) muna ese cTi m N - - :1 rm c 'OD ACCOUNTABLE s KETUhBt !i Justification for the Requested Change:

The listed valves have been removed from the ASME program by MR 9I-0001 (specifically FCN #9)

Reviewed: M 8. uf Approved: w al _ 21/6 7W asr e.,,,,,eer wn-s.mna ra w n>aseo () g ja,,..,:u:(oasa i Once completed, subnut to IST Engineer / Coordinator for incorporation into IST Program

TO: Controlled Copy Holders ofIST Pump and Valve Program manual.

Please insert the attached changes into your manuals as follows:

1. Add the divider labeled "ISTCRs" to the back of the Manual (Controlled Copy Holders No's. 20 & 21 ignore this step dividers are in place).
2. ISTCR #00'36 - In Appendix C, remove and replace page 25 of 105;In Appendix D, remove and replace Cold Shutdown Justification Request No. 63; place ISTCR #0006 in the back of the manual.
3. ISTCR #0007 -In Appendix C, remove and replace page 59 of 105; In Appendix D, insen Cold Shutdown Justification Request No's.

66 & 67; place ISTCR #0007 in the back of the manual.

4. ISTCR #0008 - In Appendix C, remove and replace pages 23 & 27 of 105; In Appendix D, insert Cold Shutdown Justification Request No's. 68 & 69; place ISTCR #0008 in the back of the manual.
5. ISTCR #0009 - In Appendix B, remove and replace Pump Relief Request No.14.; place ISTCR #0009 in the back of the manual.
6. ISTCR #0010 - In Appendix C, remove and replace page 2 of 105; place ISTCR #0010 in the back of the manual.

l 1

l

p p p z' -

N O ENTERGY OPERATIONS G

R EC EIV t~ ,

DATE H,O L D E R *t j SUG 1219f4 Al!G18 '94 05 S D C' IST CIIANGE REQUEST FORFI RIVER GEt/c STATIOkJ CONTROLLED

~

  • 'i " " " ~ ' ~

i *' ~  %

ISTCR #:  ! x.

~

R$~$ Ni?; Ee'ib? ,< . . . . .

w + MA { Y$mo F +, ?W

',sRNyfhQ g[g- gh3

~ '

0006 f, ' *'i I f. gt  : EMq"S"

. yy

~*

{ g' gyn - @.E s 4d ' y tg ,  ;,gs + yfgg Date: Requester: Department: Phone:

l June 8,1994 G. C. Hockman Systems Engineering - IST X 4452 1ssue date and revision of IST Testing Pavgram for Pumps and Valves: Affected component (s):

ISWP*MOV57A & ISWP*MOV57B RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP: Relief Requests: CR's, M R's, MWO's:

Appendix C , page 25 (ISTCR #

000l- 6/1/94) STP-256-3301 & STP-256-3302 Cold Shutdown Justification No. 63 N/A Detailed Description of the Requested change:

tinclude marked up cornes of the ISTProgram plan or RebefRequest ufappbcable)

Change Appendix C, page 25, valves ISWP*MOV57A & B, TEST INFORMATION (Freq.) from RF to CS.

Justification for the Requested Change:

Frequency is during Cold Shutdown in accordance with Cold Shutdown Justification No. 63, and also as identified in STP- 256-3301 & 256-3302.

Reviewed: d C _ W L _- /oWF / t ' 4 - tv Approved: ' me chla f99tf?-X-9ff (ISTEngsneer / Coordtnator /iCN/Date) / } (SESupervus//KCV&te)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

[ . .

i

&) RIVER BEND $TATION INSERVICE TEST PLAN -VALVES Pa e 25 er i0s UTERGY APPENDIX C l

System Alpha: Paae Rev. Date ISTCR #: System Name:

j P&!O Svstem #:

9 108 118 SWP 7/26/94 0006 SERVICE WATER - NORMAL l

VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat. Size Type Act- Posities Dws. Type Frog. Relief l Class Ga.) setw Nwmall Safety Cowd.

ISWP*MOV27A 3 8 6 BF M0 O O&C M 19 FSE Q Pl RF ISWP*MOV27B 3 B 6 BF M0 C O&C J-20 FSE Q P! RF 1SWP*MOV27C 3 8 6 BF M0 O O&C L-19 FSE Q Pl RF ISWP*MOV270 3 B 6 BF M0 C D&C H-20 FSE O Pi RF ISWP'MOV506A 3 B 8 BF M0 O D&C N-5 FSE Q PI RF ISWP'M0V5068 3 8 8 BF MD 0 O&C N-2 FSE Q PI RF ISWP'M0Y57A 3 B 30 BF M0 O C A-16 FSE CS 63 Pi RF ISWP*MOV578 3 8 30 BF M0 O C C 15 FSE CS 63 Pl RF ISWP*MOV77A 3 B 8 BF M0 O O&C P-7 FSE Q PI RF

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 63 COMPONENT: FUNCTION CLASS CATEGORY F

1SWP'MOVF057A Standby Service Water supply header 2 C .

ISWP')WOVF057B - isolation with Normal Service Water TEST Per IWV-3411 and IWV-3521, Category B valves shall be exercised REOUIREMENT: at least once every three months, i

BASIS FOR Stroke tmung and exercise testmg of these valves during cold RELIEF shutdown would require a RHR loop to be inoperable which would  !

result in a Technical Specification Limiting condition for Operation, and would disrupt Nonnal Service Water to operatmg equipment.

t ALTERNATE Full-stroke exercise and time valves at cold shutdown when service  !

TESTING: water loads are nummal and at every refueling outage. i

\

l i

l i

1 l

_J/26/94 - 0006

^ '

~'i ENTERGY OPERATIONS

{ /T (Q r-e actosan s V 05 RECEIVED MGI S '94 IST CHANGE REQUEST FORM

~ .- AUG 1 91994 gfp gj y yggy g55q:9-3 '. W]jy*Qij" ^

~

ISTCR #: hCCOUNYJ t ~~ di RETURNAEl.EP - pig .

s m ggjuW 5 ni M' i'$$ gig%sp MU P g[%dM m% jk]$4 Ni '"eMb 45M

~

EMU tUU/

ge VEWOFer%[PbEDNg

  • F Mh dWd%"u '

Date: Requester: Department: Phone:

June 30,1994 Jr. Victory Systems Engineering - IST X 3632 Affected component (s): I Issue date and ruision of IST Testing Program for Pumps and Valves:

lE51*VF030; lE51*VF040; 1E51*VF079 & IE51*VF081; RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 IE51*VF061 Affected Pages: STP: Relief Requests: CR's, M R's, MWO's:

Appendix C, page 59 of 105 N/A VRR-24; VRR-66; VRR-67 N/A Detailed Description of the Requested change:

qincluJe markeJ up copres ofthe ISTProgram plan or RebefRequen sfapphcable)

In appendix C (IE51 *VF030), add VRR-24 to the Relief column to justify the RF frequency . In appendix C (IE51*VF040), delete C from the Safety (Position) column, FSE from the Type column and CS from the Freq. column. Add Valve Relief Request No. 66 & 67 to appendix C & D to provide justification for testing the valves at cold shutdown instead of quarterly in the River Bend Station Pump and Valve Inservice Testing program (IE51*VF079 & IE51*VF081; IE51*VF061)

Justification for the Requested Change:

To identify the applicable relief request number in appendix C for IE51 *VF030. The appropriate safety position for IE51*VF040 is "Open" 1E51 *VF061,1E51*VF079 & IE51*VF081 are actually tested on a cold shutdown frequency without properjustification documented in the IST program.

Reviewed: [ vM _m tlST Engtneer / Coordu nator / KCN / Date)

OMI de/f/ Approved: m de'./a/n/7-d6-97

'(SE Super /sor/KCh/Date)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

g p RIVER BEN TATION INSERVICE TEST PLAN -VALVES p, , ios ENTERGY APPENDIX C P&i0 Ststem #- System Alpha: Paos Rev. Date ISTCR #: C< stem Name:

27-EA 209 ICS ,7126/94 0007 REACTOR CORE ISOLATION COOLING VALVE INFORMATION TEST INFORMATION REMARKS ,

Mark Nember Q Cet Size Type Act- Positime Dws. Type Freq. Relief l

Cless Gaj metw Nwmall Safety coord.

1E51*MOVF077 2 A 1.5 GL M0 O D&C G 11 FSE Q Pl RF LR RF 10 CFR 50 APP.J Test 1E51*MOVF078 2 A 2.5 GL M0 0 0&C G-13 FSE Q PI RF LR RF 10 CFR 50. APP.J Test 1E51*RVF018 2 C 1.5 RV SA C D&C P-2 SP RF2 125 psig IE51*VF011 2 C 6 CK SA C 0&C B9 FSE Q 1E51*VF030 2 C 6 CK SA C O&C A 11 FSE RF 24 1E51*VF040 2 C 12 CK SA C 0 F-10 FSE Q 1E51*VF061 2 C 15 CK SA 0 C C-8 FSE CS 67 0 FSE Q 1E51*VF079 2 C 1.5 CK SA C 0 G-11 FSE CS 66 1E51*VF081 2 C 1.5 CK SA C 0 G 12 FSE CS 66 11CS*V21 2 C 2 CX SA C 0 M-11 FSE Q

A

,q

< COLD SITUTDOWN JUSTIFICATION REOUEST NO. 66 Q,) ~

COMPONENT: FUNCTION CLASS CATEGORY lE51*VF079 RCIC Steam line cxhaust vacuum 2 C IE51*VF081 breaker check valves TEST REOUIREMENT: Full-stroke exercise valves to the open and closed positions quarterly.

BASIS FOR JUSTIFICATION: These valves open to relieve a vacuum in the RCIC steam exhaust line to prevent the steam exhaust line from filling with suppression pool water which would eventually trip the RCIC turbine. There is no external / remote means to verify valve position during system operation or an external means to cycle these valves.

These valves have a safety function in the closed position to prevent

,_D back flow of RCIC turbine exhaust steam through the vacuum

('

breaker line. Back flow of steam through this line would allow steam to be discharged directly to the suppression chamber atmosphere without quenching. Steam exhaust below the surface of the suppression pool is necessary to limit the increase in suppression pool temperature and pressure. Containment response calculations are based on the assumption that all steam will be condensed in the suppression pool.

i Testing these valves encompo:=: &sure of the automatic isolation j valves (lE51*F077 and IE51*F078)in conjunction with opening the I test / vent valvea located between them. This activity would limit l these penetrations with only one containment isolation valve which is a breach of primary containment and during reactor operation would require the applicable unit to be shut down.

1 ALTERN.6TE ]

TESTING: Full stroke exercise valves to the open position and Reverse flow test to the closed during cold shutdown.

/N 7/26/94 - 0007 :

l.

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 67 COMPONENT: FUNCTION CLASS CATEGORY lE51*VF061 RCIC System Keep-fill pump discharge 2 C check valve 4 i-TEST REOUIREMENT: Full-stroke exercise valves to the closed position quarterly.

l BASIS FOR d

JUSTIFICATION: This valve opens to ensure the RCIC system is filled to reduce the lag l time between pump start-up and attainment of full flow into the  !

reactor vessel and to eliminate the possibility of RCIC pumps  !

discharging into a dry pipe and minimizes water hammer effects _l during injection into the reactor vessel. Additionally, this valve is to - l close to prevent diversion of flow during the time the RCIC pump is in operation.

O Testing this valve in the closed direction encompasses stopping the keep-fill pump and applying reverse flow to verify valve closure.

This activity could cause a void in the RCIC discharge line introducing the possibility of a water hammer in the event of a RCIC initiation.

ALTERNATE TESTING: Reverse flow test the valve during cold shutdown.

4 7/26/94 - 0007

'O

__m______________________m.___________ _ _ _ __ _

r~s _

,s , _s W

( ' ,/

Rs ,dlV E D -

IST CIIANGE REQUEST FORM AUG 121994 ISTCH #: ,

4 p, y 7 9 .j @; i 1
'j[fg 0008 y% []*%l '

. . , A s @ g' ' ' i ; I

  • - 1%{mng NJ>+
h. g

. .N g  ; ~~

in . g ,s g D te: Requester: Department: Phone:

July 6,1994 Jr. Victory Systems Engineering - IST X 3632 I

Issue date and resision of IST Testing Program for Pumps and Valves: Affected component (s):

1 SWP*V201, ISWP*V202, ICCP*hiOV129, ICCP*MOV130,.

RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 ICCP*MOV16A, ICCP*MOVl6B, ICCP*hiOV335 &

ICCP*MOV336 Affected Pages: STP: Relief Rcquests: CR's, MR's, MWO's:

Appendix C, page 23 & 27 of 105 N/A VRR-68 & VRR-69 N/A Detailed Description of the Requested change:

(!ncluJe marked up cornes ofthe IST Program plan or RehefRequest ofappbcable)

Add Valve Relief Request No. 68 & 69 to appendix D to providejustification for testing the valves at cold shutdown instead of quaretriy in the River Bend Station Pump and Valve Inservice Testing program.

.!ustiGcation for the Requested Change:

The valves are actually tested on a cold shutdown frequency without proper justification documented in the IST program.

Reviewed: 2Z _L_ orW M/s Approved: m1 Mw .;Lh/7-14 W (ISf Engineer / CoorJmator / KCN / Datei } (SESuperuEor/KCNlDate)

Once completed, submit to IST Engineer / Coordinator for incorporation Mc '""Ch"m 7E RDY OPERATIONS DATE HOLDER #

AiE18 '94 05

_ ri : IND STATION CONTROLLEO

[ '"r CUNTABLE & RETURNASLE

A O O O g p RIVER BEND STATION INSERVICE TEST PLAN -VALVES esse 23 ef iOS

~

ENTERGY APPENDIX C P&l0 System #: System Alpha: Paae Rev. Date ISTCR #- System Name:

91B 115 CCP 7/26/94 0008 CLOSED COOLING WATER REACTOR PLANT val.VE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cet. Size Type Act- Peeition Dws. Type Freg. Relief l

Class Gaj meter Normell Safety Coord.

ICCP'MOV129 3 B 12 BF M0 O O&C N-16 FSE CS 68 PI RF 1CCP*MOV130 3 B 12 BF M0 O O&C J-16 FSE CS 68 PI RF ICCP'MOV163 3 8 2 GL M0 0 C M-7 FSE CS 14 PI RF ICCP*MOV169 3 8 2 GL M0 O C M7 FSE CS 14 PI RF ICCP*MOV16A 3 B 12 BF MD 0 D&C J-2 FSE CS 68 PI RF 1CCP*MOV168 3 B 12 BF M0 O O&C L-8 FSE CS 68 Pl RF ICCP'MOV335 3 B 12 BF M0 O O&C J 16 FSE CS 68 Pl RF 1CCP'MOV336 3 B 12 BF M0 O O&C N-15 FSE CS 68 Pl RF 1CCP*V72 3 C 12 CK SA 0 C L-8 FSE CS 15 1CCP*V73 3 C 12 CK SA 0 C J3 FSE CS 15 ICCP*VB3 3 C 1.5 CK SA 0 0 L-15 FSE Q

r ,.

O

~N RIVER BEND STATION INSERVICETESTPLAN VALVES p,7;j ,ius E GY APPENDIX C P&l0 System #: System Alpha: Paas Rev. Date ISTCR #: Svstem Name:

9-108 118 SWP 7I26/94 0008 SERVICE WATER NORMAL VALVE INFORMATION TEST INFORMATION REMARKS Mark Number Q Cat. Site Type Act- Pesities Dws. Type Freq. Relief g Class (in) unter Normal l Safety Coord. j 1SWP*V155 3 C 6 CK SA C C J-18 FSE Q ISWP*V156 3 C 6 CK SA C C G-18 FSE Q ISWP*V201 3 C 8 CK SA 0 0&C M-6 FSE CS 69 ISWP*V202 3 C 8 CK SA 0 O&C M1 FSE CS 69 ISWP*V326 3 C 30 CK SA 0 C A 16 FSE RF 58 ISWP*V327 3 C 30 CK SA 0 C C-16 FSE RF 58

. ~ _ _ _ _ _ _ _

+ ,; ,

i

)

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 69

.s .

COMPONENT: FUNCTION CLASS CATEGORY i

ISWP*V201 These valves open to allow service wat 3' C  ;

ISWP*V202 flow through the Diesel Generator Coolers and close to prevent diversion l service water flow through an inactive cooler.

IES.T_

REOUIREMENT. Full-stroke exercise valves to the open and closed position quarterly. l t

BASIS FOR JUSTIFICATION: Reverse flow testing these valves quarterly would require isolating .

service water flow to the applicable Standby Diesel Generator ,

Cooler. The interruption of service water flow to the cooler could t cause damage to the diesel in the event of a diesel start.

O ALTERNATE TESTING: Reverse flow test to the closed position during cold shutdown.  ;

l l

I 7/26/94 - 0008 O -

\

o w w - . , ~ - ,p

e . .1 i

73 COLD SHUTDOWN JUSTIFICATION REOUEST NO. 68 . 1 V

COMPONENT: FUNCTION CLASS CATEGORY ICCP*MOV16A & These valves isolate the safety related 3 B ICCP*MOV129 portion of the system from the non-saf ICCP*MOV130 related portion.

ICCP*MOV335 ICCP*MOV336 TEST REOUIREMENT: Full-stroke exercise valves and stroke time to the closed position quarterly.

BASIS FOR JUSTIFICATION: These valves are normally open to allow flow of Component Cooling Water to the Fuel Pool Cooler and to provide bearing cooling water to the RHR pumps. Their safety function is to close on Reactor Plant n

V Component Cooling Water (RPCCW) extreme low pressure to protect the safety related portion of the system. Additionally, the closure of these valves allows the Stand-by Service Water system to provide cooling water flow to the safety related portion of the system.

Testing these valves during operation would cause a loss of component cooling water flow to the RHR Motor Bearing Coolers and the Fuel Pool Coolers. The failure of any one of these valves to reopen after stroking would result in a complete loss of cooling to the associated safety related component and/or initiation of the Stand-by Service Water system.

ALTERNATE l TESTING: Full-stroke exercise and stroke time valves to the closed position

)

during cold shutdown.

7/26/94 - 0000 ,

%/

~

4 yq , - , ,c.

,/

RECEIVED AUG 121994 IST CIIANGE REQUEST FORM q n e' ISTCR #: Q LF ; .

jyg ' "'^*~ ~

, g 0009 Q'..> ' uan 7;,..

-9 . . in , J_

'~ ^

x -

'un g .. ._

~ M4 w

[gg^ ^ ;, '

EM T: s x

. g/ af&g ^ , t'

~ F#+ '

s

^

Date: Requester: Department: Phone:

l July 6,1994 G. C. Hockman Systems Engineering - IST X 4452 1ssue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

N/A RBS ist Ten Year Intenal - IST Plan - Rev. 6 - Issued 1/29/93 AITected Pages: STP: Relief Requests: CR's, M R's, MWO's:

Pump Relief Request No.14 N/A PRR-14 N/A Detailed Description of the Requested change:

(include marked up copues of the ISTPregram plan or ReliefRequest ofappbcoble)

Delete Pump Relief Request No.14 Justification for the Requested Change:

Delete per NRC SER dated 11/30/93 (reference page 2, para. 3.0).

Reviewed - I _- oe// <de J/ Approved: ,/ ,Z 07S./ f fV (IST Engsneer / Coordinator / KCN / Datei Y

} 'NupervssodKCN/Dati) '

1 Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program l

l l ENTERGY DATE OPERATIONS HOLDER #

ElB S4 05

' Q jgmgggmgh$

? 4 LOO 10 d' AC: &FETURNABLE]

p, m agiLjl7JT f3 , / ygg.jp W ,

's @cMg'W*Me[WMfpd%

%g%$$d q g ViggW Date: Requester: Department: Phone:

July 8,1994 Jr. Victory Systems Engineering - IST X 3632 Issue date and revision of IST Testing Prvgram for Pumps and Valves: Affected component (s): i ICl l *Vi l4, ICl l *V138 RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP: Renief Requests: CR's, M R's, MWO's:

Appendix C, page 2 of 105 N/A VRR-33 N/A Detailed Description of the Requested change:

t include marked up eques gshe ISTProgram plan or RehefRequest ufapp!scable)

The Safety Position for valve ICI 1 *VI14 sh'ould be O&C instead of O. USAR, paragraph 4.6.1.1.2.4.2.5 indicates that these valves also have a safety function in the closed direction to prevent the pressurized water in the scram discharge volume from interfering with rod movement.

Relief Request No. 33 and Generic Letter 89-04 allow the current methodology for fonvard and reverse flow verification.

The test frequency for valve ICI1 *V138 should be V instead of Q and Relief Request No. 33 should be referenced for this code deviation.

Justification for the Requested Change:

ICI 1 *VI 14 is actually tested both open and closed by using the testing methodology specified in the Technical Specification. The valve table should be changed to indicate verification of both safety functions.

ICI 1 *V138 is actually tested on a frequency as specified in the Technical Specification and allowed by position 7 of Generic Letter 89-04. It is impractical to test this valve quarterly as indicated in the current valve tables. Relief Request No. 33 states that this valve will be tested on the same frequency as the Air Operated Valves as specified by the Technical Specifications.

Reviewedd.8(ISt EngmeerZ_Op# r,de/d4 Approved: paa M /oSh[7-)6- fv

/ Coordmator / KCN / Date) // 'Supervssor/KCNIdate)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

f'~$ (7 V \ .I i. <

& RIVER BEND STATION e2eiiO5 S53 It! SERVICE TEST PLAN . VALVES hacy APPENDIX C P&l0 System #: System Alpha: Pace Rev. Date ISTCR #- Svstem Name:

36-1C 052 RDS 7/26/94 10 CRD HYDRAULIC VALVE INFORMATION TESTINFORMATION REMARKS Mark Number Q Cat. Size Type Act- Position Dws. Type Freq. Relief {

Ciss: Gaj sator Nwmall Safety Coord.

IC11*A0V126 2 B  ! GA A0 C 0 E-7 FSE V 33 Scram Test 145 ea.

FS V IC11*A0V127 2 B 3/4 GA A0 C 0 F-9 FSE V 33 Scram Test 145 ea.

FS V 1C11*A0VF010 2 B 1 GL A0 0 C H 16 FSE Q FS Q Pl RF IC11*A0VF011 2 B 2 GL A0 0 C A-17 FSE Q FS Q PI RF 1C11*A0VF180 2 B 1 GL A0 0 C H-17 FSE Q FS Q PI RF 1C11*A0VF181 2 B 2 GL A0 0 C A-18 FSE Q FS Q PI RF I

1C11*V114 2 C 314 CK SA C O&C F9 FSE V 33 Scram Test 145 ea.

l l 1C11*V115 2 C 1/2 CK SA C C 0-7 FSE V 33 Scram Test 145 ea.

l LR RF Special Leak Test IC11*V138 2 C II2 CK SA 0 C 0-7 FSE V 33 Scram Test 145 ea.

F T

TO: Controlled Copy Holders ofIST Pump and Valve Program manual l LJ Please insert the attached changes into your manual.

i

1. ISTCR #0011 - In Section 3, replace page 3-10; Appendix C, remove and replace pages 104 and 105 of 105;In Appendix D, remove and replace Valve Relief Request No.

65; place ISTCR #0011 in the back of the manual.

2. ISTCR #0012- In Appendix D, remove and replace Cold Shutdown Justification No. 34; place ISTCR #0012 in the back of the manual.
3. ISTCR #0013 - In Appendix C, remove and replace pages 9,10 and 20 of 105;In Appendix D, remove and replace Cold Shutdown Justification No. 39; place ISTCR #0013 in the back of the manual.

l

4. ISTCR #0014 - In Appendix C, remove and replace page 83 of 105; place ISTCR #0014 in the back of the manual.
  • *
  • NOTE * * *

+

Pages 85,86 & 88 of105 have been incorporated into ISTCR #0015.

5. ISTCR #0015 -In Appendix C, remove and replace pages 4, 5, 21, 29, 31, 36, 38, 61, 73, 84, 85, 86, 88, 97, 98 and 100 of 105;In Appendix D, remove and replace Cold Shutdown Justification No.s 14,16,37,52 & 54 ; place ISTCR #0015 in the back of the manual.
  • *
  • NOTE * *
  • Page 3 of 105 has been incorporated into ISTCR #0024.

Page 39 of 105 has been incorporated into ISTCR #0016.

Page 62 of105 has been incorporated into ISTCR #0018.

6 ISTCR #0016-In Appendix C, remove and replace page 39 of 105; place ISTCR #0016 in the back of the manual.

7 ISTCR #0017- In Appendix C, remove and replace page 64 of 105; place ISTCR #0017 in the back of the manual.

~

ENTERGY OPER4TIONS P * - '~ HOLCCRff E26 '94 72 RIVE. .u STATION CONTROLLE.D ACt ;NTASLE & RE TURNASLE j

- . - .~ . . . ..

2 of 2 e

8. ISTCR #0018- In Appendix C, remove and replace page 62 of 105; place ISTCR #0018 in the back of the manual.

- ('

9. ISTCR #0019-In Appendix C, remove and replace page 60

~ of 105; I place ISTCR #0019.in the back of the manual.

10. ISTCR #0020- In Appendix C, remove and replace page 22 of 105; place ISTCR #0020 in the back of the manual.
11. ISTCR #0021- In Appendix C, remove and replace page 55 of105; place ISTCR #0021 in the back of the manual.
12. ISTCR #0022-In Appendix C, remove and replace page 80 of 105; place ISTCR #0022 in the back of the manual.-

1

13. ISTCR #0023-In Appendix C, remove and replace page 56 of 105; place ISTCR #0023 in the back of the manual.

14 ISTCR #0024 - In Appendix C, remove and replace page 3 of105;In Appendix D, remove and replace Interim Valve Relief Request VRR-I-01 and add Cold Shutdown Justification  ;

No. 70; place ISTCR #0024 in the back of the manual. .

i v .

I j

y p . .

O.

IST CIIANGE REQUEST FORM I~

Date: Requeste:. Department: Phone:

June 24,1994 G. C. Hockman Systems Engineering - IST X 4452 issue date and revision of IST Testing Pmgram for Pumps and Valves: Affected component (s):

RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 ISSR*V706, ISSR*SOV133, I SSR*SOVl 34, ISSR*SOV140 Affected Pages: STP Change Req'd: Relief Requests: CR's, M R's, MWO's:

Section 3, page 3-10; Valve Relief Request No. 65; Appendix C, N/A VRR-65 CR 92-280 pages 104 & 105 of 105 Detailed Description of the Requested change:

linclude marked up copues ofthe JSTProgram plan or RehefRequest ufapphcable)

Delete Valve Relief Request No. 65. Add the affected valve numbers to " VALVE IST POSITION # 3.5.3, CONTAINMENT ISOLATION VALVE LISTING"(page 3-10). Change (pages 104 & 105) the valve CATEGORY for V706 from C to A/C, and SOVs 133,134 &l40 from B to A and add the requirement to perform Leak Rate Testing per 10CFR50 Appendix J. Change the FREQ. for valve V706 (page 105) from RF to Q.

Justification for the Requested Change:

Delete VRR-65 per NRC SER dated 10/22/93 (reference pages 8 & 9, para. 4.1.3 & 4.1.4). ASME Section XI, Article IWV-3420 Valve Leak Rate Test states that Category A valves shall be leak rate tested. The River Bend Pump and Valve Inservice Testing Program requires leak rate testing to be performed in accordance with 10CFR50 Appendix J . Since these valves will now require leak rate testing to be performed then ~

they should specify the proper Valve Category and Test Type.

[ d, j 09 # dr//p Approved:  %

3 , J , , / c G9(,[ 8- % Q </

Reviewed s (IST Engmeer / Coordmator / KCN / Date) (/ ISE Qervuser/KCN/ bate)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program l

l

VALVE IST POSITION # 3.5.3 3 CONTAINMENT ISOLATION VALVE LISTING (G

Subject to Appendix J leak Rate Testing IB21*VF010A,B IE12*MOVF009 IG33*MOVF039 ISFC*MOV119 1B21*AOVF032A,B IE12*MOVF023 IG33*MOVF040 ISFC*MOV120 ICCP*Vil8 IE12*MOVF027A B IG33*MOVF053 ISFC*MOV121 ICCP*V160 IE12*MOVF037A,B IG33*MOVF054 ISFC*MOV122 ,

ICCP*MOV138 IE12*MOVF042 A,B,C IHVN*V541 ISFC*MOVl39 ICCP*MOV158 IE12*MOVF053A,B lHVN*V1316 ISSR*SOV130 ICCP*MOVl59 IE21*AOVF006 IHVN*MOV102 ISSR*SOV131 1 CMS *SOV31 A,B,C.D IE21*MOVF005 IHVN*MOV127 ISSR*V706 1 CMS *SOV35A,B,C D IE22*AOVF005 IHVN*MOV128 ISSR*SOV133 ICNS*V86 IE22*AOVF065 IHVR*AOV123 ISSR*SOV134 1CNS*MOV125 IE22*MOV004 IHVR*AOV128 ISSR*SOV140 ICPP*MOV104 IE51*AOVF066 IHVR*AOV165 ISVV*V9 1CPP*MOV105 IE51*MOVF013 IHVR*AOV166 ISVV*V31 1CPP*SOV140 IE51*MOVF063  !!AS*V80 ISVV*MOVI A,B ICll*VF122 IE51*MOVF064 IIAS*MOV106 ISWP*V174 1Cll'MOVF083 IE51*MOVF068 ILMS*V7 ISWP*V175 1 DER *V4 1E51*MOVF076 ILMS*V12 1SWP*MOVS A,B IDER*AOV126 IE51*MOVF077 ILMS*V14 ISWP*MOV81 A,B  !

IDER*AOV127 IE51*MOVF078 1LMS*V16 1SWP'MOV503 A,B 1DFR*V180 IFPW*V263 1RHS*V240 ISWP'MOV507A,B IDFR*AOV101 1FPW'MOV121 ISAS*V486 1SWP*SOV522A,B,C,D O IDFR*AOV102 IG33*MOVF001 ISAS*MOV102 IWCS*RV144 V IE12*VF044A B IG33*MOVF004 ISFC*V101 IWCS*RV154 lE12*VF099A,B IG33*MOVF028 ISFC*V350 IWCS*MOV172 IE12*AOVF041C IG33*MOVF034 ISFC*V351 IWCS*MOV178 f IE12*MOVF008 j 08/04/94 - 0011

~

3 - 10 0 .

O. O O

g~

RIVER BEND STATION INSERVICETESTPLAN VALVES bGY APPENDIX C System t System Aishe- ISTCR t System Name:

P&E @ Rev. Date 21-28 610 SSR Bi4/94 0011 SAMPLING REACTOR PLANT VALVE INFORMATION TEST INFORMATION REMARKS Werk Numbw Q Cet. Sies Type Act. Peeities Dws. Type Freq. Helief Class gej unter Normell Safety Cowd.

ISSR*SOV130 2 A 112 GL SO C C L-la FSE Q C FS Q PI RF LR RF 10 CFR 50, APP.J Test 1SSR*SOV131 2 A 1/2 GL SD C C L 17 FSE Q C FS Q PI RF LR RF 10 CFR 50. APP.J Test ISSR*SOV133 2 A 344 GL S0 C C N-18 FSE Q C FS Q PI RF LR RF 10 CFR 50. APP.J Test 1SSR*SOV134 2 A 3/4 GL SO C C N-17 FSE Q C FS Q PI RF LR RF 10 CFR 50. APP.J Test 1SSR*SOV139 2 A 1 GL SG C C G-16 FSE Q C FS Q PI RF LR RF 10 CFR 50, APP.J Test ISSR*SOV140 2 A 1 GL SO C C F 16 FSE G C FS Q Pt RF LR RF 10 CFR 50, APP.J Test 1SSR*V705 2 C 1 CK SA C 0 G-17 FSE RF 24

i

(

a-

\

o O g~ -

RIVER BEND STATION INSERVICE TEST PLAN -VALVES

,,,,i,,,,, i ENTERGY APPENDIX C System Name:

M P Eystem f: System Aishe- Pass Rev. Date ISTCR F-21 28 610 SSR 8i4/94 0011 SAMPUNGREACTOR PLANT l VALVE INFORMATION TEST INFORMATION REMARKS Mart Number Q Cat. Stre Type Act- Peeities Dws. Type Frog. .Helief ,

Claes Os) seter Nonsell safety Ceerd.

ISSR*V706 2 Alt 1 CK SA C 0 F 16 ISE Q LR RF 10CFR50. APPEND 1X J TEST

VALVE REOUEST FOR RELIEF NO. 65 Deleted per NRC SER dated 10/22/93 (reference pages 8 & 9, para. 4.1.3 & 4.1.4).

O i

8/04/94 - 0011 4

O

p p t '

d- d v IST CIIANGE REQUEST FORM ISTCR #: llyg {Mgl g@M@ eg;t iq$jEP7 3; ::

12 g}ggggg%g$$g$g@g$iftMR;MMM$fjgjgggggggggggg'R$g[gg j

Date: Requester: Department: Phone:

Julyl 5,1994 Jr. Victory Systems Engineering - IST X 3632 issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ISVV*V121 & ISVV*V128 RI3S lst Ten Year Intetval - IST Plan - Rev. 6 - Issued 1/29/93 Arrected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix D, CSJ-34 N/A CSJ-34 N/A Detailed Description of the Requested change:

tinclude marked up copoes of the ISTProgram plan or ReitefRequest afappiscable)

Change the category of the valves listed on Cold Shutdown Justification (CSJ-34) from AC to C only.

Justification for the Requested Change:

The valves are actually reverse flow tested closed on a cold shutdown frequency. They do not require leak testing and therefore should be identified as category C not AC.

Reviewed: . . w 09M '

Approved: ym od+!orm/pez</y (IST Engtneer / Coordinator /KCN/ Date) G E5mpervuorlKCV/Darf}

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 34

/'

COMPONENT FUNCTION CLASS CATEGORY ISVV*V121 Reactor Safety - Relief Valve air system 2 C I SVV*V128' supply from PVLCS check TEST Per IWV - 3521, check valves shall be exercised at least once REOUIREMENT every three months.

BASIS FOR The exercise testing of the valves during normal plant operation .

RELIEF will require that the Penetration Valve Leakage Control System be made inoperable and could affect operability of the Safety -

Relief Valves (SRVs)

ALTERNATE An exercise test of each valve during cold shutdown if not TESTING: performed within the previous 92 days as allowed by IWV- 3522 O

8/12/94 - 0012 O

O O' IST CIIANGE REQUEST FORM Date: Requester- Department: Phone:

July 18,1994 Jr. Victory BCP X 3632

, Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

4 1B21*VI 024A, B, C & D and 1B21 *VF029A, B, C & D RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required: Relief Requests: CR's, M R's, MWO's:

Appendix C, pages 9,10, & 20 of N/A CSJ-39 CR 94-0983 105; Appendix D, CSJ-39 ___

Detailed Description of the Requested change:

(include marled up copses ofthe ISTProgram plan or RehefRequest sfapphcable}

Change the category of the listed valves (Appendix C , pages 9,10, & 20 ) from AC to C only. Change the safety positions from C to O&C.

Change Cold Shutdown Justification (CSJ-39) valve category from AC to C.

Justification for the Requested Change:

The valves are actually tested open and closed on a cold shutdown frequency and the Valve Table (Appendix C should be revised to indicate both safety positions. These valves also have a safety function to close to allow air pressure in the MSIV accumulator to assist in closing if the air header pressure is low. There is not a requirement that these valves be leak tight.

Reviewed: , . ## 8-//- M Approved: x m n_e/,c w /o9% ! B -t 8- 9v psrEngrneer /Coordsrutor /KCN/Date) ( pemsor/KCN/Date) I Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

g O'

O- \

%./

l g~

RIVER BEND STATION INSERVICETESTPLAN VALVES

,,,,,,,,,s Ygggy APPENDIX C Sntem #: System Alphe- Pese Rev. Date ISTCR #: Svstem Name:

E&B 31 A 109 MSS 8/18/94 0013 MAIN STEAM VALVE INFORMATION TESTINFORMATION REMARKS Meet Number . O Cat. Sire Type Act- Position Dws. Type Frog. Relief .

Close ,

Sej unter Normel l Safety Caerd.

1B21*A0VF922A 1 A 24 GL A0 0 C D-16 FSE CS 40 PSE G FS CS P1 RF LR RF PVLCS Div. Test IB21*ADVF022B 1 A 24 GL A0 0 C N5 FSE CS 40 PSE Q FS CS PI RF LR RF PVLCS Div. Test 1821*ADVF022C 1 A 24 GL A0 0 C N-16 FSE CS 40 PSE Q FS CS PI RF LR RF PVLCS Div. Test 1821'A0VF022D 1 A 24 GL A0 0 C E4 FSE CS 40 PSE Q FS CS PI RF LR RF PVLCS Div. Test 1821*VF024A 3 C 2 CK SA C D&C F-14 FSE CS 39 1821*VF0248 3 C 2 CK SA C O&C L7 FSE CS 39 1821*VF024C 3 C 2 CK SA C O&C L 15 FSE CS 39

o-

o. O g~

RIVER BEND STATION INSERVICETESTPLAN VALVES NTERGY APPENDIX C M Sntem f: System Alpha: Pass Rev. Date ISTCR r. Sotem Name:

31A 109 MSS 8/18l94 0013 MAIN STEAM VALVE INFORMATION TEST INFORMATION REMARKS Nort Number Q Cet. Sire Type Act- Posities Dws. Type Frog. Relief . .

Close Sej enter Noneal l Sefety Caerd.

1821'VF0240 3 C 2 CK SA C O&C G7 FSE CS 39 4,

O- O O' g~

~

RIVER BEND STATION INSERVICETEST PLAN VALVES P 20elin my APPENDIX C System f: System Alshe- Pass Rev. Date ISTCR A System Name:

f_&l_D_

11C 109 MSS 8/18/94 0013 MAM STEAM VALVE INFORMATION TEST INFORMATION REMARKS Aterk t, ember G Cat. She Type Act- . Posities Dws. Type Frog. Relief .

Close pej enter merieell safety Coord.

1821*MOVF0988 2 A 24 GA M0 O C M-12 FSE CS 05 Pl RF LR RF LR RF PVLCS Div. Test 1821*MOVF098C 2 A 24 GA MG 0 C 6-12 FSE CS 05 PI RF LR RF LR RF PVLCS Div. Test IB21*MOVF0980 2 A 24 GA MG 0 C L 12 FSE CS 55 Pt RF LR RF LR RF PVLCS Div. Test IB21*VF029A 3 C 2 CK SA C D&C K 17 FSE CS 39 1B21*VF0298 3 C 2 CK SA C O&C N 17 FSE CS 39 1821*VF029C 3 C 2 CK SA C D&C H-17 FSE CS 39 1B21*VF029D 3 C 2 CK SA C O&C L 17 FSE CS 39

--___t ___ ma-_ _ - - -_ _ _ - - _ m _-m_____w -__. -_ _

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 39 COMPONENT: FUNCTION CLASS CATEGORY ,

IDFR*V180 Drywell floor drain sump containment 2 AC penetration thermal expansion relief ch IB21 *VF024A, B, Inboard MSIV accumulator air supply 3 C C, D 1B21 *VF029A, B, Outboard MSIV accumulator air suppl 3 C  ;

C, D check IE_S1 Per IWV-3421, check valves shall be exercised at least once REOUIREMENT: every three months.

B ASIS FOR One of the presure taps used to verify the position of the valve JUSTIFICATION: !DFR*V180 is located in the drywell which is inaccessible during plant operation.

The inboard MSIV accumulator check valves are located in the Drywell and the outboard MSIV accumulator check valves are located in the Main Steam Tunnel (MST) north of the jet impringement barrier. Both of these areas are inaccessible

\, during plant operation.

ALTERNATE An exercise test of each valve during cold shutdown if not  :

TESTING: performed within the previous 92 days as allowed by IWV-3412(a) .

8/l8/94 - 0013 ,

O 1 f

4

) O' IST CIIANGE REQUEST FORM

'~'s '. ~,'s ' * ',* , ' ';',, ; ;:s , , p' 4 J';, :' 'a 3 3 l ., ; , 3, ; ' a " < - -~N' '

ISTCR #: s' - ' 'I 9:'s -? ; :x 'ss i t'.

0014 t; 'k :p fb 'k; f , 'f.'h' " f ih  ;',l~

' m , z;l'f ;'fll' k' k 'll "'h "N':.z' ',k[';lj'~ ~:&

l..m Jn, > : .c :'c : o,y : 2,-:.x ; - : . : w,m .,

h m s ':,4 Date: Requester: Department: Phone:

July 22,1994 Jr. Victory Systems Engineering - IST X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ICMS*SOV31 A, B, C & D; 32A & G; 35A, B, C & D RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required: Relief Requests: CR's, M R's, MWO's:

Appendix C, page 83,85,86 & 88 N/A N/A N/A of105 Detailed Description of the Requested change:

t include marked up cmoes ofthe IST Program plan or RehefRequest sfapphcabley Delete the Fail-Safe test requirement and indicate the safety position of these valves as O & C.

Justification for the Requested Change: ,

These valves fail "AS-IS" (reference 3247.501-240-003L, p.1-2; FSK33-2B, D)as do most valves in the plant .The fail safe test is only performed if the valve fails to a certain position and not "AS-IS" The valves are actually tested open and closed quatterly and the Valve Table should be revised to indicate both safety functions.

Reviewed: . M SP (ISTEngineer / CoorJmator / KCN /Datel

/ Approved: '

, f /_ /a 2w/ N2- 7v

$ESupervidor /KCW Datel j Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program i

I

- -,- _ _ .m_ - _ _

O o'-

l g~ RIVER BEND STATION IESEllVICE TEST PLAR-VALVES

,,,,,3,,,,,

my APPER0lX C f_&lo System f- Sntem Alshe- Peas Rev.Date ISTCR P. Sntese Neos:

33-2A 552 CMS W12!94 0014 CONTAINMENT ATMOS. & LEAKAGE M0egTORING i

l VALVE INFORMATION TEST INFORMATION REMARKS

, Norft Number G Cat. She Type Aet- Peeltlen Dwg. Type Frog. Relief .

Close 9mJ seter Bermell Safety Coord.

ICMS*SOV318 2 A 34 E SO O C&C G4 FSE Q l FS Q j PI RF LR flF 10 CFR 50, APP.J Test ICMS'SOV310 2 A 34 E SO O O&C F-5 FSE Q FS 0 Pl RF LR RF 10 CFR 50. APP.J Test l ICMS'SOV33B 2 8 34 E S0 C O&C J-13 FSE Q C FS 0 Pl RF 1 CMS *SOV3388 2 8 34 E SG C O&C K4 FSE Q C FS Q F1 RF ICMS*SOV330 2 B 34 E S0 C O&C K 13 FSE Q C FS 0 Pt RF ICMS'SOV33F 2 B 34 E SO C D&C J-14 FSE Q  !

C FS Q )

Pl RF l ICMS'SOV33H 2 8 34 E S0 C D&C K 12 FSE Q C FS Q PI RF f&LD Sveten A Svetem Alslet Pese Rev.Dete ISTCR f: Snten Neen:

33-2A 552 CMS W1!94 0001 CONTAINMENT ATMOS. & LEAKAGE MONITOR 50G

, . . 4 IST CIIANGE REQUEST FORM ISTCR #:  !: -}9 A k';' y' ; g',;, . p ,;;*f f ; A ,':4 ', ' J:s Q0Q c 'tl d";'7'fgith

  • v N'r: NN' '; I b Q e"' 'd':li:(Q' dc ') 2J! ML 0015 h[7fra ]v g,, ,~' ' Y, :' y;" ' 3'g: ;, M'enW'2C "',': '4'; V" 1:'r,'Q 7 : 1 ;: _, ' ,' ; 7 M',l,c'
  • m

' d ' * ,, m' ' ' :x ' p#Q; p:3 Date: Requester: Department: Phone:

August 1,1994 Jr. Victory Systems Engineering - IST 3632 Issue date and resision of IST Testing Program for Pumps and Valves: Affected component (s):

IB33* AOVF019 &O20; IB33*VF013A & B,17A & B; 1RCS*MOV58A & B,59A &

RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 B,60A & B ,61 A & B; ICCP*MOVl42,143 & 144, ICCP*VI19; ISWP*MOV4A &

4B; ISWP*RVI19 & 140; ISAS*V489; ilAS*V78; IC41*VF006 & 007; 1 CPM *MOVI A & B ,2A & B,3A & B,4 A & B; IHVR*AOV125,126,147 & 143; ICMS*SOV34B & 34D; ICMS*V41; ICMS*SOV32A & 32G; ICMS*V40; iDFR*VI. 2,3 & 4: IDER 'Vl4,15.16 & 17 Affected Pages: STP Change Required: Relief Requests: CR's, M R's, MWO's:

Appendix C, page 3,4,5,21,29, 31,36,38,39, 61, 62, 73, 84, 85, N/A CSJ-14, CSJ-16, CSJ-37, CSJ-52 94-0983 86, 88, 97,98, & 100 of 105 and & CSJ-54 CSJs 14,16,37,52 & 54 Detailed Description of the Requested change:

(include marked up copies ofthe ISTProgram plan orRebefRequest afappbcable)

As appropriate, change the VALVE CATEGORY for the listed valves from A to B and from A/C to C and delete the Leak Rate Test Requirement and the reference to the Drywell Bypass Leak Test.

Justification for the Requested Change:

These valves do not meet the definition of category "A" as defined in section XI. They are not individually leak tested and therefore should be classified as category "B" or "C" The drywell bypass leak test does not individually test these valves therefore the reference to the drywell bypass leak test should be removed from the IST Program.

Reviewed: .8 OMT 1' ,e Approved: T>tm ll e 9<4 !3-r/- W

. (IST Engroseer / CoorJmawr / KCN / Date) (} pensser/ATM/Datel Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

g -

V g-RIVER BEND STATION Page 4 of 105 INSERYlCETESTPLAN VALVES D(TERGY APPENDIXC P&JD Sntem F- Sntem Alohe- Pass Rev. Dets tSTCH f. Sntom Nome:

25 RID 053 RCS 8/19(94 0015 REACTOR RECIRCULATION l .

VALVE INFORMATION TESTINFORMATION REMARKS Nort Nember Q Cet. Siae Type &ct- Posities Dag. Type Frog. Res4 .

Class liej ester Normell Safety Coord.

IRCS* MOV58A 2 B 1 GL MG 0 C F 14 FSE CS 16 PI RF 1RCS*MOV588 2 B 1 GL MO O C F 14 FSE CS 16 Pl RF 1RCS*MOV59A 2 8 1 GL MO O C E-14 .FSE CS 16 PI RF 1RCS* MOV598 2 B 1 GL MO O C E-14 FSE CS 16 Pt RF 1RCS*MOV60A 2 B II2 GL M0 O C D-14 FSE CS 16 PI RF 1RCS*MOV60B 2 B 112 GL MG 0 C D-14 FSE CS 16 Pl RF 1RCS*MOV61A 2 8 314 GL M0 O C C-14 FSE CS 16 Pl PJ

O O' g~ -

RIVER BEND STATION INSERVICE TEST PLAN-VALVE!i

,,,, , ,, 3 3 m any APPENDIX C System F: System AW Pese Rev. Dete ISTCR F: System Name:

F8@

251D 053 RCS 8/19i94 0015 R[ACTDR RECIRCULAil0N VALVE INFORMATION TEST INFORMATION REMARKS Meet member .Q Cat. Stre Type Act- Peeition Dws. .Tyg e frog. llelief Claes Os) seter Norseell Safety Ceerd.

IRCS*M"V61B 2 B 3/4 GL M0 C C 14 FSE CS 16 PI RF l

l l

l l

l l

s . =

v g~

RIVER BEND STATION INSERVICE TEST PLAN -VALVI:S Pe.e zi ei iOS

[my APPENDIX C System f- System Alohe: Pese Rev. Date ISTCR F: System Name:

P@

91 A 115 CCP BI19f94 0015 CLOSED COOLING WATER REACTOR PLANT VALVE INFORMATION TEST INFORMATION REMARKS Merk museber Q Cat. She Type Act. Peeities Dws. Ttye Frog. Relief .

CIsee Bej meter Bermell Sefety Ceerd.

ICCP'MOV138 2 A 10 GA M0 O C B-18 FSE CS 14 Pl RF l.R RF 10 CFR 50, APP.J Test ICCP'MOV142 2 B 6 BF MD 0 C B 16 ISE CS 14 Pt RF B B B ICCP'MOV143 2 8 8 BF M0 O C JB ISE CS 14 Pl RF B B B ICCP'MOV144 2 B 6 BF MD 0 C H9 FSE CS 14 Pt RF B B B 1CCP'MOV158 2 A 10 GA M0 O C J 17 FSE CS 14 Pt RF LR RF 10 CFR 50, APP.J Test ICCP'MOV159 2 A 10 GA MO O C J-19 FSE CS 14

' PI RF LR RF 10 CFR 50, APP.J Test 1CCP*V118 2 AC 10 CK SA 0 C B-17 FSE RF 26 LR RF 10 CFR SG. APP.J Test ICCP'V119 2 C 6 CK SA 0 C B-15 FSE RF 02

~

O' g~ RIVER BEND STATION IBSERVICETEST PLAN VALVES .

Pe 2seeiO5 erretc.y APPEBolX C f_&lD.! Sutem P. System Aishe- Pam Rev.Date ISTCR f- Sntem Name:

9-100 118 SWP 8/19f94 0015 SERVICE NATER. NORMAL VALVE INFORMATION TESTINFORMATION REMARKS Berk sessber a cat. . Sere Type Ast- Posities Duse. Type Frog. . AsEst ,

ames sej seter sensellSdmV Caert .,

ISWP'MOV4A 3 8 12 GA M0 O C B-17 FSE CS 52 PI RF f

1SWP'MOV4B 3 8 12 GA MO O C D-17 FSE CS 52 P1 RF 3 i

s ISWP'MOVSA 3 A 10 GA M0 O C L 18 'FSE CS 52 .

PI RF

, LR RF 10 CFR 50. APP.J Test I

ISWP'M008 3 A 10 GA M0 O C H-18 iFSE CS 52 Pl RF Ul RF 10 CFR 50, APP.J Test ISWP'MOV81A 3 A 12 GA M0 O O&C N-20 ' FSE Q 52 Pl RF i LR RF 10 CFR 50, APP.J Test 1SWP*MOV01" 3 A 12 GA M0 O O&C H-20 FSE Q 52

, M M -

LR RF 10 CFR 50. APP.J Test ISWP'MOV501A 3 8 18 BF N0 0 C N-1 FSE Q Pl RF ISWP'MOV501B 3 B 18' BF MO O C N FSE Q l

Pt RF l

~

O- O O' g'

RIVER BEND STATION INSEfMCE1EST PLAR eVALVES

,,,,3,,,,,

ENruGY APPENDIX C P&l0 System t System Alohat Peas Rev. Date ISTCR R System Name:

9100 118 SWP BI19(94 0015 SERVICE WATER. NORMAL VALVE INFORMATION TESTINFORMATION REMARKS

. Meet Basebw Q Cat. She Type Act. Posities Dws. Type freq. Relief C!sse Bej meter Normel l Safety Caerd.

ISWP'MOV5078 3 A 12 GA MG 0 D&C D-20 FSE Q 52 Pl RF LR RF 10 CFR 50 APP.J Test ISWP'MDV510A 3 8 12 GA M0 C O&C B-21 FSE RF 11 Pt RF 1SWP'MOV510B 3 B 12 GA M0 C O&C E-21 FSE RF 11 Pl RF ISWP'MOV511 A 3 B 18 BF M0 O C G-1 FSE G Pl RF 1SWP'MOV511B 3 B 18 BF M0 O C G-3 FSE Q PI RF ISWP'RV119 3 C 1 RV SA C O&C B-1B SP RF3 ISWP'RV140 2 C 3/4 RV SA C O&C N 17 SP RF3 ISWP'V172 3 C 30 CK SA C 0 P-5 FSE RF 27 -

ISWP'V173 3 C 30 CK SA C 0 N5 FSE RF ISWP*V174 3 AC 12 CK SA 0 D&C D-18 FSE CS 42 LR RF 10 CTR 50, APP.J Test

O O- O' g~ -

RIVER BEND STATION 11SERVICETESTPtAN VALVES

,,,,3,,,,,,

cpatnGY APPENDIX C P,&@ Srstem R System Alphe- Pese Rev. Date ISTCR r. System Nems:

12-2C 121 SAS $19l94 0015 A!R SERVICE & BREATNING VALVE INFORMATION TEST INFORMATION REMARKS M eet Nember Q Cat. . She Type Act- Posities Dws. Type Frog., Reliet .

Close Bej eeter Normell Safety Ceerd.

ISAS*MOV102 2 A 4 GA MO O  :: B-16 FSE Q Pl RF LR RF 10 CFR 50. APP.J Test LR RF PVLCS Valve Test LR RF PVLCS Div. Test ISAS*MOV103 2 A 4 GA M0 0 C B:17 FSE Q PI RF LR RF PVLCS Valve Test LR RF PVLCS Div. Test 1SAS*V486 I AC 4 CK SA 0 C C;15 FSE RF 26 LR RF 10 CFR 50, APP. J Test ISAS'V489 2 8 4 GA MA LC LC F14 LR RF Drywe8 Bypass Test

g~

RIVER BEND STATION 195ERVICE TEST PLAN-VALVES

,,,,3,,,,,

OfTERGY APPENDIX C System F: Sytem Alphe- Pess Rev. Dete ISTCR F- System Neme:

P&M 121C 122 lAS 8/19l94 0015 AIR.lNSTRUMENT VALVE INFORMATION TEST INFORMATION REMARKS

. Meet Num6er G Cet. Siae Type Act: Posities Dws. Type Frog. Relief .

Close Osj ester perme4 l Sefety coord.

11AS*MOV106 2 A 3 GA M0 O C G4 FSE CS 12 Pl RF LR RF 10 CFR 50. APP.J Test LR RF PVLCS Velve Test LR RF PVLCS Div. Test IIAS*MOV107 2 A 3 GA M0 O C G-8 FSE CS 12 PI RF LR RF PVLCS Velve Test LR RF PVLCS Div. Test 11AS'SOV41A 3 B 2 GA SO O C L3 FSE Q FS Q PI RF 1AS'SOV41B 3 B 2 GA SO O C M4 FSE Q IS Q Pt RF 11AS*V78 2 C 3 CK SA 0 C H-I f FSE RF 02 Drywet Bypees Test ilAS*VBG 2 AC 3 CK SA 0 C GS FSE RF 26 LR RF 10 CFR 50, APP.J Test 11AS'V562 3 C 2 CK SA D O&C L-3 FSE CS 29 11AS*V563 ~3 C 2 CK SA 0 O&C M-3 FSE CS 29 l

~ - .- - _ -. ~ -

~

O. O O' ,

RIVER BEND STATION Page 81 et 105

- INSERVICETESTPLAN VALVES EffTERGY APPEEDIXC M Sntem F- Sntem Alshe: Pass Rev. Date ISTCR f: Sntem Name:

27-21A 254 CPM 8/18/94 0015 H2 MIXING, PURGE & RECOMBINER VALVE INFORMATION TEST INFORMATION REMARKS Mark gamber Q Cat. Biro Type Act- Position Ows. Type Frog. Relief .

Close Dej ester Normell Sofety Coord.

ICPM'MOVIA 2 B 6 BF M0 C O&C J-18 FSE CS 54 Pl RF ICPM*MOVIB 2 8 6 BF M0 C O&C J-14 FSE CS 54 Pt RF ICPM*MOV2A 2 8 6 BF M0 C D&C G-14 FSE CS 54 Pt RF 1 CPM *MOV2B 2 B 6 BF MD C O&C G-18 FSE CS 54 PI RF ICPM*MOV3A 2 B 8 BF M0 C O&C J-17 FSE CS 54 P1 RF ICPM*MOV3B 2 8 6 BF M0 C O&C J-15 FSE CS 54 I Pl RF ICPM'MOV4A 2 B 8 BF M0 C O&C G-14 FSE CS 54 Pl RF L_________________. __ ._ _.

O- 0 O' g~ e RIVER BEND STATION INSERVICETEST PLAN VALVES

,,,,,3,,,,,

'My APPENDIX C System F: System Alphr Pese Rev. Date ISTCH F- Svitem Name:

P&E 403 HVR 8/19194 0015 HVAC-CONTAlHMENT BLDG 22 18 VALVE INFORMATION TESTINFORMATION REMARKS leerk Neeshw 0 Cat. She Type Act- Posities Dws. Type Frog. Relief ,

Class SeJ unter Nwmat l safety teerd.

1HVR*A0V123 2 A 36 BF A0 C O&C C-ll FSE O 59 C FS Q Pl RF LR Q 10 CFR 50, APP.J Test 1HVR'A0V125 2 8 24 BF A0 C O&C C-9 FSE CS 37 C FS CS Pt RF 1HVR*ADV128 2 B 24 BF A0 C O&C N 18 FSE CS 37 C FS CS PI RF 1HVR*ADV129 2 A 36 BF A0 C O&C N-17 FSE Q 59 C FS Q PI RF LR Q 10 CFR 50, APP.J Test 1HVR*ADV147 2 B 24 BF A0 C O&C D9 FSE CS 37 C FS CS Pl RF IHVR*A0V148 2 B 24 BF A0 C O&C N 19 ISE CS 37 C FS CS PI RF i

l

O- O O

g~

RIVER BEND STATION luSERVICETEST PLAN VALVES

~hy APPEEDIX C VALVE INFORMATION TEST INFORMATION REMARKS Nort Num6w Q Cat. Site Type Act- Peeities Dws. Type Freg. Relief Close Sej ester Normell Sofety Coord.

. ICMS'SOV33K 2 B 34 GL SO .C D&C 111 FSE Q . .

C FS 0 Pl RF ICMS*SOV33T 2 B 34 GL 50 C O&C K-10 FSE Q C FS Q M RF ICMS'SOV33V 2 B 34 GL SD C O&C 19 FSE G C FS Q PI RF 1 CMS'SOV33X 2 8 34 GL SO C D&C K-8 FSE G C FS 0 Pl RF 1 CMS'SOV33Z 2 B 34 GL SD C O&C J7 FSE Q C FS Q Pl RF ICMS'SOV348 2 8 34 GL SD C O&C G-15 FSE Q C FS Q PI RF 1 CMS'SOV340 2 B 34 GL 50 C O&C H-15 FSE G C FS Q PI RF Orywel Bypees Test

(% '

( '

{s *

  • s g -

RIVER BEND STATION INSERVICETEST PLAN VALVES ENTERGY APPEEDIX C System Name:

R P System R System Abha- Pass Rev. Date ISTCR f 332A 552 CMS 8/19l94 0015 CONT AINMENT ATMOS. & LEAKAGE MONITORING VALVE INFORMATION TEST INFORMATION REMARKS Merk Neuber G . Cet. Sise Type Act- Peetties Dws. Type . Frog. Relief .

Close pej enter Normell Safety Coord.

ICMS*SOV358 2 A 3/4 GL SO O O&C F4 FSE Q FS Q Pl RF LR RF 10 CFR 50. APP.J Test ICMS*SOV350 2 A 3/4 GL SD 0 O&C G6 FSE Q FS Q Pl RF LR RF to CFR 50. APP.J Test ICMS*V41 2 C 3l4 CK SA 0 C F 15 FSE RF 02 DryweIBypes Test

..---..-_,-,_~,.-_en:-v. . x._. , =.=_-___--.__.--._.__.--_.______---.-_-_----._____.K-_- -_ . - _ _ __ n --

O. .

O O' RIVER BEND STATION Page 86 el106

- INSERVICETEST PLAN VALVES EffTERGY APPENDIX C P&!D Svstem F- System Alohe- Peas Rev. Oste ISTCR F: System Name:

332B 552 CMS 8/19/94 0015 CONTAINMENT ATMDS. & LEAKAGE MONITORING VALVE INFORMATION TEST INFORMATION REMARKS Mark Nem.ber Q Cat. Sire Type Act- . Peeities Dws. Type Frog. Relief .

Close On.) unter Normal l safety Coord. _ _ _

1 CMS *SUV31A 2 A 34 GL SD 0 O&C G-19 FSE Q FS Q Pt RF LR RF to CFR 50, APP.J Test ICMS*SOV31C 2 A 3/4 GL SD 0 O&C G-19 FSE Q FS Q PI RF LR RF 10 CFR 50, APP.J Test ICMS*50V32A 2 B 3/4 GL SO O O&C H-7 FSE Q FG G PI RF ICMS* SOY 32G 2 8 3/4 GL SO O O&C F-7 FSE Q FS Q Pl RF ICMS*SOV33A 2 8 3/4 GL SG C O&C K-15 FSE Q C FS Q Pl RF 1 CMS *SOV33AA 2 B 3l4 GL SO ': D&C K-7 FSE Q C FS Q PI RF

\

I

O. O O' g'

RIVER BEND STATION INSERVICE TEST PLAN -VALVES my APPEEDIX C System F- System Alohat PeseRev.Dete ISTCR F- System Name:

P&_@

33-28 552 CMS 8/19/94 0015 CONTAINMENT ATMOS. & LEAKAGE MONITORING VALVEINFORM TION TEST INFORMATION REMARKS Mert Nese6er Q Cet. Size Type Act- Feeities Dws. Type Frog. ReNel , ,

Claes Sej ester Normell Safety Ceard.

ICMS*SOV33Y 2 B 3I4 GL SO C O&C K9 FSE O C FS Q Pl RF 1 CMS'SOV34A 2 B 3/4 GL SD C O&C G-7 FSE Q C FS 0 M RF ICMS*SOV34C 2 B 3/4 GL SD C D&C G-7 FSE Q C FS Q M RF ICMS'SOV35A 2 A 3/4 GL SD 0 O&C G-16 FSE Q FS Q M RF LR RF 10 CFR 50. APP.J Tut ICMS*SOV35C 2 A 3/4 GL SO O D&C G-16 FSE O FS Q M RF LR RF 10 CFR 50, APP.J Test ICMS*V40 2 C 3/4 CK SA C C F-7 FSE RF 02 Drywel Bypes Test l

i

O- O O*

g~ RIVER BEND STATION INSERVICE TEST PLAN -VALVES ENTE.RGY APPENDIX C System A System Alshe- Peas Rev. Dete ISTCR P System Name:

P&l0 32 9A 609 0FR WIW94 0015 DRAINSTLDOR & EQUIPMENT VALVE INFORMATION TEST INFORMATION REMARKS Mark Bomber Q Cat. She Type Act- Posities Dw8 Type freq. Relief ,

Close Sej meter Bernal l Sefety Coord.

1DFR*VI 2 C 8 CK SA 0 C C-20 FSE RF 02 1DFR*V2 2 C 8 CK SA 0 C C-20 FSE RF 02 IDFR*V3 2 C 8 CK SA 0 C C-13 FSE RF 02 IDFR*V4 2 C 8 CK SA 0 C C-12 FSE RF 02

~

O. O O~

g~

RIVER BEND STATION INSERvlCE TEST PLAN VALVES RGY APPE50iX C P&lD Sotem F: Svetem Abhe- Pese Rev. Date ISTCR F- System Name:

32BB 609 DER 8/19I94 0015 DRAINSfl00R & EQULPMENT j

(

VALVE INFORMATION TEST INFORMATION REMARKS IAerk leember G, Cat. Site Type Act- Posities Dws. Type Frog. Relief .

Close 5ej ester merusell setery Ceerd.

IDER*ADV128 2 A 4 GL A0 0 C 89 FSE Q C FS Q PI RF LR RF 10 CFR 50. APP.J *est IDER*A0V127 2 A 4 GL A0 0 C B8 FSE Q C FS G 3 RF LR RF 10 CFR 50, APP.J Test IDER*V4 2 AC 14 CK SA C 0 B-9 FSE CS 41 C LR RF 10 CFR 50. APP.J Test 1 DER *V16 2 C 8 CK SA 0 C H2 FSE RF 02 1 DER *V17 2 C 8 CK SA 0 C H-2 FSE RF D2 l

O. O O~

&~

M_

RIVER BEED STATION INSERVICETESTPLAN VALVES Po,e iO0 se iO5

] APPENDIX C M Svitem f: System Aleim Pese Rev. Date ISTCR F- Sntem Name:

32 SG 609 DER 8/19i94 0015 DRAINSTLDOR & EQUIPMENT VALVE INFORMATION TEST INFORMATION REMARKS

, Mark Number Q Cat. Size Type Act- , Posities Dws. Type Frog. ReNet .

Close Sej enter Normel l Safety Caerd.

IDER*V14 2 C 8 CK SA 0 C F-19 FSE RF 02 1 DER *V15 2 C 8 CK S* O C F-18 FSE RF 02

{

I

I

~

COLD SHUTDOWN JUSTIFICATION REOUEST NO 14 O CLASS CATEGORY COMPONENT: FUNCTION ICCP*V133 Closed Cooling Water return line dryw 2 AC penetration thermal expansion release ICCP*V160 Closed Cooling Water return line 2 AC containment penetration thermal expan release check 1CCP*MOV138 Closed Cooling Water supply line to 2 B l ICCP*MOVl42 Recirculation Pump bearing cooler containment isolation ICCP*MOV148 Closed Cooling Water return line to 2 B ICCP*MOVl44 Recirculation Pump bearing cooler dry isolation ICCP*MOV158 Closed Cooling Water return line from 2 A L ICCP*MOVl59 Recirculation Pump bearing cooler

! containment isolation j 1CCP'MOV163 Closed Cooling Water supply line to th 3 A l ICCP*MOV169 Control Rod Drive pump bearing cool -f O header isolation 1 GI Per IWV-3411 and IWV-3521, Category A and B valves and 1

I TEST REOUIREMENT: check valves shall be exercised at least once every three ,

months.

BASIS FOR The exercise testing of the valves during normal operation JUSTIFICATION: coull cause overheating of the Recirculation Pump motor and )

bearings or the Control Rod Drive pump bearings. The i J

overheating of the pump bearings would require the shutdown of a pump necessary for plant operation ALTERNATE An exercise test of each valve during cold shutdown if not TESTING: performed within the previous 92 days as allowed by IWV-3412(a) and IWV-3522.

8/19/94 - 0015

~

COLD SHUTDOWN JUSTIFICATION REOUEST NO.16 LO COMPONENT: FUNCTION CLASS CATEGORY -

' i IRCS*MOV58A,B Recirculation system flow control dry 2 B ,

IRCS*MOV59A,B isolation IRCS*MOV60A,B 1RCS*MOV61 A,B l IESI Per IWV-3411 Category A and B valves and check valves shall REOUIREMENT: be exercised at least once every three months. ,

B ASIS FOR The exercise testing of the valves during normal operation JUSTIFICATION: could cause abnormal movement of the recirculation loop flow control valves resulting in a reactivity change and a possible -

+

reactor scram. The design of the valves does not facilitate a j partial stroke test ALTERNATE An exercise test of each valve during cold shutdown if not TESTING: performed within the previous 92 days as allowed by IWV-3412(a) .

O C

P I

h i

8/19/94 - 0015 O ,

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 37 COMPONENT: FUNCTION CLASS CATEGORY IHVR*AOV125 Drywell Purge System supply penetrati 2- B lHVR*AOV147 isolation lHVR*AOV126 Drywell Purge System exhaust penetra 2 B lHVR*AOV148 isolation TEST Per IWV-3411 Category A and B valves and check valves shall REOUIREMENT: be exercised at least once every three months.

BASIS FOR The opening of the valves during plant operation is not allowed JUSTIFICATION: ' by the RBS Technical Specification 3.6.2.7.

ALTERNATE An exercise test of each valve during cold shutdown if not TESTI~NG: performed within the previous 92 days as allowed by IWV-3412(a) .

O 8/19/94 - 0015 O

V

^

COLD SHUTDOWN JUSTIFICATION REOUEST NO. 52 (V \

COMPONENT: FUNCTION CLASS CATEGORY lSWP*V650 Drywell Unit Cooler Service Water ret 3 C ISWP*V651 check I SWP*MOV4A,B Drywell Unit Cooler Service Water 3 B 1SWP*MOV507A,B supply containment isolation I SWP*MOV5 A,B Drywel' Unit Cooler Service Water 3 A 1 SWP*MOV81 A,B retum containment isolation T_E_SI Per IWV-3411 and IWV-3521, Category A and B valves and REOUIREMENT: check valves shall be exercised at least once every three months.

B ASIS FOR In order to test these check valves closed, both loops of service JUSTIFICATION: water supply to the Dmvell Unit Coolers would have to be isolated since they both come together in a common return line just upstream from the check valves. This would allow the p, Drywell to exceed its temperature limits from loss of cooling.

LJ The consequences of failure of either MOV507A or MOV507B as well as for MOV4A or MOV4B would be reduced cooling water flow through the Drywell Unit Coolers which would allow the dmvell temperature to exceed its limits. If any of these valves failed during testing, it would require shutdown of the plant for repair.

The consequences of failure of either MOV81 A or MOV81B as well as for MOV5A or MOV5B would be reduced cooling water flow through the Drywell Unit Coolers which would allow the drywell temperature tom exceed its limits.

ALTERNATE An exercise test of each valve during cold shutdown if not TESTING: Performed within the previous 92 days as allowed by IWV-3412(a) and IWV-3522.

8/19/94 - 0015 l

f

COLD SIIUTDOWN JUSTIFICATION REOUEST NO. 54 COMPONENT: FUNCTION CLASS CATEGORY ICPM*MO 1 A,B Primary containment /drywell hydrogen 2 B ICPM*MOV2A,B mixing system inlet or outlet isolation.  :

ICPM*MOV3 A,B ICPM*MOV4 A,B TEST Per IWV-3411 Category A and B valves and check valves shall REOUIREMENT: be exercised at least once every three months.

B ASIS FOR The opening of the valves for testing during plant operation is JUSTIFICATION: not allowed by the RBS Technical Specification 3.6.6.2. ,

i

- ALTERNATE _ An exercise test of each valve during cold shutdown if not TESTING: performed within the previous 92 days as allowed by IWV-3412(a) .

O  !

p 5

t V

F s

8/19/94 - 0015 O .

\g

%/

t IST CIIANGE REQUEST FORM 0016 Mf Ob8 'M N sN M h$$$

NS$9hla$h5hsdkNk N i$ Nh5%$$s[hdd ' ~ C Cid$hhN$$$$$h5$ i$b_ _ -

Date: Requester: Department: Phone:

8/2/94 C. W. Walling Systems Engineering - IST 4842 Issue date and resision of IST Testing Program for Pumps and Vahes: Affected component (s):

IC41*VF033A/B R13S lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 j Affected Pages: STP Change Required: Relief Requests: CR's, M R's, MWO's:

Appendix C, page 39 of 105 STP-201-6311 & STP-201-6312 N/A CR 94-0857 Detailed Description of the Requested change:

(include marked up copres of the IST Program plan or RehefRequest ofapphcable)

Change valve safety position to "O&C" for both IC41 *VF033A & B Justification for the Requested Change:

USAR 9.3.5.2 states: "To prevent bypass flow from one pump in case of relief valve failure in the line from the other pump, a check valve is installed downstream of each relief valve line in the pump discharge pipe." This would indicate a safety function to close.

Reviewed: a/m (ISTEngmeer /Coordmator / KCN/ Date)

/ M# Approved: 2 am

/

o m i n .c b t [J M v '

sorikCN/Date) ,/ {

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program l

/ \ '

  • U -

U V g~

RIVER BEND STATION INSERVICETEST PLAN VALVES

,,,,3,,,,,

M RGY APPENDIX C System A System Alphs: Peas Rev. Dete ISTCR R System Name:

P&l0 27-16A 201 SLC & 4/94 0016 STANDBY LIQUID CONTROL VALVE INFORMATION TEST INFORMATION REMARKS Mark Nem6w 0 Cat. Side Type Act. Peetties Dwg. . Type Frog. Reisof Close lia) seter Normell Safety Coord.

1C41* MD'.4001 A 2 B 3 GL MO C 0 H 15 FSE CS 18 F1 RF 1C41*MOVF0018 2 B 3 GL M0 C 0 0-15 FSE CS 18 Pl RF IC41'RVF02SA 2 C 1.5 RV SA C O&C J-11 SP RF1 1400 psig IC41*RVF0298 2 C 1.5 RV SA C O&C E.11 SP RF3 1400 psig 1C41*VEXF004A 1 0 1.5 XP XP C 0 17 ET RF IC41*VEXF0048 1 0 1.5 XP XP C D E7 ET RF IC41*VF006 1 AC 1.5 CK SA C C F-5 FSE RF 13 0 LR RF Drywet Bypass Test 1C41'VF007 1 AC 1.5 CK SA C C F3 FSE RF 13 0 LR RF Drywet Bypass Test 1C41'VF033A 2 C 1.5 CK SA C D&C J10 FSE Q 1C41*VF0338 2 C 1.5 CK SA C O&C E-10 FSE Q i

y J f' uf IST CIIANGE REQUEST FORM

[

Date: Requester: Department: Phone:

August 16,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: AITected component (s):

ILSV*SOVX26A & B, ILSV*SOVY26A & B RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 64 of 105 STP-255-3300 N/A CR 94-0983 Detailed Description of the Requested change:

tinclude marleJ wp copses ofthe ISTProgram plan or ReliefRequest ufapplicable)

Add FS-0, Fail Safe Open test for valves ILSV*SOVX26A & B and add FS-C Fail Safe Closed for valves ILSV'SOVY26A & B.

Justification for the Requested Change:

Valves 1LSV*X26A & B have a safety function in the open direction to supply accumulator air to the compresor unload valve. They fail to the open position on loss ofpower.

Valves ILSV'Y26A & B have a safety function in the closed direction to isolate non-safety plant instrument air and establish a flow path for PVLCS accumulator air to the compressor unload valve. They fail to the closed position on loss of power.

These valves are currently tested in procedure STP-255-3300, however fail safe testing is not identified nor documented.

Reviewed: 8Wd' Approved: w u /,[ mom [ 7-l8- 9V QSTEngmeer/CoordmatoriKCN/Datel {}~ SESupernsor/KCN/6 ate)

Once completed, submit to IST Engineer / Coordinator for incorporation"into IST Program

- - - - - . - - - - _ _ - - - - - - . - . - - - _ - _ - - . - - - - - _ - - - - _ - _ _ - - - - - - - - - - - _ - - - w -- m. - --w - -+~ +e -

f'~

~\. ..

i

,v g~

RIVER BEND STATION INSERVICE TEST PLAN-VALVES ENTERGY APPENDIX C Sntem f; Sntem Aloha- Pass Rev. Date ISTCR f- System Name:

E&D 27-208 255 LSV BI18l94 0017 MSIV & PENE.VLV LEAKAGE CONTROL VALVE INFORMATION TEST INFORMATION REMARKS Merk hereber Q Cat. Sire Type l .Act- Posities Dws. Type Frog. Relief .

Close Sa) l ester Nonsell Safety Coord.

ILSV'RVSA 2 C 1XI.5 RV SA C O&C E-14 SP RF2 140 psig ILSV*RV8B 2 C IX1.5 RV SA C O&C P-14 SP RF3 140 psig ILSV*S0VX28A 2 B GL C 0 E 18 FSE Q 0 FS Q ILSV*SOVX268 2 B GL C 0 P 16 FSE Q 0 FS Q ILSV'SOVY26A 2 8 GL 0 C E 18 FSE Q 0 FS Q ILSV*SOVY268 2 8 GL 0 C P 18 FSE Q 0 FS Q ILSV'V12 2 C 1 CK SA C D&C H 17 FSE RF 04 ILSV'V18 2 C 1 CK SA C O&C F 10 FSE RF 04 ILSV'V20 2 C 1 CK SA C O&C D8 FSE RF 04 1LSV'V22 2 C 1 CK SA C G&C C-8 ISE RF 04 ILSV*V24 2 C 1 CK SA C O&C A-8 (SE RF 04 ILSV'Y26 2 C 1 CK SA C O&C N8 FSE RF 04 ILSV'V28 2 C 1 CK SA C D&C L-8 FSE RF 04 ILSV'V30 2 C 1 CK SA C O&C J8 FSE RF 04 ILSV'V32 2 C 1 CK SA C O&C H8 FSE RF 04 i

l

.p . .

u L IST CIIANGE REQUEST FORM

'* l Date: Requester: Department: Phone:

August 16,1994 J. Victoty BCP X 3632 Issue date and redsion of IST Testing Program for Pumps and Valves: Affected component (s):

ICPP*MOV104, ICPP*MOV105, ICPP*SOV140 & ICPP*V2 RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 62 of 105 STP-254-6301 N/A DR# 111 Detailed Description of the Requested change:

(include marled up ctres <fthe ISTProgram plan or RehefRequest ofa;'pbcable)

Delete the safety position of Open for the identified valves and delete ICPP'V2 from the program.

Justification for the Requested Change:

These valves have an active safety function in the closed direction as containment isolation valves. The lines up stream of these valves are non-classed and non-safety therefore, they do not have a safety function to supply air during an accident. ICPP*V2 does not have a safety function per this discussion . This valve does not have a safety function in the closed direction as the upstream valve is a containment isolation valve.

Reviewed: [ ~ l_ a 09W // Approved: su --- a u#,', o Sak/8 -/ e-W (IST Eiegmeer / Gwrknator / AEN/Ikste) / U

~Q $ubrvrsor/ AT// Date) I Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

p ,n . -

v -

a J g~ -

RIVER BEND STATION INSERVICE TEST PLAN -VALVES Po,e s2 er is j ENTERGY APPENDIX C M

P System f System Aloha- Pass Rev. Date ISTCR t. Svstem Name:

27 21A 254 CPM 8/18/94 0018 H2 M!XiNG F*JRGE & RECOMBINER VALVE INFORMATION TEST INFORMATION REMARKS gierk Num6w Q Cat. Slas Type Act- Peeities Dws. Type Freq. ReNel .

Onee Dej meter Normell Safety Coord.

1 CPM *MOV4B 2 8 6 BF MD C O&C G-17 FSE CS 54 Pl RF 1CPP'MOV104 2 A 3 GA M0 C C F-3 r$E Q PI RF LR RF 10 CFR 50. APP.J Test ICPP*MOV105 2 A 3 GA M0 C C H-2 FSE Q Pl RF LR RF 10 CFR 60. APP.J Test ICPP'SOV140 2 A 1 GA SD C C H-10 FSE Q C FS Q PI RF LR RF 10 CFR 50. APP.J Test

x- -

C -(ai IST CIIANGE REQUEST FORM 0019 f k ffd 5 If SPMI$@@ddW hkkS}IM5N$1EE N#Y!$$$MWBd$@@$$bNMa& MEiM5"#M %N!?3@NE$f$@ MnGn2 I

Date: Requester: Department: Phone:

August 16,1994 Jr. Victory BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

IFPW*MOV121 & 122, IFPW'V263 RBS ist Ten Year interval - IST Plan - Rev. 6 - Issued l/29/93 Airected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 60 of105 STP-254-6301 N/A N/A Detailed Description of the Requested change:

Onclude marked up apes ofthe ISTProgram plan uw RehefRequest ofappbcable)

Change the class designation from 3 to 2, and delete the requirement LR RF PVLCS Div. Test.

Justification for the Requested Change:

These valves are designated as class 2 on P&lD 15-IC. This is the proper designation. The PVLCS Div. test is not a separate test, it is an accumulation of the individual test therefore should not be referenced in the program as a separate test.

Reviewed: Is### /-Aff[ Approved: M(n2Ad b9c.[7-/SOf' QST Engtneer / Coordmator / KCN/ Ekte) // $ESuperveaf / KCN/Dbtes Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

%)

\v g~

RIVER BEND STATION INSERViCETESTPLAN VALVES Ympay APPENDIX C P&lD Svitem t System Alpha- Pee- 3ev. Date ISTCR R Svitem Nems:

151C 251 FPW W18l94 0019 FIRE PROTECTION WATER VALVE INFORMATION TEST INFORMATION REMARKS Meek sember G Cat. She Type Act- Posities . Dwg. Type Frog. Relief , ,

Claes linj meter Bermell Safety Coord.

1FPW'MOV121 2 A 8 GA MD C C P 16 FSE Q Pl RF LR RF 10 CFR 50, APP.J Test LR RF PVLCS Valve Test 1FPW'MOV122 2 A 6 GA MD C C P 17 FSE Q Pt RF LR RF PVLCS Valve Test 1FPW'V263 2 AC 6 CK SA C C P-14 FSE RF 26 LR RF 10 CFR 50 APP.J Test

i

("}

(%.

l f)\

k/ G I

I IST CIIANGE REQUEST FORM l

e [? 2 ,

Date: Requester: Department: Phone:

l August 17,1994 Jr. Victory BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ICCP*V133 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 22 of105 N/A N/A CR 94-0983 Detailed Description of the Requested change:

(incluJe marked up copres ofthe ISTProgram plan or RehefRequest sfappbcable)

Change the category from AC to C and delete leak rate (LR) test and reference to 10CFR50 Appendix J Test.

Justification for the Requested Change:

This valve has an active safety function as defined i 1 the Technical SpeciHcation to close for drywell integrity and open for thermal reliet.

Reviewed: I8. /-~ /r# /-/#-#7 Approved: A _h' (SESupervssor'/KCN/Date) wd uh /9k[ 8'/6'99 (ISTEnguneer / Coordinator / KCN / Date)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

O. O O'

&~

N RIVER BEND STATION leSERVICE TEST PLAN. VALVES r 22eriO5 m gy APPENDIX C P&ID Sntem f: Sntem Alpha: Pass Rev. Date ISTCH r Sntem Name:

91A 115 CCP 8(18l94 0020 CLOSED C00UNG WATER REACTOR PLANT VALVE INFORMATION TEST INFORMATION REMARKS Mark Reeser Q Cat. . Sire Type Act- Peeities Dws. Type Frog Relid .

Does Dej ester normel l setet, Ceerd.

ICCP'V133 2 C 1.5 CK SA C O&C H9 FSE CS 14 4 1CCP*V160 2 AC 1.5 CK SA C D&C K-17 FSE CS 14 LR RF 51 10 CFR 50, APP.J Test

O. O O' IST CilANGE REQUEST FORM ISTCR #: jg7^gjy$pQ$w@[Q d@!$3(ig@$1@5%n$kpf@-@a.yibggggw ig+pf gpQ$f%.kQ<w$@sy ishs w $Mn $)gs-w .p yw- mg : en m n.,  ; c : -

Q yyQ - ~ + ms i *$h I E Nh $d2 }l - kg j Date: Requester: Department: Phone:

August 17,1994 J. R.ogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

IB21*MOVF027A, B, C and D RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Arrected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 55 of 105 N/A N/A DR# LCS-5 Detailed Description of the Requested change:

t incluJe marted up copies of the IST Program plan or RehefRequest sfappbcable)

Delete these valves from the program.

Justification for the Requested Change:

These valves are the outboard Main Steam isolation Valves stem packing leakofflines motor operated isolation valves. They are normally open providing a flow path to the equipment drain system for MSIVs stem leakotT. These valves are also required to be open to allow the MS-PLCS to pressurize the outboard MSIVs stem packing areas.

These valves are classified as category B passive.

Reviewed: I /. 1 op/r - #-/8- M (IST Engmeer / Coordmator / KCN / Date)

Approved: - na d e- /- v/f-w-w

~(SESuperwhr /KCNl Dates Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program l

l

O O O' g~

RIVER BEND STATION INSERVICE TEST PLAN VALVES p,,, ,, ,, ,,s my APPENDIX C System Name:

M System t- Svitem Aus- Peas Rev. Date ISTCR f:

27 20A 208 MSI B/19194 0021 MSN POSITIVE LEAKAGE CONTROL VALVE INFORMATION TEST INFORMATION REMARKS Merk Number. O Cat. Site Type Act- Peeition Dogs. Type freq. ReEef . .

Class Osj unter Normal l Safety Ceerd.

IE33*MOVF005 2 B 2 GL M0 C O&C M-16 FSE Q Pt RF IE33*MOVF006 2 B 2 GL M0 O O&C L 16 FSE Q PI RF 1E33*MOVF007 2 B 2 GL M0 C O&C L 15 FSE Q PI RF 1E33'MOVF008 1 A 2 GL M0 C O&C K 15 FSE Q Pl RF LR RF PVLCS Div. Test IE33*MOVF025 2 8 2 GL M0 C O&C M-8 FSE Q PI RF

/-~

v -

~ v IST CIIANGE REQUEST FORM ISTCR #: fi 1Jf - ;$nt t gggy@V gedgggg 0022 !sghhNg*h"d@N g QJ$f{hMM,h%$$$$h!;Jhv];eig[@hssb[,

FREED %M tC**s R _ f ' & M ?!%@5S@p _j g gi pyM 3MM$ 8Mi@!hE*$NR MMffTi~W4 ROME \;9% $st $Wi Date: Requester: Department: Phone:

August 17,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

IIIVN*V542 & 543 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 80 of 105 N/A N/A Detailed Description of the 'tequested change:

(1xtuJe marked up copoes 4the IST Program plan or RebefRequest afappbcable)

Delete these valves from the program.

Justification for the Requested Change:

These valves are normally closed manual valves which have no specific leakage criteria. (Reference Technical Specification Table 3.6.4-1, note k) These valves should be classified as category B passive.

Reviewed: M. d . MM-- - - > 09 ste #-/#- 9/ Approved:  ! n.a ,/<b/CO94/3-/8-9V GSTEngmeer/Coordmator/KCN/Date) ] Supervssor / N/Date) l Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

O. O O~~

g~

RIVER BEND STATION INSEllVICE TEST PLAN. VALVES

'hy APPENDIXC fptem Name:

@ System t System 41pha- Peas Rev. Date ISTCR R 22-140 410 HVN BI18l94 0022 HVAC-CHILLED WATER VALVE INFORMATION TEST INFORMATION REMARKS

, . Mark Numbw Q Cat. Site Type Act- . Peeities Dws. Type Frog. Relief .

Class (ie) ester Normell Safety Cowd.

1HYN*MOV130 2 A 8 GA M0 O C D4 FSE Q Pl RF LR RF PVLCS Velve Test LR RF PVLCS Div. Test 1HVN'V541 2 AC 8 CK SA 0 C L 10 FSE RF 26 1HVN'V544 3 C 8 CK SA 0 0 K4 FSE Q 1HVN'V545 3 C 6 CK SA 0 0 H8 FSE Q 1HVN'V546 3 C 8 CK SA 0 0 M-3 FSE Q 1HVN'V547 3 C 8 CK SA C 0 G-3 FSE Q 1HVN'V1316 2 AC 3I4 CK SA C C J2 FSE RS 26 LR RF 10 CFR 50, APP.J Test l

l l

l t

. s .. .

(,)

(% v IST CIIANGE REQUEST FORM 0023 fff j, fh !;

Date: Requester: Department: Phone:

August 17,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

IE33*SOVF034 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Requierd Relief Requests: CR's, MR's, MWO's:

Appendix C, page 56 of 105 N/A N/A N/A Detailed Description of the Requested change:

(include marked up cornes ofthe ISTProgram plan or RebefRequest ofappbcabis)

Add this valve to the program.

Justification for the Requested Change:

These valves are the Main Steam Posative Leakage Control System soleniod operated pressure control bypass valves. They are normally closed isolating the PVLCS system pressure from the MS-PLCS injection piping. They are opened automatically, when the MS-PLCS is initiated , to rapidly pressurize the main steam linevo;ume in the required time limit provided the These valves are classified as category B passive.

Reviewed: Mmw #9 M 9-f / Approved: bu% , e J < l /fs 99/5 -/ 9 '#

(IST Esgmeer / Coordmator / KCN / Date) (} ~ 'Supensser/ KCf d) ate) /

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

O- O O g'

RIVER BEND STATION INSERVICE TEST PLAN -VALVES

,,,, u i ,

my APPENDIX C f

Svetem f. Svetem Alshe: Peas Rev. Dete ISTCR 7: System Name:

f_&B 27-2CA 208 MSI 8/13/94 0023 MSIV POSITIVE LEAKAGE CONTROL VALVE INFORMATION TESTINFORMATION REMARKS Merk Nember Q Cat. Sire Type Act- Peeities Dwg. Type Frog. Ilslid .

Qaee Gej meter Neneell Safety Coord.

1E33*MOVF028 2 B 2 GL MD 0 D&C L7 FSE Q PI RF 1E33'MOVF027 2 B 2 GL MD C D&C L4 FSE Q PI RF 1E33*MOVF028 2 8 2 GL M0 C O&C L-8 FSE Q PI RF 1E33*SOVF014 2 B k GL S0 C O&C L 18 FSE Q C FS Q ,

PI RF 1E33*SOVF034 2 B 2 GL SD C D&C L-9 FSE Q C FS 0 Pt RF 1E33*VF004 2 C 2 CX SA 0 0 M 17 FSE Q 1E33'VF024 2 C ,2 CK SA 0 0 M-8 FSE CS

O...

IST CIIANGE REQUEST FORM ISTCR #: > j f > f y g g : N gg p f ';s #it&g ss@$

0024 p!

gjg@N pf68@%yqsga$63fMgga g! -

peutm t%p$t97QJ$ii-T QgwM;912 Rumm&ns Q$i$$F%Ci Jhn%s'uih%%pdfD NdA s%ggW w!pg gg/ iW ssa 'T ?h' e gM . ,, k Date: Requester: Department: Phone:

August 17,1994 J. K. Roberts System Engineering - IST X 4554 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

IB33*VF013 A,13B,17A, & 17B RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required Relief Requests: CR's, M R's, MWO's:

Appendix C, page 3 of105; N/A VRR-I-01, CSJ-70 MR 92-0085 Appendix D, VRR-1-01 & CSJ-70 Detailed Description of the Requested change:

(incluJe marked up coptes ofsive ISTProgram plan or ReluefRequest ofappiscable)

Change Appendix C, page 3 of 107, TEST INFORMATION, test Freq. from "RF" to "CS and the Relief number from 02 to 70"; Appendix D delete the Interim Valve Relief Request No. VRR-I-01 which is superseded by adding Cold Shutdown Justification No. 70.

Justification for the Requested Change:

The test frequency for these valves was at refuel per Valve . Relief Request No. 2, this change is possible as the result ofimplementation ofMR 92-0085 which installs test connections ( installation complete? during RF-5).

Reviewed nbM (ISTEnyneer / Coordmator / KCN / Date)

/ / Approved: u Q M /D#6[f-N-W Superwsor/LCN/ Dated

(}

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

__-.___ -_-_- - _ _ -- - - - - , . . ~ - - - - - - , - - . - - , . - . - .- - - -- - _ _ __- - - - _ - _ .

f e -*= 0

&~

g-RIVER BEND STATION INSERVICETEST PLAN VALVES Page 3 of 105 M acy APPENDl1 C System t Svetem Alohe- Pese Rev. Date ISTCR R System Name:

PJE 251C 053 RCS Bl2194 0024 REACTOR RECRCULATION VALVE INFORMATION TEST INFORMATION REMARKS Mark Ilumber G , Cet. Sire Type Act- Peeities Dws. Type . Frog. lletief .

Close Sej meter Normell Safety Ceerd. ,

1833*A0VF019 2 B 3/4 GL A0 0 C L9 FSE Q 2 FS Q Pl RF 1833'A0VF020 2 B 3I4 GL A0 0 C L-8 FSE Q 2 FS Q Pl RF IB33'VF013A 2 C 3/4 CK SA 0 C F4 FSE CD 70 1833'VF0138 2 C %4 CK SA 0 C F 17 FSE CS 70 IB33'VF017A 2 C 3/4 CK SA 0 C E7 FSE CS 70 1B33'VF0178 2 C 3/4 CK SA 0 C E 18 FSE CS 70

~

.A

  • l INTERIM l O VALVE REOUEST FOR RELIEF NO. I-01 i

DELETED - SUPERSEDED BY CSJ-70 l

l

)

l i

O 08/23/94 - 0023 O

or a

COLD SilUTDOWN JUSTIFICATION REOUEST NO. 70 O

V COMPONENT: FUNCTION ' CLASS CATEGORY 1B33*VF013A Reactor recirculation pump mechanical 2- C IB33*VF013B water supply, drywell isolation valves IB33*VF017A IB33 *VF017B TEST Reverse flow test to the closed position quarterly.

REOUIREMENT:

BASIS FOR Reverse flow testing these valves quarterly would require JUSTIFICATION: isolating the seal water flow to the reactor recirculation pumps.

The interruption of seal water flow, even for a short time, could result in extensive damage to the pump seals.

Additionally, the test connections for these valves are located in the drywell and entry into the drywell does not routinely occur during a normal cold shutdown due tom alara considerations.

ALTERNATE Reverse flow test during cold shutdown when the drywell is TESTING: accessible to personnel.

O 8/23/94 - 0024 O

O TO: Controlled Copy Holders ofIST Pump and Valve Program manual O

Please insert the attached changes into your manual. )

1. ISTCR #0023 - In the back of the manual replace ISTCR#0023 with the CORRECTED COPY. ,

j

2. ISTCR #0025 - In Appendix C, remove and replace page 26 and 27 of 105; place ISTCR #0025 in the back of the manual. l
3. ISTCR #0026 - In Appendix C, remove and replace pages j 72 through 78 of 105; place ISTCR #0013 in the back of i the manual.

l

4. ISTCR #0027 - In Appendix C, remove and replace page 32 of 105; place ISTCR #0027 in the back of the manual.

1

5. STCR #0028 - In Appendix C, remove and replace page 34 of 105; place ISTCR #0028 in the back of the manual.

6 ISTCR #0029 - In Appendix C, remove and replace page ,

31 and 67 of 105 ;in Appendix D remove and replace  !

CSI-27; place ISTCR #0029 in the back of the manual. l

7. ISTCR #0030 In Appendix C, remove and replace page 42 through 52 of 105; place ISTCR #0030 in the back of the manual.
8. ISTCR #0031-In Appendix C, remove and replace page 31 of 105 ; in Appendix D remove and replace CSJ-78; place ISTCR #0031 in the back of the inanual. I
9. ISTCR #0032- In Appendix C, remove and replace page 64, 65 and 66 of 105; I place ISTCR #0032 in the back of the manual.

i

n s s

Q ....... CORRECTED Copy * -

FlEpGY OPERATIONG J j

HOLDEqrs IST CIIANGE REQUEST FORM! OCIl0 '94 72 l

Ll';,]' rg ' S / d%j p'[ ;? ,t'j ' j9j'q,'{ h'g g 1.E4 RETumagAMON CoffrROLLED 'U 'E ISTCR #: ,l s

0023 g

%y, ;'p^, , u . nypg;p g yn ., g;w',

w 4 ',ggj%f moww% f'Inpc

-: e&v g4 . ;qxe: m ,,,. c~ -

Requester: Department: Phone:

Drte:

August 17,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

IE33*SOVF034 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP Change Required Relief Requests: CR's, M R's, MWo's:

Affected Pages:

Appendix C, page 56 of 105 N/A N/A N/A Detailed Description of the Requested change:

t indude markeJ up copues of the ISTProgram plan or RehefRequest afappbcable)

Add this valve to the program.

Justification for the Requested Change:

These valves are the Main Steam Positive Leakage Control System solenoid operated pressure control bypass valves. They are normally closed isolating the PVLCS system pressure from the MS-PLCS injection piping. They are opened automatically, when the MS-PLCS is initiated , to rapidly pressurize the main steam line volume in the required time limit provided supply line pressure is greater than 50 psig and reactor pressure is less than 25 psig. They close automatically, when the 5 minute time delay has timed out or the steam line to the reactor pressure differential is achieved , to isolate the pressure control valve bypass flow path and limit the amount of air supplied to the process line to allow for long term leakage control operation. They also close automatically the supply air pressure from PVLCS decreases to less than 50 psig or the reactor pressure increases above 25 psig. The valve fails safe to the closed position on loss of power This valve is currently tested in accordance with STP-208-6701.

Reviewed: - L,w OMf .F @k Approved: >n A /oNc/ y-27-y l (IST Er:guneer / Coordinator / KCN / Datel Q' ( SupervusorlKCN/D}e)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

( /7

(_/

I~ EfMERGY OPERAHONS l

~

e not.cen e I

V IST CIIANGE REQUEST FORN, OCIl0 94 72 5

0025 N '

Ikk$$hIbis NhhEE$!N[ijIM C IRTM !N MF

+

fS Nk$ e ,$ N b $ N $$ ^ d b Ik is$hsh@$PNM9??

Requester: Department: Phone:

Date:

R. H. Martin Systems Engineering - IST X 4836 August 23,1994 Issue riate and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ISWP*PVY32A, B, C & D RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP Change Req'd: Relief Requests: CR's, M R's, MWO's:

Affected Pages:

Appendix C, page 26 of 105 STP-256-6321 & STP-256-6322 N/A CR 94-0997 4

Detailed Description of the Requested change:

(include marked up copres ofthe ISTProgram plan or RehefRequest sf appbcable)

Add these valves to the Program for Full Stroke Exercise (FSE), Stroke time to the open position (ST-0) and Fail-Safe test in the open direction Justification for the Requested Change:

These valves have a safety function to fail-safe to the open position on loss of power to allow maximum cooling flow through the Control Bldg.

Chilled Water Chiller condensers.

I f_ w #M' //> f/9.y/ Approved: b ,la !c.;9/3-d5-W Reviewed: tSESuper/sor/KC$/Date)

(1$T Engineeri Cadunator / ArN / Date)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program LMS7xA5cf Af' MAV A#M nr SS h y w s/nL wea9aaews Drch dest dd# fdWW

<1  %,

RIVER BEND STATION Page 26 el 105

- 15SEIMCE TEST PtAR -VALVES APPERDIX C EMERGY System t System Alshe- Pass Rev. Date ISTCR r System Name:

_P&@

9-108 118 SWP OI2W94 0025 SERVICE WATER IIORMAL VALVE INFORMATION TESTINFORMATION REMARKS Cork 5 ember Q Cat. Bire Type Act- Posities Dus. Type Frog. llelief Does Sej meter Bermell Safety Caerd.

ISWP'MOV778 3 B B BF M0 O O&C P-4 FSE Q Pl RF .

ISWP'MOV96A 3 B 30 BF MO O C D-18 FSE Q Pl RF ISWP'MOV968 3 B 30 BF M0 O C E-17 FSE Q PI RF ISWP'V77 3 C 8 CK SA 0 0 M-17 FSE Q  ;

ISWP*V78 3 C 8 CK SA 0 0 L 18 FSE Q ISWP*V79 3 C 6 CK SA 0 0 J-19 FSE Q ISWP'V90 3 C 6 CK SA C 0 G-19 FSE Q ISWP'PV32A 3 8 6 GL HYD TIE O M 11 FSE Q 0 FS Q ISWP*PV328 3 B 6 GL HYD TIE O K 13 ,

FSE Q 0 FS Q ISWP'PV32C 3 8 8 GL HYD Tie O L-11 FSE Q 0 FS Q ISWP'PV320 3 8 6 GL HYD TIE O G-13 FSE Q 0 FS Q

o o o

~~

g-RIVER BEND STATION INSERVICETESTPLAN VALVES

,,e.e 27 er iO5 my APPENDIX C System Alshc Paes Rev. Date ISTCRF- System Name:

E8@ Svitem f:

9-10B 118 SWP 8/29/94 0025 SERVICE WATER NORMAL VALVE INFORMATION TEST INFORMATION REMARKS Q Cet. Site Type Act- Peeities Dws. Type Frog. Relief Cork Number Close Saj ester Normell Safety Coord.

3 C 8 CK SA 0 O&C P4 FSE RF 25 ISWP'V135 ISWP'V136 3 C 8 CK SA 0 O&C P-5 FSE RF 25 ISWP*V143 3 C 8 CK SA 0 O&C N4 FSE RF 25 ISWP'V144 3 C 8 CK SA 0 D&C N-3 FSE RF 25 ISWP'V153 3 C 6 CK SA C C M 17 FSE Q 1SWP'V154 3 C 6 CK SA C C L 17 FSE Q ISWP*V155 3 8 6 CK SA C C J-18 FSE -Q 1S"P'V156 3 C 6 CK SA C C G-18 FSE Q ISWP'V201 3 C 8 CK SA 0 O&C M-6 FSE CS 69 ISWP'V202 3 C 8 CK SA 0 O&C M1 FSE CS 68 ISWP'V326 3 C 30 CK SA 0 C A-16 FSE RF 58 ISWP'V327 3 C 30 CK SA 0 C C-16 FSE RF 58

O O ' '

ENTERGY OPERATIONS i D 7 HOLDER # ,/

IST CIIANGE REQUEST FORM OCT10 '94 72 isTCR n: e g g pi h ggg g ,% g 6 gj$$g$TM@g@g$$g$g$g$g$ggggg@g$$@f%$$$2WM!3s M di $i d M M  % MMm i

Dtte: Requester: Department: Phone:

August 29,1994 Jr. Victory BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

lHVC*MOVI A, lHVC*MOVlB, lHVR*AOV123, lHVR*AOV125, RBS Ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 IHVR*AOV126, lHVR*AOV128, lHVR*AOV147, IllVR*AOV148, lHVR*AOV165, IIIVR*AOV166, lHVR*AOD23A, lHVR* AOD23B, lHVR* AOD161, lHVF* AOD102, lHVF*AOD104, l HVF* AOD I 12, lHVF* AOD137, lHVF* AOD101, IllVF* AOD 122, lHVR*AOD10A, lHVR*AOD10B, l HVR*AOD143, lHVR*AOD164, lHVR* AOD214, lHVR*AOD249 &

lHVR*AOD262 Affected Pages: STP Change Required Relief Requests: CR's, MR's, MWO's:

Appendix C, page 72,73,74,75, N/A N/A N/A 76,77 and 78 of 105 Detailed Description of the Requested change:

(include marked up copues ofthe ISTProgram plan or RehefRequest ofappbcable)

Change the safety position from "O&C" to "C" Justification for the Requested Change:

These valves have an active safety function in the closed position only. They r,re Drywell, Containment, or Secondary Containment Isolation valves. They are not required to reopen after receiving an isolation signal nor are they required to, open to support the Standby Gas Treatment System. They fait closed on loss of power and are not supplied with a safety power source since they are not required to reopen.

Reviewed: d [. b O' N # 4 Approved: n t . .I /3 M/ N/ *

(IST Engmeer / Coordmator / KCN /Date) Supernsod/KCN/ base) l Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program l

O O

~

O' g'

RIVER BEND STATION 15SERVICETESTPLAN VALVES

,,,,y,,,

my APPE50lX C System t. System Alshe- Peas Rev.Date ISTCR R System Name:

P!dD 402 iNC SI29f94 0026 HVAC CONTROLBLDG 22 9A VALVE INFORMATION TESTINFORMATION REMARKS C:ert Bomber G Cet. Sire Type Act- Posities Dwg. Type Freq. - Relief Clase Sej meter Bermell Safety Coord.

. 1HVC*MOVit: 3 8 24 BF M0 O C J-12 FSE Q PI RF t 1HYC*MOV1B 3 8 24 BF MG 0 C J 12 FSE G Pl RF

_______.._______m___.__.____ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _- . _ _ _. ~ , -

O~

O O g~

RIVER BEND STATION INSEllVICE TEST PLAN -VALVES

, ,,3 ,,,os "my APPENDIX C Pass Rev. Date ISTCR R System Name:

P&t0 Svetem e Svitem Aishe:

221B 403 HVR 8/29/94 0028 HVAC-CONTAINMENT BLDG VALVE INFORMATION TESTINFORMATION REMARKS Cert Bamber G Cat. Size Type Act- Peeition Dag. Type Frog. Relief Close gej ester Normal l Safety Ceard.

2 A 36 BF A0 C C C-11 FSE Q 59 1HVR*A0V123 C FS Q PI RF LR Q 10 CFR 50. APP.J Test 1HVR*A0V125 2 8 24 BF AD C C C-9 FSE CS 37 C FS CS PI RF 1HVR'A0V126 2 B 24 BF A0 C C N 18 FSE CS 37 C FS CS

- P1 RF 1HVR*A0V128 2 A 36 BF A0 C C N-17 FSE Q 59 C FS Q PI RF LR Q 10 CFR 50, APP.J Test 1HVR*A0V147 2 B 24 BF A0 C C D-9 FSE CS 37 C FS CS Pl RF 1HVR'A0V148 2 B 24 RF AD C C N-19 FSE CS 37 C FS CS Pl RF

~ M *

'd (O g-RIVER BEND STATION INSERVICETEST PLAN-VALVES my APPENDIX C System f- System Alpha- Pese Rev. Dete ISTCR f- System Name:

E&lo 221B 403 HVR 8/29I94 0026 HVAC-CONTAMMENT BLOG VALVE INFORMATION TEST INFORMATION REMARKS Cork member Q Cat. She Type Act- Posities Dws. Type Freq. Relief Close GeJ ester serieell Safety Coord.

1HVR*A0V165 2 A 36 BF A0 C C D-12 FSE Q 59 C FS Q

' Pt RF LR C 10 CFR 50, APP.J Test 1HVR*A0V166 2 A 36 BF AD C C N-14 FSE Q 59 C FS Q Pt RF LR Q 10 CFR 50, APP.J Test

' ~

Q Q -Q

RIVER BEND STATION Page 75 el 105

- INSERVICETESTPLAN VALVES M uy APPEN0lX C l

P&iD Sv tem A System Alshe- Pese Rev. Date ISTCR F- Svetem Name:

l 221C 403 HVR 8I29I94 0026 HVAC-CONTAINMENT BLDG l

VALVE INFORMATION TESTINFORMATION REMARKS Cork Number a Cat. Siae Type Act- i Peeition Dws. Type Frog. Reuet i

Class Sm) seter l Normell Safety Coord.

lHVR'A0023A - B 18X12 DP A0 0 C E 10 FSE Q Demper, T.S. 4.8.5.3 I C FS Q PI RF 1HVR*A00238 - B 18X12 DP A0 0 C D-10 FSE Q Demper. T.S. 4.8.5.3 C FS Q PI RF 1HVR*A00161 -

B 18X12 DP A0 0 C B-12 FSE Q Demper, T.S. 4.8.5.3 C FS Q PI RF

. r i

~

O' O O e-Mac,Y RIVER BEND STATION l#SElIVICE TEST PLAN-VALVES APPENDIX C Page 76 el 105 ISTCR t System Name:

g System t System Abhe- Pese Rev.Date 406 HVF BI29I94 0026 HVACRIEL BLDG 22-8A VALVE INFORMATION TESTINFORMATION REMARKS Cork Bomber D Cet. She- Type Act- Femities Deus. Type Freq. Reuel Claes Sej ester Bermell Safety Coord.

1HVF'A00102 8 30X24 DP A0 0 C B-17 FSE Q Desper, T.S. 4.6.5.3 C FS Q Pl RF i 8 30X24 DP A0 0 C F4 FSE Q Demper. T.S. 4.8.5.3 1HVF'A00104 C FS Q j

Pt RF 30X24 DF A0 0 C B 16 FSE Q Desper. T.S. 4.8.5.3 l

1HVF'A00112 -

B l C FS Q Pt RF l

j IHVF*A00137 B 30X24 DP A0 0 C G-3 FSE Q- Demper, T.S. 4.6.5.3 C FS Q PI RF

~ ...

g-RIVER BEND STATION IBSERVICE TEST PLAN- VALVES APPE30lX C eNinGY System F: Sntem Alphe- Pese Rev. Dets ISTCR F- System Name:

P&lg 406 HVF &'29I94 0026 HVACREL BLDG 2248 VALVE INFORMATION TEST INFORMATION REMARKS Cert Bomber G Cat. Size Type Act- Posities Dws. Type Frog. IleEst Claes Sej enter Bermell Safety Ceerd.

1HVF'A00101 - B 38X36 DP A0 0 C N-15 FSE Q Dee, T.S. 4.6.5.3 FS Q PI RF 8 36X36 DP A0 0 C N-16 FSE G Demper. T.S. 4.6.5.3 1HVF'A00122 C FS Q Pl RF 1

l 9-

O~

~

O O

&~ RIVER BEND STATION INSERVICE TEST PLAN -VALVES

,,,, ,, ,, , os APPENDIX C ENTERGY System Alohe- ISTCR F: System Name:

M System F: Paes Rev. Date 22-10 409 HVR 8/2W94 0026 HVAC. AUXILIARY BLDG VALVE INFORMATION TEST INFORMATION REMARKS Cork Neober Q Cet. Sire . Type Act- Peeities Dws. Type Frog. Relief -

Close (isj motor Normal l Safety Coord.

B 30124 DP A0 0 C N-6 FSE Q Damper T.S.4.6.5.3 1HVR*A0010A -

C FS Q PI RF B 30X24 DP A0 0 C M-6 FSE Q Damper, T.S. 4.6.5.3 1HVR'A0010B -

C FS 0 Pl RF B 36X48 DP A0 0 C L19 FSE Q Demper, T.S. 4.6.5.3 1HVR'A00143 -

C FS 0 PI RF 1HVR'A00164 B *36X48 DP A0 0 C M 19 - FSE Q

  • Deeper, T.S. 4.6.5.3 C FS 0 Pl RF B 36X36 DP A0 0 C N-13 FSE Q Damper, T.S. 4.6.5.3 1HVR'A00214 -

C FS 0 PI RF 1HVR*A00248 - B 30X24 DP A0 0 C N5 ,

FSE D Damper. T.S. 4.6.5.3 C FS Q PI RF 1HVR*A00262 - B 36X36 DP A0 0 C N-13 FSE Q Demper, T.S. 4.6.5.3 C FS Q Pl RF

. _ _ _ _ - _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ - - _ - . ._ _. _. - _ _ - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ = _ - _ _ _ _ -

_ w ". .-

s .

f ENTERGY = OPERATIONS so:.oen n -

l IST CIIANGE REQUEST FORM OCT10 94 72

' ' ' * * ~~ ~*' '****M

":ACA' ufGA'9'W& RETURt%lg5 ;

  • "Qvg%V

~ '

ISTCR "- ' G l:T'

:; :a , ;;Or ' G: < ^ ". w 0027  :'-N'Af a' m% i:?~:;'d 'W" &' ' ' :' ' ' % ! ' :'\

. , 'JiD,9:;;'V 5/'i^g%':*

  • "V"*;+:'%^ 1 V'

,,.s<(5B 4 y .., c') ' ? IN,'1 j',, /pNs s 't y n q'iM ' _g'M :'~s ,'t JfE 'J62@ '.(t"!"'R,b - a [ ' " Q. _&s Requester: Department: Phone:

Dtte:

August 29,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ISWP*V650 & V651 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP Change Required Relief Requests: CR's, M R's, MWO's:

Affected Pages:

Appendix C, page 32 of 105 N/A N/A Detailed Description of the Requested change:

(include marked up copues ofthe IST Program plan or ReisefRequest sfappiscablel Change the safety position from "O&C" to "C" Justification for the Requested Change:

These valves are in the service water to the drywell unit coolers return header piping. The non-class drywell unit coolers are isolated, upon receipt of an automatic or manual containment isolation signal, by valves 1SWP*MOV4A, B and 1SWP*MOV5A, B closing. Check valves V650 and V651 are located upstream of MOV5A, B and are isolated when the MOVs close.

Reviewed: orba ; # '

/ Approved: b ic /64/F-d'n Superwsot'lKCN/Liate)

(IST Eiguneer / Coordsnotar / KCN/Da:ep Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

'~

O O O g~ w RIVER BEND STATION teSEllVICETESTPLAN VALVES Pe e32eiiOS y APPER0lX C M System F; System Alshe: Pese Rev. Date ISTCR f- Svstem Name:

9-10D 118 SWP 8!28(94 0027 SERVICE WATER -NORMAL VALVE INFORMATION TEST INFORMATION REMARKS i tark Number a Cat. Sire Type- Act- Peefties Ows. Type Frog. Ilefief Clase GeJ ester senseil Safety Coord.

ISWP'Vl75 3 C 12 CK SA 0 O&C B-18 FSE CS 42 ,

LR RF 10 CFR 50, APP.J Test IS*P'V203 3 C 8 CK SA C 0 E-18 FSE RF 11 ISWP'V204 3 C 8 CK SA C 0 C-18 FSE RF 11 ISWP*V650 3 C 10 CK SA 0 C L 17 FSE CS 52 ISWP'V651 3 C 10 CK SA 0 C H-17 FSE CS 52 1

l l -

P- m. ._ m _.___.__.__.____..u.__________._.____________E.______m____E. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

T ~ p -

} ENT$RGY OPERATIONS ci HOLDER #

IST CIIANGE REQUEST FORAI OCT10 '94 72

,s.

  • ^W ' . . *Wly i 9, ~

LSTCRu L GQyk3%

A y+A nni> Oggf

, i t??Mk yg* 4 $fc g$ Q - 9% i P"MpdNg38W&RETURMABIELf "4%66 J **MPOMCDNTRCLLuc 0028 a

eazg Na94 L+~

n =gNM at m qsg g gkgkh

$dfNMbb &s FIA N M 8 M v*/ . 15$ M $$ [ $$ hib $~ 90 MQ$#*d* 6 DEI #'[

Requester: Department: Phone:

Date:

August 29,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ISWP*VIO86 & V1087 RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP Change Required Relief Requests: CR's, M R's, MWO's:

Affected Pages:

Appendix C, page 34 of 105 N/A N/A Detailed Description of the Requested change:

(Include marked up copies of the ISTProgram plan or RehefRequest sfapplicable)

Change the safety position from "O&C" to "C" Justification for the Requested Change:

These valves are the air inlet checks for the vacuum release accumulators. The air supply is non-safety and is not credited, therefore there is no safety function for the valves to open to supply air to the accumulators. Accumulator isolation is provided by solenoid valves ISWP*SOV55A

& B. These SOVs are normally open and close automatically if vacuum release solenoids ISWP*SOV522A-D open or instrument air pressure drops below 100 psig.

Reviewed: [ rX M w [ 4d9 [ Approved: <tM [ 4 / J -2 7- W (ISTEngsneer / Coordunator / KCN / Date)

/ (/ Q (SESuperdsor/Ar$/Dase) l l

Once completed, submit to IST Engineer / Coordmator for incorporation into IST Program l

l

A J

B e may RIVER BEND STATION INSERVICETESTPLAN VALVES APPEB0lX C Pege 34 of 105 P&lD Sntem A System Alphac Pese Rev. Date ISTCR R Sntse Nune:

9-10F 118 SWP 8l2W94 0029 SERVICE WATER -NORMAL VALVE INFORMATION TEST INFORMATION REMARKS Cas senber Q Cat. Site Type Act- Peeition Owg. Type Freq. Assef Claes Sej ester Bermell5efety Coord.

1EWP'SOV522D 2 A 1 GL SO C O&C B-12 FSE CS 30 PI RF LR RF 10 CFR 50, APP.J Test ISWP'SOV5238 3 8 34 GA SO C O&C N-12 FSE CS 30 PI RF ISWP'SOV523D 3 B 34 GA S0 C D&C N 11 FSE CS 30 PI RF ISWP*SOV552A 3 8 34 GL SO O C B 15 FSE CS 30

. Pl RF 1SWP'SOV5528 3 B 34 GL SO O .C B-10 FSE CS 30 Pl RF ISWP'V199 3 C 18 CK SA C 0 J4 FSE Q ISWP'V200 3 C 18 CK SA C 0 J4 FSE Q ISWP'V1086 3 C 34 CK SA C C B 16 FSE CS 30 ISWP'V1007 3 C 34 CK SA C C B-11 FSE CS 30 1SWP'V1091 2 C 34 CK SA F 0 A 17 FSE CS 30 ISWP'V1092 2 C 34 CK SA C 0 B 12 FSE CS 30

O o G

ENTERGY OPERATIONS i

- ~

s euxonn e J -

IST CIIANGE REQUEST FORM (C110 34 72 29 ,

Date: Requester: Department: Phone:

August 29,1994 J. Rogers BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ISWP*Vl72 & V173; ISWP*V147, V148, Vl49 & VISO RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 Affected Pages: STP Change Required Relief Requests: CR's, MR's, MWO's:

Appendix C, page 31 and 67 of STP-256-3301 CSJ-27 CR 94-0736, CR 94-1131 105: Appendix D, CSJ-27 Detr.iled Description of the Requested change:

cinclude marked up copses ofthe ISTProgram plan or RehefRequest sfappbcable)

In Appendix D, add valve ISWP*V173 to CSJ-27;in Appendix C, change Freq. from RF to CS and add 27 to the reliefcolumn for V173.

ISWP*Vl47, V148, V149 & VISO , in Appendix C, change Freq. from RF to CS and add 27 to the relief column (FSE), and add a PSE quarterly - .

Justification for the Requested Change:

To identify the applicable Cold Shutdown Justification (CSJ-27) and add ISWP*V173, V147, V148, V149 & V150 to this Justification.

Partial stroke open and full stroke closed the pump discharge check valves quarterly. Full stoke open exercise these check valves at cold shut down.

Reviewed: d. [m  ; //M Approved: ' or m/l oph / 9-/357 cisY Eregmur / Coonimator /KCN/Date) Sufervusor/AJA/Date)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

g-RIVER BEND STATION INSERVICETEST PLAE. VALVE 5

,,,,3,,,,,

my APPEBOlX C System F- Svetem Alphe- PeasRev.Date ISTCR F: Svetem Nons:

t&B 9-100 118 SWP 9(13I94 0029 SERVICE WATER- NORMAL VALVE INFORMATION TEST INFORMATION REMARKS terti sembw a Cat. - Site Type Ast- Peetties Ows. Type Frog.- ReNef Does Sej ester Bermell Sofwy Coord.

ISWP'MOV507B 3 A 12 GA M0 O O&C D-20 ESE Q 52 Pt RF LR RF 10 CFR 50, APP.J Test ISWP*MOV510A 3 8 12 GA M0 C O&C B-21 FSE RF 11 M RF 1SWP'MOV510B 3 8 12 GA M0 C O&C E-21 FSE RF 11 M RF ISWP'MOV511 A 3 B 18 BF M0 O C G-1 FSE Q M RF ISWP'MOV511B 3 B 18 BF M0 O C G-3 FSE Q M RF ISWP'RV119 3 C 1 RV SA C D&C B-16 SP RF3 ISWP'RV140 2 C 3i4 RV SA C O&C N-17 SP RF3 1SWP*Vl72 3 C 30 CK SA C 0 P4 FSE CS 27 ISWP'V173 3 C 30 CK SA C 0 N-5 FSE CS 27 I

ISWP'V174 3 AC 12 CK SA 0 O&C D-18 FSE CS 42 LR RF 10 CFR 50, APP.J Test

O s- m -

}

) 0 g-RIVER BEND STATION INSERVICE TEST PLAN . VALVES APPEN0lX C ENTERGY System f. System Aishe- Pese Rev. Date ISTCR F- System Name:

P&g 910E 256 SWP 9I13f94 0029 SERVICEWATER STANOBY VALVE INFORMATION TEST INFORMATION REMARKS Lart Nember Q Cat. 54ae Type Act- Peelties Dws. Type Frog. Relief Goes pej eeter Normell Safety Coord.

ISWP'A0V599 3 B 16 BF A0 D&C H-16 FSE Q MR 924012 ISWP'MOV40A 3 B 18 BF M0 C O&C G 10 FSE Q PI RF 1SWP'MOV40B 3 B 18 BF M0 C O&C G4 FSE Q PI RF ISWP'MOV40C 3 B 18 BF M0 C O&C G-9 FSE Q PI RF 1SWP'MOV400 3 8 18 BF M0 C O&C G-7 FSE Q PI RF ISWP'MOV55A 3 8 30 BF M0 C D&C F 18 FSE Q PI RF ISWP*MOV558 3 8 30 BF M0 C D&C G-15 FSE Q Pl RF ISWP'V147 3 C 19 CK SA C O&C F 10 FSE CS 27 PC Q ISY P'V148 3 C 18 CK SA C D&C F-9 FSE CS 27 PSE Q ISWP'V149 3 C 18 CK SA C D&C F4 FSE CS 27 PSE Q ISWP'V150 3 C 18 CK SA C O&C F-7 FSE CS 27 PSE Q

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ . . ~ . . .- - -.

i e

b COLD SHUTDOWN JUSTIFICATION REQUEST NO. 27 COMPONENT FUNCTION CLASS CATEGORY 1SWP*V172 These Standby Service Water to normal service 3 C 1SWP*V173 water header check valves open to allow SSW pump flow into the supply system piping.

1 SWP*V147 These pump discharge check valves open to 3 C 1SWP*V148 allow Standby Service Water pump flow to the 1SWP V149 discharge header and close to prevent diversion 1SWP*V150 of flow through an idle pump.

IliS1 REQUIREMENT Full stroke exercise open and closed quarterly per IWV-3521 and 3522.

BASIS FOR JUSTIFICATION These check valves are normally closed since the Standby Service Water pumps are normally in standby with normal service water supplying the plant systems OV cooling requirements. The pump discharge check valves are part-stroked open and full closed during quarterly pump testing. This testing uses a test loop which does not allow pump full flow. Also, the header check valves are not in the test loop. To test the header check valves open and full flow test the pump discharge check valves would require initiating SSW in the normal flow path. Standby Service Water system temperature is lower than normal service water which will cause a rapid increase in detta T's of unit coolers supplied with normal service water. Exceeding the delta T setpoint on unit cooler 1HVR*UC8 will cause isolation of the MSIVs and a reactor scram. Initiating Standby Service Water in the normal flow path is not practical during power operation.

ALTERNATE TESTING Part stroke open and full stroke closed the pump discharge check valves quarterly.

Full stroke open exercise test these check valves at cold shutdown.

(d 9/13/94 - 0029  ;

7 ENTERGY OPERATICNS ,r

  • _

['T n w:t OEn #

'd L ,) j IST CIIANGE REQUEST FORM 0C110 '94 72 i

ISTCR #:

F N

g; ykaghRETURNA g%,, _Btf  :

NP ;' ": \ 3hM b${M N$6? k k [ $ldgg 7 M'@ruwf* ^ '

@ F'-

Requester: Department: Phone:

D::te:

Jr. Victory BCP X 3632 September 7,1994 issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

1E12*MOVF026A & B,74A & B,87A & B, IRHS*V34, V64 & V65, IEl2*RVF101 RB3 ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP Change Required Relief Requests: CR's, M R's, MWO's:

Affected Pages:

Yes N/A hiR 93-0047, CR 94-1063 Appendix C, page 42 through 52 of105 Detailed Description of the Requested change:

Delete valves IE12*hiOVF026A & B,74A & B,87A & B, IRilS*V34, V64 & V65 from the program.

Justification for the Requested Change:

1E12*h10VF026A & B: The power has been removed from these valves. They are normally closed and their safety position is closed. The safety function of these components (Steam Condensing) is not allowed by Tech Specs. Since the power has been removed, a situation where the valves could be in the open position does not exist.

1E12 *hiOVF074A & B: These valves are for operator convenience and do not have a safety function as defined by the code.

1E12*hiOVF087A & B: A blank flange has been installed in the line upstream of these valves and the power has been removed. These valves are normally closed and their safety position is closed , there is not a situation where these valves could be in the open position.

The above valves should be reclassified as "B" Passive and as such are not required to be tested by the code.

1 RIIS*V34, IRIIS*V64, IRHS*V65 - the internals were removed from these valves and they should be removed from IST testing, since they no longer perform a safety function (Refer. h1R 93-0047).

[

  1. 7 f-f-// Approved: m L,  %*( / 7 - Io - W Reviewed:

tIST Engmeer / CoorJmator / KCN / Date) iSupervesor/fCN/Dfte)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

2 IST CIIANGE REQUEST FORM (continuation sheet)

?$

Affected component (s):

1E12*MOVWO3A, *MOVF004B, *MOVWI1 A & B, *MOVW21, *MOVF040,

  • MOVF046A & B, *MOVW47A & B, *MOVW49, *MOVW73A, IRilS*V240 IE12*VW99A & B; IE12*VW46A, B &C; IE12*VW98 Detriled Description of the Requested change (Cont.):

Per CR 94-1063, add valve IE12*RVF101 to the program.

In Appendix C for the following Valves: lE12*MOVF003A, *MOVF004B, *MOVF011 A & B, *MOVF021, *MOVF040, *MOVF046A & B,

  • MOVF047A & B, *MOVF049, *MOVF073A change the normal position to O & C.

Add PIV test to the valve table for valve 1RilS*V240 Add "C" under the safety position in the valve table for: IE12*VF099A & B Change the safety position from "O" to "O & C" for IE12*VF046A, B &C and "O & C" to "O" for IE12*VF098.

J:stification for the Requested Change:

Add IE12*RVF101 per CR 94-1063.

Change to the position for valves 1E12*MOVF003 A, *MOVF004B, *MOVF011 A & B, *MOVF021, *MOVF040, *MOVF046A & B,

  • MOVF047A & B, *MOVF049, *MOVF073 A is consistent with the basis document iRIIS*V240, this is a 1" check valve and is the first normally closed valve in line 750-351-2(Z-). PIVs are two normally closed valves separating the RPV pressure from a low pressure line. If this valve is not classified as a PlV, IE12*F008 is the only closed valve separating the RPV pressure from the low pressure line using line 750-351-2(Z-) as the flow path. The valve is tested as a PIV in parallel with IE12*F009 and would only require the valve tables to be updated with no additional testing.

Change the normal position in Appendix "C" for valves IE12*VF099A & B to be consistent with the basis document.

l Change the safety position in Appendix "C" for valves 1E12*VF046A B & C and iE12*VF098 to be consistent with the basis document.

.- -. __ -_ _ _ _ 2 W2. _ _ __ - __.

~ ~

'O RIVER BEND STATION Pege 42 et 105

- INSERVICETESTPLAN VALVES APPENDIX C ENTERGY System t System Alohe: Peas Rev. Date ISTCR R System Name:

P&!D 204 RHS Si10(94 0030 RHR LPCI 27 7A VALVE INFORMATION TEST INFORMATION REMARKS tert Number Q Cat. She Type Act- Peeities Dws. Type Freq. Relief Close (iej ester Berenell Setety Coord.

2 C 1.5 RV SA C O&C F 16 SP RF 500 peig 1E12' RVF025A 1E12' RVF036 2 C 8 RV SA C D&C N 12 SP 44 75 psig (not tested IE12' RVF055A 2 C 4 RV SA C D&C K 13 SP 500 pois (not tested 1E12*A0VF041A 1 AC 10 CK SA C O&C M4 FSE CS 01 TesteWe Check Velve PI RF LR RF RCS Boundary Test 1E12't0VF003A 2 8 14 GL MO O&C 0 L 11 FSE Q Pl RF IE12*MOVF004A 2 A 20 GA MO O O&C B-17 FSE Q Pl RF LR RF Water Test 1E12*MOVF006A 2 B IB GA M0 C D&C B 11 ,FSE Q Pt RF 1E12*COVF0068 2 B 16 GA M0 C O&C D-7 FSE Q PI RF 1E12* MOVF0f'8 1 A 18 GA MD C O&C 0-18 FSE CS 19 PI RF LR RF RCS Boundary Test LR RF 10 CFR 50, APP.J Test

s

%./

RIVER BEND STATION Page 43 el 105

- INSEllVICE TEST PLAB-VALVES may APPEEDIX C System Name:

g Svetem t; Svitem Alphc Peen Rev. Date ISTCR#-

27-7A 204 RHS 9(10/94 0030 RHR -LPCI VALVE INFORMATION TEST INFORMATION REMARKS L'ed geseher a Cat. Site Type Act- Posities Dws. Type Frog. Ilefief Does Dej meter permell Safety coord, 1E12'MOVF009 1 A 19 GA M0 C D&C F 20 FSE CS 19 Pl RF LR RF RCS Baumisry Test LR RF 10 CFR 50, APP.J Test IE12*MOVF011 A 2 A 4 GL M0 C&C C M-11 FSE Q Pl RF LR RF Water Test 1E12*MOVF023 1 A 4 GL M0 C O&C J-20 FSE CS 19 Pl RF LR RF RCS Boundary Test

  • LR RF
  • 10 CFR 50, APP.J Test 1E12*MOVF024A 2 A 14 BF M0 C O&C E-19 FSE Q Pl RF LR RF Water Test IE12*MOVF027A 2 A 10 GA M0 C O&C M6 FSE Q PI RF LR RF 10 CFR 50, APP.J Test 1E12'MOVF037A 2 A 10 GL M0 C O&C N5 FSE CS 21 P1 RF LR RF 10 CFR 50, APP.J Test

O h i

j l

g. -

RIVER BEND STATION IBSERVICETEST PLAR VALVES p,,,,,,,,,

l "my APPEB0lX C l System Name:

System F: System Alsha: Peas Rev.Date ISTCH F-P83 RHS Bi10I94 0030 RHR LPCI 27-7A 204 VALVE INFORMATION TEST INFORMATION REMARKS

-a Cat. Sire Type Act- Peetties Dws. - Type Frog. Relief Cert member Claes 8ej meter Berieell Sessty Coord.

B 6 GL M0 O&C C N-18 FSE CS 45 l 1E12'MOVF040 2 P1 RF IE12*MOVF042A 1 A 10 GA M0 C D&C M4 FSE CS 19 PI RF LR RF RCS Boundary Test LR RF 10 CFR 50, APP.J Test IE12*t0VF047A 2 B 14 GA M0 D&C 0 H4 FSE Q PI RF 1E12*MOVF048A 2 B 14 GL MD 0 D&C K-15 FSE Q

. RF

. PI 2 B 8 GA M0 O&C C M 19 FSE CS 45 IE12'MOVF049 Pl RF 2 A 10 GL MD C O&C G-18 FSE CS TP 1E12'MOVF053A PI RF LR RF 10 CFR 50, APP.J Test IE12*MOVF064A 2 A 4 GA M0 O O&C E 15 FSE O PI RF LR RF Water Test 1E12'MOVF073A 2 A 2 GL M0 D&C C H-9 FSE Q PI RF LR RF Water Test

g O RIVER BEND STATION O o'~

-m IBSERVICETEST PLAN-VALVES bGY APPER0lX C g System F; System Ahhe- Pese Rev.Date ISTCH F- Svitem Name:

27 7A 204 RMS C'10f94 0030 RHR LPCI VALVE INFORMATION TEST INFORMATION REMARKS L:ert Reseber Q Cat. She Type Act- Peeities Daug. Type Freq. IIslief

[ Class SeJ ester sermell safety Ceerd.

1E12'VF019 1 C 4 CK SA C 0 L-20 FSE CS 07 1E12'VF031A 2 C 14 CK SA C D&C D-14 FSE Q IE12*VF048A 2 C 4 CK SA C O&C F-15 FSE Q 1E12'VF050A 2 C 10 CK SA C C H-18 FSE RF 20 0 FSE CS 82 Namel 0ps 2 1.5 CK .SA 0 C E 13 FSE RF 24 Disassembly IE12'YF084A C 0 FE Q 1E12'VF085A 2 C 1.5 SC SA 0 C E 13 FSE RF 24 Dissesembly O FSE Q AP 8 GL MA C C N5 LR RF 10 CFR 50, APP.J Test 1E12*VF099A 2 IRHS'RV3A 2 C 4 RV SA C O&C J-14 SP 485 peig(est tested) 1RHS*V34 2 N/A 14 N/A N/A N/A NIA C 18 N/A N/A Velve latemels Removed Not Tested g

O~

O O g-RIVER BEND STATION INSERVICETESTPLAN VALVES my APPEEDIX C System Aloha- Pass Rev.Dete ISTCR F- System Nems:

P&fD System F:

RHS 9/10/94 002 ; RHR LPCI 27-7A 204 VALVE INFORMATION TESTINFORMATION REMARKS Q Cat. Site Type Act- Posities Dws. Type Frog. ReLei Cork meeshw Claes liaj ester Bermell Sofety Ceerd.

AC 1 CK SA C O&C E 20 FSE 8tF 23 1RHS*V240 1 LR RF 10CTR50, APP J Test LR RF RCS Besedary Test I

e 1

~

O O O' g~

RIVER BEND STATION IBSERVICE TEST PLAR-VALVES p,,,,,,,

"my APPE9011C System f System Alohe- Paes Rev.Dete ISTCR f System Name:

P&JO 27 7B 204 RHS 9l10/94 0030 RHR -LPCI VALVE INFORMATION TESTINFORMATION REMARKS Cert somber Q Cat. Size Type Act- Peeities Dws. Type Frog. lleliet Claes OnJ ester Beneell Sefsty Coert 1E12'A0WD41B 1 AC la CK SA C D&C N4 FSE CS 01 Testehls CheckVelve Pl RF LR RF RCS Baumisry Test 2 C 10 CK SA C 0 G-5 FSE Q Testable Check Velve IE12*A0VF098 N RF 1E12'MOWOO3B 2 B 14 GL M0 D&C D E4 FSE Q PI RF 1E12*M0W0048 2 A 20 GA M0 O D&C B-19 FSE Q Pl RF

  • LR RF Water Test 1E12*MOYF011B 2 A 4 GL M0 O&C C H-7 FSE Q PI RF LR RF Water Test IE12'M0WC248 2 A 14 BF M0 C O&C L7 FSE Q PI RF LR RF Water Test 1E12'MOVF027B 2 A 10 GA M0 O O&C M-1 FSE Q Pl RF LR RF 10 CFR 50, APP.J Test

n . .

M b b-s RIVER BEND STATION Page 48 of 105

- IBSERYlCETEST PLAN VALVES M nov APPERDIX C System f: System Abbe: Pese Rev. Data ISTCRF: System Nome:

f&l0 27 7B 204 RHS $1W94 0030 RHR -LPCI VALVE INFORMATION TESTINFORMATION REMARKS Cork Beeber Q- Cat. Site Type Act- Peeities Dwg. Type Frog. Relief Close (iej meter Bennel l Safety Coord.

1E12*MOVF037B 2 A 10 GL M0 C O&C N1 FSE CS 21 PI RF LR RF 10 CFR 50, APP.J Test 1E12*MOVF042B 1 A 10 GA MD C O&C N3 FSE CS 19 Pi RF LR RF 10 CFR 50, APP.J Test LR RF RCS Boundary Test IE12*MOVF047B 2 B 14 GA M0 O&C D F-11 FSE Q Pl RF 1E12*MOVF0488 2 B 14 GL Ma 0 D&C G FSE Q PI RF 1E12*MOVF053B 2 A 10 GL M0 C O&C N-9 FSE CS 19 PI RF LR RF 10 CFR 60. APP.J Test IL2*MOVF0648 2 A 4 GA M0 O O&C C 15 FSE Q Pt RF LR RF Water Test 1E12'MOVF0738 2 A 2 GL MD C C F-10 FSE Q PI RF LR RF Water Test

g RIVER BEND STATION INSERVICE TEST PEAR-VALVES my APPEEDlX C System Nems:

g System F: System Abksc Pese Rev. Date ISTCR F-204 RHS Gl10I94 0030 RHR LPCI 2778 VALVE INFORMATION TESTINFORMATION REMARKS Cert Sumter G Cat. Site Type Act- Posities Dws. Type Freq. llelief Close pej ester Bermell 8efety Coord.

1E12*MovF094 3 B 10 GA M0 C 0 G-3 FSE Q PI RF 1E12*MOVF096 2 B 10 64 M0 C 0 G4 FSE G PI RF 2 C 1.5 RV SA C O&C G-15 SP RF1 500 peig 1E12'RVF0258 IE12*RVF055B 2 C 4 RV SA C D&C H-12 SP 500 psig(eet tested 1E12*VF031B 2 C 14 CK SA C O&C B-13 FSE Q 1E12'VF0468 2 C 4 CK* SA C O&C D 15 FSE Q IE12'VF0508 2 C 10 CK SA C C N9 FSE RF 20 0 FSE CS 62 Normelops 1E12'VF0848 2 C 1.5 CK SA 0 C B 14 FSE RF 24 Duessenny 0 FSE Q 1E12'VF0058 2 C 1.5 SC SA 0 C B-13 FSE RF 24 Disassembly 0 FM Q AP 8 GL MA C C P-2 LR RF 10 CFR 50, APP.J Test 1E12'VF0998 2 1RHS'RV38 2 C 4 RV SA C O&C H-12 SP 485 psig(eet tested

O o o~~

g RIVER BEND STATION INSERVICE TEST PLAN-VALVES APPEtelX C m ,

System Aishe- Pese Rev.Dets ISTCR R System Nems:

[&B Svetem t 27 7B 204 RHS 9I10/94 0030 RHR -LPCI VALVE INFORMATION TEST INFORMATION REMARKS Q- Cat. site Type Act- Posities Dws. Type Freg. Reuel Corkmember Claes Dej ester normell sateey Ceerd.

THIS PAGE BLANK

n .m - .

U_

J U RIVER BEND STATION Pese 51 et 105

- INSERVICETESTPLAN VALVES EpnERGY APPENDIX C Svitem f; Sv tem Alshe Pese Rw.Date ISTCR f: Sntem Name:

E&tD 204 RHS 9Il0iS4 0030 RHR LPCI 27-7C VALVE INFORMATION TESTINFORMATION REMARKS Cork gambw Q Cat. She Type Act- Peeitise Duwg. Type Frog. Relief Close Sej meter Bermell Safety Ceerd.

1E12'A0VF041C 1 AC 10 CK SA C D&C K5 FSE CS 01 TesteMe Check Velve Pl RF LR RF RCS Boundary Test LR RF 10 CFR 50, APP.J Test 1E12*MOVF021 2 A 14 GL M0 O&C C F4 FSE Q PI RF LR RF Water Test I A 10 GA M0 C O&C K-3 FSE CS 19 1E12'MOVF042C Pt RF LR RF RCS Boundary Test

  • LR- RF 10 CFR 50, APP.J Test IE12*MOYF064C 2 A 4 GA M0 O O&C E 10 FSE Q Pl RF LR RF Water Test 1E12*MOVF105 2 A 25 GA M0 O D&C B-20 FSE Q Pt RF

. LR RF Water Test l

1E12*RVF025C 2 C 1.5 RV SA C O&C G-8 SP SYR 500 peig 1E12*RVF101 2 C 314 RV SA C O&C J-12 SP SYR 1E12'VF031C 2 C 14 CK SA C O&C D-11 FSE Q 1E12*VF046C 2 C 4 CK SA C O&C E-9 FSE Q

O O O~

g~

RIVER BEND STATION INSEIMCETESTPLAN VALVES es,e s2 ef is my APPEB0lX C System P. Ey_ stem Aishe- Pese Rev. Date ISTCRt- System Nmne:

g&lD 204 RHS 9!10f94 0030 RHR .LPCI 27 7C VALVE INFORMATION TEST INFORMATION REMARKS G- Cat. Sire Type Act- Peeities Dwg. Type Frog. Rebel Lort member Claes gej enter Bennell Safety Coord.

2 C 1.5 CK SA 0 C E 13 FSE RF 24 Duessembly 1E12'VF084C 0 FSE Q 2 C 1.5 SC SA 0 C E 12 FSE RF 24 Disassenely 1E12*VF005C 0 FSE O l

l L--____________-_______________________ __ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . ___________________-____------_-__-.__a

1~ ENTERGY OPERATIONS

(' 3

- x nouceu (qj IST CIIANGE REQUEST FORY OCT10 'S4 T2 I

3' MNM hendus misem!$a$a$h!NhMNfhhh=$$$meeram#""a k a Requester: Department: Phone:

Date:

August 9,1994 Jr. Victory BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

1DFR*V181 & V182 RBS ist Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 STP Change Required Relief Requests: CR's, M R's, MWO's:

Affected Pages:

Appendix C, page103 of 105; N/A CSJ-78 N/A Appendix D, CSJ-78 Detailed Description of the Requested change:

6ncis,Je marked up copues ofthe ISTProgram plan or RehefRequest ofappbcable)

Add Cold Shutdown Justification (CSJ-78) to the program.

Justification for the Requested Change:

CSJ-78 has been initiated tojustify testing IDFR*V181 & V182 at Cold Shutdown instead of Quarterly.

Reviewed: .

. - sle _ _ - #9M 9{f 9[ Approved: ._ MJ . [o256i / 6-/&W GST Enguneer / Coordin ator / KCN / Date) Q 'rvs'sor /KCN/l} ate)

Once completed, submit to IST Engineer / Coordinator for incorporation into IST Program

g O RIVER BEND STATION O o

p,,, , ,3 ,, ,,

- lWSERVICETESTPLAN VALVES my APPENDIX C System A System Alshe- Paes Rev. Date ISTCR t- System Nome:

P_&g 32BP 609 DFR 9110/94 0031 DRAINSRDOR & EQUIPMENT

~

VALVE INFORMATION TEST INF0F6MATl0N REMARKS Cork Rember a cat. Sire Type Act- Posities Dwg. Type Frog. Ilefief Close Osj eeter Normell Safety Coord.

1DFR'ADV144 2 B 3 GL A0 0 C M-3 FSE Q C FS Q Pl RF IDFR*A0V145 2 8 3 GL A0 0 C 0-12 FSE G C FS Q PI RF 1DFR'MOV146 2 A 4 GA M0 O O&C D-11 FSE Q PI RF

  • LR RF Water Test 1DFR*V181 2 AC 4 *CK SA C O&C C-10 FSE CS 78 LR RF Wetw Test 10FR'V182 2 AC 4 CK SA C O&C C 12 FSE CS 78 LR RF Wetw Test i

f

COLD SHUTDOWN JUSTIFICATION REQUEST NO. 78 O

COMPONENT FUNCTION CLASS CATEGORY 1DFR*V181 Containment Sump to Suppression Pool 2 C 1DFR*V182 Pumpback Check Valves ,

TEST REQUIREMENT: Full stroke exercise open every 3 months per IWV-3521 and IWV-3522.

flASIS FOR JUSTIFICATION: The Containment Sump to Suppression Pool Pumpback Check Valves have an active safety function to open to allow 50 gpm flow from the Containment Sump Pumps to the Suppression Pool to prevent flooding of the electrical equipment in Containment. The valves have an active safety function to close to prevent diversion of opposite train flow and provide Containment isolation.

Full stroke exercising of these check valves requires passing the 4 maximum required accident condition flow (50 gpm) through the valves.

The normal flow path for the pumps is to the Radwaste Processing System. Check valves 1DFR*V181 and 1DFR*V182 are not within the normal flow path. The 50 gpm flowrate can only be achieved by running the Containment Sump Pumps. Quarterly full flow testing of the check valves with the sump pumps would require pumping to the Suppression Pool. This activity would require repeated flushing of the sumps prior to the test to prevent contam! nation of the Suppression Pool inventory.

Flushing the sumps would generate liquid waste that would have to be processed by the Radwaste System. Partial stroke testing of the check valves can be performed quarterly using an attemate clean water source and would not require flushing of the sumps. Performance of full stroke testing at cold shutdown frequency would limit the time required to flush the sumps and the amount of liquid radwaste that would have to be processed.

ALTERNATE TESTING: Partial stroke open exercise quart 2rly with less than 50 gpm flow.

Full stroke open exercise test (50 gpm) during cold shutdown if not performed within the previous 92 days as allowed by IWV-3412(a) and IWV-3522.

l 1

9/10/94 - 0031

O O m"~~~se masn O IST CIIANGE REQUEST FORM OCT10 '94 7p ,

n 1 i i  %

0032 wwg..Rhwgggggy i }

geggggggggggg ggggg , . qg m

~

Requester: Department: Phone:

Dzte:

August 9,1994 Jr. Victoty BCP X 3632 Issue date and revision of IST Testing Program for Pumps and Valves: Affected component (s):

ILSV*PV10A & B; ILSV*AOV44A & B; ILSV*V3032A&B; RBS lst Ten Year Interval - IST Plan - Rev. 6 - Issued 1/29/93 ILSV*V110AA, V110AB, V110CA, V110CB, V110EA & V110EB STP Change Required Relief Requests: CR's, M R's, MWO's:

Affected Pages:

N/A VRR-24 CR 94-0831, CR 94-0983 Appendix C, pages 64,65 & 66 of105; Detailed Description of the Requested change:

(include marked up copses eithe ISTProgram plan or RehefRequest sfappbcable)

Add the listed valves to the program: ILSV*PV10A/B, AOV44A/B, V3032A/B, VI10AA, AB, CA, CB, EA & EB Junification for the Requested Change:

Valves PV10A/B are the PVLCS Division 1(II) header pressure control valves. They modulate to maintain a constant air supply to the leakage control injection headers. They have a safety function to fail safe to the closed position on loss of control power, providing PVLCS isolation in the event power is lost to the motor operated isolation valves but not to the PVLCS compressor. This prevents the possibility of the running compressor over pressurizing containment.

Valves AOV*44A&B have a safety function in the open direction to relieve excess compressor pressure. They have a safety function in the closed direction to allow the compressor to build up pressure. Proper operation of these valves is required to ensure proper operation of the PVLCS compressors (ILSV*C3 A/B).

Valves V3032A/B are the PVLCS compressors ILSV*C3A/B inlet check valves. They open to allow air into the compressors. These valves are normally closed when the compressors are not mnning. The compressors automatically start and stop to maintain the accumulators charged.

Reviewed: [ 4_v #M[ f >I Approved: w <.LJ !O4 [ 9 -/ 34r QSTEngmeer /Coordmator/KCN/Date) ($$Supervssor/f:CN/Datel Once completed, submit to IST Enginect / Coordinator for incorporation into IST Program

O O. O IST CIIANGE REQUEST FORM (continuation sheet) 0032 _

{gf ;

/Eccted compoecat(s)(Cost.):

ILSVaV12, V35, V36, V42, V46, V72 V76 & V90; ILSVaRV8A/B, ILSVaV112, Vild, V118 & V120 Detailed Description of the Requested change (Coet.):

In Appendix "C" add VRR-24 and " Disassembly for valva ILSV*V12, V35, V36, V42, V46, V72 V76 & V90.

ILSV*RV8A/B, change the frequency from RF-2 & 3 to 5YR. ILSV*VI12 and VI18 change the Normal position from 0 to O&C.

ILSV'VI14 change the size from 3/4 to 1 and Normal / Safety positions from C to O&C. ILSV'V120 change the Normal / Safety positions from C to O&C.

Justification for the Requested Change (Comt.):

Valves ILSV*VI10AA, AB, EA & EB have a safety function in the open direction to allow water from the seperator to return to the compressor seal water inlet piping. They have a safety function in the closed direction to prevent the service water seal water from bypassing the compressor and filling the seperator.

Valves ILSV*VI10CA & CB have a safety function in the open direction to allow seal water from the compressor to the separator tank. They have a safety function in the closed direction to prevent water from the separator tank from flowing back to the compressor when the compressor is not running.*"

ILSV*V12, V35, V36, V42, V46, V72 V76 & V90 are currently listed for disassembly on VRR-24.

IL' SV*RVSA/B, ILSV*VI12, VI14, VI18 & V120 changes made to Appendix C for these valves are being made to be consistent with the basis document.

2

g o RIVER BEND STATION o o'~

- IWSERVICE TEST PLAE-VALVES my APPEBelX C ISTCR #- System Name:

M Sv tem t. Svetem Aishe- Pass Rev.Date 27 208 255 LSY W13I94 0032- MSIV & PENE.VLV LEAKAGE CONTROL VALVE INFORMATION TEST INFORMATION REMARKS Cert Bomber Q Cat. Sire Type Act. Poemen Duss. Type Frog. Reuel Close SeJ ester Germell Safety Coord.

ILSV'RV8A 2 C 1XI.5 RV SA C D&C E-14 SP 8VR 1LSV'RV8B 2 C 1X1.5 RV SA C 0&C P 14 SP SVR ILSV*SOVX26A 2 B GL C 0 E 16 FSE Q 0 FS Q ILEV'SOVX268 2 B GL C 0 P 16 FSE Q

~

0 FS Q ILSV'SOVY26A 2 B GL 0 C E-18 FSE a 0 FS Q ILSV'S0VY268 2 8 GL 0 C P 18 FSE Q 0 FS Q ILSV'V12 2 C 1 CK SA C O&C H-17 FSE RF 04,24 Disassenhiy ILSV'V18 2 C 1 CK SA C D&C F 18 FSE RF . 04 ILSV'V20 2 C 1 CK SA C 0&C D-8 FSE RF 04 ILSV'V22 2 C 1 CK SA C O&C C-9 FSE RF 04 ILSV'V24 2 C 1 CK SA C O&C A-9 FSE If 04 ILSV'V26 2 C 1 CK SA C D&C N4 FSE RF 04 ILSV'V28 2 C 1 CK SA C O&C L4 FSE RF 04 1LSV'V30 2 C 1 CK SA C O&C J6 FSE RF 04 -

1LSV'Y32 2 C 1 CK SA C~ O&C H6 FSE RF 04

. _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ __ _ _ _ . . . -- . . _ _ .- _. ~ . . _ _ - ______ _,

Y ,

RIVER BEND STATION Page 65 of 105

- INSERVICE TEST PLAN -VALVES my APPENDIX C System Alpha: Pese Rev. Dete ISTCR F- System Name:

P&lD System F-27 20B 255 LSV 9I13I94 0032 MSIV & PENE.VLV LEAKAGE CONTROL val.VE INFORMATIOk TEST INFORMATION REMARKS Q Cat. Size Type Act- Peeition Dwg. Type Frog. Relief Lart Neober Close Enj ester Nerusell Safety Coord.

2 C 1 CK SA C O&C H 17 FSE RF 04.24 Dinessembly 1LSV'V35 2 C 1 CK SA C O&C J-14 FSE RF 04,24 Disassembly 1LSV'V36 2 C 1 CK SA C O&C H-17 FSE RF 04,24 Disassembly 1LSV'V42 2 C CK SA C O&C H-17 FSE RF 04,24 DuessendJy 1LSV'V46 1 2 CK SA C O&C G-17 FSE RF 04 ILSV'V48 C 1 2 C CK SA C D&C E-8 FSE RF 04 ILSV'V50 1 2 CK* SA C D&C C-9 FSE RF 04 ILSV'V52 C 1 2 CK SA C O&C A-9 FSE RF 04 ILSV'V54 C 1 2 CK SA C D&C N8 FSE RF 04 ILSV'V56 C 1 2 CK SA C D&C M-6 FSE RF 04 ILSV'V58 C 1 ILSV'V60 2 C 1 CK SA C O&C K-6 FSE RF 04 1LSV'V62 2 C 1 CK SA C O&C J-6 FSE RF 04 CK SA C O&C K 14 FSE RF 04.24 DisasseeWy ILSV'V72 2 C 1 ILSV'V76 2 C 1 CK SA C D&C K-14 FSE RF 04,24 Disassembly ILSV'V82 2 C 2 CK SA C 0 N-12 FSE Q l

O O O

& ~

g-RIVER BEND STATION Page 66 et 105 INSERVICETESTPLAN VALVES APPE4 DIX C ENTERGY l

System Alshe- PassRev.Dete ISTCR f-. System Name:

[@ Svetem f-27 208 255 LSV Si1394 0032 MSIV & PENE.VLV LEAKAGE CONTROL VALVE INFORMATION TESTINFORMATION REMARKS Cert geseber Q Cat. Sire Type Act- Posities Dwg. Type Frog. Iloisef Claes Osj ester Normal l setety Ceerd.

ILSV'V90 2 C 1 CK SA C O&C K-14 FSE RF 04,24 Disessembly ILSV'V98 2 C 2 CK SA C 0 0-12. FSE Q 1LSV'V112 2 C 34 CK SA O&C C E 18 FSE Q 2 CK SA O&C O&C D-15 FSE RF 24 Dwassembly ILSV'V114 C 1 1LSV'V118 2 C 34 CK SA O&C C P-18 FSE Q 2 CK SA D&C O&C N 14 FSE RF 24 Disassembly ILSV'V120 C 1 ILSV'PVIDA 2

  • B 2 GA HYD 0 C D-12 FSE Q C FS Q 1LSV'PV108 2 8 2 GA HYD 0 C P 12 FSE Q C FS Q ILSV'A0V44A 2 8 34 GA A0 O&C O&C D-18 FSE Q ILSV'A0V448 2 B 3l4 GA A0 O&C O&C M-18 - FSE Q ILSV'V3032A 2 C 2 CK SA O&C 0 B-18 FSE Q ILSV'3032B 2 C 2 CK SA D&C 0 B-18 FSE Q ILSV'V110AA 2 C 112 CK SA O&C O&C B-18 FSE Q D4essembly ILSV'V110AB 2 C 1/2 CK SA D&C O&C L 18 FSE Q Disassembly ILSV'V110CA 2 C 3I4 CK SA O&C O&C C-17 FSE Q Disassembly 1LSV'V110CB 2 C 34 CK SA O&C O&C M 17 FSE Q Disassembly ILSV'V110EA 2 C 1 CK SA O&C O&C B-18 FSE Q Deessembly 1LSV'V110fB 2 C 1 CK SA D&C O&C L 18 FSE Q Deessembly

- - - - _ _ . . _ _ _ _ _ - _. ___ _ ._ ~. - - -

b. _ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _

_