RBG-41013, Forwards Updates to IST Pump & Valve Program Manual, Correcting Discrepancies,Improving Clarity & Structuring Plan So as to Provide Clear & Understandable Description of Pump & Valve IST Program at Plant

From kanterella
Jump to navigation Jump to search
Forwards Updates to IST Pump & Valve Program Manual, Correcting Discrepancies,Improving Clarity & Structuring Plan So as to Provide Clear & Understandable Description of Pump & Valve IST Program at Plant
ML20076K905
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/27/1994
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20076K909 List:
References
RBF1-94-0092, RBF1-94-92, RBG-41013, NUDOCS 9411020182
Download: ML20076K905 (2)


Text

(

Entargy Opsrctions, Inc.

[; R.ver Bend Station S485 US Highway 01

-==~ ENTERGY Zr";"A m ons .

(504) 336-6225 FAX (504) 635-5068 JAMES J. FISICARO Director N; clear Safety October 27,1994 U.S. Nuclear Regulatory Commission Document Control Desk M/S PI-37 Washington, D.C. 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Pump and Valve Plan File Nos.: G9.5, 224.600 RBG- 41013 RBF1-94-0092 Gentlemen:

The River Bend Station (RBS) Inservice Testing (IST) program is undergoing a systematic review in accordance with the long term performance improvement plan (L'It'IP), submitted to the NRC on March 28,1994, (RBG-40428). This program includes, in part, an IST Improvement Plan to upgmde the technical adequacy and functionality of the IST program.

During the first phase of this effort, changes were made to the Pump and Wlve Plan to correct discrepancies, improve clarity, and structure the plan so as to provide a clear and understandable description of the Pump and Valve Inservice Testing Program at RBS.

Enclosed are the updates to the Pump and Valve Plan. Instructions for incorporation are provided with each package.

If you have any questions or require additional information, please feel free to contact me or my staff.

Very imly yours, hwj - )bl.cn JJF\jem enclosures e 4 o b, u.i nO Uv O

9411020182 941027 PDR ADOCK 05000458 ,{ g\\

p PDR \

l Pump and Valve Plan October 28,1994 RBG- 41013 RBF1-94-0092 Page 2 of 2 l 1

i cc: U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 l

NRC Sr. Resident Inspector P.O. Box 1051 .

St. Francisville, LA 70775 Mr. David Wigginton

- U.S. Nuclear Regulatory Commission M/S O 13-H-3 l Washington, DC 20555 Ms. P. Campbell U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 i

. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - >