MONTHYEARML20210H2901999-07-30030 July 1999 Proposed Tech Specs Pages,Extending Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt ML20205P8701999-04-15015 April 1999 Proposed Tech Specs,Implementing Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long-term Solution ML20205L7321999-04-0808 April 1999 Proposed Tech Specs,Removing Notes That Refer to Specific Cycles,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20198E8091998-12-16016 December 1998 Proposed Tech Specs Pages Re Change to TS Safety Limit 2.1.1.2,changing Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13 ML20196A1401998-11-20020 November 1998 Proposed Tech Specs Adding 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned for Early Dec 1998 ML20154H3691998-10-0808 October 1998 Proposed Tech Specs Implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution, Enhanced Option I-A ML20153H0311998-09-23023 September 1998 Proposed Tech Specs Changing Specific Gravity Acceptance Criteria for Div III Battery ML20153E8111998-09-22022 September 1998 Proposed Tech Specs Deleting License Conditions Associated with Transamerica Delaval,Inc EDGs ML20217J0951998-04-21021 April 1998 Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7 ML20216F1941998-04-0909 April 1998 Proposed Tech Specs License Condition 2.C(13) Re Partial Feedwater Heating & Final Feedwater Temp Reduction ML20216E4861997-09-0505 September 1997 Proposed Tech Specs Re APRM Setpoints,Reactivity Anomalies & RPS Instrumentation ML20210K2131997-08-15015 August 1997 Proposed Administrative Changes to TS 2.1.1.2 W/Note to Indicate Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents Used in Approving SLMCPR Changes for Given Cycle ML20217J0481997-08-0505 August 1997 Proposed Tech Specs 2.1.1.2, Reactor Core (Safety Limits), Increasing Two Recirculation Loop MCPR Limit to 1.13 & Single Recirculation Loop MCPR Limit to 1.14 ML20151L6041997-07-31031 July 1997 Proposed Tech Specs,Requesting Approval of Change to TS 3.6.1.8, Penetration Valve Leakage Control Sys, for Upcoming Outage ML20196J7741997-07-30030 July 1997 Proposed Tech Specs Clarifying Surveillance Requirements 3.6.4.2.1 & 3.6.4.2.2 to Match Corresponding Changes to NUREG-1434 ML20134A7021997-01-20020 January 1997 Proposed Tech Specs to License NPF-47,enhancing Operation of Plant to Allow Operation at 100% Power W/Lower Core Flows & Use of Flow Control Spectral Shift Strategies to Increase Cycle Energy ML20133M0451997-01-10010 January 1997 Proposed Tech Specs 3.4.11 Re RCS Pressure & Temp Limits ML20134M2271996-11-15015 November 1996 Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12 ML20134M0151996-11-15015 November 1996 Proposed Tech Specs 3.8.1 Re AC Sources Operating ML20134M2061996-11-0606 November 1996 Proposed Tech Specs,Permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Ms Positive Leakage Control Sys Requirements ML20129J4231996-10-24024 October 1996 Proposed Tech Specs 3.8.1 Re A.C. Sources - Operating ML20117K1071996-08-29029 August 1996 Proposed Tech Specs Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule ML20117G7401996-08-29029 August 1996 Proposed Tech Specs 3.1 Re Reactivity Control Systems ML20116J3151996-08-0707 August 1996 Proposed Tech Specs,Submitting TS Bases Pages for Revs Performed Since 951001 Approval of TS Bases ML20116L6321996-08-0101 August 1996 Proposed Tech Specs Re Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20112E7831996-05-30030 May 1996 Proposed Tech Spec 3.8.3 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG ML20117H3271996-05-20020 May 1996 Proposed Tech Specs Re Change in Co Name from Gulf States Utils Co to Entergy Gulf States,Inc ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20094N7741995-11-22022 November 1995 Proposed Tech Specs,Clarifying Info Contained in License Amend Request (LAR) 95-21 ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20094N0091995-11-20020 November 1995 Proposed Tech Specs Eliminating Selected Response Time Testing Requirements ML20094B0001995-10-26026 October 1995 Proposed Tech Specs,Consisting of Change Request 95-10, Deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections ML20093L7361995-10-24024 October 1995 Proposed Tech Specs 3.6.1.1 Through 3.6.1.3 Re Containment Sys ML20087J5451995-08-17017 August 1995 Proposed Tech Specs Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions ML20084L4541995-05-30030 May 1995 Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors ML20084L5001995-05-30030 May 1995 Proposed Tech Specs,Allowing TS 3/4.6.2.2, Drywell Bypass Leakage, Tests to Be Performed at Intervals as Long as Five Yrs Based on Demonstrated Performance of Drywell Structure ML20078M1171995-02-0808 February 1995 Proposed Tech Specs Page Re Secondary Containment Automatic Isolation Dampers ML20077S4401995-01-18018 January 1995 Revised Pages of Proposed Tech Specs Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20078H0881994-11-10010 November 1994 Proposed Tech Specs Reflecting Clarifications to LAR 91-11 ML20024J3341994-10-0404 October 1994 Proposed Tech Spec Removing one-hour Requirement for Completing Noble Gas & Tritium Sampling & Analysis ML20073B2381994-09-12012 September 1994 Proposed TS 3/4.2.2, APRM Setpoints ML20072U7901994-09-0808 September 1994 Proposed Tech Spec 3.10.2, Special Test Exceptions - Rod Pattern Control Sys ML20064L6481994-03-15015 March 1994 Proposed Tech Specs,Reflecting Removal of Turbine Overspeed Protection Sys Requirements ML20064C0961994-03-0303 March 1994 Proposed Tech Specs,Reflecting Relocation of Response Time Limits to Usar,Per GL 93-08 ML20063K3721994-02-22022 February 1994 Proposed Tech Specs 3.6.1.8 & 3.6.1.9 Re Penetration Valve Leakage Control Sys Air Compressor ML20063A6301994-01-14014 January 1994 Proposed Tech Specs Reflecting Removal of Component Lists ML20059G8181994-01-14014 January 1994 Proposed Tech Specs Re Surveillance Test Interval & Allowed Outage Time Extension Request 1999-07-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210H2901999-07-30030 July 1999 Proposed Tech Specs Pages,Extending Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt ML20205P8701999-04-15015 April 1999 Proposed Tech Specs,Implementing Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long-term Solution ML20205L7321999-04-0808 April 1999 Proposed Tech Specs,Removing Notes That Refer to Specific Cycles,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20199C1881999-01-0808 January 1999 Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan ML20198E8091998-12-16016 December 1998 Proposed Tech Specs Pages Re Change to TS Safety Limit 2.1.1.2,changing Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13 ML20196A1401998-11-20020 November 1998 Proposed Tech Specs Adding 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned for Early Dec 1998 ML20154H3691998-10-0808 October 1998 Proposed Tech Specs Implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution, Enhanced Option I-A ML20153H0311998-09-23023 September 1998 Proposed Tech Specs Changing Specific Gravity Acceptance Criteria for Div III Battery ML20153E8111998-09-22022 September 1998 Proposed Tech Specs Deleting License Conditions Associated with Transamerica Delaval,Inc EDGs ML20217J0951998-04-21021 April 1998 Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7 ML20216F1941998-04-0909 April 1998 Proposed Tech Specs License Condition 2.C(13) Re Partial Feedwater Heating & Final Feedwater Temp Reduction RBG-44355, Cycle 8 Startup Physics Test Summary1998-01-19019 January 1998 Cycle 8 Startup Physics Test Summary ML20202F0361997-11-26026 November 1997 Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval ML20216E4861997-09-0505 September 1997 Proposed Tech Specs Re APRM Setpoints,Reactivity Anomalies & RPS Instrumentation ML20210K2131997-08-15015 August 1997 Proposed Administrative Changes to TS 2.1.1.2 W/Note to Indicate Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents Used in Approving SLMCPR Changes for Given Cycle ML20217J0481997-08-0505 August 1997 Proposed Tech Specs 2.1.1.2, Reactor Core (Safety Limits), Increasing Two Recirculation Loop MCPR Limit to 1.13 & Single Recirculation Loop MCPR Limit to 1.14 ML20151L6041997-07-31031 July 1997 Proposed Tech Specs,Requesting Approval of Change to TS 3.6.1.8, Penetration Valve Leakage Control Sys, for Upcoming Outage ML20196J7741997-07-30030 July 1997 Proposed Tech Specs Clarifying Surveillance Requirements 3.6.4.2.1 & 3.6.4.2.2 to Match Corresponding Changes to NUREG-1434 ML20134A7021997-01-20020 January 1997 Proposed Tech Specs to License NPF-47,enhancing Operation of Plant to Allow Operation at 100% Power W/Lower Core Flows & Use of Flow Control Spectral Shift Strategies to Increase Cycle Energy ML20133M0451997-01-10010 January 1997 Proposed Tech Specs 3.4.11 Re RCS Pressure & Temp Limits ML20140F0151996-12-26026 December 1996 Rev 6 to RSP-0008, ODCM Procedure ML20134M2271996-11-15015 November 1996 Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12 ML20134M0151996-11-15015 November 1996 Proposed Tech Specs 3.8.1 Re AC Sources Operating ML20134M2061996-11-0606 November 1996 Proposed Tech Specs,Permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Ms Positive Leakage Control Sys Requirements ML20129J4231996-10-24024 October 1996 Proposed Tech Specs 3.8.1 Re A.C. Sources - Operating ML20117K1071996-08-29029 August 1996 Proposed Tech Specs Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule ML20117G7401996-08-29029 August 1996 Proposed Tech Specs 3.1 Re Reactivity Control Systems ML20116P1341996-08-0808 August 1996 Technical Requirements Manual ML20116J3151996-08-0707 August 1996 Proposed Tech Specs,Submitting TS Bases Pages for Revs Performed Since 951001 Approval of TS Bases ML20116L6321996-08-0101 August 1996 Proposed Tech Specs Re Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20113F2271996-06-12012 June 1996 Rev 0 to Calculation PI-0103-00203.002-101, Ampacity Derating Evaluation ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20112E7831996-05-30030 May 1996 Proposed Tech Spec 3.8.3 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG ML20117H3271996-05-20020 May 1996 Proposed Tech Specs Re Change in Co Name from Gulf States Utils Co to Entergy Gulf States,Inc B130180, Surveillance Specimen Program Evaluation for River Bend Station1996-04-30030 April 1996 Surveillance Specimen Program Evaluation for River Bend Station ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20094N7741995-11-22022 November 1995 Proposed Tech Specs,Clarifying Info Contained in License Amend Request (LAR) 95-21 ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20094N0091995-11-20020 November 1995 Proposed Tech Specs Eliminating Selected Response Time Testing Requirements ML20094B0001995-10-26026 October 1995 Proposed Tech Specs,Consisting of Change Request 95-10, Deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections ML20093L7361995-10-24024 October 1995 Proposed Tech Specs 3.6.1.1 Through 3.6.1.3 Re Containment Sys ML20108B5941995-10-0101 October 1995 Rev 5A to River Bend Station Offsite Dose Calculation Manual Procedure ML20087J5451995-08-17017 August 1995 Proposed Tech Specs Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions ML20084L5001995-05-30030 May 1995 Proposed Tech Specs,Allowing TS 3/4.6.2.2, Drywell Bypass Leakage, Tests to Be Performed at Intervals as Long as Five Yrs Based on Demonstrated Performance of Drywell Structure ML20084L4541995-05-30030 May 1995 Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors ML20078M1171995-02-0808 February 1995 Proposed Tech Specs Page Re Secondary Containment Automatic Isolation Dampers ML20077S4401995-01-18018 January 1995 Revised Pages of Proposed Tech Specs Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20078H0881994-11-10010 November 1994 Proposed Tech Specs Reflecting Clarifications to LAR 91-11 1999-07-30
[Table view] |
Text
. - .- - - . - . . . - _ _ _ - _ . - - - - - _ - . - . . - _ . - - . = = _ _
4 ,
AC Sources--Operating 3.8.1 l '
1 SURVEILLANCE REQUIREMENTS 5 SURVEILLANCE FREQUENCY !
i SR 3.8.1.1 Verify correct breaker alignment and 7 days i indicated power availability for each required offsite circuit. ;
I J
SR 3.8.1.2
NOTE--------------------
- -All DG starts may be preceded by an engine 1
prelube period and followed by a warmup
- period prior to loading.
- Verify each DG starts from standby As s cifi in 4 conditions and achieves
- T e3 .1-1 I a. For DG 1A and DG 18, steady state 1
voltage a: 3740 V and s 4580 V and 7/c/ctygr .
frequency a: 58.8 Hz and s 61.2 Hz, l in s 10 seconds. ;
i
- b. For DG IC:
! t j 1. Maximum of 5400 V, and 66.75 Hz, i and
. 2. Steady state voltage a: 3740 V and
- l s 4580 V and frequency a: 58.8 Hz
- - and s 61.2 Hz, in s 13 seconds. ,
i (continued)
I ;
e i
9611060252 961024 PDR ADOCK 05000458 P pm RIVER BEND 3.8-5 Amendment No. 81
l \
AC Sources-Operating
3.8.1 '
i 1
SURVEILLANCE RE00lREMENTS (continued) l SURVEILLANCE FREQUENCY SR 3.8.1.3 -------------
NOTES-------------------
l 1. DG loadings may include gradual loading as recommended by the manufacturer.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by, and immediately follow, without shutdown, l a successful performance of SR 3.8.1.2.
Verify each DG operates for a 60 minutes spec' ed !
at a load a 3000 kW and s 3100 kW for DG abl .8.1 1A and DG 18, and a 2500 kW and s 2600 kW for DG IC. 7/ f l
SR 3.8.1.4 Verify each day tank contains a 316.3 gal 31 days of fuel oil.
SR 3.8.1.5 Check for and remove accumulated water from 31 days each day tank.
SR 3.8.1.6 Verify the fuel oil transfer system 31 days operates to automatically transfer fuel oil from the storage tank to the day tank.
(continued) l l
RIVER BEND 3.8-6 Amendment No. 81
AC Sources-Operating 1 l
3.8.1 J
~~
Table 3. 1-1 (page 1 o 1) '
Diesel nerator Test S edule j
/
j I BER OF FAILUR AST 25 VALID TS(a)
[ FREQ NCY 3 31 days
! 24 7 days (b) ut 2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) i 1
)
l i
(a) Criteria for de rmining number of ilures and valid ests shall b in accordance wi Regulatory Positi C.2.e of Regulat ry Guide 1.10 ,
Revision 1, here the number of ests and failures s determined na per DG ba s. l
)
, (b) This t st frequency shall e maintained until even consecut ve failure .
l j free tarts from standby conditions and loa and run tests ave been l t per ormed. If, subse ent to the 7 failur free tests, 1 r more l l a ditional failures cur such that ther are again 4 or ore failures
- n the last 25 tes , the testing inte al shall again reduced as I noted above and intained until 7 ce secutive failure free tests have l
- been performed. /
i Tab le 1. 9.I- I h<r be.en deleted.
I l
l I
i RIVE. BEND 3.8-16 Amendment No. 81
AC Sources-Operating B 3.8.1 f
BASES SURVEILLANCE SR 3.8.1.2 (continued)
REQUIREMENTS
- The ormal 31 day Frequency _for SR 3.8.1._ (s Ar 44.1-1/ Uter,41 Ge(eratorAest Jched e" is consistent with the industry guidelines for assessment of ,
diesel generator performance 4Ref. M). %e crc q=c-in '
prcvida adequate assurance of DG OPERABILITY, while ;
minimizing degradation resulting from testing.
Qe Nr. l g& fy),jf fregen SR 3.8.1.3 '
?rd Vd65/ \
This Surveillance demonstrates that the DGs are capable of synchronizing and accepting greater than or equal to the !
equivalent of the maximum expected accident loads. A 1 minimum run time of 60 minutes is required to stabilize '
l 4 engine temperatures, while minimizing the time that the DG 4 is connected to the offsite source. l Although no power factor requirements are established by this SR, the DG is normally operated at a power factor l between 0.8 lagging and 1.0. The 0.8 value is the design i rating of the machine, while 1.0 is an operational j limitation to ensure circulating currents are minimized. i The load band is provided to avoid routine overloading of the DG. Routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY. )
1 The7, n :131 day Frequency for this Surveillance 44as.
T d h ? " 1-1).is consistent with the industry guidelines for assessment of diesel generator performance (Ref. 14). I'
% an/15' Note 1 modifies this Surveillance to indicate that diesel ,
engine runs for this Surveillance may include gradual l loading, as recommended by the manufacturer, so that mechanical stress and wear on the diesel engine are minimized.
Note 2 modifies this Surveillance by stating that momentary transients because of changing bus loads do not invalidate this test.
(continued)
RIVER BEND B 3.8-15 Revision No. 0
)
- AC Sources-Operating B 3.8.1 BASES -
SURVEILLANCE REQUIREMENTS
[ Diesel Genefator Test ScheduM (continued) The test schedule (T e 3.8.1-1) i ements the ind ry .
gu elines for asses nt of diesel nerator performa e '
ef. 14). The pu ose of this te schedule is to ovide '
timely test data o establish a nfidence level a ociated ,
with the. goal maintain DG r iability at > 0. per test. !
\
According the industry idelines (Ref. 1 , each DG unit :
should b tested at leas once every 31 da . Whenever a has e rienced 4 or e valid failure n the last 25 v id tests, the ximum time betw n tests is red ed to 7 ys. Four fai res in 25 valid sts is a failur rate 0.16, or the reshold of acce able DG perfo nee, and
/hence may be early indicati of the degrada on of DG reliability When considere in the light o a long history of tests, owever. 4 fail s in the last valid tests may only be statistically robable distrib ion of random event . Increasing test Frequenc allows a more timel acc' ulation of ad tional test dat upon which to base ju ment of the liability of th G. The increased est F equency mus e maintained un 1 seven consecutiv failure ree tests ve been perfo .
The Fra ency for accele ted testing is 7 ys, but no less than hours. Tests nducted at interv s of less than 24 urs may.be cre ed for complianc with Required A ions. However for the purpose re-establishing the ormal 31-day equency, a succes ul test at an interv of less than 24 ours should be c sidered an invalid t and not count owards the seven nsecutive failure fr starts, and the onsecutive test nt is not reset. .
At t interval in e ss of 7 days (or 31 ays, as a ropriate) const utes a failure to SRs and resu s n the associat DG being declared i perable. It s not, however, onstitute a valid t or failure o the DG,
@ any con cutive test count i not reset.
REFERENCES 1. 10 CFR 50, Appendix A, GDC 17.
- 2. USAR, Chapter 8.
- 3. Regulatory Guide 1.9.
(continued)
RIVER BEND B 3.8-32 Revision No O
." AC Sources-Operating B 3.8.1 BASES REFERENCES 4. USAR, Chapter 6.
(continued)
- 5. USAR, Chapter 15.
- 6. Regulatory Guide 1.93.
- 7. Generic Letter 84-15, July 2, 1984.
- 8. 10 CFR 50, Appendix A, GDC 18.
- 9. Regulatory Guide 1.108.
- 10. Regulatory Guide 1.137.
- 11. ANSI C84.1, 1982.
- 12. ASME, Boiler and Pressure Vessel Code,Section XI.
- 13. IEEE Standard 308.
~
I L - *>"a c e7 00, nevistor, 1, Aoso,t 1931.-
7
(
lt 10 CPR 50,67 IT. Re pletery Guide I,lgo Y /
(
RIVER BEND B 3.8-33 Revision No. 0 l
/