r 1
8 1
RIVER REED STATION i
APPROVAL SIEET STATION OPERATING PROCEDURES 50.
ADM-0053 TITLE ASIATIC CLAM CONTROL PROGRAM M MTED TER E0 TECENICAL REVIEW EEqUIRED TES E0]
RET.
PAGES INDEP.
E0.
ISSUED EEVIN
~
TECE.
REVIEW APPROVED BY SIGRATURE/DATE SICEATURE/DATE SIGRATURE/MTE EFFECT DATE W.Qe2 FRC MTG.
0~
0 1 THRU 7 pfso/WLC-DF 85-23
{
\\
p-gg u 6-n-f f 06-16-85 6 soffr i
- -FOR INFORMATIO !OM ISSUED jg N ' '.2 19! I i
CONTROL STATION DOCUMEN._
1 8507010356 850621 DR ADOCK 05000458 PDR hbb Y
003
- ~ - - ' ~ ~ ~ -
~ ~~
f.
I I
]
ASIATIC CLAM CONTROL PROGRAM 1
l l
1 1
l I
l TABLE OF CONTENTS 1
l I
I l
SECTION I
PAGE NO.
l l
-l 1.0 PURPOSE / APPLICABILITY 1
2 l
l l
2.0 REFERENCES
1 2
l l
l
~ 3. 0 RESPONSIBILITIES 1
2 l
l l
4.0 ADMINISTRATIVE CONTROLS l
4 l
l l
5.0 GENERAL REQUIREMENTS l
4 l
l l
l 5.1 Monitoring and Trending of Safety Related l
l Equipment Using Service Water 4
j.
l 5.2 Biological Monitoring for Asiatic Clams 4
l l
5.3 Sampling & Visual Inspections 5
ti l
5.4 Chlorination 6
l 5.5 Reporting l
6 l
l l
l 1
l I
1 l
i
~
I i
-l I
I I
l
-l I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I l
i I
i l
I l
I l
I I
I ll 1
i I
I i
11 I
I I
l N/A l
N/A
((
ADM - 0053 l REV - 0 I
PAGE 10F7l r
-l.
I il I
I i
1 l -1.0 PURPOSE / APPLICABILITY I
I I
I I
l This procedure establishes the program for prevention and detec-I 1.1 l
tion of Asiatic clams, performance monitoring of safety related l
I equipment using normal service water, and the required reporting.
l I
I 1.2 l
This Program shall apply to all Station Operating Personnel, I
l Environmental Services Personnel, and Licensing Personnel respon-l I
sible for the monitoring, detection, preventative maintenance, and i
I reporting as required by this procedure.
l I
1.3 I
l This procedure becomes applicable upon introduction of river water l
into the normal service water system.
I I
I
2.0 REFERENCES
I l
l I
2.1 1
l RBS Technical Specifications Sections 6.8.4.d and 6.9.2.b l
l 2.2 1
l IE Bulletin 81-03 Flow Blockage of Cooling Water to Safety System l
Components by Corbicula sp. (Asiatic Clams) and Mytilus sp.
l l
(Mussel)
I I
I I
2.3 ESP-8-049 Biological Monitoring for Asiatic Clams el i
I 2.4 I
I ADM-0048 Performance Monitoring and Trend Analysis Program i
l 2.5 I
I PEP-0025 Biofouling Detection of Safety Related Equipment i
I I
2.6 PMP-8047 Preventative Maintenance Inspections and Sampling for I
l
~
i I
l 2.7 SOP-0094 Hypochlorination and Chemical Feed i
I I
l 2.8 ADM-0010 Station Reporting Requirements l
I I
2.9 I
l RBG-18715 Lettor Booker (GSU) to Seyfrit (NRC) dated August 21, I
1984 I
I I
l 2.10 Joint Intervenors and State of Louisiana's motion to withdraw con-l l
tention 1 related to the ASIATIC clam.
Dated October 10, 1984 l
l l
l 2.11 ADM-0019 " Initiation and Processing Condition Report" l
i I
3.0 RESPONSIBILITIES I
I I
l 3.1 I
I Plant Manager has overall responsibility to ensure this program is l
implemented in accordance with commitments to the NRC and l
l Technical Specification Requirements.
l I
I I
I I
I I
I I
I I
I I
I I
I il i
I l
l N/A I
N/A ll ADM-0053 i
REV - 0 l
PAGE 2 0F 7 I
I I
il i
I l
l.
l.
I I
3.2 l
Supervisor Environmental Services, or designee, is responsible for l
l ensuring that biological monitoring is conducted in accordance l
I
.with Reference 2.3 and for reporting per section 5.5 of this l
procedure.
I I
I I
3.3 I
Mechanical Maintenance Supervisor, or designee, is responsible for l
I coordination of the inspection and sampling of Safety related l
I equipment in accordance with Reference 2.6.
I l
~3.4 I
Process Systems Supervisor, or des'ignee, is responsible for en-l I
suring that Performance monitoring and trend analysis are carried I
l out in accordance with Reference 2.4 and 2.5.
Results shall be l
l submitted to the Supervisor Environmental Services for reporting I
purposes.
I l
I I
3.5 I
Assistant Plant Manger Technical Services Responsible for review l
I of ACCP per section 4.1 of this procedure.
l I
I 4.0 ADMINISTRATIVE CONTROLS l
l 1
4.1 Review l
l l
l 4.1.1 I
Review of the ACCP and its results for adequacy shall be II I
conducted after each twelfth quarterly report (once every l
three years). This review will be conducted by the l
l I
Supervisor Environmental Services and Assistant Plant l
Manager Tech Services. A review for adequacy will also l
I I
follow any Licensee Event Report attributable to Asiatic l
clams.
I l
l l
4.2 Record Retention I
i I
I 4.2.1 l
Records relative to the ACCP shall be retained for five l
l years and shall include the following:
i l
l a.
.'.CCP Reviews I
l I
I b.
l Licensee Event Reports attributable to Asiatic Clams i
l l
c.
Request for changes 1
I I
d.
I Quarterly reports I
I 4.3 Changes to the ACCP l
l l
l 4.3.1 I
Requests for changes to the ACCP must be submitted to the l
l NRC and should include an assessment of the proposed l
l changes and supporting justification. Written approval of I
I the proposed changes from the NRC shall be received prior l
to their implementation.
I I
I I
l l
I 1
I I
l l
l ll l
l l
I N/A l
N/A ll ADM-0053 l
REV - O l
PAGE 3 0F 7 l
l l
ll l
l l
F
I I
5.0 GENERAL REQUIREMENTS i
.I l
l 5.1 I
I Monitoring and Trending of Safety-Related Equipment using Normal I
I l
l 5.1.1 I
l The Performance Engineer is responsible for monitoring and l
l trending the performance of Safety Related Equipment in ac-l I
cordance with Reference 2.4 and 2.5.
l l
i l
The Performance Engineer will submit a.
reports quarterly l
I to the Process Systems Supervisor in accordance with l
l section 5.5 of this procedure.
i l
b.
l l
Performance Monitoring will be conducted monthly on l
I the following equipment:
l l
I 1)
I Control building Water Chiller Condensers l
l I
2)
Auxiliary Building Unit Coolers l
I l~
I 3)
l I
4) 1 Residual Heat Removal Heat Exchangers Il I
1 5) l Penetration Leakage Control Compressors and after l
coolers.
I l
l I
I Trending will be accomplished in accordance with I
c.
Reference 2.4.
l Heat exchanger not meeting performance l
I Acceptance Criteria shall be removed from service, in-l l
spected and corrective action taken.
l I
l 5.2 Biological Monitoring for Asiatic Clams l
l l
5.2.1 l
l Biological monitoring for Asiatic Clams will be accom-l plished in accordance with Reference 2.3.
Monitoring will
-l I
l 1
be performed to detect the presence or relative abundance I-of corbicula in the following areas:
I i
I i
l l
Mississippi River - Jemi-Monthly April thru November, I
a.
Monthly December thru March l
I I
l b.
Intske Embayment - Monthly l
I I
I Normal Cooling tower Basins - Monthly - one basin each l
c.
l Month
-l l
l I
d.
l Clarifier Influent - Semi-Monthly April thru November, I
Monthly December thru March l
I I
I l
l
.I I
I I
I I
I I
I ll 1
1 I
l N/A I
-N/A ll Aw* l-0053 l
REV - 0 l
PAGE 4 0F 7 l
l l
ll I
l-I
I l
I Clarifier Effluent - Weekly April thru November, I
g.
e.
g Monthly December thru March 5.2.2 -During any period of interruption of continuous ch-I l
lorination of the Normal Services Water Syste n greater than I
l 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> per step 5.4.1 of this procedure, sampling I
l frequency of the clarifier effluent shall increase to
.I L
g daily.
5.3 Samplina and Visual Inspections l
5.3.1 Visual-inspection and sampling will be performed by the I
i g
Mechanical Maintenance section and the Environmental I
g Services Section in accordance with Reference 2.6.
The I
g following equipment will be inspected at the prescribed g
intervals. Environmental Group will take samples of g
sediment in each component to be analyzed for the presence I
g of Asiatic clams.
Control building Water Chiller Condensers - Yearly I
a.
g (One Condenser each Quarter) b.
Auxilliary Building Unit Coolers - Yearly (One Cooler. f!
g each month)
Emergency Diesel Generator Coolers - each cooler every I c.
g-Refueling Outage i
g d.
Penetration Leakage Control Compressor After Coolers - I g
Yearly (One Cooler each 6 months.)
l RHR Heat Exchangers - each heat exchanger every I
e.
Refueling Outage.
I 5.3.2 I
In the event Service Water is cross connected with the Fire I I
Protection or RPCCW System, the Shift Supervisor / Control I
Operating Foreman shall be responsible for notifying the I
Mechanical Maintenance Supervisor, and the responsible I
I System Engineers. Cross connection will require preven-I I
tative maintenance in accordance with the applicable sec-I tion of Reference 2.6.
The affected system will be flushed I with domineralized water to remove any infestations.
1 I
I I
I i
I I
1 I
I I
I I
I I
I I
I I
I I
I I
I I
il i
I l
I II N/A N/A ADM-0053 I REV - 0 I
PAGE 5 0F 7 I
i l
I ll I
i l
'l I
I 5.3.3 I
If any Sampling inspections reveal juvenile or adult class I
l in any heat exchanger listed in Step 5-.3.1 above, perform-l I
ance. testing of all other S.afety-Related components I
monitored in section 5.1.1 will be conducted within seven l
(7) days. A Condition Report will be generated in accord-I I
ance with Reference 2.11 which identifies the amount of I
clams relative to the size of the heat exchanges, systems I
affected and corrective actions taken to prevent further I
g spread of clams.
5.4 Chlorination l
I I
I 5.4.1 Chlorination will be in accordance with Reference 2.7.
The I
chlorination system will be operated continuously during I
the months of April thru November to maintain total free I
residual chlorine concentration between 0.6 ppe and 0.8 ppe I
in the Service Water return header as read on recorder 1-I WTH-AR144. The Service Water Return Header Chlorine Hi/ Low I
alarm setpoints will be 0.3 ppe Lo and 1.1 ppe Hi.
In the I
I event the chlorination system is not able to maintain I
greater than.3 ppe residual chlorine, a Condition Report I
shall be initiated within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance with l
Reference 2.11.
g I
5.4.2 Chlorination during the months of December thru March I
I should be maintained at a level to control biofouling, I
I without exceeding the chlorine discharge limits of the I
I NPDES permit.
I l
5.5 Reporting I
I I
I 5.5.1
~I Report preparation will be the responsibility of the l
I Environmental Services Group Supervisor, and will be in ac-l I
cordance with Reference 2.8.
Reports will be submitted on l
l a quarterly basis to the Joint Intervenors following the l
I end of each calender quarter. The period of the first l
report will begin upon initial introduction of river. water I
I into the Normal Service Water System and will include at l
I least one full calender quarter. The reports will contain l
I a summary of the ACCP activities at River Bend Station and I
I copies of NPDES monitoring reports of chlorine discharges I
I for the quarter. The Process System Supervisor, or l
I designee, will provide trend analysis results of systems l
I-using river water to the Supervisor Environmental Services l
I for inclusion in this report. Copies of this report will l
l I
be submitted to the Nuclear Licensing group for formal sub-I l
I mittal to the State of Louisiana and the NRC.
l l,
I I
l I
l-l 1
l I
I l-I I
1 I
I I
ll l
l l
I N/A I
N/A II ADM-0053 I REV - 0 l
PAGE 6 0F 7 l
l l
ll l
l l
~
V t
i l-l I
5.5.2. Upon identification of infestation of any Class in a l
I Safety-Related system of a magnitude which causes or may l-I cause flow blockage, a report will be submitted'to the NRC l
I within 30 days describing the level of infestation, af-l I
facted system, and measures taken to prevent further I
infestation.
I I
I I
I I
I I
I I
I I
I I
I I
l l
l l
l l
l 1
1 I
I I
I I
I I
I I
I I
i el I
I I
I I
I I
I I
I I
l i
I I
I I
I I
l i
I I
I I
I
-l l
-1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i I
i l
l I
I I
I I
I I
I I
I I
ll l
l l
l N/A l
N/A ll ADM-0053 I REV - O l
PAGE 7 0F 7 l
I I
ll l
l l
i
' o & m =e**
GULF STATES UTILITIES COMPANY POSTOFFICEBOX 2951
- BEAUMONT, TEXAS 77704 AREA CODE 713 838-6631 June 21, 1985 RBG-21363 File No. G9.5 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
River Bend Station - Unit 1 Docket No. 50-458 Enclosed for your review is our Asiatic Clam Control Program for River. Bend Station.
Any questions or comments should be directed to Mr. James Cook at (409) 839-3013.
Sincerely,
- f. E. h J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/JWC/lp Enclosure