ML20237F754
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/29/1987
From: Booker J, Walling C
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
PROC-870729, RBG-26506, NUDOCS 8709010408
Download: ML20237F754 (3)


Text

- - -

a D

PUMP AND VALVE INSERVICE TESTING PLAN RIVER BEND STATION FIRST TEN YEAR INSPECTION INTERVAL REVISION 4 0 $ b Prepared by lw I 7l2Al97 Dath

/ 6 eyedny k0g / 7/2.7/P,7 Date /

bd /.) a,,, .a ~

/ 9/zd84 pptoved By*

~

Date h,spts urg,,

C.? HOLDER f 'o.

AUG 4 1987

\o *.~,'l.,*:";*:.", 5 ott t et AP O asceiveo Y, 870901040s DR a70729 ADDCit 05000458 SDC PDR

1 1

e a

l O

V VALVE REQUEST FOR RELIEF NO. 31 COMPONENT FUNCTION CLASS CATEGORY See Containment Isolation 1, 2 A or AC attached or 3 list TEST REQUIREMENT: Per IWV-3421, Category A valves shall be leak tested per IWV-3422 thru IWV-3427.

BASIS FOR RELIEF: Containment isolation valve leak rate testing will be conducted in accordance with Appendix J to 10CFR50. The NRC considers the Appendix J Type C test to be more limiting than the IWV-3421-3427 test; therefore, relief from paragraph IWV-3421-3427 for containment isolation valves 4 presents no reduction in safety since the intent of IWV-3421-3427 is conservatively met by the 10CFR50 Appendix J requirements.

}

The owner shall specify leakage rates which, when exceeded, corrective action shall be taken to repair or replace the valve. Trending of these valves will not be necessary as the Appendix J testing program conservatively assumes continued containment leakage integrity between outages by limiting Type B and C leakage to 0.6 La. This limit provides sufficient allowance for degradation 4 6s u ritiU4 gf in maintaining overall containment leakage to La or less.

s 9? Additional administrative measures are not gotoE" # needed as any additional test requirements will be 6g addressed in the respective corrective action plan 4 for the failure on a case basis. A preselected ggt ,

g increase in test frequency may not be appropriate F w ','"by ,,,,,.maa' +

  1. in all cases. Furthermore, degradation in containment leakage rate in the interval between 9bh*74ste s *cp Type A tests is accounted for in the as left acceptance criteria of 0.75 La for Type A test and 0.6 La for Types B and C.

ALTERNATE TESTING: Conduct containment isolation valve leak rate testing in accordance with 10CFR50 Appendix J.

O RECEIVED JUL 2 91987 soc

e Q ,a 1, i

GULF STATES UTILETIES COMPANY Hrvt H HEND ST A ION POST OFFICE ffoX 220 - 51 FRANCISVllLE LOtGANA 70/76 arf. A CODE SM C35 00% $ 346 M61 August 25, 1987 RBG - 26506 File No. G9.5, G12.5 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 Enclosed for your review is Revision 4 (Control Copy #6) of the River Bend Station Pump and Valve. Inservice Testing Plan. A summary of the revisions are described in the Attachment. This submittal is provided in accordance with 10CFR50.55a(g).

Pursuant to 10CFR170.12, GSU has enclosed a check for one-hundred fifty dollars ($150.00) for the application fee for review of this submittal.

Your prompt attention to this application is appreciated.

Sincerely, J. E. Booker Manager-River Bend Oversight River Bend Nuclear Group JEB/ ERG / /ch Enclosure cc: U.S. Nuclear Regulatory Commission (Control Copy #7)