ML20078H088

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Reflecting Clarifications to LAR 91-11
ML20078H088
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/10/1994
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20078H077 List:
References
NUDOCS 9411170010
Download: ML20078H088 (4)


Text

[associafec] Mk euh}ti be 3

rw ary co d e 44 e.lectrifal penshadon ctreui+ shs OPERA BLE. The seqe crf b these pro 4teWe deusces tvelucles Hase c'eicuils he wMeh t

credible O.ulf correntJ would nd exceed ne ELECTRICAL POWER SYSTEMS elec4rnal penetraboo{deup ec&ep:.

__-~

s 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICE LIMITING CONDITION FOR OPERATION Nd9 andbackup)

/

3.8.4.1 A+i rimary.m:nta!=nt 2:n:tratten ::nt tB overcurrent protective ]

devices e m " T W :

1 0." l L -. ' 3: ' r_."= U d APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

With one or more of theQ-imaa Esatei=:nt penetratier,-conducteBovercurrent protective devices ;---.;. " :: ::

2. -

_: - inoperable, declare the affected system or component inoperable and apply the appropriate ACTION statement for the affacted system and:

For 4.16 kV circuit breakers, de-energize the 4.16 kV circuit (s) by tripp-a.

ing the associated redundant circuit breaker (s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verify-ing, at least once per 7 days thereafter, the redundant circuit breaker to be tripped.

b.

For 480 volt circuit breakers, remove the inoperable circuit breaker (s) from service by racking out the breaker within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verifying, at least once per 7 days thereafter, the inoperable breaker (s) to be racked out.

For 480 volt MCC circuit breaker / fuse combination starters, remove the c.

inoperable starter (s) from service by locking the breakers open and remov-ing the control power fuse within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verifying, at least once per 7 days thereafter, the inoperable starter (s) circuit breaker to be locked open with the control power fuse removed.

d.

For 120/140 volt molded case circuit breakers, remove the inoperable cir-cuit breaker (s) from service by tripping both 120/140 volt breakers open and locking the upstream 480 volt MCC breaker open within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verifying, at least once per 7 days thereafter, the 480 volt MCC breaker (s) to be locked open.

.Q Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

RIVER BEND - UNIT 1 3/4 8-25 Amendment No. 47 9411170010 941110 PDR ADDCK 05000458 P

PDR

i l

ELECTRICAL POWER Sh.OtS

_ SURVEILLANCE REQUIREMENTS 2

4.8.4.1 Each of th e '

protective devices r ='n/ ::nt:r=.: ;;n;t :t';., c;;.Omovercurrent i

N:

1 2.2 0 shalf be demonstrated OPERA 8LE:

At least once per 18 months:

a.

1.

By verifying that the medium voltage 4.16 kv circuit breakers are OPERABLE by selecting, on a rotating basis, at least one the four circuit breakers and performing:

a)

A CHANNEL CALIBRATION of the associated protectiv and b)

An integrated system functional test which includes simula automatic actuation of the system and verifying that each circuits function as designed. relay and associated cir c)

For each circuit breaker found inoperable during these f tests, an additional representative sample of at least one of the four circuit breakers of the inoperable type shall i

also be functionally tested until no more failures are found or all circuit breakers.of that type have been functionally tested.

2.

By selecting and functionally testing a representative sample of at least 10% of each type of lower voltage circuit breakers Circuit breakers selected for functional testing shall be selected 1

on a rotating basis.

Testing of these circuit breakers shall setpoint and measuring the response time of th short time delay elements and the setpoint of the instantaneous element, as appropriate.

to the manufacturer's data to ensure that it is less than or equal to a value specified by the manufacturer.

OPERABLE status prior to resuming operation.found For each circuit breaker found inoperable during these functional tests, an addi-

.stional representative sample of at least 10% of all the circuit b'reakers of the inoperable type shall also be functionally teste until no more failures are found or all circuit breakers of type have been functionally tested.

RIVER BEND - UNIT 1 3/4 8-26

Ib 4k hk Cmbol bm safeh-d* 6*JhbD ELECTRICAL POWER SYSTEMS

%d A primr3 ga secoq Res At+crrnh. Sam ef Fbwcv OTHER OVERCURRENT PROTECTIVE DEVICE LIMITING CONDITION FOR OPERATION

ss s

c.,L r M :.! Cpri m )

v 3.8.4.2 vercurrent protection devic d sr:1r -- -----

2 - shall be OPERABLE.

APPLICABILITY:

At all times.

ACTION:

With one or more of the overcurrent protective devices inoperable, remove the circuit breaker (s) feeding the control room lighting and/

or alternate RPS supply as appropriate from service by opening the breaker (s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and return the overcurrent protection devices to OPERABLE status within 7 days, or verify the appropriate breakers open at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.*

SURVEILLANCE REQUIREMENTS 4.8.4.2 The overcurrent protective devices shall be demonstrated OPERABLE at least once per 18 months by selecting and testing one-half of each type of circuit breaker on a rotating basis.

Testing of these circuit breakers shall consist of injecting currents in excess of the breaker's nominal setpoint and measuring the response time of the long time and short time delay elemen+.s and the setpoint of the instantaneous element, as appropriate.

The measured data shall be compared to the manufacturer's data to ensure that it is less j

than or equal to a value specified by the manufacturer.

1 I

i d%

  • Except at least once per 31 days if locked, sealed, or otherwise secured in the open position.

RIVER BEND - UNIT 1 3/4 8-33 Amendment No. 47

q

[ 4 e 64aaf %M3 HVAc, twpu Ccc%

HVAc, RWca, ImumJ Fwl Lasfcv Tub <, bJ %d-ELECTRICAL POWER SYSTEMS h

ns 4 red %du j

A.C. CIRCUITS Insite CONTAINMENT 4eo o ad ?40 Azo LIMITING CONDIT N FOR OPERATION j

4Ea&A n;... x J J s

\\

3.8.4.4vt= '

-^-

--- + A. C. ci rcui de energized *9 insidecontainmentJshallbe j

t Equipment 10/

Location Device IMHR*CR 1EJS* C2A AC802 IF42-P P003 15 PNL8C1 Ci t Breaker 1 -

IF4 002H A-PNL8C1 C

uit Breaker 15 1

-PNL106 SCA-PNL882 ircuit Breaker 2 FT-PNL106 ISCA-PNL882 Circuit Breaker 1 1HVR*UC1AH ISCY"PNL2A2 Circuit Breaker 1HVR*UC18H ISCV*PNL2B2 Circuit Break 12 1HVR-UCICli ISCA-PNL2C1 Circuit Bre r9 1HVR-FNIAH ISCA-PNL2A2 Circuit B aker 3 i

1HVR-FN1BH ISCA-PNL2F Circuit reaker 6 1HVR-FNIC

.1SCA-PN Circu Breaker 1 1HVR-FN i

1SCA-P B1 Ci it Breaker 6 10RS-15 NL2E1 uit B'reaker 2.

10R C1BH 1

-PNL2F1 freuit Breaker 3 S-UCICH CA-PNL2E1 Circuit Breaker 2 RS-UC10H ISCA-PNL2F1 Circuit Breaker

~~

10RS-UC1EH 15CA-PNL2E1 Circuit Break 2

j 10RS-UC1FH ISCA-pnp!F1 Circuit Bre r3 1WCS-P5AH ISCA-PNL2E1 Circuit B aker 4 IWCS-P5BH ISCA-PNL2F Circuit reaker 2 j APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.

ACTION:

A. C.

With an G6@egetee% circui energized, trip the associated circuit breaker s) in the specified location w thin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

SURVEILLANCE REQUIREMENTS EachM6E::;&@A.C. circui X shall be determined to be 4.8.4.4 de-energized by verifying at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />"* that the associated circuit breakers are in the tripped condition.

i "Except during entry into the containment.

    • Except at least once per 31 days if locked, sealed or otherwise secured in the tripped condition.

RIVER BEND - UNIT 1 3/4 8-36

)

,