ML20117K107
Jump to navigation
Jump to search
| ML20117K107 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/29/1996 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20117K092 | List: |
| References | |
| NUDOCS 9609110131 | |
| Download: ML20117K107 (2) | |
Text
RCS Pressure and Temperature (P/T) Limits TR 3. 4.11 TR 3.4.11 RCS Pressure and Temperature (P/T) Limits TABLE 3.4.11-1 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM-WITHDRAWAL SCHEDULE CAPSULE VESSEL LEAD FACTOR AT WITHDRAWAL TIME NUMBER LOCATION I.D./4T (EFPY) 1 3*
0.67/0.89
/0h 2
177*
0.67/0.89 15 3
183*
0.67/0.89 Standby RIVER BEND TR 3.4-10 REVISION 5 (321) 9609110131 960829 PDR ADOCK 05000458 i
P PDR
License Amendment Request (LAR) 96-35
)
ENCLOSUREl i
GE SURVEILLANCE SPECIMEN PROGRAM EVALUATION FOR RIVER BEND STATION
,