ML20199C1888 January 1999Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan
ML20202F03626 November 1997Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr IntervalSafe Shutdown
Ultimate heat sink
Stroke time
Hydrostatic
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
ML20140F01526 December 1996Rev 6 to RSP-0008, ODCM ProcedureOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML20116P1348 August 1996Technical Requirements ManualSafe Shutdown
Time of Discovery
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Pressure Boundary Leakage
Fire Protection Program
Fire Watch
Early Warning Fire Detection
Power change
Unidentified leakage
ML20113F22712 June 1996Rev 0 to Calculation PI-0103-00203.002-101, Ampacity Derating EvaluationFire Barrier
B130180, Surveillance Specimen Program Evaluation for River Bend Station30 April 1996Surveillance Specimen Program Evaluation for River Bend Station
ML20108B5941 October 1995Rev 5A to River Bend Station Offsite Dose Calculation Manual ProcedureOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML20076K91627 October 1994Updates to IST Pump & Valve Program ManualSafe Shutdown
Stroke time
Scram Discharge Volume
Cold shutdown justification
Power Operated Valves
ML20059A85023 December 1993Near-Term Performance Improvement PlanEmergency Lighting
ML20128D92229 January 1993Rev 6 to Pump & Valve Inservice Testing Plan for River Bend Station First 10-Yr Insp Interval
ML20045E03119 August 1992Change 92-01 to Rev 3 to RSP-0008, Odcm.
ML20114D07119 August 1992Rev 3 to Odcm
ML20086G8412 October 1991Rev 5 to Inservice Insp Plan for River Bend Station - Unit 1
ML20082M0069 August 1991Rev 4 to RWS-0204, Radwaste Processing Control ProgramProcess Control Program
RBG-35-380, Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl26 July 1991Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests EnclHigh Radiation Area
Hydrostatic
Cold shutdown justification
ML20029B7846 March 1991Station,Inservice Insp Plan,Summary Rept Refuel Outage RF-3 Second Period,First Interval, Vols 1 & 2Non-Destructive Examination
VT-2
Liquid penetrant
ML20070U77226 February 1991Rev 4 to River Bend Station Inservice Insp Plan (First Interval)Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Scaffolding
ML20245F01024 April 1989Rev 2 to Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20114B7418 March 1989Rev 5 to Procedure RWS-0304, Radwaste Handling & ControlHigh Radiation Area
Process Control Program
ML20245F00414 February 1989Rev 3 to Offsite Dose Calculation Manual ProcedureOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20154C98516 August 1988Rev 3 to Inservice Insp-First IntervalHydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Scaffolding
ML18053A71022 March 1988Rev 5 to Pump & Valve Inservice Testing Plan,First 10 Yr Insp Interval. W/880422 Ltr
ML20238C36513 August 1987Rev 1 to Station Operating Procedure RSP-0008, Offsite Dose Calculation Manual ProcedureOffsite Dose Calculation Manual
RBG-26506, Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid29 July 1987Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid
ML20235Y05916 July 1987Rev 2 to Radwaste Processing Control ProgramProcess Control Program
RBG-26044, Rev 2 to Inservice Insp Plan - First Interval2 June 1987Rev 2 to Inservice Insp Plan - First IntervalNon-Destructive Examination
Hydrostatic
Nondestructive Examination
Liquid penetrant
Scaffolding
ML20114B72814 May 1987Rev 3 to Procedure RWS-0307, Radwaste Segregation
RBG-25841, Rev 0 to Procedure RSP-0008, River Bend Station,Offsite Dose Calculation Manual30 April 1987Rev 0 to Procedure RSP-0008, River Bend Station,Offsite Dose Calculation ManualOffsite Dose Calculation Manual
ML20114B73116 March 1987Rev 2 to Procedure RWS-0207, Radwaste Shipping CriteriaProcess Control Program
ML20209G3122 January 1987Rev 3 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp IntervalStroke time
Hydrostatic
Scaffolding
ML20214T62311 September 1986Revised Emergency Plan Implementing Procedures,Including Rev 5 to EIP-2-007, Protective Action Recommendation Guidelines & Rev 4 to EIP-2-024, Offsite Dose Calculations Manual Method
ML20214N6816 August 1986Rev 2 to Pump & Valve Inservice Testing Plan,First 10-Yr Insp IntervalHydrostatic
ML20207E8712 July 1986Vol 1 to Rev 1 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp IntervalStroke time
Hydrostatic
Power Operated Valves
Scaffolding
ML20206J15020 June 1986Rev 4 to River Bend Station Unit 1,Preservice Insp Plan, Final UpdateNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
ML20238C41418 May 1986Rev to Nonradioactive Oil/Hazardous Matl Spill Prevention, Control & Countermeasure Plan
ML20155G53926 February 1986Station,Emergency Response Exercise Manual, Evaluated Exercise
RBG-22-117, Rev 3 to Offsite Dose Calculation Manual16 September 1985Rev 3 to Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20135A63327 June 1985Revs to Nuclear Plant Engineering Preservice Insp/Pump & Valve Testing Plan, Replacing Pages 4 & 5 & App FVT-2
Liquid penetrant
RBG-21363, Rev 0 to Station Operating Procedure ADM-0053, Asiatic Clam Control Program21 June 1985Rev 0 to Station Operating Procedure ADM-0053, Asiatic Clam Control ProgramBiofouling
ML20135A92117 June 1985Rev 1 to OSP-0007, Preparation of Operations Sections Procedures
ML20125D27510 June 1985Updated Rev 1 to Nuclear Plant Engineering Preservice Insp/Pump & Valve Testing Plan
ML20129E9536 June 1985Rev 2 to Station Operating Procedure ADM-0022, Conduct of OperationsHigh Radiation Area
ML20117P48330 May 1985Rev 1 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp IntervalStroke time
RBG-21545, Rev 2 to River Bend Station Offsite Dose Calculation Manual27 May 1985Rev 2 to River Bend Station Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20128E88817 May 1985Revised Program Plan for Tdi Standby Diesel GeneratorsHydrostatic
ML20117P14313 May 1985Rev 2 to Procedure COP-1050, Post-Accident Estimation of Fuel Core DamageFuel cladding
RBG-21-165, Rev 1 to, River Bend Station Offsite Dose Calculation Manual24 April 1985Rev 1 to, River Bend Station Offsite Dose Calculation ManualOffsite Dose Calculation Manual
ML20129E95927 March 1985Rev 1 to Station Operating Procedure AOP-0001, Reactor ScramScram Discharge Volume
ML20112G4647 January 1985Offsite Dose Calculation ManualOffsite Dose Calculation Manual
ML20112G4497 January 1985Rev 0 to Procedure RWS-0204, Process Control ProgramProcess Control Program