Text
.. -.
1 i
}
i Attackment 3 TecidicalSpecification Mark-Up j
Page1of1 j
]
2.0 SAFETY LIMITS (SLs) 1 1
)
2.1 Sts i
)
l 2.1.1 Reactor Core SLs 1
2.1.1.1 With the reactor steam dome pressure < 785 psig or core j
flow < 105 rated core flow:
j I
l THERMAL POWER shall be s 255 RTP.
2.1.1.2 With the reactor steam dome pressure a: 785 psig and core 1
flow a: 105 rated flow:
.30 i
MCPR shall be or two recirculation loop operation or
.h.- or single recirculation loop l
operation.
l 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
a i
2.1.2 Reactor Coolant System Pressure SL i
l Reactor steam dome pressure shall be s 1325 psig.
i 1
2.2 SL Violations j
Wit.h any SL violation, the following actions shall be completed:
a 2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.
1 l
2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
l 2.2.2.1 Restore compliance with all SLs; and l
2.2.2.2 Insert all insertable control rods.
I 2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the plant manager and the corporate j
executive responsible for overall plant nuclear safety.
i (continuedl i