Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12
ML20134M227
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/15/1996
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20134M224 List:
References
NUDOCS 9611220278
Download: ML20134M227 (1)


Text

.. -.

1 i

}

i Attackment 3 TecidicalSpecification Mark-Up j

Page1of1 j

]

2.0 SAFETY LIMITS (SLs) 1 1

)

2.1 Sts i

)

l 2.1.1 Reactor Core SLs 1

2.1.1.1 With the reactor steam dome pressure < 785 psig or core j

flow < 105 rated core flow:

j I

l THERMAL POWER shall be s 255 RTP.

2.1.1.2 With the reactor steam dome pressure a: 785 psig and core 1

flow a: 105 rated flow:

.30 i

MCPR shall be or two recirculation loop operation or

.h.- or single recirculation loop l

operation.

l 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

a i

2.1.2 Reactor Coolant System Pressure SL i

l Reactor steam dome pressure shall be s 1325 psig.

i 1

2.2 SL Violations j

Wit.h any SL violation, the following actions shall be completed:

a 2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

1 l

2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

l 2.2.2.1 Restore compliance with all SLs; and l

2.2.2.2 Insert all insertable control rods.

I 2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the plant manager and the corporate j

executive responsible for overall plant nuclear safety.

i (continuedl i

9611220278 96111S PDR ADOCK 05000458 j

P PDR 1

i

)

RIVER BEND 2.0-1 Amendment No. 81 i