Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan
ML20199C188
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/08/1999
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20199C187 List:
References
PROC-990108, NUDOCS 9901140249
Download: ML20199C188 (1)


Text

...

).

2. O Yes @ No WOULD THE CHANGE DECREASE THE OVERALL LEVEL 1 OF SECURITY SYSTEM PERFORMANCE AS DESCRIBED IN PARAGRAPHS (b) THROUGH (h) OF 10 CFR 73.55 TO PROTECT WITH THE OBJECTIVE OF h!GH ASSURANCE AGAINST THE  :

DESIGN BASIS THREAT OF RADIOLOGICAL SABOTAGE AS STATED IN 10 CFR 73.1 (a)?

Rationale: The present course allows for no artificial support (use of l barricades) and includes a sitting position. These positions are not  ;

realistic for confronting an adversary in a contingency event. The changes are being made so that security officers may qualify in positions that would most likely be taken in a contingency event where the use of rifle would be necessary. It will also improve the safety of the security officers in a live fire scenario. This is an approved course in accordance with Appendix B of10CFR73. '

3. Yes @ No FOR ANY LICENSEE THAT HAS 'JRC-APPROVED SECURITY PLAN COMMITMENTS AS ALTERNATIVES TO ONE OR MORE OF THE REQUIREMENTS OF 10 CFR 73.55 (b) THROUGH (h):

DOES THIS CHANGE DECREASE THE OVERALL LEVEL OF SECURITY SYSTEM PERFORMANCE NEEDED TO PROTECT WITH THE OBJECTIVE OF HIGH ASSURANCE AGAINST THE DESIGN BASIS THREAT OF RADIOLOGICAL SABOTAGE AS STATED IN 10 CFR 73.1 (a)?

Rationale: N/A ITEM #6 CONSISTENCY IN TERMINOLOGY SECTIONfrITLE: Section 4.0 Security Force Equipment (now Section 5.0)

PROPOSED COMMITMENT:

Currently reads:

Section 4.0 " Helmets, Combat" Changed to read: -

Section 5.0 " Helmets, Riot" IMPACT ON EFFECTIVENESS OF A GENERIC PLAN:

1. Yes @ No DOES THIS CHANGE DELETE OR CONTRADICT ANY REGULATORY REQUIREMENT 7

~

9901140249 990108 PDR ADOCK 05000458 F PDR _

RHS T&Q PLAN Summary of Changes REV-13 PAGE 7 OF 21