| title = Responds to 820827 Ltr Requesting Addl Info Re NUREG-0737, Item III.D.3.4, Control Room Habitability. Revised Response Encl
| title = Responds to Requesting Addl Info Re NUREG-0737, Item III.D.3.4, Control Room Habitability. Revised Response Encl
| author name = Hurford W
| author name = Hurford W
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 12: Line 12:
| case reference number = RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM
| case reference number = RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM
| document report number = NUDOCS 8303040585
| document report number = NUDOCS 8303040585
| title reference date = 08-27-1982
| package number = ML20079P325
| package number = ML20079P325
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 23: Line 24:
==Dear Mr. Vassallo:==
==Dear Mr. Vassallo:==


In accordance with your August 27, 1982 letter requesting Carolina Power & Light Company (CP&L) to provide additional information concerning NUREG-0737 Item III.D.3.4, Contcol Room Habitability, CP&L has reviewed ite recember 30, 1980 response. As a result, CP&L's response repcrt NUS-3697
In accordance with your {{letter dated|date=August 27, 1982|text=August 27, 1982 letter}} requesting Carolina Power & Light Company (CP&L) to provide additional information concerning NUREG-0737 Item III.D.3.4, Contcol Room Habitability, CP&L has reviewed ite recember 30, 1980 response. As a result, CP&L's response repcrt NUS-3697
               " Control Room Habitability Evaluation, Brunswick Steam Electric Plant" has been reviewed and revised. Revision 1 of this report (dated January 1983) is attached and provides a more detailed review and evaluation of the NUREG-0737 requirements. The revised report indicates those areas where CP&L complies with the requirements of NUREG-0737 Item III.D.3.4 and provides a justification for the areas where the requirements are not totally fulfilled.
               " Control Room Habitability Evaluation, Brunswick Steam Electric Plant" has been reviewed and revised. Revision 1 of this report (dated January 1983) is attached and provides a more detailed review and evaluation of the NUREG-0737 requirements. The revised report indicates those areas where CP&L complies with the requirements of NUREG-0737 Item III.D.3.4 and provides a justification for the areas where the requirements are not totally fulfilled.
The areas of concern that were indicated in our December 30, 1980 response have been totally resolved. As a result of our previous examination, CP&L discovered that the logic for the chlorine isolation function did not perform as required. This deficiency was reported to the NRC by Licensee Event Report No. 2-28-84 and resolved by Plant Modification 81-032.
The areas of concern that were indicated in our December 30, 1980 response have been totally resolved. As a result of our previous examination, CP&L discovered that the logic for the chlorine isolation function did not perform as required. This deficiency was reported to the NRC by Licensee Event Report No. 2-28-84 and resolved by Plant Modification 81-032.

Latest revision as of 22:59, 26 September 2022

Responds to Requesting Addl Info Re NUREG-0737, Item III.D.3.4, Control Room Habitability. Revised Response Encl
ML20079P322
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/02/1983
From: Hurford W
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20079P325 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM NUDOCS 8303040585
Download: ML20079P322 (2)


Text

,. --

Cp&L Carolina Power & Light Company MAR 62 1983 Director of Nuclear Reactor Regulation Attention: Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing United States Nuclear Regulatory Commist tar Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 NUREG-0737 ITEM III.D.3.4 CONTROL ROOM HABITABILITY

Dear Mr. Vassallo:

In accordance with your August 27, 1982 letter requesting Carolina Power & Light Company (CP&L) to provide additional information concerning NUREG-0737 Item III.D.3.4, Contcol Room Habitability, CP&L has reviewed ite recember 30, 1980 response. As a result, CP&L's response repcrt NUS-3697

" Control Room Habitability Evaluation, Brunswick Steam Electric Plant" has been reviewed and revised. Revision 1 of this report (dated January 1983) is attached and provides a more detailed review and evaluation of the NUREG-0737 requirements. The revised report indicates those areas where CP&L complies with the requirements of NUREG-0737 Item III.D.3.4 and provides a justification for the areas where the requirements are not totally fulfilled.

The areas of concern that were indicated in our December 30, 1980 response have been totally resolved. As a result of our previous examination, CP&L discovered that the logic for the chlorine isolation function did not perform as required. This deficiency was reported to the NRC by Licensee Event Report No. 2-28-84 and resolved by Plant Modification 81-032.

Carolina Power & Light Company will incorporate into its existing periodic test the acceptance criteria required to verify the 1/8-inch water gauge positive pressure in the control room every 18 months. This procedure will be revised prior to its next scheduled performance. Control room positive pressure is currently verified on a periodic basis; however, the pressure differential has not been quantified.

8303040585 830302 p DR ADOCK 05000324 PDR h

411 Fayettevine Street

  • P. O. Box 1551
  • Raleigh. N. C. 27602
v. . .;; m

, , . , -. -- , .- . , . , . , . . , ~ , , . , . , - . - . . , - ~. ,

)

D. B. Vassallo The findings of this review have lead CP&L to conclude that the control room will be habitable as required. - The information in the report is presently undergoing a quality check; however, we do not expect the results and conclusions to change as a consequence of that verification. Any significant changes will be promptly brought to your attention.

Should you have any questions on this issue, please contact our

-staff.

Yours very truly,

(, ,

W. . Hurfo Manager ,

Technical Services WRM/ mag (6114C10T2)