ML20117P174: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20117P174
| number = ML20117P174
| issue date = 05/14/1985
| issue date = 05/14/1985
| title = Advises That 850503 Ltr Should Be Amended to Request Latest Facility Completion Date of 881231.Previous Date of 871231 Should Be Supplemented by Encl Latest Date,Per Telcon W/Nrc
| title = Advises That Should Be Amended to Request Latest Facility Completion Date of 881231.Previous Date of 871231 Should Be Supplemented by Encl Latest Date,Per Telcon W/Nrc
| author name = Bauer T
| author name = Bauer T
| author affiliation = TEXAS, UNIV. OF, AUSTIN, TX
| author affiliation = TEXAS, UNIV. OF, AUSTIN, TX
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8505200450
| document report number = NUDOCS 8505200450
| title reference date = 05-03-1985
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
Line 25: Line 26:
==Dear Mr. Denton:==
==Dear Mr. Denton:==


The letter dated May 3, 1985 should be amended to re-quest a latest facility completion date of December 31, 1988. The previous date (December 31, 1987) estimated pro-
The {{letter dated|date=May 3, 1985|text=letter dated May 3, 1985}} should be amended to re-quest a latest facility completion date of December 31, 1988. The previous date (December 31, 1987) estimated pro-
                         -ject completion and.should be supplemented'by the enclosed latest date as we discussed by telephone with NRC staff.
                         -ject completion and.should be supplemented'by the enclosed latest date as we discussed by telephone with NRC staff.
Sincerely, I b*
Sincerely, I b*

Latest revision as of 00:21, 23 September 2022

Advises That Should Be Amended to Request Latest Facility Completion Date of 881231.Previous Date of 871231 Should Be Supplemented by Encl Latest Date,Per Telcon W/Nrc
ML20117P174
Person / Time
Site: University of Texas at Austin
Issue date: 05/14/1985
From: Bauer T
TEXAS, UNIV. OF, AUSTIN, TX
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8505200450
Download: ML20117P174 (1)


Text

,.

THE UNIVERSITY OF TEX AS

. COLLEGE OF ENGINEERING AUSTIN, TEX AS 78712.

' Department of AfechanicalEngineering .

- Nudear Engineering Program May 14, 1985 312 - 471-3136 -

Mr~. Harold Denton Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 c/o Standardization and Special Projects-Branch Atten: Document Control #50-602

Dear Mr. Denton:

The letter dated May 3, 1985 should be amended to re-quest a latest facility completion date of December 31, 1988. The previous date (December 31, 1987) estimated pro-

-ject completion and.should be supplemented'by the enclosed latest date as we discussed by telephone with NRC staff.

Sincerely, I b*

Thomas L. Bauer Assistant Director Nuclear Engineering Teaching Laboratory Appr ved:

Dale E. Klein

?

Gerl(ard J. Fonken TLB:bjm 05052Og g $5g50 02 cc: Dr. E.F. Gloyna PDR A PDR Dr.'H.G. Rylander A Dr. H.L. Marcus Dr. H.A. Walls S ed before me this /g day of May, 1985.

cd D M A Notary for the State of feias. g

My connaission expires d - 3 4 -ff .

I