ML20245E966: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000275/1989020]]
{{Adams
| number = ML20245E966
| issue date = 07/31/1989
| title = Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program
| author name = Schaefer D, Schuster M
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name =
| addressee affiliation =
| docket = 05000275, 05000323
| license number =
| contact person =
| document report number = 50-275-89-20, 50-323-89-20, NUDOCS 8908140070
| package number = ML20245E970
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000275/1989020]]
 
=Text=
{{#Wiki_filter:-
                      T
[
g.
r
                                                                    S AFEOi'. bs'40S 4?e UMM AD2
    J.;''
                                        The information on this page-is considered to be' appropriate
                                                  for public, disclosure pursuant to 10 CFR. 2.790
                                                                U. S. NUCLEAR REGULATORY COMMISSION
  <
                                                                                                                                            REGION V
l
                              Report No's.                  50-275/89-20 and 50-323/89-20 (IE-V-898)
                              Docket Nos.                  50-275.and 50-323
                              License Nos.          'DPR-80 and DPR-82
                              Licensee:              ' Pacific Gas and Electro: Q.roany
                                                            77 Beale Street, Room 1451
                                                            San Francisco, California 94106
                              Facility Name:                Diablo' Canyon Power Plant (DCPP), Jnits 1 and 2
                              Inspected At:                San.Luis Obispo County, California
                            . Inspection Conducted: July 10 through 18, 1989
                                                                                                                        ..              q
                              Inspector:              l      G < i']                                            !                        ^!  e-                                E''    l
                                                  D. W.        Schaefer, Physigal Security Inspector                                                                      Date Signed
                                                                  1
                              Approved By: hh                        b                                                                                                          1//Ett
                                                  M. D. 6chuster, Chief, Safeguards Secticn                                                                              Dats Si'gne'd
                              Inspection Summary:
                              Areas Inspected:                This routine unannounced inspection by a region-based
                              inspector examined the following portions of the licensee's physical ' security
                              program: Physical Security Program for Power Reactors (CORE Inspection
                              Program); Security System Power Supply; Access Control-Personnel; Personnel
                              Training and Qualification Plan; and Follow-up on Events, Generic Letter, and
                              Inspector Identified Problems.                                                                            During this inspection, portions of Inspection
                              Procedures 30703, 81700, 81058, 81070, 81501, 92700, 92701, rind 92703 were
                              used.
                            - This inspection was begun during regular hours.
                              Results:        In the areas inspected, the licensee's security program appeared
                              adequate to accomplish their security objective. The licensee was found to be
                              in' compliance with NRC requirements within the areas examined during this
                              inspection, except for the non-cited violation in the area ot:                                                                                Compensatory
                              Measures (Inspection Report Details, Paragraph 6).                                                                              This non-cited violation
                              involved the licensee's- discovery of a contract security officer sleeping
                              while acting as a compensatory measure for a protected area perimeter alarm
                              zone,      8908140070 890731                                                                              "
                                        PDR      ADDCK 05000275
                                        G                                                  PDR
                      .. . .  ..;. ..+. M "5
                        'e      . . N[Md.E.'[ $$ [.                                                                                                  ,,    ,    ,,,    ..gg.
                                                                                                                                                    '* ' -
                                                                                                                                          ,
                      L .'Ai .1: - AT i ' '. 71 E
                                            ^
                                                                                                                      O                                    *          * '    ' ' *
                        I A0B 4 " .r. ',!ROl.IC.
    --    _ _ - - - _-.-___                        . _ _ -          - - _ _ . _ _ _ _ - - - _ _ - _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _                                                  _ _ - _ _ _ _ - _ _ _ - -
}}

Latest revision as of 02:04, 1 February 2022

Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program
ML20245E966
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/31/1989
From: Schaefer D, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20245E970 List:
References
50-275-89-20, 50-323-89-20, NUDOCS 8908140070
Download: ML20245E966 (1)


See also: IR 05000275/1989020

Text

-

T

[

g.

r

S AFEOi'. bs'40S 4?e UMM AD2

J.;

The information on this page-is considered to be' appropriate

for public, disclosure pursuant to 10 CFR. 2.790

U. S. NUCLEAR REGULATORY COMMISSION

<

REGION V

l

Report No's. 50-275/89-20 and 50-323/89-20 (IE-V-898)

Docket Nos. 50-275.and 50-323

License Nos. 'DPR-80 and DPR-82

Licensee: ' Pacific Gas and Electro: Q.roany

77 Beale Street, Room 1451

San Francisco, California 94106

Facility Name: Diablo' Canyon Power Plant (DCPP), Jnits 1 and 2

Inspected At: San.Luis Obispo County, California

. Inspection Conducted: July 10 through 18, 1989

.. q

Inspector: l G < i']  ! ^! e- E l

D. W. Schaefer, Physigal Security Inspector Date Signed

1

Approved By: hh b 1//Ett

M. D. 6chuster, Chief, Safeguards Secticn Dats Si'gne'd

Inspection Summary:

Areas Inspected: This routine unannounced inspection by a region-based

inspector examined the following portions of the licensee's physical ' security

program: Physical Security Program for Power Reactors (CORE Inspection

Program); Security System Power Supply; Access Control-Personnel; Personnel

Training and Qualification Plan; and Follow-up on Events, Generic Letter, and

Inspector Identified Problems. During this inspection, portions of Inspection

Procedures 30703, 81700, 81058, 81070, 81501, 92700, 92701, rind 92703 were

used.

- This inspection was begun during regular hours.

Results: In the areas inspected, the licensee's security program appeared

adequate to accomplish their security objective. The licensee was found to be

in' compliance with NRC requirements within the areas examined during this

inspection, except for the non-cited violation in the area ot: Compensatory

Measures (Inspection Report Details, Paragraph 6). This non-cited violation

involved the licensee's- discovery of a contract security officer sleeping

while acting as a compensatory measure for a protected area perimeter alarm

zone, 8908140070 890731 "

PDR ADDCK 05000275

G PDR

.. . . ..;. ..+. M "5

'e . . N[Md.E.'[ $$ [. ,, , ,,, ..gg.

'* ' -

,

L .'Ai .1: - AT i ' '. 71 E

^

O * * ' ' ' *

I A0B 4 " .r. ',!ROl.IC.

-- _ _ - - - _-.-___ . _ _ - - - _ _ . _ _ _ _ - - - _ _ - _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ - _ _ _ _ - _ _ _ - -