IR 05000275/1982015

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-275/82-15 on 820524-28.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization Mgt & Security Program Audit.Details Withheld (Ref 10CFR73.21)
ML20054F755
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/11/1982
From: Mcqueen A, Schaefer D, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20054F747 List:
References
50-275-82-15, NUDOCS 8206170289
Download: ML20054F755 (2)


Text

_

. .

.

The information oNhNNsNODdIahriate

'

'

,

for public disclosure pursuant to 10 CFR 2.79 .

>

U.S. fiUCLEAR REGULATORY COMMISSION Region V Report flo. 50-275/82-15 (IE-V-500)

Docket f! License fi DPR-76 Safeguards Group Licensee: Pacific Gas & Electric Company 77 Beale Street San Francisco, California 94106 Facility flame: Diablo Canyon Power Plant, Unit l'

Inspection at: San Luis Obispo County, California Inspection Conducted: May 24-28, 1982 Date of Last Physical Security Inspection Visit: March 15-19, 1982 Type of Inspect'on: Routive m Unannounced. Physical Security Inspectors: / a /d a o hu y, /0. W.Schaefer,PpsicalProtectionInspector / Date Signed Mk uJLa~ w il , /i82 A. D. McQueen', Physical' Protection Inspector b Date Signed Date Signed ilpproved by: /)v C- bbg (,/p/go M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:

Areas Inspected: Included a review of Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Program Audit; Records and Reports; Testing and Maintenance; Vital Area Barriers; Security System Power Supply; Lighting; Assessttient Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-PA; Detection Aids-VA; Alarm Stations; Communications; Appendix B to

'

10 CFR 73; Follow-up Items on Previous Inspections; Follow-up on Information Notices; and Independent Effor The inspection involved 88 inspector hours onsite and 3 in-office inspector hours by two NRC inspectors. The inspection was begun during regular hour Of the total onsite inspection hours, 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> were accomplished during off-shift period INCI4SLEE CONTAniS SAFEGUARDS INPOWATION*

trm sr/sAncu nus PAGE IS D= 7mm* 8206170289 820611 PDR ADOCK 05000275 --

O f2

_ _ _ . _ _ _ _ _ . . _ _ _ _ _ _ _ .

.

-

. . ,

-

.

. .

,

Inspection Summary: -2- June 11, 1982 Results: The licensee was found to be in compliance with NRC requirements within the areas inspecte ,

_ . . . _ _ ._