IR 05000275/1982015
| ML20054F755 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/11/1982 |
| From: | Mcqueen A, Schaefer D, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20054F747 | List: |
| References | |
| 50-275-82-15, NUDOCS 8206170289 | |
| Download: ML20054F755 (2) | |
Text
_
.
.
.
The information oNhNNsNODdIahriate
'
'
,
for public disclosure pursuant to 10 CFR 2.790.
>
.
U.S. fiUCLEAR REGULATORY COMMISSION Region V Report flo. 50-275/82-15 (IE-V-500)
Docket f!o.
50-275 License fio.
DPR-76 Safeguards Group Licensee:
Pacific Gas & Electric Company 77 Beale Street San Francisco, California 94106 Facility flame: Diablo Canyon Power Plant, Unit l'
Inspection at: San Luis Obispo County, California Inspection Conducted: May 24-28, 1982 Date of Last Physical Security Inspection Visit: March 15-19, 1982 Type of Inspect'on:
Routive Unannounced. Physical Security m
Inspectors: / a /d a o hu y, /0. P.2 W.Schaefer,PpsicalProtectionInspector
/
Date Signed Mk uJLa~
w il, /i82 A. D. McQueen', Physical' Protection Inspector b
Date Signed Date Signed ilpproved by: /)v C-bbg (,/p/go M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:
Areas Inspected:
Included a review of Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Program Audit; Records and Reports; Testing and Maintenance; Vital Area Barriers; Security System Power Supply; Lighting; Assessttient Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-PA; Detection Aids-VA; Alarm Stations; Communications; Appendix B to
'
10 CFR 73; Follow-up Items on Previous Inspections; Follow-up on Information Notices; and Independent Effort.
The inspection involved 88 inspector hours onsite and 3 in-office inspector hours by two NRC inspectors. The inspection was begun during regular hours.
Of the total onsite inspection hours, 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> were accomplished during off-shift periods.
INCI4SLEE CONTAniS SAFEGUARDS INPOWATION* -
trm sr/sAncu nus PAGE IS D= 7mm*
8206170289 820611 PDR ADOCK 05000275
--
O f2
_ _ _.
_ _ _ _ _.
. _ _ _ _ _ _ _.
.
-
.
.
,
-
.
.
.
,
Inspection Summary:
-2-June 11, 1982 Results: The licensee was found to be in compliance with NRC requirements within the areas inspected.
,
_... _ _._