IE Safeguards Insp Rept 50-275/82-15 on 820524-28.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization Mgt & Security Program Audit.Details Withheld (Ref 10CFR73.21)
ML20054F755
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/11/1982
From: Mcqueen A, Schaefer D, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20054F747 List:
References
50-275-82-15, NUDOCS 8206170289
Download: ML20054F755 (2)


Text

_

.

.

.

The information oNhNNsNODdIahriate

'

'

,

for public disclosure pursuant to 10 CFR 2.790.

>

.

U.S. fiUCLEAR REGULATORY COMMISSION Region V Report flo. 50-275/82-15 (IE-V-500)

Docket f!o.

50-275 License fio.

DPR-76 Safeguards Group Licensee:

Pacific Gas & Electric Company 77 Beale Street San Francisco, California 94106 Facility flame: Diablo Canyon Power Plant, Unit l'

Inspection at: San Luis Obispo County, California Inspection Conducted: May 24-28, 1982 Date of Last Physical Security Inspection Visit: March 15-19, 1982 Type of Inspect'on:

Routive Unannounced. Physical Security m

Inspectors: / a /d a o hu y, /0. P.2 W.Schaefer,PpsicalProtectionInspector

/

Date Signed Mk uJLa~

w il, /i82 A. D. McQueen', Physical' Protection Inspector b

Date Signed Date Signed ilpproved by: /)v C-bbg (,/p/go M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:

Areas Inspected:

Included a review of Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Program Audit; Records and Reports; Testing and Maintenance; Vital Area Barriers; Security System Power Supply; Lighting; Assessttient Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-PA; Detection Aids-VA; Alarm Stations; Communications; Appendix B to

'

10 CFR 73; Follow-up Items on Previous Inspections; Follow-up on Information Notices; and Independent Effort.

The inspection involved 88 inspector hours onsite and 3 in-office inspector hours by two NRC inspectors. The inspection was begun during regular hours.

Of the total onsite inspection hours, 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> were accomplished during off-shift periods.

INCI4SLEE CONTAniS SAFEGUARDS INPOWATION* -

trm sr/sAncu nus PAGE IS D= 7mm*

8206170289 820611 PDR ADOCK 05000275

--

O f2

_ _ _.

_ _ _ _ _.

. _ _ _ _ _ _ _.

.

-

.

.

,

-

.

.

.

,

Inspection Summary:

-2-June 11, 1982 Results: The licensee was found to be in compliance with NRC requirements within the areas inspected.

,

_... _ _._