Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs
ML20198J141
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/09/1986
From: Ang W, Burdoin J, Mendonca M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20198J127 List:
References
50-275-86-14-EC, 50-323-86-15, NUDOCS 8605300693
Download: ML20198J141 (11)


Text

.

_ _ - . . . . _ _ _ , - _ . _ - _ . - _ . , _ _ . , _ . . . . _ . . . ... . . . _ . _ _ . .

d

'

I 1 ,

!

l

. U. S. NUCL: EAR REGULATORY COMMISSIDN

<

REGION V i I l Report Nos. 50-275/86-14, 50-323/85415

.I i Docket Nos. 50-275, 50-323

, License Nos. DPR-8D, DPR-62

. Licensee: Pacific Cas and Electric Comp 4ny 77 Beale Street, Room 1451 ,

San Francisco, Californ%a 9411)6

! Facility Nam ; Diablo Canyon Units 1 and 2

I Location Region V Office Walnut Creek. California Conference Conducted: April 25, 1996

[ Prepared by:  % . h b b _,; f /T hs, J. P. Burdoin, Reactor Inspector Date Signed

% % % A

_ -- [n .s ~fy // 4 W P. Ang, Reactor Inspectot7 Date Signed

, Approved by:  %%N s ~.. f/7/d'a

! M. M. Mendoaca, Cliief Date Signed i

Reactor Project Section 1 Summary:

{

En'forcement Conference on April 25, 1986 (Report Nos. 50-275/66-14 and l

'

S0-323/86-15) .

, The licensee presented a detailed description of his action plan to correct the problem of missed Technical Specifications surveillance j One item of noncompliance was identified, in the area of followup of licensee j event report ,

This management meeting involved a total of 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> by sewn NRC

-

representative ,

8605300693 860512 PDR ADOCK 05000275 G PM

.

,ap.+syeen,-w-=t"- **we3 *ewi'. a.-P P er w&re b e >9M- MM- 9 -'W 7' *EE*- Y

.

.

MANAGEMENT MEETING Meeting Attendees Pacific Gas and Electric Company (PG&E)

J. D. Shiffer, Vice President B. Lew, Director, Nuclear Regulatory Affairs R. C. Thornberry, Plant Manager S. M. Skidmore, Manager, Quality Assurance J. A. Sexton, Operation Manager S. G. Banton, Surveillance Test Supervisor D. A. Taggart, Acting Director, Quality Support QA J. M. Gission, Assistant Plant Manager, Technical Service T. L. Grgbel, Regulatory Compliance Supervisor G. A. Sarkisian, Coordinator Nuclear Information Nuclear Regula, tory Commission (NRC) Region V J. B. Martin, Regional Administrator B. H. Faulkenberry, Deputy Regional Administrator D. F. Kirsch, Director, Division of Reactor Safety and Projects R. T. Dodds, Chief, Reae, tor Project Section 1 M. M. Hendonca, Senior Resident Inspector, Diablo Canyon J. F. Burdoin, Reactor Inspector

'

W. P. Ang, Reactor Inspector Meeting Sugmary

.

The meeting convened at approximately 10:00 a.m. in the Region V i

conference room. Mr. Shiffer introduced the PG&E attendees. Mr. Martin made opening remarks and discussed the purpose of the meeting, i.e. , to discuss the findings of the April 7-11, 1986, NRC inspection of missed surveillances as reported by PG&E in recent Licensee Event Reports; corrective actions by PG&E; NRC concerns; and NRC enforcement action Mr. Dodds presented a brief history of missed surveillances going back to the last SALP report in which the licensee received a grade of "two" with a downward trend in this area. It was also pointed out that since January 1st, eight Licensee Event Reports (LERs) were reported, involving 22 Technical Specification (TS) required surveillances that had not been performed within the TS allowed time limits. Mr. Dodds indicated that these LEPs raised questions into the adequacy of the licensee's corrective actions and Quality Assurance (QA)/ Quality Control (QC)

involvement. Mr. Dodds also indicated that the licensee should provide a discussion on the scale of the problem and actions to address the p roble Mr, Thornberry pointed out that the licensee had developed an action plan as early as last year when they recognized the problem. Their action plan included a reorganization in this area and appointment of Mr. B:.nton as Surveillance Test Superviso . . . -

.

_ _ __ ___

'

.

Mr. Shiffer then requested that Mr. Banton discuss the licensee's record review and surveillance test program which grew out of the licensee's corrective action pla Mr. Banton then presented the program by projecting in sequence eight transparencies (attached as enclosure 1) on the screen and described in detail the licensee method to control TS surveillances. Mr. Banton discussed that the licensee has added controls to the updating and inputting of changes to their surveillance program, that QA and QC are involved in the program, and that the findings of the April 7 through 11 inspection had been addresse Mr. Martin expressed his concern as to the licensee's IST program and whether the IST programs (Units 1 and 2) are fully approved. Messr Gisclon and Lew responded that a program had been submitted to the Office of Nuclecr Reactor Regulation (NRR), that NRR had prepared a safety evaluation, and that the licensee had complied with the NRR evaluatio Mr. Thornberry indicated that a major part of the licensee's plan inv>1ved more related training that has been planned. Mr. Martin pointed or; that this required top management involvement to be effectiv Mr. Martin asked the extent of QA involvement in the program; and Messr Skidmore and Taggert indicated that QC is currently reviewing 100% of surveillance activities at the site. Further, QA was involved in extensive records reviews. On questic ling by Mr. Martin, Mr. Sexton indicated that there was a daily meeting where significant operating activities, including surveillance activities, were discusse Mr. Shiffer summed-up the licensee's presentation with a broad overview of the overall program. Specifically, increased attention by the Onsite Review Group to Technical Review Group activities, initiation of a Human Performance Evaluation System, and a Plant Staff Review Committee special meeting every quarter to address and trend problem Mr. Martin's concluding remarks included a concern about failing equipment in the older plants, i.e., a San Onofre Unit I cable failure due to aging effects. Mr. Shiffer indicated understanding of the importance of maintaining good plant material conditio The meeting concluded at approximately 12:20 ' ENCLOSURE 1

.

,, SUMMARY: DCPP SURVEILLANCE TEST PROGRAM

.

.

( AP C-3S1 Master Surveillance Test Schedule o PSRC approved listing of all surveillance requirements o Data basis for PMTS computer schedule

.

o Procedure outline Surveillance Test Program Plant Manual (Vol 6) Surveillance Test Procedures (STP's)

o Other STP's contained in other volumes (C&RP, OP's) PMTS Computerized Test Schedule o File 08 (Unit 1), File 58 (Unit 2) -

o All surveillances with frequency greater than 7 days Routine and Conditional Surveillance Requirements (less than 7 day frequency)

,

o Shiftly, daily procedures, turnover lists o Conditional surveillances Department Test Coordinators ( o Responsibility for conducting surveillances on time o Update PMTS when tests are complete o Verify updates are properly entered F,. Surveillance Test Supervisor ,

'

.

o Overall Program responsibility o Routine verification of PMTS data base o Responsibility for accuracy of PMTS data base and Master Surveillance Test Schedule (AP C-3S1)

o Informs Test Coordinators of generic issues regarding Surveillance Test program  !

!

C -

-= = -  : - - --

DC0344 11

. _ _

. _ . _ _ - . . - .

ENCLOSURE 1

. SURVEILLANCE PROBLEM IDENTIFICATION

- LER's identifying program weaknesses

{ SA[P issued October 18, 1985 Identified negative trend (based on LERs) in surveillance evaluation category Reexamination of surveillance control procedures and practices Reexamination of staffing levels and training adequacy in surveillance area

.

I I

~

's _

,

i L _ _- .

.

.. _

- .

.

DC0344 21

_ _ _ .

.- - , - _ _ , . -- ._, . _ _ . . - . - - . . , . . .. .

-

ENCLOSURE 1

'

, SURVEILLANCE IMPROVEMENT ACTION PLAN Action Plan developed 4th quarter 1985 to address concerns regarding l l[ surveillance category negative trend, as well as our perception of other problems that were continuing to surface Action Plan submitted to management December 12, 1985 Action Plan Key Areas:

o PMTS Improvement Program

,

o Implement PIMS Recurring Task Schedule o Improvements to AP C-3S1 Master Surveillance Control document o STP improvements / revisions -

o Surveillance Test Department expansion, improvements, group charter

% .

.

t L

- _ = = --

-

-

~ -- -

.. ___

$

DC0344 31

- _ _ .. - - . - , , - .. - _- - . . . . . .

ENCLOSURE 1

-

.

ACTION PLAN IMPLEMENTATION Initial Progress ,

~

o- PMTS controls directive (Issued 11-21-85) .

o PMTS error diagnostic sorts (Issued 12-1-85)

o AP C-3S1 revision (submitted 12-26-85)

o Surveillance Test Procedure Review Program (started 1-15-86)

o File 08/58 review (started 1-30-86)

o Hire surveillance coordinator (January)

o Hire 6 consulting engineers for procedure revision (Jan, Feb)

o Plant Manager directive - (March), personnel accountability for accuracy IST Program Review (December 1985)

o LER 1-84-036 (check valve 8912 not being tested)

i o LER 1-85-036 (8807A & B wrong frequency)

o LER 1-85-037 (containment spray pumps, frequency not increased)

( I&C File Review (January 1986)

o LER 1-86-001 (partial surveillance updated as complete) Engineering Department File Review (March / April 1986)

o LER 2-85-026 (Notice of Violation) spare penetration 82 ~

'.

,

.

-

o NRC PAT team inspection - STP V-2J blanks Revise Action Plan (4-21-86)

o Lessons learned from file reviews o

Increased responsibilities of Surveillance Test Supervisor

.

L -

_

-

_ _ = ,_=.= .

,_ _-

_ . _ __ __ .. _ . _ _ .

. * = - e_e.e-t

'

DC0344 4I

_ - - _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _ - _ _ _ _ _ _ - . - _ - _ _ _ -_ -___ - ___- - -_ __ _ - _ __ --__ _______ _ -___- - ____ _ ___

.

_ - .__ _. __ _ _ _ _ _ _ _ _ _ _ _ . . _ _

Ei4 CLOSURE 1

-

.

ROOT CAUSES OF MISSED SURVEILLANCES LERs (PAST and PENDING) involving surveillances (1984-1986)

( o Incomplete surveillance o Inadequate procedure / procedure review process o Inadequate communications / lack of effective tracking

-

o Training deficiencies .

o Personnel error o Missed incorporation of regulatory requirements

.

.

.

i

':

. -

.- .

.

.

<

1

._ --_ _-. , _ . _-

~ - ~ ~ ~

.

. - _ . - - . . . . - - . . . - _ .- . . .

n.__r n~.._ ._ n ._. J ~

.

DC0344 SI

- _ - . - - . . - . . . -

- . . . . . _ . _ - _ . - ...- _.. - - - . -,. .

_ __

ENCLOSURE 1

-

SUMMARY: REVISED SORVEILLANCE IMPROVEMENT ACTION PLAN

. . Based on feedback file reviews and LERs

! o More emphasis on correcting file 08/58 errors o Include all regulatory based survA111ances on file 08/58 o Provide training to all applicable departments on the importance of thorough data sheet reviews o Complete file reviews in all departments which are responsible for STPs o Quality Control Department commitment to perform data sheet - file 08/58 cross-check ,

  • '

Provide verification and feedback mechanism

! .

4 k

.

..U e

$

i

L _

. . . .

DC0344 61 *

. -- -

, , _

_ , . - .

_ _

ENCLOSURE 1

-

.

_ ACTION PLAN G0AL _ Master schedule tightly controlled and monitored

'

o Closely tied to procedgre revisions and regulatory changes Implement use of PIMS Recurring Task Schedule i

o More flexible and easier to use Clearly defined responsibilities for Surveillance Test Supervisor and Department Test Coordinators Dedicated full time surveillance coordinator o Monitors program on full time basis

'

o Answers to Surveillance- Test Supervisor Improved Surveillance Test Procedures o Clear, concise to minimize errors Routine training program for involved personnel Consolidated file containing all re~gulatory surveillances i

k'

~

.

.

.

i l

.

-

.-

  • %,_

--

"

+mMM use I

,

.: - :- . - .. : - . ::~r- -- - .-

^

.- .

DC0344 7I ~

_ __ _ , __

. . _ _ _ __ , _ _ _,

.. - - . .-- _ - - - -. -

. SUMMARY i

-

\

,

, Problems have mainly occurred in 1984, 1985 and prior to implementation of the Action Plan'

i

,

( .

Plan is thorough and'is already working

.

-

l o Initial improvements started in November 1985 o Since then, only 4 events (LERs)

Partial surveillances updated as complete

Procedure deficiency - inadequate precautions

l Lack of adequate communications at shift turnover

Personnel error - lack of effective monitoring ~

o Above items being addressed in Action Plan

, Most Action Plan items complete except for long term items

,

!

j (

.

~

...

.

,

i I

I

,

i

)'

c k -

.. -

' --

.

. -- . .. . - _ _ .

DC0344 81 -

't m - - , , - , - .

+r --n-y-, ,ne o -. , -,.7 -, v,e-m., ,- w s g,- ~

xs-r-r--- --w-* N v r e m ---m-= r- re .ww~., v s y n - ~ ---r---nst-+>v