IR 05000275/199001722 October 1990Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program
ML20245E96631 July 1989Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program
IR 05000275/198901218 April 1989Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness ProgramSiren
IR 05000275/19890038 February 1989Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation ActivitiesAnnual Radiological Environmental Operating Report
Process Control Program
Scaffolding
Overexposure
IR 05000323/198703917 November 1987Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505Nondestructive Examination
IR 05000275/19870321 September 1987Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306
IR 05000275/198702223 June 1987Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List
IR 05000275/19870188 May 1987Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment
IR 05000275/198700125 March 1987Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over LubricantsBoric Acid
Stroke time
Post Accident Monitoring
Probabilistic Risk Assessment
Commercial Grade
IR 05000275/198603317 March 1987Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety
IR 05000275/198700911 March 1987Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & EquipmentTemporary Modification
Fire Watch
IR 05000275/198700420 February 1987Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERsBoric Acid
Stroke time
Biofouling
IR 05000275/198700712 February 1987Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance ReptsMissed surveillance
IR 05000275/19870066 February 1987Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration
IR 05000275/198603230 January 1987Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & AllegationsUnanalyzed Condition
Time of Discovery
Loop seal
Post Accident Monitoring
Anchor Darling
Missed surveillance
Earthquake
Water hammer
IR 05000275/198700330 January 1987Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility ToursHigh Radiation Area
Process Control Program
IR 05000275/198700528 January 1987Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 ContainmentLiquid penetrant
IR 05000275/198602517 September 1986Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling ActivitiesShutdown Margin
Reactor Vessel Water Level
IR 05000275/19860155 June 1986Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified
IR 05000275/19860149 May 1986Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERsMissed surveillance
IR 05000275/19850389 December 1985Insp Repts 50-275/85-38 & 50-323/85-36 on 851118-22.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Findings,Transportation Activities,Solid Waste Mgt Program,Low Level Waste Mgt & Licensee EventsHigh Radiation Area
Process Control Program
Exclusive Use
IR 05000275/19850328 October 1985Insp Repts 50-275/85-32 & 50-323/85-29 on 850818-0928. Violation Noted:Nrc Inspector,Not on Approved Access List, Entered Class 1 safety-related Matl Storage Area UnescortedBoric Acid
Stroke time
IR 05000275/198502414 August 1985Insp Rept 50-275/85-24 on 850603-07.No Violations or Deficiencies Noted.Major Areas Inspected:Emergency Response Facilities Compliance W/Suppl 1 to NUREG-0737,including Technical Support Ctr & Operational Support Ctr
IR 05000275/198502330 July 1985Insp Rept 50-275/85-23 on 850610-28.Violation Noted: Weaknesses in Implementation of Qa/Qc Program Re Control of Measuring & Test Equipment & Unqualified Individual Assigned as TechnicianFitness for Duty
High Radiation Area
Probabilistic Risk Assessment
Temporary Modification
IR 05000323/200501012 June 1985Insp Rept 50-440/85-17 on 850323-0510.Noncompliance Noted: Failure to Provide Adequate Administrative Procedural Controls & Failure to Adequately Accomplish Release for Test pre-test Checklist VerificationSafe Shutdown
Hydrostatic
Squib
Emergency Lighting
Overspeed trip
IR 05000323/200500622 May 1985Insp Repts 50-424/85-13 & 50-425/85-13 on 850323-0506.No Violations or Deviations Noted.Major Areas Inspected:Qa,Fire Protection/Prevention,Containment Dome Reinforcing Steel & Tendon Sheathing & Cavity Liner Plate WeldingBoric Acid
Coatings
Liquid penetrant
IR 05000275/19850143 April 1985Insp Repts 50-275/85-14 & 50-323/85-02 on 850304-08.No Noncompliance or Deviation Noted.Major Areas Inspected:Area Insp,Licensee Actions on Previously Identified Items,Ie bulletins,10CFR50.55(e) Items & TMI Task Action Items
IR 05000275/19840056 June 1984IE Insp Rept 50-275/84-05 on 840326-30.No Violations or Deviations Noted.Major Areas Inspected:New Chemistry & Radiation Protection Dept Organization,Radiation Protection Training,Followup on Noncompliance & IE Info Notices
IR 05000275/19820242 August 1982IE Insp Rept 50-275/82-24 on 820712-15.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Onsite Review Committee & Independent Insp
IR 05000275/198202330 July 1982IE Insp Repts 50-275/82-23 & 50-323/82-12 on 820721-23.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circulars,Info Notices & Bulletins,Preoperational Testing & Monitoring CalibrGrab sample
IR 05000275/198201228 July 1982IE Insp Repts 50-275/82-12 & 50-323/82-07 Have Been Canceled
IR 05000275/198202226 July 1982IE Insp Repts 50-275/82-22 & 50-323/82-11 on 820526-28 & 0628-0702.No Noncompliance Noted.Major Areas Inspected: Action on Previous Items,Mods to Piping & Electrical Raceway Supports & Unit 2 VesselNondestructive Examination
Emergency Lighting
IR 05000275/198202119 July 1982IE Insp Rept 50-275/82-21 on 820606-0703.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Physical Security,Maint,Ler Followup & Licensee QA Program
IR 05000275/198202028 June 1982IE Insp Repts 50-275/82-20 & 50-323/82-10 on 820506-28.No Noncompliance Noted.Major Areas Inspected:Implementation of Independent Verification Program Including Independence & Qualification of Personnel & Exam of QA Programs
IR 05000275/198201918 June 1982IE Insp Rept 50-275/82-19 on 820502-0604.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Physical Security,Maint,Ler Followup & QA Program
IR 05000275/198201815 June 1982IE Insp Rept 50-275/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Plant Layout,General Employee Training,Chemistry & Radiation Protection Staff Training & NUREG-0737,Items II.B.3 & II.F.1
IR 05000275/198201611 June 1982IE Insp Repts 50-275/82-16 & 50-323/82-09 on 820329-0402 & 0510-14.Noncompliance Noted:Class I Matl Released for Const Prior to Satisfying Established Matl Receiving,Handling & Processing QC Procedures
IR 05000275/198201511 June 1982IE Safeguards Insp Rept 50-275/82-15 on 820524-28.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization Mgt & Security Program Audit.Details Withheld (Ref 10CFR73.21)
IR 05000275/197800726 May 1978IE Insp Rept 50-275/78-07 on 780227-0303.No Deviations or Items of Noncompliance Noted.Major Areas Inspected:Emergency Planning.Related Encls Include Various Allegations,Qa Matl & I Yin Notes.Partially Withheld Interviews & Notes Also Encl
ML20154D45222 July 1971Insp Rept 50-275/71-02 on 710723-25 & 30.No Enforcement Action Noted.Major Areas Inspected:Unresolved Items, Unusual Occurrences,Design Changes,Status of Const, Procedures & Records & Review of QC Sys for Components
ML20212N77830 December 1970Div of Compliance Insp Rept 50-275/70-05 on 701201-03.Major Areas Inspected:Status of Previously Identified Items of Concern,Discrepancy Repts & QA Audit Activities
ML20212N77712 November 1970Div of Compliance Insp Rept 50-323/70-02 on 700930,1001 & 13.Major Areas Inspected:Design of Steam Generator Supports. QA Procedures Officially Approved & in Use by Design Groups
ML20154D84616 October 1970Insp Rept 50-275/70-04 on 700915-16.No Nonconformance Noted. Major Areas Inspected:Qa/Qc Review for Fabrication & Erection of Steam Generator Supports & Review Status of Previously Reported DeficienciesNondestructive Examination
Liquid penetrant
ML20154E43117 July 1970Insp Rept 50-275/70-02 on 700623-26.Nonconformance Noted. Major Areas Inspected:Steam Generator Supports,Liquid Holdup Tanks & Gas Decay Tanks,Receiving & Storage of Reactor Vessel & Previously Identified DeficienciesHydrostatic
Liquid penetrant
ML20154D86916 July 1970Insp Rept 50-275/70-03 on 700706.No Nonconformance Noted. Major Areas Inspected:Initial Review of Util Operation & Startup Organization,Safety Committtee & Training Activities
ML20212N76713 May 1970Div of Compliance Insp Rept 50-323/70-04 on 700507.Major Areas Inspected:Qa Program,Test Control,Nonconforming Matl, Parts or Components & AuditsHigh winds
Coatings
Liquid penetrant
ML20212N78223 April 1970Div of Compliance Insp Rept 50-323/70-02 on 700326-27.Major Areas Inspected:Qa Program,Procurement & Onsite & Design Activities
ML20154E6843 April 1970Insp Rept 50-275/70-01 on 700302-05.Nonconformance Noted. Major Areas Inspected:Attachment C Containment,Followup Record Review & Observation of Work Re Concrete,Rebar & Liner of Containment Bldg
ML20212N77323 January 1970Div of Compliance Mgt Meeting Rept 50-323/70-01 on 700106. Major Area Discussed:Results of Initial QA Insp Conducted on 691208-09.QA Program Seriously Inadequate Due to Lack of Systematic,Documented Program to Implement QA Plan
ML20212N76024 December 1969Div of Compliance Insp Rept 50-323/69-02 on 691208-09.Major Area Inspected:Qa Program.Qa Manual Being Prepared Under Contractual Arrangement Between Applicant & Westinghouse