| {{#Wiki_filter:}} | | {{#Wiki_filter:From: Wall, Scott Sent: Wednesday, January 27, 2021 5:21 PM To: Couture III, Philip Cc: Andrea Sterdis; Raimo, Susan; Lewis, David R.; Perkins, Katherine L.; Miksa, James P |
| | |
| | ==Subject:== |
| | Palisades Nuclear Plant - Acceptance of License Transfer Application (EPID No. L-2020-LLM-0003) |
| | |
| | ==Dear Mr. Culture:== |
| | |
| | By {{letter dated|date=December 23, 2020|text=letter dated December 23, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20358A075), Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself, Entergy Nuclear Palisades, LLC (ENP), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) (collectively, the applicants), requested that the U.S. |
| | Nuclear Regulatory Commission (NRC) approve the transfer of control of Provisional Operating License No. DPR 6 and Renewed Facility Operating License No. DPR 20 for Big Rock Point Plant (Big Rock Point) and Palisades Nuclear Plant (Palisades), respectively, as well as the general license for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI) and the Palisades ISFSI (collectively, the licenses). Specifically, the application requests that the NRC consent to (1) the transfer of control of the licenses to Holtec and (2) the transfer of ENOIs operating authority to HDI. The NRC is also considering amending the licenses for administrative purposes to reflect the proposed transfer. In addition, on December 23, 2020, HDI submitted a Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant, (ADAMS Accession No. ML20358A232), which the NRC is considering as a supplement to the license transfer application. |
| | The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | The NRC staff has reviewed your application, as further informed by information provided in HDIs December 23, 2020, transmittal to the NRC, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| | |
| | Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 400 hours to complete. The NRC staff expects to complete this review by January 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. |
| | These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. |
| | If you have any questions, please contact me at (301) 415-2855 or e-mail at Scott.Wall@nrc.gov. |
| | Scott P. Wall, LSS BB, BSP Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov |
| | |
| | Hearing Identifier: NRR_DRMA Email Number: 986 Mail Envelope Properties (MN2PR09MB5019039DD98FF89909BA982F92BB9) |
| | |
| | ==Subject:== |
| | Palisades Nuclear Plant - Acceptance of License Transfer Application (EPID No. |
| | L-2020-LLM-0003) |
| | Sent Date: 1/27/2021 5:21:20 PM Received Date: 1/27/2021 5:21:22 PM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients: |
| | "Andrea Sterdis" <A.Sterdis@holtec.com> |
| | Tracking Status: None "Raimo, Susan" <sraimo@entergy.com> |
| | Tracking Status: None "Lewis, David R." <david.lewis@pillsburylaw.com> |
| | Tracking Status: None "Perkins, Katherine L." <k.perkins@Holtec.com> |
| | Tracking Status: None "Miksa, James P" <jmiksa@entergy.com> |
| | Tracking Status: None "Couture III, Philip " <pcoutur@entergy.com> |
| | Tracking Status: None Post Office: MN2PR09MB5019.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4512 1/27/2021 5:21:22 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}} |
Letter Sequence Acceptance Review |
---|
EPID:L-2020-LLM-0003, Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML20358A2322020-12-23023 December 2020 Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant Project stage: Request ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application Project stage: Acceptance Review ML21012A0352021-02-0101 February 2021 and Big Rock Point Plant - Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) Project stage: Other ML21012A0312021-02-0101 February 2021 and Big Rock Point Plant - Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing Project stage: Other ML21011A0672021-02-0101 February 2021 Proposed Post-Shutdown Decommissioning Activities Report with Site-Specific Decommissioning Cost Estimate Project stage: Other ML21055A9532021-02-24024 February 2021 Petition of Beyond Nuclear, Michigan Safe Energy Future and Don'T Waste Michigan for Leave to Intervene, and Request for an Adjudicatory Hearing Project stage: Request ML21055A8882021-02-24024 February 2021 Petition of the Michigan Attorney General for Leave to Intervene and for a Hearing Project stage: Request ML21055A9142021-02-24024 February 2021 the Environmental Law & Policy Center Petition to Intervene and Hearing Request Project stage: Request ML21281A0022021-10-13013 October 2021 and Big Rock Point Plant - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments Project stage: Other ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments Project stage: Request ML21337A3022021-12-0303 December 2021 Notification of Significant Licensing Action Regarding Proposed Issuance of an Order Approving a License Transfer Application for Which a Hearing Has Been Requested Project stage: Approval ML21291A2372021-12-0303 December 2021 Proposed Issuance of an Order Approving a License Transfer Application for Which a Hearing Has Been Requested Project stage: Approval ML21292A1452021-12-13013 December 2021 and Big Rock Point Plant - Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Letter) Project stage: Draft Other ML21292A1462021-12-13013 December 2021 and ISFSI and Big Rock Point and ISFSI - Order Approving Direct and Indirect Transfers of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Enclosure 1) Project stage: Draft Other ML21292A1492021-12-13013 December 2021 and Big Rock Nuclear Plant- Federal Register Notice Re Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments Project stage: Draft Other ML21292A1472021-12-13013 December 2021 Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2) Project stage: Draft Other ML21292A1482021-12-13013 December 2021 Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00 Project stage: Approval ML21286A5812021-12-13013 December 2021 Holtec Dtf Exemption Project stage: Request ML21292A1552021-12-13013 December 2021 License Transfers Project stage: Request ML22173A1792022-06-23023 June 2022, 28 June 2022 Conforming Amendments for License Transfer to Holtec (L-2022-LLM-0002 and L-2020-LLM-0003) Project stage: Request ML22173A1782022-06-23023 June 2022 Enclosure 4 - Palisades Amendment to Indemnity Agreement No. B-40 - Amendment No. 13 Project stage: Other ML22173A1772022-06-23023 June 2022 Enclosure 3 - Big Rock Point Amendment to Indemnity Agreement No. B-22 - Amendment No. 20 Project stage: Other ML22178A0772022-06-24024 June 2022 (HDI) Satisfactory Documentary Evidence Required Before the Planned Closing Date of the Purchase and Sale Transaction of Palisades Nuclear Plant and Big Rock Point Plant Project stage: Request PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals Project stage: Request ML22173A1762022-06-28028 June 2022 Enclosure 2 - Holtec Palisades, LLC and Holtec Decommissioning International, LLC - Palisades Nuclear Plant Amendment to Renewed Facility Operating License Project stage: Other ML22173A1752022-06-28028 June 2022 Enclosure 1 - Holtec Palisades, LLC and Holtec Decommissioning International, LLC - Big Rock Point Plant Amendment to Facility Operating License Project stage: Other ML22173A1732022-06-28028 June 2022 and Big Rock Point Plant - Issuance of Amendment Nos. 129 and 273 Order Approving Transfer of Licenses and Conforming License Amendments (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) Project stage: Approval ML22322A0722022-11-18018 November 2022 NRC-001 - Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI Project stage: Approval 2021-12-03
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24289A1962024-10-10010 October 2024 Email Dated October 10, 2024 from Wallace Taylor Indicating His Intention to Refile ML24289A1952024-10-0909 October 2024 Follow-up Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding the Filing Error ML24289A1932024-10-0808 October 2024 Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding Filing Error ML24289A1942024-10-0808 October 2024 Email Dated October 8, 2024 from the Office of the Secretary to the Participants of the Palisades 50-255 & 72-007 LT-3 Proceeding Regarding Filing Error ML24277A3082024-10-0303 October 2024 Restart La Docs - 10-2-2024 Michigan SHPO Comments Re Palisades Nuclear Plant Architectural Survey ML24277A3062024-10-0303 October 2024 Restart La Docs - 9-18-2024 Michigan SHPO Comments on Palisades Phase I Archaeological Survey ML24277A3042024-10-0303 October 2024 Restart La Docs - Sokaogon Chippewa Community Reply to NRC Status Update Re Palisades Restart ML24277A3032024-10-0303 October 2024 Restart La Docs - (External_Sender) Re Status Update - Palisades Request for Reauthorization of Power Operations ML24277A3072024-10-0202 October 2024 Restart La Docs - (External_Sender) ER24-431 Palisades Nuclear Plant Subsequent License Renewal, Covert Township, Van Buren County (NRC) ML24270A2622024-09-26026 September 2024 Email to Petitioners and Licensee Representatives Transmitting Order of the Secretary Re Petition for Declaratory Order from Beyond Nuclear Et Al., for the Palisades Nuclear Plant ML24269A0162024-09-24024 September 2024 Email from Holtec Decommissioning International, LLC Re Reply to Beyond Nuclear Et Al.S Petition for Declaratory Order ML24277A3052024-09-18018 September 2024 Restart La Docs - (External_Sender) Sec. 106 Consultation - ER24-431, Palisades Phase I Archaeological Survey ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24291A2442024-09-18018 September 2024 Response to Questions from Alan Blind Regarding Public Meeting on August 1, 2024 ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24260A3542024-09-12012 September 2024 Restart La Docs - (External_Sender) Re Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0902024-08-28028 August 2024 Steam Generator Inspection Call ML24270A2712024-08-0707 August 2024 Public Comments for August 1, 2024, Public Outreach Meeting on Potential Palisades Nuclear Plant Restart ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24187A1332024-07-0505 July 2024 LTR-24-0069 Emailed Response Regarding Palisades Restart Project ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24135A3542024-05-20020 May 2024 NRC Response to Jody Flynn of Michigan Regarding Statements Made About Holtec in the April 25, 2024 Peekskill Herald Article: Holtec Playing Fast and Loose with Taxpayers Money by Tina Volz-Bongar (Docket 50-255) ML24141A0862024-05-16016 May 2024 Notification of NRC Activities Regarding Palisades Restart ML24170A8812024-05-15015 May 2024 NRR E-mail Capture - Post Acceptance/Abeyance Process for the 10 CFR 2.206 Petition on Palisades Misuse of Decommissioning Trust Fund ML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) Primary and Secondary Liability Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22159A2652022-05-0303 May 2022 Questions Asked at Palisades Plant Performance Public Meeting April 26, 2022 ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML22208A1052021-11-16016 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML21309A5152021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21209A9802021-07-28028 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Rescission of Interim Compensatory Measure from Order EA-02-026 ML21189A2462021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML21189A0432021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Permanently Defueled Technical Specifications ML21054A1822021-02-23023 February 2021 NRR E-mail Capture - Regarding Public Comment on Palisades Request for Relief RR 5-8 ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23055A1542023-02-24024 February 2023 Attachment: Request for Additional Information on the Palisades PSDAR ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18309A1342018-11-0808 November 2018 Supplemental Information Needed for Acceptance or Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-425, Revision 3 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17118A3342017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/2017 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part B Items (Exf) ML17118A3312017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/17 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part a Items ML17072A2752017-03-10010 March 2017 NRR E-mail Capture - Palisades Nuclear Plant - Final Request for Additional Information Regarding Relief Request No. RR 4-25 ML16238A0302016-08-29029 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Control Rod Drive Exercise Surveillance ML16130A0762016-05-11011 May 2016 Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternative Repair Criterion on the Steam Generator Tubes ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15258A2432015-09-0101 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - Palisades Nuclear Plant ML15149A2462015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15072A2542015-03-19019 March 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML15022A1382015-01-22022 January 2015 E-Mail - Palisades Request for Information ML15016A1842015-01-20020 January 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14157A3642014-06-0505 June 2014 CDBI Request for Information ML13353A0422013-12-16016 December 2013 NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321 ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13051A7772013-02-19019 February 2013 Request for Additional Information, 2012 SG Inspection Report ML12314A4222012-11-0808 November 2012 ME8074 - Request for Additional Information Regarding Replacement of Spent Fuel Pool Region I Storage Racks ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML12206A4042012-07-24024 July 2012 Request for Additional Information (Revised) - Palisades - SFP Rerack LAR - ME8074 ML12206A3322012-07-19019 July 2012 E-mail Combined Request for Additional Information for Several Branches of NRR for the Submittal on Palisades re-sack LAR 2024-09-20
[Table view] |
Text
From: Wall, Scott Sent: Wednesday, January 27, 2021 5:21 PM To: Couture III, Philip Cc: Andrea Sterdis; Raimo, Susan; Lewis, David R.; Perkins, Katherine L.; Miksa, James P
Subject:
Palisades Nuclear Plant - Acceptance of License Transfer Application (EPID No. L-2020-LLM-0003)
Dear Mr. Culture:
By letter dated December 23, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20358A075), Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself, Entergy Nuclear Palisades, LLC (ENP), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) (collectively, the applicants), requested that the U.S.
Nuclear Regulatory Commission (NRC) approve the transfer of control of Provisional Operating License No. DPR 6 and Renewed Facility Operating License No. DPR 20 for Big Rock Point Plant (Big Rock Point) and Palisades Nuclear Plant (Palisades), respectively, as well as the general license for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI) and the Palisades ISFSI (collectively, the licenses). Specifically, the application requests that the NRC consent to (1) the transfer of control of the licenses to Holtec and (2) the transfer of ENOIs operating authority to HDI. The NRC is also considering amending the licenses for administrative purposes to reflect the proposed transfer. In addition, on December 23, 2020, HDI submitted a Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant, (ADAMS Accession No. ML20358A232), which the NRC is considering as a supplement to the license transfer application.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application, as further informed by information provided in HDIs December 23, 2020, transmittal to the NRC, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> to complete. The NRC staff expects to complete this review by January 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me at (301) 415-2855 or e-mail at Scott.Wall@nrc.gov.
Scott P. Wall, LSS BB, BSP Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov
Hearing Identifier: NRR_DRMA Email Number: 986 Mail Envelope Properties (MN2PR09MB5019039DD98FF89909BA982F92BB9)
Subject:
Palisades Nuclear Plant - Acceptance of License Transfer Application (EPID No.
L-2020-LLM-0003)
Sent Date: 1/27/2021 5:21:20 PM Received Date: 1/27/2021 5:21:22 PM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients:
"Andrea Sterdis" <A.Sterdis@holtec.com>
Tracking Status: None "Raimo, Susan" <sraimo@entergy.com>
Tracking Status: None "Lewis, David R." <david.lewis@pillsburylaw.com>
Tracking Status: None "Perkins, Katherine L." <k.perkins@Holtec.com>
Tracking Status: None "Miksa, James P" <jmiksa@entergy.com>
Tracking Status: None "Couture III, Philip " <pcoutur@entergy.com>
Tracking Status: None Post Office: MN2PR09MB5019.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4512 1/27/2021 5:21:22 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: