MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23055A1542023-02-24024 February 2023 Attachment: Request for Additional Information on the Palisades PSDAR ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18309A1342018-11-0808 November 2018 Supplemental Information Needed for Acceptance or Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-425, Revision 3 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17118A3342017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/2017 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part B Items (Exf) ML17118A3312017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/17 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part a Items ML17072A2752017-03-10010 March 2017 NRR E-mail Capture - Palisades Nuclear Plant - Final Request for Additional Information Regarding Relief Request No. RR 4-25 ML16238A0302016-08-29029 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Control Rod Drive Exercise Surveillance ML16130A0762016-05-11011 May 2016 Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternative Repair Criterion on the Steam Generator Tubes ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15258A2432015-09-0101 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - Palisades Nuclear Plant ML15149A2462015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15072A2542015-03-19019 March 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML15022A1382015-01-22022 January 2015 E-Mail - Palisades Request for Information ML15016A1842015-01-20020 January 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14157A3642014-06-0505 June 2014 CDBI Request for Information ML13353A0422013-12-16016 December 2013 NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321 ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13051A7772013-02-19019 February 2013 Request for Additional Information, 2012 SG Inspection Report ML12314A4222012-11-0808 November 2012 ME8074 - Request for Additional Information Regarding Replacement of Spent Fuel Pool Region I Storage Racks ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML12206A4042012-07-24024 July 2012 Request for Additional Information (Revised) - Palisades - SFP Rerack LAR - ME8074 ML12206A3322012-07-19019 July 2012 E-mail Combined Request for Additional Information for Several Branches of NRR for the Submittal on Palisades re-sack LAR ML12121A7032012-04-27027 April 2012 Relief Request - Proposed Alternative - Use of Alternate ASME Code Case N-770-1 Baseline Examination - ME8492 ML1209604492012-04-0505 April 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat ML12068A3882012-04-0202 April 2012 Request for Additional Information Regarding License Renewal Commitment to Submit Alloy 600 Program ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic 2023-02-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 11, 2016 Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT-REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST FOR IMPLEMENTATION OF AN ALTERNATE REPAIR CRITERION ON THE STEAM GENERATOR TUBES (CAC NO. MF7435)
Dear Sir or Madam:
By letter dated March 3, 2016 (Agencywide Documents Access and Management System Accession No. ML16075A103), Entergy Nuclear Operations, Inc. (the licensee) submitted a license amendment for Palisades Nuclear Plant (PNP). The proposed amendment would revise the PNP technical specifications, as they apply to the Steam Generator (SG) Program.
Specifically, the licensee requested to implement an alternate repair criteria that invokes a C - Star inspection length (C*), on a permanent basis for the cold-leg side of the SGs' tube sheet.
The U.S. Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information identified in the enclosure to this letter is needed to complete its review. The draft copy of the request for additional information (RAI) was provided to Mr. James Miksa and Mr. Jeffrey Erickson of your staff via e-mail on April 18, 2016. A conference call to clarify the RAls was held with Mr. Miksa and Mr. Erickson and other members of your staff on May 5, 2016. Following the clarification call, it was determined that changes were necessary to the draft RAls. As such, RAI 2, RAI 3a, RAI 3b, and RAI 5 were revised for clarity. Based on our discussions we understand that a response to the RAI will be provided within 30 days of the date of this letter.
If you have any questions, please contact me at Jennivine.Rankin@nrc.gov or (301) 415-1530.
Sincerely,
~~**'-
Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION ENTERGY NUCLEAR OPERATIONS, INC.
PALISADES NUCLEAR PLANT LICENSE AMENDMENT REQUEST TO USE THE C* ALTERNATE REPAIR CRITERION FOR STEAM GENERATORS DOCKET NO. 50-255 By letter dated March 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16075A103), Entergy Nuclear Operations, Inc. (the licensee) submitted a license amendment for Palisades Nuclear Plant (PNP). The proposed amendment would revise the PNP technical specifications, as they apply to the Steam Generator (SG)
Program. Specifically, the licensee requested to implement an alternate repair criteria that invokes a C - Star inspection length (C*), on a permanent basis for the cold-leg side of the SGs' tube sheet.
Based on its review of the amendment request, the U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete the review. The requests for additional information below only pertain to the cold-leg; however, the licensee may want to consider revising the hot-leg requirements to prevent the TS from becoming overly complex.
In Section 5.1 of Attachment 1 (page 9), the tube-to-tubesheet (TTS) weld is described as a seal weld. As noted in Regulatory Issue Summary 2016-02, "Design Basis Issues Related to Tube-to-Tubesheet Joints in Pressurized-Water Reactor Steam Generators," dated March 23, 2016 (ADAMS Accession No. ML15169A543), the term "seal weld" does not always fully describe whether the weld was also qualified as a "structural weld." Please clarify whether the TTS welds in the PNP SGs are qualified as structural welds and whether this qualification was in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. If not, please discuss the design basis of the TTS joint to ensure structural integrity.
Please discuss whether any of the qualification data for the TTS joint (if the joint is not a structural weld) is applicable to the C* methodology. If applicable, discuss its impact on your application for C*.
The proposed wording of TS Section 5.5.8c.2 addresses plugging tubes with flaws found within 12.5 inches below the bottom of the cold-leg expansion transition or top of the cold-leg tubesheet, whichever is lower. Since a flaw is generally regarded as a mark, fault, or other imperfection, this requirement would require tubes with non-service-induced flaws (e.g., manufacturing burnish marks or over expansions) to be plugged. Although the industry Enclosure
may have different definitions for flaws in specific applications, those definitions are not part of the TS. Please clarify if plugging all non-service-induced flaws was your intent. If not, consider revising the TS for clarity.
When the NRC staff reviewed the H* alternate repair criteria, one of the concerns was that cracks could exist in the TTS welds. If H* was not applied to all tubes (i.e., if application of H*
was optional, rather than mandatory), it was not clear to the NRC staff how the integrity of the TTS welds would be assured, since there was not a qualified inspection technique for the TTS welds. As a result, licensees that adopted H* applied it to all tubes in all of the steam generators at a given unit, rather than allowing an option that it may be applied.
- a. Please discuss whether C* will be applied to all tubes on the cold-leg, rather than providing an option for it to be applied at PNP. The staff notes that if C* was approved but not implemented, any inspection program would have to consider the entire length of the tube within the tubesheet, not just the upper portion of the tube within the C* distance.
- b. In the proposed TS 5.5.8d, periodic inspections are required to be performed from the TTS weld at the tube inlet (i.e., hot-leg), to the TTS weld at the tube outlet (i.e., cold-leg). During these inspections, if a crack were found between the C* depth and a TTS weld, TS 5.5.8d.3 requires an inspection for cracking in the next refueling outage, even though the tube with the crack would not require plugging in the current outage. Please discuss if TS 5.5.8d.3 is consistent with your proposed application of the C* alternate repair criteria. (The staff notes that licensees recently implementing similar alternate repair criteria to C*, have revised this section to limit inspection depth to that distance defined by the alternate repair criteria.)
- c. In the proposed TS 5.5.8d.5, there is a 100 percent sampling of cold-leg tubes when and if C* is implemented. The NRC staff notes that licensees adopting alternate repair criteria similar to C* (e.g., H* and F*) typically used an inspection strategy that was less than a 100 percent sample on the cold-leg, based on their degradation assessment and their performance-based technical specification requirement to maintain tube integrity. Given past precedent, discuss whether you would still like to retain the 100 percent sampling requirement.
- d. TS 5.5.8d states, " ... requirements of d.1, d.2, and d.3, d.4, and d.5 below, ... " The staff notes that TS 5.5.8d contains an extra "and" between d.2 and d.3. Please discuss your plans to remove the redundant "and."
TS 5.6.8i references monitoring tubes for displacement. The word displacement could be misinterpreted to mean rotation or bending. The slippage of concern associated with implementation of C* is axial tube displacement. Was your intent to monitor and report all these displacements? If not, please clarify what you plan to monitor and report in the Steam Generator Tube Inspection Report.
The following questions pertain to Attachment 8 of the application, "Discussion of Applicability of H* Lessons Learned, If Applicable to the Palisades Nuclear Plant Cold Leg C* Analysis," LTR-SGMP-15-88, Rev. 1 NP-Attachment, dated February 23, 2016.
- a. Table 1 (page 4) provides cold-leg C* distances, ranging from 12.79 inches to 13.67 inches, for various coefficient of thermal expansion (CTE) conditions. As part of the basis for not increasing the previously calculated C* inspection distance of 12.5 inches, you referenced the current practice at PNP of inspecting one inch greater than the 12.5 inch inspection distance. It is possible that the tubesheet has a plus one sigma CTE and the tube has a minus one sigma CTE. Given that surveillance requirements are intended to assure the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met, please explain why the C* inspection distance on the cold-leg is proposed at 12.5 inches, or provide a revised value supported by the analysis of Attachment 8 of the application (e.g. 13.67 inches). If the likelihood of having specific circumstances occur (e.g., a tube with a specific coefficient of thermal expansion and a tubesheet with a specific coefficient of thermal expansion, at a specific location in the tube bundle) is used as the basis for your response to this question, the staff would expect that all significant parameters would be evaluated quantitatively and probabilistically (e.g., tube pullout data) and an appropriately conservative estimate of C* distance would be determined (e.g., .95 probability with a 95 percent confidence interval).
- b. On page 5, it is stated that the only potential leakage source is from postulated indications below the inspection distance, since indications detected within the C*
distance must be plugged. Although this may be true most of the time, unexpected conditions could arise (e.g., missed indications or indications below the threshold of detectability within the C* region). Please discuss your plans to assess the indications detected within the C* distance to confirm that they do not pose an accident induced leakage concern.
ML16130A076 OFFICE DORL/LPL3-1 /PM DORL/LPL3-1 /LA DE/ESGB/BC DORL/LPL3-1 /BC DORL/LPL3-1/PM GKulesa DWrona JRankin NAME JRankin MHenderson (PKlein for) (RKuntz for)
DATE 5/9/16 5/9/16 5/10/16 5/10/16 5/11/16