Letter Sequence Other |
---|
EPID:L-2020-LLM-0003, Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant (Approved, Closed) EPID:L-2022-LLM-0002, Firstenergy Nuclear Operating Company - Letter, Order, SE Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley, Units 1 and 2, Davis-Besse, Unit 1, and Perry, Unit 1 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML19193A0022019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Letter, Order, SE Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley, Units 1 and 2, Davis-Besse, Unit 1, and Perry, Unit 1 Project stage: Request ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments Project stage: Approval L-20-086, Submittal of Indemnity Agreements2020-03-12012 March 2020 Submittal of Indemnity Agreements Project stage: Other ML20080H7112020-03-23023 March 2020 Correction Letter for Conforming License Amendments Nos. 304 and 194, Order Approving Transfer of Licenses and Conforming License Amendments Project stage: Other ML20358A2322020-12-23023 December 2020 Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant Project stage: Request ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application Project stage: Acceptance Review ML21011A0672021-02-0101 February 2021 Proposed Post-Shutdown Decommissioning Activities Report with Site-Specific Decommissioning Cost Estimate Project stage: Other ML21012A0312021-02-0101 February 2021 and Big Rock Point Plant - Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing Project stage: Other ML21012A0352021-02-0101 February 2021 and Big Rock Point Plant - Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) Project stage: Other ML21055A8882021-02-24024 February 2021 Petition of the Michigan Attorney General for Leave to Intervene and for a Hearing Project stage: Request ML21055A9142021-02-24024 February 2021 the Environmental Law & Policy Center Petition to Intervene and Hearing Request Project stage: Request ML21055A9532021-02-24024 February 2021 Petition of Beyond Nuclear, Michigan Safe Energy Future and Don'T Waste Michigan for Leave to Intervene, and Request for an Adjudicatory Hearing Project stage: Request ML21281A0022021-10-13013 October 2021 and Big Rock Point Plant - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21302A0642021-10-29029 October 2021 and Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments Project stage: Supplement ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments Project stage: Other ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments Project stage: Request ML21337A3022021-12-0303 December 2021 Notification of Significant Licensing Action Regarding Proposed Issuance of an Order Approving a License Transfer Application for Which a Hearing Has Been Requested Project stage: Approval ML21291A2372021-12-0303 December 2021 Proposed Issuance of an Order Approving a License Transfer Application for Which a Hearing Has Been Requested Project stage: Approval ML21292A1452021-12-13013 December 2021 and Big Rock Point Plant - Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Letter) Project stage: Draft Other ML21292A1462021-12-13013 December 2021 and ISFSI and Big Rock Point and ISFSI - Order Approving Direct and Indirect Transfers of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Enclosure 1) Project stage: Draft Other ML21292A1552021-12-13013 December 2021 License Transfers Project stage: Request ML21286A5812021-12-13013 December 2021 Holtec Dtf Exemption Project stage: Request ML21292A1472021-12-13013 December 2021 Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2) Project stage: Draft Other ML21292A1482021-12-13013 December 2021 Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00 Project stage: Approval ML21292A1492021-12-13013 December 2021 and Big Rock Nuclear Plant- Federal Register Notice Re Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments Project stage: Draft Other ML22021B6702022-01-21021 January 2022 and Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments Project stage: Supplement ML22096A3042022-05-0909 May 2022 and Big Rock Point Plant - New Information Regarding Order Approving Transfer of Licenses (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) Project stage: Other ML22173A1792022-06-23023 June 2022, 28 June 2022 Conforming Amendments for License Transfer to Holtec (L-2022-LLM-0002 and L-2020-LLM-0003) Project stage: Request ML22173A1782022-06-23023 June 2022 Enclosure 4 - Palisades Amendment to Indemnity Agreement No. B-40 - Amendment No. 13 Project stage: Other ML22173A1772022-06-23023 June 2022 Enclosure 3 - Big Rock Point Amendment to Indemnity Agreement No. B-22 - Amendment No. 20 Project stage: Other ML22178A0772022-06-24024 June 2022 (HDI) Satisfactory Documentary Evidence Required Before the Planned Closing Date of the Purchase and Sale Transaction of Palisades Nuclear Plant and Big Rock Point Plant Project stage: Request PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals Project stage: Request ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) Project stage: Other ML22173A1732022-06-28028 June 2022 and Big Rock Point Plant - Issuance of Amendment Nos. 129 and 273 Order Approving Transfer of Licenses and Conforming License Amendments (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) Project stage: Approval ML22173A1752022-06-28028 June 2022 Enclosure 1 - Holtec Palisades, LLC and Holtec Decommissioning International, LLC - Big Rock Point Plant Amendment to Facility Operating License Project stage: Other ML22173A1762022-06-28028 June 2022 Enclosure 2 - Holtec Palisades, LLC and Holtec Decommissioning International, LLC - Palisades Nuclear Plant Amendment to Renewed Facility Operating License Project stage: Other ML22322A0722022-11-18018 November 2022 NRC-001 - Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI Project stage: Approval 2021-11-05
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML22173A1762022-06-28028 June 2022 Enclosure 2 - Holtec Palisades, LLC and Holtec Decommissioning International, LLC - Palisades Nuclear Plant Amendment to Renewed Facility Operating License ML22173A1752022-06-28028 June 2022 Enclosure 1 - Holtec Palisades, LLC and Holtec Decommissioning International, LLC - Big Rock Point Plant Amendment to Facility Operating License ML22039A1982022-05-13013 May 2022 Issuance of Amendment No. 272 Permanently Defueled Technical Specifications ML21292A1482021-12-13013 December 2021 Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00 ML21292A1472021-12-13013 December 2021 Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2) ML19317D8552019-12-30030 December 2019 Issuance of Amendment No. 271 Regarding Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19198A0802019-08-20020 August 2019 Issuance of Amendments No. 269 Regarding Changes to NFPA 805 Modifications and Change to Full Compliance Implementation Date for the Fire Protection Program (Epids L-2018-LLA-0296 and L-2019-LLA-0049) ML19107A0532019-05-13013 May 2019 Issuance of Amendment No. 268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement PNP 2019-004, License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b2019-03-28028 March 2019 License Amendment Request Resubmittal to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML18346A2872018-12-12012 December 2018 Appendix a to Provisional Operating License DPR-20, Technical Specifications for the Palisades Plant, Consumers Power Company, Docket No 50-255 PNP 2018-052, Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force.2018-11-16016 November 2018 Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force. ML18170A2192018-09-24024 September 2018 Issuance of Amendment Changes to the Emergency Plan for Permanently Defueled Condition (CAC No. MG0198; EPID L-2017-LLA-0305) ML18114A4102018-06-0404 June 2018 Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition (CAC No. MG0021; EPID L-2017-LLA-0266) ML18039A2442018-02-27027 February 2018 Issuance of Amendment License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications ML17328B0332017-12-15015 December 2017 Issuance of Amendment Cyber Security Plan Implementation Schedule (CAC No. MF9523; EPID L-2017-LLA-0199) ML17128A4462017-06-21021 June 2017 Correction to License Amendment No. 235 to Correct an Error Introduced During Issuance of Renewed Facility Operating License ML17121A5102017-06-0808 June 2017 Issuance of Amendment License Amendment Request for Editorial and Administrative Changes to Technical Specifications ML17082A4652017-05-30030 May 2017 Issuance of Amendment Application to Revise Technical Specifications to Adopt TSTF 545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16300A0302016-12-19019 December 2016 Issuance of Amendment Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region ML16281A4982016-10-28028 October 2016 Issuance of Amendment No. 260, Revise License Condition 2.C.(4) and Technical Specifications Related to Control Rod Drive Exercise Surveillance ML16078A0682016-05-0202 May 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML15106A6822015-11-23023 November 2015 Issuance of Amendment License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margins Analysis ML15209A7912015-11-23023 November 2015 Issuance of Amendment License Amendment Request to Implement 10 CFR 50.61a, Alternative Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events ML15103A0592015-05-18018 May 2015 Issuance of Amendment Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiatives 6B and 6C. ML15055A1062015-04-22022 April 2015 Issuance of Amendment License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML15007A1912015-02-27027 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14283A2872014-10-22022 October 2014 Issuance of Amendment Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML13056A5142013-02-28028 February 2013 Non-Proprietary Issuance of Amendment Regarding Replacement of Spent Fuel Pool Region 1 Storage Racks ML12279A1572012-12-0505 December 2012 Issuance of Amendment Revised Cyber Security Plan Implementation Schedule Milestone 6 ML1207400812012-04-23023 April 2012 Issuance of Amendment to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML11362A4682012-01-27027 January 2012 License Amendment, Issuance of Amendment No. 246 to Revise TS Sections 3.7.16 and 4.3 Regarding Fuel Storage Criticality ML1132203702012-01-19019 January 2012 Issuance of Amendment Revise Calculated Peak Containment Internal Pressure ML1134803032012-01-19019 January 2012 Issuance of Amendment Primary Coolant System Pressure-Temperature Limits ML1118012432011-07-28028 July 2011 Issuance of Amendment Regarding Cyber Security Plan ML1115701362011-07-26026 July 2011 License Amendment, Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML1101005992011-01-25025 January 2011 Issuance of Amendment Change to License Section 2.E ML1020901372010-08-23023 August 2010 License Amendment, Issuance of Amendment One-time Extension to the Integrated Leak Rate Test Interval ML1013805342010-06-0202 June 2010 License Amendment, Issuance of Emergency Amendment Control Rod Drive Exercise Surveillance ML0902204422009-02-11011 February 2009 Issuance of Amendment Change to In-Service Inspection Interval. ML0901602382009-02-0606 February 2009 Issuance of Amendment Spent Fuel Pool Region I Storage Requirements ML0833700592008-12-19019 December 2008 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing ML0829100562008-12-12012 December 2008 Issuance of Amendment Request to Support Use of M5 Alloy ML0827404452008-11-20020 November 2008 Issuance of Amendment Eliminate License Condition 2.F ML0725500572007-10-0404 October 2007 Issuance of Amendment 228 Proposal to Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity ML0725307352007-10-0202 October 2007 License Amendment, Issuance of Amendment Replacement of Containment Sump Buffer (Tac No. MD5893) ML0724706672007-09-28028 September 2007 License Amendment, Implemented Alternative Radiological Source Term ML0721800242007-08-0909 August 2007 Revised Pages of Renewed Facility Operating License No. DPR-20 2023-12-27
[Table view] |
Text
HOLTEC PALISADES, LLC HOLTEC DECOMMISSIONING INTERNATIONAL, LLC DOCKET NO. 50-155 BIG ROCK POINT PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 129 License No. DPR-6
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by Entergy Nuclear Operations, Inc., on behalf of itself; Entergy Nuclear Palisades, LLC; Holtec International; and Holtec Decommissioning International, LLC, dated December 23, 2020, as supplemented by letters dated December 23, 2020, December 23, 2020, October 29, 2021, and January 21, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, Facility Operating License No. DPR-6 is amended as indicated in the attachment to this license amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days from that date.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Bernard H. Bernard H. White Date: 2022.06.28 White 12:46:10 -04'00' Bernard H. White IV, Acting Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Attachments:
Changes to Facility Operating License No. DPR-6 and Technical Specifications Date of Issuance: June 28, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 129 BIG ROCK POINT PLANT FACILITY OPERATING LICENSE NO. DPR-6 DOCKET NO. 50-155 Replace the following pages of Facility Operating License No. DPR-6 and Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License No DPR-6 Remove Pages Insert Pages through through Appendix A, Technical Specifications Remove Pages Insert Pages 6-1 6-1 6-2 6-2
HOLTEC PALISADES, LLC HOLTEC DECOMMISSIONING INTERNATIONAL, LLC DOCKET NO. 50-155 BIG ROCK POINT PLANT FACILITY OPERATING LICENSE License No. DPR-06
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for a license amendment by Holtec Palisades, LLC (Holtec Palisades) and Holtec Decommissioning International, LLC (HDI), (the licensees),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance that: (i) the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission; D. The licensees are technically and financially qualified to engage in the activities authorized by this operating license in accordance with the rules and regulations of the Commission; E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the rules and regulations of the Commission and all applicable requirements have been satisfied; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements, of the Commissions regulations; G. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and H. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this license will be in accordance with the Commissions regulations in 10 CFR Parts 30, 40, and 70, including 10 CFR Sections 30.33, 40.32, 70.23, and 70.31.
Amendment No. 127, 129 June 28, 2022
- 2. Facility Operating License No. DPR-06, is hereby issued to Holtec Palisades and HDI in its entirety to read as follows:
A. This license applies to the Big Rock Point Plant (the facility) owned by Holtec Palisades. The facility is located in Charlevoix County, Michigan, and is described in the licensees application dated January 14, 1960, and the Final Hazards Summary Report, as supplemented, updated, and amended by subsequent filings by the licensee.
B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses Holtec Palisades and HDI:
B.(1) Pursuant to Section 104b of the Act and 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, to possess the facility at the designated location in Charlevoix County, Michigan, in accordance with the procedures and limitations set forth in this license; B.(2) Pursuant to the Act and 10 CFR Part 70, Domestic Licensing of Special Nuclear Material, to possess at any one time up to: a) 2500 kilograms of contained uranium-235 in fuel rods, b) 10.32 grams of uranium-235 as contained in fission counters, c) 150 kilograms of plutonium contained in PuO2-UO2 fuel rods, and d) 5 curies of plutonium encapsulated as a plutonium-beryllium neutron source, (a) Deleted (b) Deleted (c) Deleted (d) Deleted (e) Deleted (f) Deleted (g) Deleted B.(3) Pursuant to the Act and 10 CFR Part 30, Rules of General Applicability to Domestic Licensing of Byproduct Material, to receive, possess, and use at any one time up to 7000 curies of antimony-beryllium in the form of neutron sources, 3.7 curies of cobalt-60 as sealed sources, 45 curies of cesium-137 as sealed sources, 10 microcuries of miscellaneous alpha-emitting material as sealed sources, and up to 500 millicuries per nuclide of any byproduct material between atomic numbers 1 and 83, inclusive, without restriction as to chemical and physical form; B.(4) Pursuant to the Act and 10 CFR Part 40, Domestic Licensing of Source Material, to possess at any one time up to 500 kilograms of depleted uranium dioxide contained in the facilitys fuel assemblies; Amendment No. 127, 129 June 28, 2022
B.(5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess. but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
C.(1) Reactor Operation The reactor is not licensed for power operation. Fuel shall not be placed in the reactor vessel.
C.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 129, are hereby incorporated in the license. HDI shall maintain the facility in accordance with the Technical Specifications.
C.(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the physical security, guard training and qualification, and safeguards contingency plans approved by the Commission and all amendments and revisions to such plans made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p), as modified by NRG-approved exemptions. The plan, which contains safeguards information protected under 10 CFR 73.21, is entitled: Big Rock Point ISFSI Security Plan, as submitted on July 31, 2001, and modified by letter dated March 6, 2002. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
C.(4) License Termination Plan The License Termination Plan (LTP) dated April 1, 2003, as supplemented by LTP, Rev. 1, dated July 1, 2004, is approved by NRC License Amendment No. 126.
In addition to those criteria specified in 10 CFR 50.59, 10 CFR 50.82(a)(6),
and 10 CFR 50.82(a)(7), changes to the approved LTP shall require NRC approval prior to being implemented if the change:
(a) Increases in radionuclide-specific derived concentration guideline levels of area factors (discussed in Chapter 6 of the LTP);
Amendment No. 128, 129 June 28, 2022
BIG ROCK POINT DEFUELED TECHNICAL SPECIFICATIONS 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY AND AUTHORITY 6.1.1 SENIOR NUCLEAR OFFICER The Senior Nuclear Officer shall be the HDI President and shall be responsible for the overall operation, maintenance and decommissioning of the Big Rock Point nuclear power plant.
6.1.2 SITE GENERAL MANAGER The site general manager shall be responsible for overall facility operation, maintenance and decommissioning and for periods of absence shall delegate in writing the succession to this responsibility. Unless otherwise specified, the site general manager's delegate has authority to perform all actions and grant approvals assigned by these specifications to the site general manager. The site general manager may delegate specific tasks to other individuals who may perform those tasks whether the site general manager is absent or present at the site.
6.2 ORGANIZATION 6.2.1 REPORTING RELATIONSHIPS Onsite organization and corporate reporting relationship shall be established as described in the Quality Program Description for Big Rock Point.
6.2.2 FACILITY ORGANIZATION The site general manager or his designate shall verify that required security staffing and Dry Fuel Storage Technical Specification surveillance(s) have been met.
6-1 Amendment No. 127, 129 June 28, 2022
BIG ROCK POINT DEFUELED TECHNICAL SPECIFICATIONS 6.0 ADMINISTRATIVE CONTROLS 6.3 STAFF QUALIFICATIONS Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions with exceptions specified in the Quality Assurance Program Manual (QAPM).
6.4 REVIEW AND AUDIT Requirements for onsite and offsite reviews and audits are described in the Quality Program Description for Big Rock Point.
6-2 Amendment No. 128, 129 June 28, 2022