Letter Sequence RAI |
---|
EPID:L-2018-LLA-0296, License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications (Approved, Closed) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24289A1962024-10-10010 October 2024 Email Dated October 10, 2024 from Wallace Taylor Indicating His Intention to Refile ML24289A1952024-10-0909 October 2024 Follow-up Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding the Filing Error ML24289A1932024-10-0808 October 2024 Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding Filing Error ML24289A1942024-10-0808 October 2024 Email Dated October 8, 2024 from the Office of the Secretary to the Participants of the Palisades 50-255 & 72-007 LT-3 Proceeding Regarding Filing Error ML24277A3082024-10-0303 October 2024 Restart La Docs - 10-2-2024 Michigan SHPO Comments Re Palisades Nuclear Plant Architectural Survey ML24277A3042024-10-0303 October 2024 Restart La Docs - Sokaogon Chippewa Community Reply to NRC Status Update Re Palisades Restart ML24277A3032024-10-0303 October 2024 Restart La Docs - (External_Sender) Re Status Update - Palisades Request for Reauthorization of Power Operations ML24277A3062024-10-0303 October 2024 Restart La Docs - 9-18-2024 Michigan SHPO Comments on Palisades Phase I Archaeological Survey ML24277A3072024-10-0202 October 2024 Restart La Docs - (External_Sender) ER24-431 Palisades Nuclear Plant Subsequent License Renewal, Covert Township, Van Buren County (NRC) ML24270A2622024-09-26026 September 2024 Email to Petitioners and Licensee Representatives Transmitting Order of the Secretary Re Petition for Declaratory Order from Beyond Nuclear Et Al., for the Palisades Nuclear Plant ML24269A0162024-09-24024 September 2024 Email from Holtec Decommissioning International, LLC Re Reply to Beyond Nuclear Et Al.S Petition for Declaratory Order ML24277A3052024-09-18018 September 2024 Restart La Docs - (External_Sender) Sec. 106 Consultation - ER24-431, Palisades Phase I Archaeological Survey ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24291A2442024-09-18018 September 2024 Response to Questions from Alan Blind Regarding Public Meeting on August 1, 2024 ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24260A3542024-09-12012 September 2024 Restart La Docs - (External_Sender) Re Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0902024-08-28028 August 2024 Steam Generator Inspection Call ML24270A2712024-08-0707 August 2024 Public Comments for August 1, 2024, Public Outreach Meeting on Potential Palisades Nuclear Plant Restart ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24187A1332024-07-0505 July 2024 LTR-24-0069 Emailed Response Regarding Palisades Restart Project ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24135A3542024-05-20020 May 2024 NRC Response to Jody Flynn of Michigan Regarding Statements Made About Holtec in the April 25, 2024 Peekskill Herald Article: Holtec Playing Fast and Loose with Taxpayers Money by Tina Volz-Bongar (Docket 50-255) ML24141A0862024-05-16016 May 2024 Notification of NRC Activities Regarding Palisades Restart ML24170A8812024-05-15015 May 2024 NRR E-mail Capture - Post Acceptance/Abeyance Process for the 10 CFR 2.206 Petition on Palisades Misuse of Decommissioning Trust Fund ML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) – Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22159A2652022-05-0303 May 2022 Questions Asked at Palisades Plant Performance Public Meeting April 26, 2022 ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML22208A1052021-11-16016 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A5152021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML21209A9802021-07-28028 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Rescission of Interim Compensatory Measure from Order EA-02-026 ML21189A2462021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML21189A0432021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Permanently Defueled Technical Specifications 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23055A1542023-02-24024 February 2023 Attachment: Request for Additional Information on the Palisades PSDAR ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18309A1342018-11-0808 November 2018 Supplemental Information Needed for Acceptance or Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-425, Revision 3 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17118A3312017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/17 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part a Items ML17118A3342017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/2017 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part B Items (Exf) ML17072A2752017-03-10010 March 2017 NRR E-mail Capture - Palisades Nuclear Plant - Final Request for Additional Information Regarding Relief Request No. RR 4-25 ML16238A0302016-08-29029 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Control Rod Drive Exercise Surveillance ML16130A0762016-05-11011 May 2016 Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternative Repair Criterion on the Steam Generator Tubes ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15258A2432015-09-0101 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - Palisades Nuclear Plant ML15149A2462015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15072A2542015-03-19019 March 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML15022A1382015-01-22022 January 2015 E-Mail - Palisades Request for Information ML15016A1842015-01-20020 January 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14157A3642014-06-0505 June 2014 CDBI Request for Information ML13353A0422013-12-16016 December 2013 NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321 ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13051A7772013-02-19019 February 2013 Request for Additional Information, 2012 SG Inspection Report ML12314A4222012-11-0808 November 2012 ME8074 - Request for Additional Information Regarding Replacement of Spent Fuel Pool Region I Storage Racks ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs 2024-09-20
[Table view] |
Text
NRR-DMPSPEm Resource From: Green, Kimberly Sent: Monday, April 29, 2019 12:38 PM To: ERICKSON, JEFFREY S; MIKSA, JAMES P Cc: rgasto1@entergy.com; spyle@entergy.com
Subject:
Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications (EPID L-2018-LLA-0296)
Attachments: Final RAI.docx
Dear Mr. Erickson and Mr. Miksa:
By letter dated November 1, 2018, Entergy Nuclear Operations, Inc. (ENO) requested changes to the approved fire protection program for the Palisades Nuclear Plant (Agencywide Documents Access and Management System Accession No. ML18305B320).
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has identified an area where additional information is needed to complete its review. Attached, please find a draft request for additional information (RAI).
A draft RAI was previously transmitted to you by email dated April 11, 2019. At your request, the NRC held a clarification call with ENO on April 25, 2019, to clarify the NRC staffs request. No changes were made the draft RAI as a result of the clarification call.
A response to the attached RAI is requested within 30 days from the date of this email.
If circumstances result in the need to revise the requested response date, please contact me.
Respectfully, Kimberly Green (301) 415-1627 kimberly.green@nrc.gov 1
Hearing Identifier: NRR_DMPS Email Number: 941 Mail Envelope Properties (BN8PR09MB3458F2162A6268964A87BA328F390)
Subject:
Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications (EPID L-2018-LLA-0296)
Sent Date: 4/29/2019 12:38:06 PM Received Date: 4/29/2019 12:38:00 PM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:
"rgasto1@entergy.com" <rgasto1@entergy.com>
Tracking Status: None "spyle@entergy.com" <spyle@entergy.com>
Tracking Status: None "ERICKSON, JEFFREY S" <JERICKS@entergy.com>
Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com>
Tracking Status: None Post Office: BN8PR09MB3458.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1093 4/29/2019 12:38:00 PM Final RAI.docx 29899 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION ENTERGY NUCLEAR OPERATIONS, INC.
PALISADES NUCLEAR PLANT DOCKET NO. 50-255 By letter dated November 1, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18305B320), Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request (LAR) for the Palisades Nuclear Plant (PNP) that requested approval of several changes to the PNPs approved fire protection program under 10 CFR 50.48(c), National Fire Protection Association [NFPA] Standard NFPA 805.
Specifically, ENO has proposed to cancel 6 modifications and clarify 10 modifications, which are described in Attachment S, Table S-2, as referenced in the PNPs NFPA 805 transition license condition. The NRC staff is reviewing the LAR and has determined that additional information is needed to complete its review.
Probabilistic Risk Assessment (PRA) RAI 01 The LAR included an updated Attachment W that has been revised to reflect the deletion of the six modifications as described in the LAR, according to the text in section Under Attachment W, Table W-1, Fire Initiating Events Contributing > 1% to the Calculated Fire Risk and Table W-2 PNP Fire Area Risk Summary. The discussion related to Attachment W does not indicate that the clarifications to the modifications are included in the updated Attachment W results.
Of the 10 modifications where clarifications are being provided, Attachment S, Table S-2 indicated that modification items S2-15 and S2-21 are included in the PRA. The LAR indicates that the methodology described in NUREG/CR-7150, Volume 2, Joint Assessment of Cable Damage and Quantification of Effects from Fire (JACQUE-FIRE), Technical Resolution to Open Issues on Nuclear Power Plant Fire-Induced Electrical Circuit Failure, (ADAMS Accession No. ML14141A129), was applied to modification S2-15. Removal of plant-specific fire-related modifications due to more refined analysis is typical of plants submitting LARs to request changes to its obligations, but these changes are incorporated in the PRA and the results are compared to Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis guidelines (ADAMS Accession No. ML17317A256).
Based on the information provided in the LAR, it is unclear whether the clarifications related to modification items S2-15 and S2-21 have been included in the PRA and the updated Attachment W. If the clarifications for S2-15 and S2-21 are not included in the PRA, provide a justification for this exclusion. Absent a justification, provide an updated Attachment W that incorporates these changes, including updated total risk and change in risk values and compare the risk with RG 1.174 guidelines. Should the delta risk not be negative, provide the new additional risk of recovery actions.
PRA RAI 02 Section 4.2.4.2 of NFPA 805 requires that the use of fire risk evaluation for the performance-based approach shall consist of an integrated assessment of the acceptability of risk, defense-in-depth (DID), and safety margins.
Item iv of the LAR, Defense-in-Depth and Safety Margin, indicates that a review of prior determinations for DID, taking into account the modifications being eliminated, established that DID continues to meet the acceptance criteria of NFPA 805, Section 4.2.4, with no change to the required modifications or DID actions. However, the only stated acceptance criteria in NFPA 805, Section 4.2.4, are the risk acceptance criteria. Meeting risk guidelines does not constitute meeting DID. Indicate whether the DID approach accepted for NFPA 805 implementation applies to the modifications that are being deleted and modifications S2-15 and S2-21 that are being clarified and describe how each proposed change satisfies each DID echelon.
Fire Protection RAI 01 The LAR states that several modifications in Attachment S, Table S-2 have been implemented since Table S-2 was last submitted on August 14, 2014 (ADAMS Accession No. ML14226A498), and that Table S-2 was not updated to reflect modifications that have already been installed and could be transferred to Table S-1, Plant Modifications Completed. The LAR proposes a revision to transition license condition 2.C.(3)(c)2. to reference the Table S-2 dated November 1, 2018, which based on your statement above, does not reflect the current status of the modifications. The regulation at 10 CFR 50.48(c)(3)(i) states, in part, that the application must identify any orders and license conditions that must be revised or superseded, and contain any necessary revisions to the plants technical specifications and the bases thereof, and the Director of the Office of Nuclear Reactor Regulation, or a designee of the Director, may approve the application if the Director or designee determines that the licensee has identified orders, license conditions, and the technical specifications that must be revised or superseded, and that any necessary revisions are adequate. Based on the information provided in the LAR, the NRC cannot determine whether the proposed change to transition license condition 2.C.(3)(c)2. is adequate. Provide revised Attachment S, Tables S-1 and S-2, that reflect the current status of the modifications. Also provide a revised license condition 2.C.(3)(c)2 that reflects the date that Table S-2 was revised.