IR 05000382/2020010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 22, 2021
{{#Wiki_filter:
 
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000382/2020010
 
==Dear Mr. Ferrick:==
On December 11, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
 
The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety. However, the team identified a weakness associated with prioritizing and evaluating these problems. Specifically, the team identified corrective actions to prevent recurrence and others that were not characterized appropriately and condition reports that were inconsistently categorized.
 
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
 
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety. Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment. Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
 
Two findings of very low safety significance (Green) are documented in this report. Both of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.
 
If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Waterford Steam Electric Station, Unit 3.
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Waterford Steam Electric Station, Unit 3.
 
This letter, Enclosure 1, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Ami N. Agrawal, Team Lead Inspection Program and Assessment Team Division of Reactor Safety Docket No. 05000382 License No. NPF-38 Enclosure:
As stated cc w/o encl: Distribution via LISTSERV ML21022A119 Sensitive  Non-Publicly Available SUNSI Review Non-Sensitive  Publicly Available OFFICE RI:DRS/EB2 AES:ACES SSI:DRS/PSB1 SPE:DRP/RPBA SRI:DRS/IPAT NAME NOkonkwo PJayroe DHolman HFreeman  DDodson DATE 01/20/21 01/20/21 01/20/21 01/20/21  01/20/21 OFFICE TL:DRS/IPAT NAME AAgrawal DATE 01/21/21
}}
}}

Revision as of 09:07, 18 January 2022

Biennial Problem Identification and Resolution Inspection Report 05000382/2020010
ML21022A119
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/22/2021
From: Ami Agrawal
Division of Reactor Safety IV
To: Ferrick J
Entergy Operations
Clark D
References
IR 2020010
Download: ML21022A119 (3)


Text