Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-V-94-006, on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported1994-03-21021 March 1994 PNO-V-94-006:on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported PNO-V-93-022, on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry1993-12-22022 December 1993 PNO-V-93-022:on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry PNO-V-93-021, on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant1993-12-0202 December 1993 PNO-V-93-021:on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts1993-11-18018 November 1993 PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts PNO-V-93-018, on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation1993-10-26026 October 1993 PNO-V-93-018:on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power PNO-V-93-015, on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I1993-08-11011 August 1993 PNO-V-93-015:on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee PNO-V-93-013, on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant1993-08-0909 August 1993 PNO-V-93-013:on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined PNO-V-93-008, on 930222,State of California Licensed Well Logging Company Notified Region V That 100 Mci Cs-137 Sealed Source Was Discovered Missing from Storage Container Following Shipment of Container to Offshore Oil Platform1993-02-22022 February 1993 PNO-V-93-008:on 930222,State of California Licensed Well Logging Company Notified Region V That 100 Mci Cs-137 Sealed Source Was Discovered Missing from Storage Container Following Shipment of Container to Offshore Oil Platform PNO-V-93-007, on 930211,patient Forcibly Removed Cervical Applicator Containing Four Cs-137 Sources Totalling 130 Mci. RSO Does Not Believe Any Member of Medical Staff Received Exposure in Excess of Regulatory Limits1993-02-11011 February 1993 PNO-V-93-007:on 930211,patient Forcibly Removed Cervical Applicator Containing Four Cs-137 Sources Totalling 130 Mci. RSO Does Not Believe Any Member of Medical Staff Received Exposure in Excess of Regulatory Limits PNO-V-93-004, on 930121,automatic Reactor Scram Received Due to Low Level in Reactor Pressure Vessel.Licensee Estimates That Plant Will Be Shut Down for Repairs & Maint for 3 to 5 Days.Inspector Onsite During Event.Press Release Issued1993-01-21021 January 1993 PNO-V-93-004:on 930121,automatic Reactor Scram Received Due to Low Level in Reactor Pressure Vessel.Licensee Estimates That Plant Will Be Shut Down for Repairs & Maint for 3 to 5 Days.Inspector Onsite During Event.Press Release Issued PNO-V-93-003, on 930120,minor Accident,Involving Export Shipment of LEU U Fuel Pellets Occurred Approx 5 Miles East of Des Moines,Ia.Tractor Trailer Slipped on Black Ice.No Damage to Inner Containers or Personnel Injuries Occurred1993-01-20020 January 1993 PNO-V-93-003:on 930120,minor Accident,Involving Export Shipment of LEU U Fuel Pellets Occurred Approx 5 Miles East of Des Moines,Ia.Tractor Trailer Slipped on Black Ice.No Damage to Inner Containers or Personnel Injuries Occurred PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart PNO-V-92-034, on 921106,M Debblie Notified Region V Ofc of Overexposure to Radiographer from 50 Ci Co-60 Source. Radiographer Came in Physical Contact W/Source & Undergone Preliminary Medical Exams.State of or Investigating Event1992-11-0606 November 1992 PNO-V-92-034:on 921106,M Debblie Notified Region V Ofc of Overexposure to Radiographer from 50 Ci Co-60 Source. Radiographer Came in Physical Contact W/Source & Undergone Preliminary Medical Exams.State of or Investigating Event PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield1992-10-20020 October 1992 PNO-V-92-033:on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield PNO-V-92-024, on 920711,while Retesting Main Steam SRV at Approx 14% Reactor Power,Srv 3B Opened When Operated from Control Room But Would Not Close.Reactor Operators Reduced Reactor Pressure in Effort to Reseat Valve1992-07-13013 July 1992 PNO-V-92-024:on 920711,while Retesting Main Steam SRV at Approx 14% Reactor Power,Srv 3B Opened When Operated from Control Room But Would Not Close.Reactor Operators Reduced Reactor Pressure in Effort to Reseat Valve PNO-V-92-017, on 920605,earthquake W/Richter Magnitude of 5.0 Occurred.Plant Walkdowns Performed & No Problems Noted1992-06-0505 June 1992 PNO-V-92-017:on 920605,earthquake W/Richter Magnitude of 5.0 Occurred.Plant Walkdowns Performed & No Problems Noted PNO-V-92-010, on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop1992-04-0202 April 1992 PNO-V-92-010:on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 PNO-V-91-031, on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed1991-11-19019 November 1991 PNO-V-91-031:on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter1991-08-0909 August 1991 PNO-V-91-016:on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg1991-07-16016 July 1991 PNO-V-91-014:on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg ML20203C2231991-06-14014 June 1991 PNO-V-91-04B on 910614,Region V Issued Rev 3 to CAL Concerning Actions to Be Taken by WPPSS Subsequent to Unsuccessful Simulator Requalification Retake Exam Performed 910605-06 PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core1991-03-0707 March 1991 PNO-V-91-003:on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable PNO-V-90-049, on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion1990-12-0707 December 1990 PNO-V-90-049:on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion PNO-V-90-048, on 901126,diagnostic Misadministration Occurred w/73 Yr Old Patient Given 250 Mci of Tc99m.Patient Hospitalized & Being Administered Thyroid Blocking Agents1990-11-27027 November 1990 PNO-V-90-048:on 901126,diagnostic Misadministration Occurred w/73 Yr Old Patient Given 250 Mci of Tc99m.Patient Hospitalized & Being Administered Thyroid Blocking Agents PNO-V-90-047B, updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys1990-11-23023 November 1990 PNO-V-90-047B:updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys PNO-V-90-047A, on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys1990-11-21021 November 1990 PNO-V-90-047A:on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys PNO-V-90-047, on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel1990-11-20020 November 1990 PNO-V-90-047:on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference PNO-V-90-042A, on 901102,contamination of Hosp Labs & Public Areas Noted.Nrc Confirmed Licensee Monitoring Indicating That Contamination Removed to Acceptable Levels & Posed No Health Hazard to Workers or General Public1990-11-0505 November 1990 PNO-V-90-042A:on 901102,contamination of Hosp Labs & Public Areas Noted.Nrc Confirmed Licensee Monitoring Indicating That Contamination Removed to Acceptable Levels & Posed No Health Hazard to Workers or General Public PNO-V-90-042, on 901102,contamination Found in Eight Labs & Public Areas,Involving Unknown Amount of P-32.Licensee in Process of Decontaminating Labs & Assessing Contamination1990-11-0202 November 1990 PNO-V-90-042:on 901102,contamination Found in Eight Labs & Public Areas,Involving Unknown Amount of P-32.Licensee in Process of Decontaminating Labs & Assessing Contamination PNO-V-90-041, on 901024,licensee Declared Unusual Event After Determining That Vital & non-vital Instrument Power Supplies Interconnected Through Certain Sys Instrumentation1990-10-25025 October 1990 PNO-V-90-041:on 901024,licensee Declared Unusual Event After Determining That Vital & non-vital Instrument Power Supplies Interconnected Through Certain Sys Instrumentation PNO-V-90-038, A:on 900927,main Generator Trip Resulted in Unplanned Plant Shutdown.Transient Caused 140 MW Excursion on Grid,Tripped Off Nearby Substation & Shook Turbine Bldg Deck.Ge Contacted for Recommendations1990-09-27027 September 1990 PNO-V-90-038-A:on 900927,main Generator Trip Resulted in Unplanned Plant Shutdown.Transient Caused 140 MW Excursion on Grid,Tripped Off Nearby Substation & Shook Turbine Bldg Deck.Ge Contacted for Recommendations PNO-V-90-036, on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned1990-09-10010 September 1990 PNO-V-90-036:on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned PNO-V-90-035, on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected1990-08-0606 August 1990 PNO-V-90-035:on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed1990-07-30030 July 1990 PNO-V-90-034:on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed PNO-V-90-033, on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant1990-07-27027 July 1990 PNO-V-90-033:on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant PNO-V-90-032, on 900711,steam Dumps Did Not Automatically Open to Pick Up Load Lost from Turbine During Performance of Turbine Test.Operators Took Manual Control & Stabilized Plant.Plant Shutdown to Investigate Event1990-07-11011 July 1990 PNO-V-90-032:on 900711,steam Dumps Did Not Automatically Open to Pick Up Load Lost from Turbine During Performance of Turbine Test.Operators Took Manual Control & Stabilized Plant.Plant Shutdown to Investigate Event PNO-V-90-031, on 900627,unintentional Overexposure of Infant Thyroid Discovered.Mother Administered 4.89 Mci I-131 on 900619 W/O Being Instructed to Stop Breast Feeding. Concentration of I-131 Discovered in Breast Milk1990-06-28028 June 1990 PNO-V-90-031:on 900627,unintentional Overexposure of Infant Thyroid Discovered.Mother Administered 4.89 Mci I-131 on 900619 W/O Being Instructed to Stop Breast Feeding. Concentration of I-131 Discovered in Breast Milk PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement1990-03-20020 March 1990 PNO-V-90-011:on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs1990-03-20020 March 1990 PNO-V-90-010:on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs PNO-V-90-001, on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers1990-01-0202 January 1990 PNO-V-90-001:on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers 1994-03-21
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-V-94-006, on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported1994-03-21021 March 1994 PNO-V-94-006:on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported IR 05000361/19930391994-01-10010 January 1994 Insp Repts 50-361/93-39 & 50-362/93-39 on 931206-10.No Violations Noted.Major Areas Inspected:Review of ISI Activities Conducted During Current Unit 3 Cycle Seven Refueling Outage & Licensee Actions for Open Items ML20059K6311994-01-0606 January 1994 Notice of Deviation from Insp on 931206-10.Deviation Noted: Licensee Had No Documentation of Having Contacted Limitorque Nor Any Documentation of Limitorque Concurrence W/Licensee Determination of MOV Actuator Capability ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000361/19930361994-01-0404 January 1994 Insp Repts 50-361/93-36 & 50-362/93-36 on 931206-10. Deviations Noted.Major Areas Inspected:Ler & Followup of Items from Previous Insps PNO-V-93-022, on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry1993-12-22022 December 1993 PNO-V-93-022:on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise ML20059A3781993-12-10010 December 1993 Insp Rept 70-0734/93-08 on 931108-10.No Violations Noted. Major Areas Inspected:Dismantlement of HTGR Fuel Fabrication Facility IR 05000374/19930341993-12-0606 December 1993 Insp Rept 50-374/93-34 on 930916-1124.No Violations or Deviations Noted.Major Areas Inspected:Isi Activities, Including Review of Programs,Procedures,Observation of Work Activities,Data Review & Erosion/Corrosion Activities IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues PNO-V-93-021, on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant1993-12-0202 December 1993 PNO-V-93-021:on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant IR 015000004/19930131993-11-24024 November 1993 Insp Rept 15000004/93-13 on 930929-1025.Violation Being Considered for Escalated Enforcement Action.Major Areas Inspected:Concerns Involving Use of Byproduct Matl in Areas Under Federal Jurisdiction ML20058K7011993-11-24024 November 1993 Notice of Violation from Insp on 930920-1022.Violation Noted:Activities Were Not Accomplished in Accordance W/ Procedures in That on 930708,signature for Procedures Were Entered by Supervisor Who Did Not Conduct Rotation IR 05000361/19930271993-11-24024 November 1993 Insp Repts 50-361/93-27 & 50-362/93-27 on 930920-1022.No Violations Noted.Major Areas inspected:post-mod & Maint,Ts Surveillance,Ist & Predictive Maint Testing ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts1993-11-18018 November 1993 PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000361/19930341993-11-12012 November 1993 Insp Repts 50-361/93-34 & 50-362/93-34 on 931025-29.No Violations or Deviations Noted.Major Areas Inspected: Adequacy of Licensee Fire Protection & Prevention Program ML20058D4571993-11-0505 November 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Noncompliance Noted:Licensee Personnel Did Not Perform Adequate Survey After Each Radiographic Exposure IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area PNO-V-93-018, on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation1993-10-26026 October 1993 PNO-V-93-018:on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20058D2571993-10-17017 October 1993 Insp Rept 70-0734/93-07 on 930927-1001.No Deviations or Violations Noted.Major Areas Inspected:Radwaste Mgt Program, Ep,Environ Protection Program,Environ Monitoring Program & Followup on Previous Insp Findings ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects ML20059D2141993-10-15015 October 1993 Notice of Violation from Insp on 930402-0517.Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete & Accurate in All Matl Respects ML20059D1041993-10-0606 October 1993 Insp Rept 70-0734/93-06 on 930913-17.Violation Noted But Not Cited.Major Areas Inspected:Safety,Operations Review, Operator Training/Qualification,Maintenance/Surveillance Testing & Followup on Open Items IR 05000206/19930211993-10-0404 October 1993 Insp Repts 50-206/93-21,50-361/93-21 & 50-362/93-21 on 930913-17.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program,Followup on Open Items & Associated Critiques IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program ML20057E7121993-09-23023 September 1993 Notice of Violation from Insp on 930816-27.Violation Noted: Indications of Improper MOV Operation During 920323 Diagnostic Test of Auxiliary Feedwater Control Valve 3HV-4705 Not Documented Nor Promptly Corrected PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7201993-09-17017 September 1993 Insp Repts 50-361/93-17 & 50-362/93-17 on 930816-27. Violations Noted.Major Areas Inspected:Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety Related Motor-Operator Valve Testing & Surveillance ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057C5691993-09-13013 September 1993 Safety Insp on 930812-18 of License 50-23509-01.Insp Findings:Portable Gauges Containing Licensed Matl Were Stored at Location Not Authorized by License Condition 10 IR 015000004/19930111993-09-10010 September 1993 Enforcement Conference Rept 15000004/93-11 on 930819.Major Areas Discussed:Violations Noted from Insp on 930729 & 30 ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments 1994-03-21
[Table view]Some use of "" in your query was not closed by a matching "". |