ML20206A248: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20206A248
| number = ML20206A248
| issue date = 04/21/1999
| issue date = 04/21/1999
| title = Informs That Umrr Is Withdrawing Request Listed as Item 2 of 990126 Ltr Re Changes to QA Program.Revised Page 4 of QA Plan Which Conforms to 10CFR71 Guidelines,Encl
| title = Informs That Umrr Is Withdrawing Request Listed as Item 2 of Re Changes to QA Program.Revised Page 4 of QA Plan Which Conforms to 10CFR71 Guidelines,Encl
| author name = Mckibben J, Schoone T
| author name = Mckibben J, Schoone T
| author affiliation = MISSOURI, UNIV. OF, COLUMBIA, MO
| author affiliation = MISSOURI, UNIV. OF, COLUMBIA, MO
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9904280111
| document report number = NUDOCS 9904280111
| title reference date = 01-26-1999
| package number = ML20206A252
| package number = ML20206A252
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
Line 28: Line 29:
==Subject:==
==Subject:==
Request Changes to Quality Assurance Program l
Request Changes to Quality Assurance Program l
This request is to inform you that the University of Missouri Research Reactor is withdrawing one of the              l requested changes made in the letter dated January 26,1999.                                                          l The University of Missouri would find it useful to have the ability to make changes to the QA plan that do not decrease its effectiveness, llowever, we understand that 10CFR 71 does not allow this at this time.
This request is to inform you that the University of Missouri Research Reactor is withdrawing one of the              l requested changes made in the {{letter dated|date=January 26, 1999|text=letter dated January 26,1999}}.                                                          l The University of Missouri would find it useful to have the ability to make changes to the QA plan that do not decrease its effectiveness, llowever, we understand that 10CFR 71 does not allow this at this time.
Based on this, the University of Missouri withdraws the request listed as item 2 of the January 26,1999 letter.
Based on this, the University of Missouri withdraws the request listed as item 2 of the {{letter dated|date=January 26, 1999|text=January 26,1999 letter}}.
The following is item two as listed in the January 26,1999 letter; "On page 4, a paragraph is added to allow changes to the QA prcyam that do not reduce the effectiveness of the program. The Reactor                    f Manager will authorize these changes and subsequently the Reactor Advisory Committee will review the              /
The following is item two as listed in the {{letter dated|date=January 26, 1999|text=January 26,1999 letter}}; "On page 4, a paragraph is added to allow changes to the QA prcyam that do not reduce the effectiveness of the program. The Reactor                    f Manager will authorize these changes and subsequently the Reactor Advisory Committee will review the              /
changes. The changes will be submitted to the NRC as a follow-up. This would allow the same latitude in
changes. The changes will be submitted to the NRC as a follow-up. This would allow the same latitude in
                                                                                                                                 .f this plan as is allowed in Security and Emergency plans approved by the NRC under 10 CFR 54(p) and 10 CFR 54(q)." The attached page 4 of the MURR QA Plan conforms to the 10CFR 71Fuidelines and should replace page 4 of the MURR QA plan submitted on January 26,1999.
                                                                                                                                 .f this plan as is allowed in Security and Emergency plans approved by the NRC under 10 CFR 54(p) and 10 CFR 54(q)." The attached page 4 of the MURR QA Plan conforms to the 10CFR 71Fuidelines and should replace page 4 of the MURR QA plan submitted on January 26,1999.

Latest revision as of 16:11, 6 December 2021

Informs That Umrr Is Withdrawing Request Listed as Item 2 of Re Changes to QA Program.Revised Page 4 of QA Plan Which Conforms to 10CFR71 Guidelines,Encl
ML20206A248
Person / Time
Site: University of Missouri-Columbia, 07100108
Issue date: 04/21/1999
From: Mckibben J, Schoone T
MISSOURI, UNIV. OF, COLUMBIA, MO
To: Eng P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20206A252 List:
References
NUDOCS 9904280111
Download: ML20206A248 (1)


Text

.*

ReSearch Reactor Center Rmarch Park l Columbia, MO 65211 l * - University of Missouri-Columbia

,,nov (573) 882-4211 ru (573) HH2-3443 l

1 April 21,1999  ;

Patricia Eng Office of Nuclear Material Safety and Safeguards Mail Stops 06F18 U.S. Nuclear Regulatory Commission Washington, DC 20555 .

Reference:

Docket No. 50-186 University of Missouri Research Reactor Facility Reactor License R-103 i

Subject:

Request Changes to Quality Assurance Program l

This request is to inform you that the University of Missouri Research Reactor is withdrawing one of the l requested changes made in the letter dated January 26,1999. l The University of Missouri would find it useful to have the ability to make changes to the QA plan that do not decrease its effectiveness, llowever, we understand that 10CFR 71 does not allow this at this time.

Based on this, the University of Missouri withdraws the request listed as item 2 of the January 26,1999 letter.

The following is item two as listed in the January 26,1999 letter; "On page 4, a paragraph is added to allow changes to the QA prcyam that do not reduce the effectiveness of the program. The Reactor f Manager will authorize these changes and subsequently the Reactor Advisory Committee will review the /

changes. The changes will be submitted to the NRC as a follow-up. This would allow the same latitude in

.f this plan as is allowed in Security and Emergency plans approved by the NRC under 10 CFR 54(p) and 10 CFR 54(q)." The attached page 4 of the MURR QA Plan conforms to the 10CFR 71Fuidelines and should replace page 4 of the MURR QA plan submitted on January 26,1999.

If you have additional questions or require additional clarification please call me at 573-882 5296.

M Sincerely. ENDORSEMENT:

Reviewed anel Approved

-Y tT d Tony Schoone J. Charles McKibben Reactor Manager Associate Director vit Subscribed and sworn to before me this 22nd day of April, 1999.

Attachment N\( kLill O . dW Michelle M. Blevins Notary Public My Commission Expires: 2/10/2003 MICHELLE M. BLEVINS 9904290111 990421 Notary Publie Notary Seal

. A KO STATE OF MISSOURI V ,", }- CALLAWAY COUNTY U My Commission Expires: Feb.10,2003 n int u omarty n/Alu rwm enus I

l