#REDIRECT [[IR 05000482/1986005]]
{{Adams
| number = ML20197E685
| issue date = 05/01/1986
| title = Insp Rept 50-482/86-05 During Mar 1986.Violation Noted: Performance of Control Room Emergency Ventilation Sys Train B Operability Test Not Documented According to Procedure
| author name = Bartlett B, Cummins J, Hunter D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name =
| addressee affiliation =
| docket = 05000482
| license number =
| contact person =
| document report number = 50-482-86-05, 50-482-86-5, NUDOCS 8605150298
| package number = ML20197E630
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 8
}}
See also: [[see also::IR 05000482/1986005]]
 
=Text=
{{#Wiki_filter:_ _ - _ _ _ - _
      .    .
                                              APPEtiDIX B
                                  U.S. NUCLEAR REGULATORY C0tHISSION
                                                REGION IV
        NRC Inspection Report: 50-482/86-05                    LP:  NPF-42
        Docket: 50-482
        Licensee:    Kansas Gas and Electric Company (KG&E)
                      Post Office Box 208                                              .
                    Wichita, Kansas 67201
        Facility Name: Wolf Creek Generating Station (WCGS)
        Inspection At: Wolf Creek Site, Coffey County, Burlington, Kansas
        Inspection Conducted: March 1-31, 1986
        Inspectors:    bl                    -l
                        J. I. IUmmins, Sen'ior Rbsident Inspector, Operations    Date
                              tilb            i e
                        B. L. Bartlett, Residel[t' Reactor Inspector,            Date
                          Operations
        Approved:                b          i
                        D. R. Hunter, Chief, Project Section B, Reactor          Uate
                                                                                      !/4
                          Projects Branch
        Inspection Summary
        Inspection Conducted March 1-31, 1986 (Report 50-482/86-05)
        Areas Inspected:      Routine, unannounced inspection including followup on
        previously identified NRC items, operational safety verification, engineered
        safety features system walkdown, onsite followup of events, monthly
        surveillance observation, monthly maintenance observation, and plant tours.
        Results: Within the seven areas inspected, one violation was identified
        (failure to document the performance of a surveillance test in accordance with
        procedure, paragraph 6). One open item is identified in paragraph 5.
          8605150298 860507
          PDR
          G      ADOCK 05000482
                                PDR:
_____.
 
.    .
                                            -2-
                                        DETAILS
  1.    Persons Contacted
        Principal Licensee Personnel
      *J. A. Bailey, Interim Site Director
      *F. T. Rhodes, Plant Manager
        M. Estes, Superintendent of Operations
        M. D. Rich, Superintendent of Maintenance
      *M.  G. Williams, Superintendent of Regulatory, Quality, and
          Administrative Services
        0. L. Maynard, Manager, Licensing
        J. Goode, Licensing
      *K. Peterson, Licensing
      *G. Pendergrass, Licensing
      *W.  M. Lindsay, Supervisor, Quality Systems
        C. E. Parry, Superintendent-Quality Systems Engineering
      *C. J. Hoch, QA Technologist
        R. D. Flannigan, Supervisor, Compliance Engineering
      *A. A. Freitag, Manager, Nuclear Plant Engineering-WCGS
      *C. M. Herbst, Project Engineer, Bechtel
        M. Megehee, Compliance Engineer
      *W.  J. Rudolph, QA Manager
        The NRC inspectors also contacted other members of the licensee's staff
        during the inspection period to discuss identified issues.
      * Denotes those personnel in attendance at the exit meeting held on
        April 2, 1986.
  2.    Followup on Previously Identified NRC Items
        (Closed) Violation (50-482/EA85-127-A and 50-482/8535-01): Violation
        Of Technical Specification-Centrifugal Charging Pump (CCP) Inoperable.
        The violation involved a failure to restore CCP '1A' to operable status
        within the time limit of the action statement for Technical Specifica-
        tion 3.5.2. The NRC inspector reviewed the licensee's response and veri-
        fied that changes have been made to STS BG-100A and STS BG-1008 to correct
        ambiguous statements; that Licensee Event Report (LER) 85-063-00 was placed
        in the operations required reading and was signed off as being read by the
        appropriate shift personnel; that shift supervisors were trained in post-
        test review requirements; and by walkdowns of selected engineered safety
        features (ESF) systems that Technical Specification requirements were
        being met. This violation is closed.
 
        .
          . .
                                                    -3-
                  (Closed) Violation (50-482/EA85-127-B and 50-482/8535-02): Failure to
                  Observe Protective Clothing Requirements Of a Radiation Work Permit.
                  The violation involved a radiation worker entering a radiologically
                  controlled work area without donning the required protective clothing.
                  The NRC inspector verified that this event was documented in accordance
                  with Procedure ADM 03-006, " Notice of Radiological Work Practice
                  Violation," and that the station operator was counseled on the
                  importance of complying with RWP procedures. This violation is closed.
                  (Closed) Violation (50-482/EA85-127-C and 50-482/8535-03):      Violation
                  Of Technical Specification-Containment Fire Detection Instrumentation
                  Out-0f-Service.
                  The violation involved failure to establish a fire watch or monitor
                  containment air temperature in accordance with Technical Specifica-
                  tion 3.3.3.8 when the fire detection instrument for Fire Detection
                  Zone 201 was inoperable. The NRC inspector verified that Procedure
                  ADM 02-010, " Shift Relief and Turnover," and LER 85-070-00 were assigned
                  and read as required reading. In addition, the NRC inspector, through
                  interviews with licensed operators, ve.ified that oncoming crew members
                  were cognizant of plant equipment status prior to assuming shift duties.
                  This violation is closed.
                  (Closed) Violation (50-482/EA85-127-0 and 50-482/8535-04):      Failure To
                  Follow Installation Criteria For Various Conduits.
                  The violation involved using an unapproved method to install a flexible
                  conduit. The NRC inspector reviewed the management letter that was sent to
                  all station employees. Field _ inspections by the NRC inspector of
                  selected items revealed no other violations of this type. This item is
                  closed.
                  (Closed) Violation (50-482/8537-01):    Nonseismic Glass Level Gauge Not
                  Isolated.
                  The violation involved a failure to isolate a seismic portion of a
                  safety-related system from a nonseismic portion. The NRC inspector
                  verified that Checklist (CKL) EG-120 had been revised to show the four
                  valves locked closed; that the five additional tanks that were-
                  identified each had their appropriate checklist revised; that Procedure
                  ADM 02-102, " Cont.01 of Locked Component Status," had been revised to
                  show proper positioning; and through field inspection verified that the
                  appropriate valves were closed and locked.    This item is closed.
                  No violations or deviations were identified.
          3.    Operational Safety Verification
                  The NRC inspectors verified that the facility was being operated safely
                  and in conformance with regulatory requirements by direct observation
_----_.    . _ _
 
  . . .
                                            -4-
        of licensee facilities, tours of the facility, interviews and discussions
        with licensee personnel, independent verification of safety system status
        and limiting conditions for operations, and by reviewing facility records.
        The NRC inspectors, by observation, interview of personnel, and review of
        documents, verified the physical security plan was being implemented in
        accordance with the security plan and that radiation protection activities
        were controlled.
        By observing valve position, electrical breaker position, and control
          room indication, the NRC inspectors confirmed the operability of the
        accumulator safety injection system and the coolant charging system.
4
        The NRC inspectors also visually inspected safety components for leakage,
        physical damage, and any other impairment that could prevent them from
        performing their designed function.
        No violations or deviations were identified.
      4. Engineered Safety Features (ESF) System Walkdown
!
l
        The NRC inspectors verified the operability of ESF systems by walking
        down selected accessible portions of the systems. The NRC inspectors
        verified valves and electrical circuit breakers were in the required
        position, power was available, and valves were locked where required.
        The NRC inspectors also inspected system components for damage or other
        conditions that could degrade system performance.
        The ESF systems listed below were walked down during this inspection
        report period:
        -
              Refueling Water Storage (BN)
        -
              High Pressure Coolant Injection (EM)
        -
              Emergency Fuel Oil (JE)
        No violations or deviations were identified.
      5. Onsite Followup of Events
        The NRC inspectors performed onsite followup of nonemergency events that
        occurred during this report period. The NRC inspectors (when available)
        observed control room personnel response, observed instrumentation
        indicators of reactor plant parameters, reviewed logs and computer
        printouts, and discussed the event with cognizant personnel. The NRC
        inspectors verified the licensee had responded to the event in accordance
        with procedures and had notified the NRC and other agencies as required in
        a timely fashion.
        Engineered Safety Feature actuations that occurred during the report
,        period are listed in the table below. Where applicable, the NRC
        inspector will review the LER for each of these events and will report
        any findings in subsequent NRC inspection reports.
 
          .  .    .                                            _    _                              _ . .          .      _
    .  . .
4                                                                              -5-
1
I
                    Date                Event *                    Plant Status                          Cause
                  3/26/86              CRVIS                              Mode 1                          Blown Fuse on
,
                                                                                                            Chlorine Detector
'
                  3/27/86              CRVIS, CPIS,
,
                                        & FBVIS                            Mode 1                          Failed Power Supply
?                  3/27/86              AFW, Actuation
                                        With LSP Switch-
1                                        over to ESW                      Mode 1                          Personnel Error
              * Event
i            CRVIS - control room ventilation isolation signal.
              CPIS - containment purge isolation signal
              FBVIS - fuel building ventilation isolation signal
              AFW - auxiliary feed water
.              LSP - low suction pressure
              ESW - essential service water
              Selected NRC inspector observations:
              On March 27, 1986, at 1813 hours a CRVIS, CPIS, and FBVIS were generated
              when the -15 volt DC power supply failed in Cabinet SA 036D. After
              approximately 2 hours of reviewing prints, the instrumentation and control
              (I&C) personnel trouble shooting the problem removed a fuse in a 120V AC
              circuit and when it was replaced, an AFW actuation occurred along with an
              AFW low suction pressure automatic switchover to ESW. As designed, only
              the '1A' train ESW pump started. The balance of plant (80P) operator
              shut down the three running AFW pumps before any ESW water was placed in
              the steam generators (S/Gs).
              Operations personnel flushed the ESW water out of '1A' motor driven AFW
              pump and the turbine driven AFW pumps (TDAFWP) using 1-inch drain lines and
              gravity feed from the condensate storage tank (CST). After chemistry
4
              samples taken from the AFW system and analyzed indicated the system was
              again clean, the AFW pumps were run in their normal modes supplying water
              to the S/Gs to ensure all ESW water was flushed from the AFW system.
              Currently an evaluation is in progress to determine the corrective action
              required to ensure that the' long term operation of the AFW system has not
              been degraded through chemical reactions to the ESW water. The NRC
              inspector will follow up this evaluation to verify proper corrective
              action has been taken. Using Work Request (WR) 01336-86, I&C replaced the
              failed power supply on March 28, 1986. This will be tracked as Open Item
*
              No. 50-482/8605-02.
              No violations or deviations were identified.
        6.    Monthly Surveillance Observation
              The NRC inspectors observed selected portions of the performance of.
              surveillance testing and/or reviewed completed surveillance test procedures
l
;
  - . _              ,-  _. , _ . _ . - _ _ , _ , . - . . . _  _ . _ , , . , _ --__ . - ..,,_._ _              ,_  , , -  . . . , . . _ . . . .
 
  . . .
                                            -6-
        to verify that surveillance activities were performed in accordance with
        TS requirements and administrative procedures. The NRC inspectors
        considered the following items while inspecting survePlance activities:
        -    Testing was being accomplished by qualified personnel in accordance
              with an approved procedure.
        -    The surveillance procedure conformed to TS requirements.
        -    Required test instrumentation was calibrated.
        -    Technical Specification limiting conditions for operation (LCO) were
              satisfied.
        -    Test data was accurate and complete. Where appropriate, the NRC
              inspectors performed independent calculations of selected test data
              to verify their accuracy.
        -
              The performance of the surveillance procedure conformed to applicable
              administrative procedures.
        -
              The surveillance was performed within the required frequency and the
              test results met the required limits.
    Surveillances witnessed and/or reviewed by the NRC inspectors are listed below:
        -
              STS IC-920, Revision 4, " Containment Hydrogen Analyzer GS 065A
              Calibration Test"
        -
              STS EJ-100A, Revision 0, "RHR System Inservice Pump '1A' Test"
        -
              STS GK-001B, Revision 5, " Control Room Emergency Ventilation System"
        -
              STS IC-913, Revision 4, " Containment Hydrogen Analyzer GS 065B
              Calibration Test"
        -
              STS 88-004, Revision 4, "RCS Water Inventory Balance"
        Selected NRC inspector observations:
        -
              On March 26, 1986, the NRC inspector observed a portion of the
              performance of STS GK-001B and then reviewed the surveillance proce-
              dure. During this review, the NRC inspector observed that even though
              the surveillance had been in progress for a number of hours, Section 3,
              " Initial Conditions," had not been signed off as completed. When the
              supervising operator was informed, he stated, that when the previous
              shift had started the surveillance, they had missed signoff of this
              section. This failure to document the performance of a Section 3 of
              the surveillance in accordance with procedure is an apparent violation
              (50-482/8605-01).
i
 
  . . .
                                                -7-
    7.  Monthly Maintenance Observation
        The NRC inspector observed maintenance activities performed on
        safety related systems and components to verify that these activities
        were conducted in accordance with approved procedures, Technical
3      Specifications, and applicable _ industry codes and standards. The following
        elements were considered by the NRC inspector during the observation and/or
        review of the maintenance activities:
        -
              LCO were met and, where applicable, redundant components were
              operable.
        -
              Activities complied with adequate administrative controls.
        -
              Where required, adequate, approved, and up-to-date procedures were
              used.                                    ,
        -
              Craftsmen were qualified to accomplish the designated task and
              technical expertise (i.e., engineering, health physics, operations)
              were made available when appropriate.
;
        -
              Replacement parts and materials being used were properly certified.
        -
              Required radiological controls were implemented.
                                                                                              t'
        -
              Fire prevention controls were implemented where appropriate.
        -
              Required alignments and surveillances to verify post maintenance
              operability were performed.
        -
              Quality control hold points and/or checklists were used when
              appropriate and quality control personnel observed designated work
              activities.
        Selected portions of the maintenance activities accomplished on the work
        requests (WR) listed below were observed and related documentation reviewed
        by the NRC inspector:
        -
              WR 01305-86, "BB FB-426A, Replace NAll Card"
        -
              WR 01112-86, " Containment Hydrogen Analyzer GS 065A, Zero Reading Is
              Off Scale"
        -
              WR 01336-86, "SA 036D, -15 Volt DC Power Available Light Not-                    l
              Illuminated, All Red Train Process Monitor Bistables Tripped"                    l
        No violations or deviations were identified.
                            ._      _    _ - _ _    _  _      _ _ _ _ . . - . - - _ -- - .
 
                                                        _ _ - _ _ - _
      . ..
                                                                -8-
        8.            Plant Tours
                      At various times during the course of the inspection period, the NRC
                      inspectors conducted general tours of the reactor building, auxiliary
                      building, radwaste building, fuel handling building, control building,
                      turbine building, and the secured area surrounding the buildings. During
                      the tours, the NRC inspectors observed housekeeping practices, fire
                      protection barriers and equipment, and maintenance on equipment. The NRC
                      inspectors also discussed various subjects with licensee personnel.
                      No vialations or deviations were identified.
        9.            Open Items
                      Open items are matters which have been discussed with the licensee, which
                      will be reviewed further by the inspector, and which involve some action
                      on the part of the NRC or licensee or both. An open item disclosed during
                      the inspection is discussed in paragraph 5.
        10.            Exit Meeting
                      The NRC inspectors met with licensee personnel to discuss the scope and
                      findings of this inspection on April 2, 1986. The NRC inspectors also
                      attended entrance / exit meeting with another NRC region-based inspector
                      identified below:
                      Inspection            Lead                          Area          Inspection
                        Period            Inspector                      Inspected        Report No.
                      3/10-14/86          C. Hackney                    Emergency          86-06
                                                                          Preparedness
!
!
,,, .      . . . . . .            .
                                    .
                                                      .  .
                                                                      ..
                                                                                      . .
                                                                                                  ..  .
                                                                                                        ... -
}}

Latest revision as of 08:17, 2 January 2021

Insp Rept 50-482/86-05 During Mar 1986.Violation Noted: Performance of Control Room Emergency Ventilation Sys Train B Operability Test Not Documented According to Procedure
ML20197E685
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/01/1986
From: Bruce Bartlett, Cummins J, Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20197E630 List:
References
50-482-86-05, 50-482-86-5, NUDOCS 8605150298
Download: ML20197E685 (8)


See also: IR 05000482/1986005

Text

_ _ - _ _ _ - _

. .

APPEtiDIX B

U.S. NUCLEAR REGULATORY C0tHISSION

REGION IV

NRC Inspection Report: 50-482/86-05 LP: NPF-42

Docket: 50-482

Licensee: Kansas Gas and Electric Company (KG&E)

Post Office Box 208 .

Wichita, Kansas 67201

Facility Name: Wolf Creek Generating Station (WCGS)

Inspection At: Wolf Creek Site, Coffey County, Burlington, Kansas

Inspection Conducted: March 1-31, 1986

Inspectors: bl -l

J. I. IUmmins, Sen'ior Rbsident Inspector, Operations Date

tilb i e

B. L. Bartlett, Residel[t' Reactor Inspector, Date

Operations

Approved: b i

D. R. Hunter, Chief, Project Section B, Reactor Uate

!/4

Projects Branch

Inspection Summary

Inspection Conducted March 1-31, 1986 (Report 50-482/86-05)

Areas Inspected: Routine, unannounced inspection including followup on

previously identified NRC items, operational safety verification, engineered

safety features system walkdown, onsite followup of events, monthly

surveillance observation, monthly maintenance observation, and plant tours.

Results: Within the seven areas inspected, one violation was identified

(failure to document the performance of a surveillance test in accordance with

procedure, paragraph 6). One open item is identified in paragraph 5.

8605150298 860507

PDR

G ADOCK 05000482

PDR:

_____.

. .

-2-

DETAILS

1. Persons Contacted

Principal Licensee Personnel

  • J. A. Bailey, Interim Site Director
  • F. T. Rhodes, Plant Manager

M. Estes, Superintendent of Operations

M. D. Rich, Superintendent of Maintenance

  • M. G. Williams, Superintendent of Regulatory, Quality, and

Administrative Services

0. L. Maynard, Manager, Licensing

J. Goode, Licensing

  • K. Peterson, Licensing
  • G. Pendergrass, Licensing
  • W. M. Lindsay, Supervisor, Quality Systems

C. E. Parry, Superintendent-Quality Systems Engineering

  • C. J. Hoch, QA Technologist

R. D. Flannigan, Supervisor, Compliance Engineering

  • A. A. Freitag, Manager, Nuclear Plant Engineering-WCGS
  • C. M. Herbst, Project Engineer, Bechtel

M. Megehee, Compliance Engineer

  • W. J. Rudolph, QA Manager

The NRC inspectors also contacted other members of the licensee's staff

during the inspection period to discuss identified issues.

  • Denotes those personnel in attendance at the exit meeting held on

April 2, 1986.

2. Followup on Previously Identified NRC Items

(Closed) Violation (50-482/EA85-127-A and 50-482/8535-01): Violation

Of Technical Specification-Centrifugal Charging Pump (CCP) Inoperable.

The violation involved a failure to restore CCP '1A' to operable status

within the time limit of the action statement for Technical Specifica-

tion 3.5.2. The NRC inspector reviewed the licensee's response and veri-

fied that changes have been made to STS BG-100A and STS BG-1008 to correct

ambiguous statements; that Licensee Event Report (LER) 85-063-00 was placed

in the operations required reading and was signed off as being read by the

appropriate shift personnel; that shift supervisors were trained in post-

test review requirements; and by walkdowns of selected engineered safety

features (ESF) systems that Technical Specification requirements were

being met. This violation is closed.

.

. .

-3-

(Closed) Violation (50-482/EA85-127-B and 50-482/8535-02): Failure to

Observe Protective Clothing Requirements Of a Radiation Work Permit.

The violation involved a radiation worker entering a radiologically

controlled work area without donning the required protective clothing.

The NRC inspector verified that this event was documented in accordance

with Procedure ADM 03-006, " Notice of Radiological Work Practice

Violation," and that the station operator was counseled on the

importance of complying with RWP procedures. This violation is closed.

(Closed) Violation (50-482/EA85-127-C and 50-482/8535-03): Violation

Of Technical Specification-Containment Fire Detection Instrumentation

Out-0f-Service.

The violation involved failure to establish a fire watch or monitor

containment air temperature in accordance with Technical Specifica-

tion 3.3.3.8 when the fire detection instrument for Fire Detection

Zone 201 was inoperable. The NRC inspector verified that Procedure

ADM 02-010, " Shift Relief and Turnover," and LER 85-070-00 were assigned

and read as required reading. In addition, the NRC inspector, through

interviews with licensed operators, ve.ified that oncoming crew members

were cognizant of plant equipment status prior to assuming shift duties.

This violation is closed.

(Closed) Violation (50-482/EA85-127-0 and 50-482/8535-04): Failure To

Follow Installation Criteria For Various Conduits.

The violation involved using an unapproved method to install a flexible

conduit. The NRC inspector reviewed the management letter that was sent to

all station employees. Field _ inspections by the NRC inspector of

selected items revealed no other violations of this type. This item is

closed.

(Closed) Violation (50-482/8537-01): Nonseismic Glass Level Gauge Not

Isolated.

The violation involved a failure to isolate a seismic portion of a

safety-related system from a nonseismic portion. The NRC inspector

verified that Checklist (CKL) EG-120 had been revised to show the four

valves locked closed; that the five additional tanks that were-

identified each had their appropriate checklist revised; that Procedure

ADM 02-102, " Cont.01 of Locked Component Status," had been revised to

show proper positioning; and through field inspection verified that the

appropriate valves were closed and locked. This item is closed.

No violations or deviations were identified.

3. Operational Safety Verification

The NRC inspectors verified that the facility was being operated safely

and in conformance with regulatory requirements by direct observation

_----_. . _ _

. . .

-4-

of licensee facilities, tours of the facility, interviews and discussions

with licensee personnel, independent verification of safety system status

and limiting conditions for operations, and by reviewing facility records.

The NRC inspectors, by observation, interview of personnel, and review of

documents, verified the physical security plan was being implemented in

accordance with the security plan and that radiation protection activities

were controlled.

By observing valve position, electrical breaker position, and control

room indication, the NRC inspectors confirmed the operability of the

accumulator safety injection system and the coolant charging system.

4

The NRC inspectors also visually inspected safety components for leakage,

physical damage, and any other impairment that could prevent them from

performing their designed function.

No violations or deviations were identified.

4. Engineered Safety Features (ESF) System Walkdown

!

l

The NRC inspectors verified the operability of ESF systems by walking

down selected accessible portions of the systems. The NRC inspectors

verified valves and electrical circuit breakers were in the required

position, power was available, and valves were locked where required.

The NRC inspectors also inspected system components for damage or other

conditions that could degrade system performance.

The ESF systems listed below were walked down during this inspection

report period:

-

Refueling Water Storage (BN)

-

High Pressure Coolant Injection (EM)

-

Emergency Fuel Oil (JE)

No violations or deviations were identified.

5. Onsite Followup of Events

The NRC inspectors performed onsite followup of nonemergency events that

occurred during this report period. The NRC inspectors (when available)

observed control room personnel response, observed instrumentation

indicators of reactor plant parameters, reviewed logs and computer

printouts, and discussed the event with cognizant personnel. The NRC

inspectors verified the licensee had responded to the event in accordance

with procedures and had notified the NRC and other agencies as required in

a timely fashion.

Engineered Safety Feature actuations that occurred during the report

, period are listed in the table below. Where applicable, the NRC

inspector will review the LER for each of these events and will report

any findings in subsequent NRC inspection reports.

. . . _ _ _ . . . _

. . .

4 -5-

1

I

Date Event * Plant Status Cause

3/26/86 CRVIS Mode 1 Blown Fuse on

,

Chlorine Detector

'

3/27/86 CRVIS, CPIS,

,

& FBVIS Mode 1 Failed Power Supply

? 3/27/86 AFW, Actuation

With LSP Switch-

1 over to ESW Mode 1 Personnel Error

  • Event

i CRVIS - control room ventilation isolation signal.

CPIS - containment purge isolation signal

FBVIS - fuel building ventilation isolation signal

AFW - auxiliary feed water

. LSP - low suction pressure

ESW - essential service water

Selected NRC inspector observations:

On March 27, 1986, at 1813 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.898465e-4 months <br /> a CRVIS, CPIS, and FBVIS were generated

when the -15 volt DC power supply failed in Cabinet SA 036D. After

approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of reviewing prints, the instrumentation and control

(I&C) personnel trouble shooting the problem removed a fuse in a 120V AC

circuit and when it was replaced, an AFW actuation occurred along with an

AFW low suction pressure automatic switchover to ESW. As designed, only

the '1A' train ESW pump started. The balance of plant (80P) operator

shut down the three running AFW pumps before any ESW water was placed in

the steam generators (S/Gs).

Operations personnel flushed the ESW water out of '1A' motor driven AFW

pump and the turbine driven AFW pumps (TDAFWP) using 1-inch drain lines and

gravity feed from the condensate storage tank (CST). After chemistry

4

samples taken from the AFW system and analyzed indicated the system was

again clean, the AFW pumps were run in their normal modes supplying water

to the S/Gs to ensure all ESW water was flushed from the AFW system.

Currently an evaluation is in progress to determine the corrective action

required to ensure that the' long term operation of the AFW system has not

been degraded through chemical reactions to the ESW water. The NRC

inspector will follow up this evaluation to verify proper corrective

action has been taken. Using Work Request (WR) 01336-86, I&C replaced the

failed power supply on March 28, 1986. This will be tracked as Open Item

No. 50-482/8605-02.

No violations or deviations were identified.

6. Monthly Surveillance Observation

The NRC inspectors observed selected portions of the performance of.

surveillance testing and/or reviewed completed surveillance test procedures

l

- . _ ,- _. , _ . _ . - _ _ , _ , . - . . . _ _ . _ , , . , _ --__ . - ..,,_._ _ ,_ , , - . . . , . . _ . . . .

. . .

-6-

to verify that surveillance activities were performed in accordance with

TS requirements and administrative procedures. The NRC inspectors

considered the following items while inspecting survePlance activities:

- Testing was being accomplished by qualified personnel in accordance

with an approved procedure.

- The surveillance procedure conformed to TS requirements.

- Required test instrumentation was calibrated.

- Technical Specification limiting conditions for operation (LCO) were

satisfied.

- Test data was accurate and complete. Where appropriate, the NRC

inspectors performed independent calculations of selected test data

to verify their accuracy.

-

The performance of the surveillance procedure conformed to applicable

administrative procedures.

-

The surveillance was performed within the required frequency and the

test results met the required limits.

Surveillances witnessed and/or reviewed by the NRC inspectors are listed below:

-

STS IC-920, Revision 4, " Containment Hydrogen Analyzer GS 065A

Calibration Test"

-

STS EJ-100A, Revision 0, "RHR System Inservice Pump '1A' Test"

-

STS GK-001B, Revision 5, " Control Room Emergency Ventilation System"

-

STS IC-913, Revision 4, " Containment Hydrogen Analyzer GS 065B

Calibration Test"

-

STS88-004, Revision 4, "RCS Water Inventory Balance"

Selected NRC inspector observations:

-

On March 26, 1986, the NRC inspector observed a portion of the

performance of STS GK-001B and then reviewed the surveillance proce-

dure. During this review, the NRC inspector observed that even though

the surveillance had been in progress for a number of hours, Section 3,

" Initial Conditions," had not been signed off as completed. When the

supervising operator was informed, he stated, that when the previous

shift had started the surveillance, they had missed signoff of this

section. This failure to document the performance of a Section 3 of

the surveillance in accordance with procedure is an apparent violation

(50-482/8605-01).

i

. . .

-7-

7. Monthly Maintenance Observation

The NRC inspector observed maintenance activities performed on

safety related systems and components to verify that these activities

were conducted in accordance with approved procedures, Technical

3 Specifications, and applicable _ industry codes and standards. The following

elements were considered by the NRC inspector during the observation and/or

review of the maintenance activities:

-

LCO were met and, where applicable, redundant components were

operable.

-

Activities complied with adequate administrative controls.

-

Where required, adequate, approved, and up-to-date procedures were

used. ,

-

Craftsmen were qualified to accomplish the designated task and

technical expertise (i.e., engineering, health physics, operations)

were made available when appropriate.

-

Replacement parts and materials being used were properly certified.

-

Required radiological controls were implemented.

t'

-

Fire prevention controls were implemented where appropriate.

-

Required alignments and surveillances to verify post maintenance

operability were performed.

-

Quality control hold points and/or checklists were used when

appropriate and quality control personnel observed designated work

activities.

Selected portions of the maintenance activities accomplished on the work

requests (WR) listed below were observed and related documentation reviewed

by the NRC inspector:

-

WR 01305-86, "BB FB-426A, Replace NAll Card"

-

WR 01112-86, " Containment Hydrogen Analyzer GS 065A, Zero Reading Is

Off Scale"

-

WR 01336-86, "SA 036D, -15 Volt DC Power Available Light Not- l

Illuminated, All Red Train Process Monitor Bistables Tripped" l

No violations or deviations were identified.

._ _ _ - _ _ _ _ _ _ _ _ . . - . - - _ -- - .

_ _ - _ _ - _

. ..

-8-

8. Plant Tours

At various times during the course of the inspection period, the NRC

inspectors conducted general tours of the reactor building, auxiliary

building, radwaste building, fuel handling building, control building,

turbine building, and the secured area surrounding the buildings. During

the tours, the NRC inspectors observed housekeeping practices, fire

protection barriers and equipment, and maintenance on equipment. The NRC

inspectors also discussed various subjects with licensee personnel.

No vialations or deviations were identified.

9. Open Items

Open items are matters which have been discussed with the licensee, which

will be reviewed further by the inspector, and which involve some action

on the part of the NRC or licensee or both. An open item disclosed during

the inspection is discussed in paragraph 5.

10. Exit Meeting

The NRC inspectors met with licensee personnel to discuss the scope and

findings of this inspection on April 2, 1986. The NRC inspectors also

attended entrance / exit meeting with another NRC region-based inspector

identified below:

Inspection Lead Area Inspection

Period Inspector Inspected Report No.

3/10-14/86 C. Hackney Emergency 86-06