MAY 0 71986
In Reply Refer To:
Docket: STN 50-482/86-05
Kansas Gas and Electric Company
ATTN: Glenn L. Koester
Vice President - Nuclear
P. O. Box 208
Wichita, Kansas 67201
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. Cumins and B. L.
Bartlett of this office during the period March 1-31, 1986, of activities
authorized by NRC Operating License NPF-42 for the Wolf Creek Generating
Station, and to the discussion of our findings with Mr. F. T. Rhodes and
other members of your staff at the conclusion of the inspection.
4
Areas examined during the inspection included followup on previously
identified NRC items, operational safety verification, engineered safety
features system walkdown, onsite followup of events, monthly surveillance
observation, monthly maintenance observation, and plant tours. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspectors. These firidings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics
contained in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified NRC items. The status of these items is identified in
paragraph 2 of the enclosed report.
!
B605150290 860507
ADOCK 05000482
G
O l
/,
1
,
l
f
RIV:RPB/B
RPB/
RPB
y
l ')
l'h
RPMullikin
DRHun r
JEGag%rdo
q/g/86
[/g/86
f //,
-.
- _ .
--
- ..
, - -
.-.
,.
.
..
_
___
.
.
_ _
_
E.
'
Kansas Gas and Electric Company
-2-
'
The response directed by this letter and the accompanying Notice is not
.
subject to the clearance procedures of the Office of Management and Budget
I
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
1
i
Sincerely,
1
i
~
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/86-05
cc w/encit,ures:
'
Kansas Gas and Electric Company
ATTN: Otto L. Maynard, Manager
of Licensing
)
P. O. Box 309 (Sharp Road)
Wichita,- Kansas
67201
>
Forrest Rhodes, Plant Superintendent
Wolf Creek Generating Station
P. O. Box 309
Burlington, Kansas
66839
bcc to DMB (IE01)
bcc distrib. by RIV:
- RPB
Myron Karman, ELD, MNBB (1)
- Resident Inspector
R. D. Martin, RA
- Section Chief, (RPB/B)
DRSP
- R&SPB
RIV File
- RSB
MIS System
- RSTS Operator
D. Weiss, LFM8 (AR-2015)